This manual concerns the alternator AVR which you have just purchased.
We wish to draw your attention to the contents of this maintenance manual.
SAFETY MEASURES
2
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
CONTENTS
1 - GENERAL DESCRIPTION..................................................................................................4
3 - TECHNICAL SPECIFICATION............................................................................................5
5 - AVR SETTINGS................................................................................................................... 7
6 - AVR CONTROLS................................................................................................................. 7
7 - TROUBLESHOOTING CHART...........................................................................................8
8 - MULTIMETER CHECKS.....................................................................................................9
10 - DIMENSIONS.................................................................................................................. 12
11 - SPARE PARTS................................................................................................................ 13
11.1 - Designation............................................................................................................... 13
11.2 - Technical support service..........................................................................................13
3
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
1 - GENERAL DESCRIPTION 2 - OPERATION OF THE AVR
The R121 automatic voltage regulator The AVR is powered by the line-to-neutral
(AVR) is a compact, high-performance terminal of the AC generator, with 240 VAC
encapsulated unit. It incorporates the latest rms at 50 Hz or 60 Hz. The sensing voltage,
technology and efficient components to which is the regulated voltage, is based on
achieve a high degree of miniaturisation line-to-line (for 3-phase) and line-to-neutral
when used with 3-phase and 1-phase AC (for 1-phase). The AVR forms an important
brushless generators within its input and part of the closed loop system comprising
output limits. The unit offers excellent the generator field, generator armature and
reliability. the AVR.
The AVR provides DC excitation to the The AVR first builds up the generator voltage
exciter field of a brushless generator to keep from its residual levels, to the rated value of
the voltage within the approximate operating 415 V for 3-phase and 240 V for 1-phase.
limits from NO-LOAD to FULL LOAD. When the generator is loaded, the sensed
voltage decreases and generates an error
The typical recovery time in the event of
voltage, which is required in order for the
sudden loading is around 0.5 sec. to recover
closed loop system to work.
98% of the rated voltage. Transient
performance such as voltage dip and
The AVR contains a high gain amplifier,
recovery time is mainly determined by the
ramp and a pedestal circuit. Depending
generator and exciter design parameters.
upon the value of the amplifier voltage
Optimum AVR performance can be
(either high or low) the ramp intersects the
obtained by keeping full-load excitation to
amplified voltage at a point, which is either
around 60 VDC.
early or late in the half-cycle. At this
The generator uses a true average sensing intersection point a starting pulse is
circuit, dV/dt snubber and special filter produced to trigger the power device.
circuits to manage NON-LINEAR loads
such as battery chargers, DC motors, etc. When the power device is triggered early in
the half-cycle, more voltage is transmitted to
Voltage regulation is only guaranteed for the field and when triggered late in the half-
linear loads. Severely distorting NON- cycle, less voltage is transmitted to the field.
LINEAR loads can cause regulation
problems. In order to reduce the generator voltage at
low speed, a signal inversely proportional
Each AVR is tested prior to dispatch as part to the speed is generated as an extra input.
of a quality plan, for standard voltage and At higher speeds the voltage decreases at a
frequency. faster rate than in proportion with the speed.
A soft-start circuit is included which provides
smooth control of the build-up of generator
output voltage.
A frequency roll-off circuit continuously
monitors the generator underspeed
protection by reducing the generator output
voltage in proportion with the speed below a
threshold.
4
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
3 - TECHNICAL SPECIFICATION 15) Overexcitation protection: 10 VDC to
1) Sensing input 85 VDC.
- Voltage: 277 VAC ± 10% for 1-phase, Set point: 60 VDC
415 VAC line-to-line ± 10% for 3-phase, 16) Protection fuse: 4 A, 240 VAC.
2-line sensing. The AVR senses the true
average of the line-to-line waveform. Use 17) Potentiometer sealing: except for the
the resistor (SMD) network for trouble-free V-trim potentiometer, all potentiometers are
sensing and control of sensed voltage/ sealed.
regulation.
18) Frequency roll-off indicator: LED
2) Input power provided (UF).
- Voltage: 277 VAC rms ± 10%
- Frequency: 50/60 Hz 19) Sensing loss indicator: LED provided
(SL).
3) Output power
- Voltage: 95 VDC for 240 VAC Input 20) Overexcitation indicator: LED provided
- Current: (OE).
• 4 A DC 21) Protection on the devices: suitable R-C
• 6 A for 30 sec. (when allowed by the field snubber to be provided for the device used
resistance) to protect against voltage surges.
4) Operating temperature: -20ºC to +70ºC 22) Potting/Encapsulation details: the
5) Storage temperature: -40ºC to +80ºC components on the AVR should be
completely encapsulated with suitable PU
6) Voltage setting: min ± 10% of rated resin compound to absorb transients/
voltage. vibrations during operation.
7) Stability setting: can be adjusted to obtain 23) Alternator excitation details: (typical)
a correct transient response in steady state. - Full load:
8) Under frequency roll-off setting: available • Excitation voltage: 40 to 50 V
below 46 Hz for 50 Hz and below 56 Hz for • Excitation current: 2.5 to 4.0 A
60 Hz. 24) Terminal marking: see diagram
9) Voltage build-up: 2 Volts (L-N) 25) Dimensions:
10) Voltage regulation: ± 1% at the AVR - Overall: 104 x 94 x 40 (mm)
terminals with a THC <5%. - Mounting: 83 (mm)
- Mounting hole dia: 5.5 (mm)
11) Thermal drift: ± 1% for 30ºC change in
temperature. 26) Weight: 185 g
5
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
MAIN FIELD T1 T2 T3
U1 V1 W1
Delta configuration
Star configuration
Armature
Varistor
Exciter field
black
T4 T5 T6
red
U2 V2 W2
blue
green
yellow
OE Under UF SL
Over-excitation frequency Sensing loss
V V S UF OPEN IN 60Hz OE UF SL
Voltage
S
Stability
U/F
50 Hz
60 Hz
Frequency
Fuse 4 A
240 V
V N1 U N F1 F2
* Note: for delta configuration (1PH – 3PH), use terminals N and U, short N and N1.
6
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
The AVR builds up the generator voltage 5.2 - UF - Under frequency knee
from its residual voltage to rated voltage. point setting
When the generator is loaded, the sensed This function is provided to protect the AC
voltage decreases and generates an error generator from sustained low speed
signal, which is required in order for the operation through a potentiometer. The AVR
closed loop system to work. will reduce the voltage in proportion with the
speed below the defined value.
Depending upon the value of the amplified
The procedure for setting the UF
voltage, the ramp intersects the amplified
voltage at a point which is early or late in the potentiometer is as follows:
half-cycle. First run the generator at full speed (50 Hz)
At this intersection point, a starting pulse is and turn UF by a few turns clockwise,
produced to trigger the power device. making sure that the voltage does not
increase. Now turn the UF potentiometer
slowly anticlockwise. At a particular point
the red LED glows and the voltage will start
to decrease. Stop turning the potentiometer
at this point and turn the potentiometer
Only qualified personnel should replace/ clockwise by two turns after rated voltage is
work on the AVR. restored.
Do not increase the voltage beyond the
rated voltage. The factory default setting is 46 Hz.
6 - AVR CONTROLS
No. Control Function Direction
1 VOLTS Sets the generator output voltage Turn clockwise to increase output voltage
7
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
7 - TROUBLESHOOTING CHART
Symptom Cause Action
No voltage Fuse blown Check and replace
build-up Low residual voltage across U If the generator’s residual voltage at rated speed
and N terminals is less than 2.5 VAC (L-N), disconnect the AVR
and connect a 24 VDC battery, keeping F1 as
positive and F2 as negative.
Connecting a freewheel diode (BY 127) across
the field with the diode cathode to F1 and the
anode to F2 during field flashing will help restore
the residual voltage.
WARNING:
Remove the diode (BY-127) after field flashing.
The 24 V battery positive terminal must only be
connected to F1 and the negative to F2.
Swapping the connection will cause diode BY127
to explode instantly.
8
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
9
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
AVR (3-PH)
Model: R120
VAC
0-500 V
WITH NEUTRAL
100 W
230 V
VARIAC
8A, 415 V
This test should only be attempted after 5. It is difficult to prescribe a static test for
making sure that the AVR has passed all checking the stability, as this is more easily
multimeter checks. Connect the AVR to the detected during closed loop tests. However,
three-phase variable voltage source as a healthy AVR will behave as described
shown in diagram 3 in this manual. below.
1. Keep ‘V-TRIM’ in the minimum position. First keep the ‘STAB’ potentiometer in the
fully anticlockwise position. Perform the
2. Keep UF in the fully maximum position.
static test as described in steps 1, 2 and 3.
3. Increase the applied voltage. The lamp The lamp will go out fairly quickly at 360-
should glow increasingly brightly. At a 380 V and come on again quickly when the
voltage of around 360-380 V the lamp voltage is reduced to below 360 V.
should go out slowly. Increase the voltage Now keep the ‘STAB’ potentiometer fully
again up to 415 V. The lamp should stay clockwise, and perform the static test as in
OFF. 1, 2, and 3. The lamp should go out much
Decrease the voltage to below 360 V. The more slowly and come on again much more
lamp should glow brightly again. slowly. At the end of this test reset the
potentiometer in the middle position.
4. Turn the UF potentiometer anticlockwise;
the lamp should go out slowly. Now turn the If the AVR behaves as described above
UF potentiometer clockwise. The lamp then it is in good working order.
should glow brightly again.
10
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
AVR (1-PH)
Model: R120
VAC
0-300 V
VARIAC
8 A, 230 V
This test should only be attempted after 5. It is difficult to prescribe a static test for
making sure that the AVR has passed all checking the stability, as this is more easily
multimeter checks. Connect the AVR to the detected during closed loop tests. However,
single-phase variable voltage source as a healthy AVR will behave as described
shown in diagram 1 in this manual. below.
1. Keep ‘V-TRIM’ in the minimum position. First keep the ‘STAB’ potentiometer in the
fully anticlockwise position. Perform the
2. Keep UF in the fully maximum position.
static test as described in steps 1, 2 and 3.
3. Increase the applied voltage. The lamp The lamp will go out fairly quickly at 200-
should glow increasingly brightly. At a 220 V and come on again quickly when the
voltage of around 200-220 V the lamp voltage is reduced to below 240 V.
should go out slowly. Increase the voltage Now keep the ‘STAB’ potentiometer fully
again up to 240 V. The lamp should stay clockwise, and perform the static test as in
OFF. 1, 2, and 3. The lamp should go out much
Decrease the voltage to below 200 volts. more slowly and come on again much more
The lamp should glow brightly again. slowly. At the end of this test reset the
potentiometer in the middle position.
4. Turn the UF potentiometer anticlockwise;
the lamp should go out slowly. Now turn the If the AVR behaves as described above
UF potentiometer clockwise. The lamp then it is in good working order.
should glow brightly again.
11
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
10 - DIMENSIONS
94 mm
82 mm
V S UF OE UF SL
OPEN IN 60Hz
52 mm
R120
FUSE
104 mm
2 x holes Ø 5.5
x 83 mm
V N1 U N F1 F2
12
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
11 - SPARE PARTS
11.1 - Designation
Description Type Code
AVR R120 4969966
13
Electric Power Generation Installation and maintenance 5243 en - 2018.01 / k
R120
AVRs
Disposal and recycling instructions
We are committed limiting the
environmental impact of our activity. We
continuously monitor our production
processes, material sourcing and products
design to improve recyclability and minimise
our environmental footprint.
These instructions are for information
purposes only. It is the user’s responsibility
to comply with local legislation regarding
product disposal and recycling.
14
Service & Support
Life Extension
•Reconditioning Start-up
•System upgrade
•Commissioning
•Training
Optimisation
•Monitoring Operation
•System audit •Genuine spare parts
•Repair services
Contact us:
Americas: +1 (507) 625 4011
Europe & Rest of the world: +33 238 609 908
Asia Pacific: +65 6250 8488
China: +86 591 88373036
India: +91 806 726 4867
Middle East: +971 4 811 8483 Scan the code or go to:
service.epg@leroy-somer.com www.lrsm.co/support
www.leroy-somer.com/epg
Linkedin.com/company/Leroy-Somer
Twitter.com/Leroy_Somer_en
Facebook.com/LeroySomer.Nidec.en
YouTube.com/LeroySomerOfficiel
5243 en - 2018.01 / k