CONSTRUCTION JOB HAZARDS ANALYSIS
Demolition
Rev: 2015
Building & Room(s): Contractor/Subcontractor Name: 1/2013

Project: Date:

Scope of Work: Please list the scope of work in this area. (list areas and equipment to be demoed) (and remove these directions).

Tasks being Performed Potential Safety Risks/Hazards Safety Controls / Mitigations


Proper PPE shall be worn by adjacent personnel, as required by their proximity to the work task.
Risk of bodily injuries.
This is a TEMPLATE Be aware of your surroundings at all times.
Please identify your scope of
Maintain proper body positioning so that the tools used are below shoulder height.
work along with your means &
methods to complete such work.
Use constant, moderate pressure at point of operation.

Limit excessive pressure and stress when using tools.

LOTO may be required.


Risk of release or discharge of
hazardous energies. Follow LOTO permit

Penetration permit maybe required


Risk of hitting a utilities
Ensure all areas to be penetrated have been scanned prior to the start of work.

Follow Penetration Permit

Risk of exposure to contaminates Ensure all areas have been abated and or swiped for contaminates.
or Environmental hazards

House Keeping & Clean-up Risk of injuries due to Slips, Trips Housekeeping shall be maintained but not limited to hourly/daily, as site conditions change or as
& Falls needed.

Employee Signatures: Date: Employee Signatures: Date: Employee Signatures: Date:

A signed copy of this JHA must be posted while the applicable subcontractor is working on-site and be available to any employee upon request.