Full Thesis PDF
Full Thesis PDF
Full Thesis PDF
KHULNA SHIPYARD
•
By
MD. MUNIRUZZAMAN
October 2003
Department ofIndustrial & Production EngIneering
BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY,
DHAKA-l 000, BANGLADESH--- ~ ---- _
I!
1111111111111111111111111111111111
#98691#
l __
~_
..•
The thesis titled "Business process re-engineering in Khulna Shipyard" submitted
by Md. Muniruzzaman Student No. 100 I0800 1F, Session - Oct 200 I has been
accepted as satisfactory in prr;.tia! fulfillment of the requirement for the degree of
Master of Engineering in Industrial and Production Engineering (IPE) in October
2003.
BOARD OF EXAMINERS
~-'
3.Dr.A K M Masud Member
Assistant Professor, Department of Industrial
and Production Engineering, BUET
111
DECLARA nON
This is to certifY that this work has heen done hy me and it was not suhmitted
elsewhere for the award of any degree or diploma except for publication.
IV
DEDICATED
TO
MY PARENTS
v
ACKNOWLEDGEMENT
First and foremost, the author would like to express sincere thanks and heartiest
honour to his project supervisor Dr.M.Ahsan Akhtar Basin, Associate Professor.
Department of Industrial and Production Engineering (lPE), Bangladesh University of
Engineering and Technology (BUET), Dhaka for his constant guidance, full t1edged
support, valuable advice and overall encouragement Irom the inception to the
complction of this project work. The author is also extremely indebted to him for the
support by providing materials/books related to this project work.
The author also expresses his deep sense of gratitude to Dr.Md.Golam Mohiudclin
Professor. Department of Industrial and Production Engineering, and Dr. A K M
Masud Assistant Professor, Department of Industrial and Production Engineering.
SUET for their agreement to act as examiners of the project thesis.
The author is grateful to the concerned authorities of Bangladesh Navy who all has
permitted and allowed to perform the project work at Khulna Shipyard. The author is
also grateful to the concerned authorities and personnel of Khulna Shipyard who all
has allowed and assisted to visit Khulna Shipyard, as well as helped in all respect to
collect necessary information and data. Especially the author would like to
acknowledge the contributions of those offices who agreed to give their valuable time
and suggestions regarding Khulna Shipyard. it's past, present and future.
The author would like to extend thanks and gratitude to his teachers of the department.
colleagues, classmates and other friends who helped him directly or indirectly in
furnishing the total work.
Finally, the author would like to thank his wife, Tanjin Munir Eva for her
encouragement, support and also typing the manuscript some times.
It is to be mentioned that, different comments has been made in the report regarding
management and activities of Khulna Shipyard. These are not criticisms rather,
limitations, which need to be improved/taken care off in order to increase productivity.
Even then if somebody feels offended then the author is extremely sorry for that.
Author
VI
ABSTRACT
This project work is the outcome of an attempt to study Khulna Shipyard and re-
engineering its processes. The main feature of Khulna Shipyard has been discussed in
brief. In order to ascertain the bottlenecks of KSY the existing management and their
policy, working facilities, capabilities & limitations of the workshops, employees and
their status, customers, cost, quality of products, invento'ry status and policy, causes of
idle man hour production etc. has been analysed.
va
I
CONTENTS
1.1 . Introduction 01
2.1 Introductions 05
2.2 Background To BPR 05
VIII
CHAPTER 3 DESCRIPTION OFKHULNA SHIPYARD LIMITED
. n.
5.7 Advantages and Benefits OflSO Certification 69
5.8 Quality Management System 70
5.9 Management Responsibility 72
BIBLIOGRAPHY 120
x
LIST OF FIGURES
Description Pa~No.
Figure 2.1: Business re-engineering represents a large change programme 08
Figure: 2.2 ClarifYing objectives and methods 09
Figure:2.3 Four steps to Business Re-engineering 10
Figure:2.4 The re-engineering spectrum 17
Figure: 2.5 Fundamental breakthroughs 19
Figure 2.6 Interpreting the opportunities 20
Figure: 2.7 Defining strategic architecture 22
Figure 2.8 The five 'Cs' and 'Ps' 26
Figure: 2 9 SWOT Analysis 26
Figure: 2.10 Value versus Cost 27
Figure: 2.11 Market versus Product Strategies 27
Figure: 2.12 what versus how one sell? 28
Figure: 2.13 Supplier availability versus value added 29
Figure: 3.1 Organogramme .of Khulna Shipyard Limited 38
Figure: 3.2 Lay-out Plan of Khulna Shipyard 39
Figure: 4.1 The Deming Cycle 59
Figure: 4.2 Quality versus Cost Relationship 65
Figure: 6.1 Different Inventory Costs 94
Xl
LIST OF ABBREVIA nONS USED IN REPORT
INTRODUCTION
1.1 INTRODUCTION
To survive and prosper a business must adapt to the changing requirements of its
customers and to other internal and external pressures. An organization's response
and the kind of change required will depend on its situations and circumstances. A
demanding and turbulent business environment, formidable competitors,
technological innovation and low barriers to entry put a premium on learning,
flexibility and responsiveness. The variety, scale and intensity of the challenges
have made people receptive to talk of 'revolution'. Although not all enterprises
face the imminent threat of extinction, some require more than mere evolutionary
change. The scaling back of internal resources to match declining external
competitiveness can result in a negative spiral of cutbacks and layoffs. This may
not be avoided by the incremental adaptation offered by Total Quality
Management (TQM). Companies are therefore turning to reengineering, whether it
is one or more of their business processes; their total organization; or the way in
which business is done within their particular marketplace. [Colin, 1994]
Thus the reengineering of business process is concerned with fundamentally
rethinking and redesigning business processes to obtain dramatic and sustaining
improvements in quality, cost, service, lead-times, outcomes, flexibility and
innovation (Hammer and Champy, 1993).
Khulna Shipyard Limited (KSY) is the first and the biggest shipbuilding industry
of Bangladesh. It was established in 1954-57 by the then Pakistan government in
Labanchara on the bank of the river Qazi Bacha, Khulna. It is basically a jobshop
production oriented industry for shipbuilding, ship repair and other various
engineering works. With the elapse of time the plant machinery started getting
older and older. On the other hand most of the regular customers like sugar mills,
jute mills, power station, newsprint mill, hardboard mill etc became mostly sick .
industries. So they hardly place any work order to KSY. As a result KSY turned to
a burden of the Government and at its age of 41 years, the Government declared it
as a sick industry. Then the Government was looking for a capable private
entrepreneur to handover KSY, but finding no other alternatives finally it was
decided to handover KSY to Bangladesh Navy (BN) to run it commercially.
Bangladesh Navy took over the responsibilities of KSY since 09 May 1999. This
research aims to evaluate possible improvements by reengineering the total
organization.
1.4 METHODOLOGY
In order to carryout. the project work. a comprehensive review of relevant
literature on BPR implementation through concerned books, journals, websites
and publications were done. The literature review provides a ground of the
research and focus, as well as establishing a basis for implementing BPR in a
relevant organization. Khulna Shipyard Limited is selected as a mode.! to
implement BPR. In that view Khulna Shipyard Limited has been visited several
times and relevant information and data were collected.. The steps may be
illustrated as:
a. In order to investigate into the present state of KSY, the previous history
obtained from various sources, is studied.
b. Present working facilities, capabilities and perfonnance of the entire
2
production department (workshop) as well as service departments
(support department) are evaluated.
c. The knowledge and awareness of the workers and management about
quality control is evaluated.
d. The assessment of existing systems to determine compliance or degree of
compliance with the standard like ISO 9000 is considered.
e. Inventory status of KSY and its ABC (First, Medium and Slow moving)
classification and EOQ are analyzed.
f. Finally the qualitative and quantitative techniq\!es as per requirements are
recommended for re-engineering the processes.
as mentioned below:
Khulna Shipyard Limited was a forgotten industry and almost no organized details
background and history was found. So, the background and history part has been
collected from few publications written by some Naval officers who were working
there since t,aken over by Bangladesh Navy and some other experienced
Employees working for last 20 ~ 30 years. As there was no formal study on KSY
before, so there is no readymade information about the present' status and position.
So, each and every comer of KSY has been visited and extensive interviews have
been taken to grasp required information at all levels (from workers to MD). In
addition proposed website, some previous audit reports, and inventory list of all
workshop were also studied. Finally higher authorities of KSY working at Naval
Headquarters were also consulted for clarification.
3
of 43years. As a result slipway :;(miage, the main workshops as a whole the total
KSY have been in dire state with old and obsolete machinery. (Baten, 2000)
Once naval control was established at KSY, there has been a general improvemcnt
on the average moral of the personnel. BMRE has been planned in modified form
and will be executed phase wise for the overall development of the yard. (Baten,
2000). Even though development and progress processes is a continuous
phenomena, which has no end. AI-Mashari and Zairi. (2000) suggest that
reengineering of business processes involves changes in people (behaviour and
culture), processes and technology. As a result there are many factors that prevent
the effective implementation of BPR and hence, restrict innovation and continuous
improvement.
KSY is a moderate standard shipyard. It has wide variety of machineries and
different production and internal service departments. Because of time constraint
detail study in every individual areas and their analysis could not be carried out.
An overview of the whole KSY and the major contributing areas of production are
studied.
4
CHAPTER TWO
2.1 INTRODUCTION
Business Re- engineering or Business Process Redesign, as advocated by some
researchers and consultants, involves starting with a clean sheet 'of paper to design the
processes of a company without referring to the existing processes or modes of
operation. The practice of Business Re- engineering is not new. But the new is the
jargon of Business Re- engineering believed to have been coined and popularized by
Michael Hammer, an MIT computer science professor turned management consultant.
Ever since the 'invention' of re- engineering, there has been an exponential increase in
the number of researchers and consultants working in this field. However, not everyone
defines re- engineering in the same way, and not everyone agrees on what Re-
engineering should do and deliver. [Colin,1994].A frame work for conducting Re-
engineering is proposed which deviates somewhat from that clean sheet approach in
that it allows systematic and incremental changes to be made to an organization in a
given condition. Rules for re- engineering can be spelled out and the execution can be
automated.
5
Automate, obliterate' which appeared in Harvard Business Review in 1990. He warned
against 'paving the cow paths' with IT and suggested that organizations should rethink
their business by capitalizing on the opportunities provided by the new information
technologies. [Gerard Burke and Joe Peppard) 995]
6
fundamental revaluation! redesign of a company's business processes and
organizational structure in order to achieve dramatic improvements in its critical
success factors quality, productivity, customer satisfaction and time to market etc ."
This definition is most similar to that ofHarnmcr with the exception that it relCrs to a
process in particular.
According to Morris and Brandon (1993), "re-engineering is an approach to planning
and controlling change. Business re- engineering' means "redesigning business
processes and then implementing the new processes." In this definition the purpose of
the change is not expliCitly stated, but the implementation of the change is highlighted.
The AT&T Quality steering Committee (199 I) defines re-engineering as "the redesign
and implementation of a process or a major part of a process to meet new customer
requirements or achieve significant improvements in process performance." Again, this
is another Hammer' look -alike' definition, though the focus is on process only, and
the objective of the change is nat specified in greater details such as cost, quality
capital, service and speed.
Butler Cox Foundation,(I991) defines BPR as,---"a way of transfonning the business,
which frees it from the restrictions of the traditional approach by cutting across
functional divisions. Information systems ---are the fundamental ingredient of
redesigned business processes."
Business intelligence (1993) defines BPR as, "The transformation of a company from
one based on functions such as accounting, marketing and manufacturing to one based
on processes such as order processing and fulfilling customer expectations."
Hall, Rosenthal and Wade (1993) also regard re-engineering as "the redesign and
improvements of business processes both in depth (roles and responsibilities,
measurement and incentives, organizational structure, infonnation technology, shared
values and skills) and breadth (activities to be included) which can lead to long term
profit". Again the focus here is on business processes. However, the' things' to be
changed are discussed in detail. One of the objectives highlighted was long-term profit.
Davenport (1993) takes it one step further. According to him, "A revolutionary new
approach that uses IT and HRM to dramatically improve business performances."
Business re- engineering or business processes redesign is only part of what is
7
necessary In the radical change of processes. The term 'process innovation' was
suggested by him to encompass the envisioning of new work strategies, the actual
process design activity, and the implementation of change in organizations involving
human beings and technology. Hence, his definition is the most dynamic one of all the
above.
Gerard Burke and Joe Peppard, giv~n their opinion regarding the term BPR as,' "An
approach to organizational improvement
• Which seeks opportunities for fundamental transformations
• By focusing on' the processes by which the organization delivers products or
'OC" Il
'"u
..c High High
u
--"'"
'50
•... Culture
'-'"
0
Change
1:! Pro!!ramme
-""
><
-0
C , Business
'"
C Process
-'"
.S:
N
Re-engineering
'"'"
OIl
•...
0 Total Qual ity
'-o
"
"0 Management
..c Employee
~ empow'ered
'"'"0 change
•...
u programme
-'"'""-
u
- S
Low
__________________ --1.~High
ow
Low
Perceived need for change by senior management
8
TQM, process re-engineering ect) as it typically demands a higt: degree from each
variable as shown in the figure:2.1. If the variables do not score highly, then the
re-engineering should not be attempted. [Nick, 1994].
~
...OJ BOX3 BOXI
~ Establish sound changes Efficient achievement
U
Methods and processes check to innovate
U..l
-
>
f-
U
U..l
.....,
co BOX4 BOX2
0
Change management Use change methods
...
OJ Clarity and establish to innovate and improve
<l)
0
c
;:J -
Unclear METHOD Clear
improved methods and processes to meet those objectives. Thus an organization needs to be
always at box I,as shown in Figure: 2.2. Once in 1999 KSY was in Box no.4, and the total
management has been changed. Now the aim of the new management should be to reach at
the BOX I, through BOX 4 and BOX 3 as soon as possible.
9
Before considering BPR, number of internal circumstances like improvement of
internal law and order situation, completing pending works of the customers, minimum
amount of working capital has been earned.
The diagram shown in figure: 2.3 outlines a process to make the radical change of
Business Re-engineering happen, following the four simple steps. The two additional
Monitor
steps in two sides are also important, and represents firstly, when the change fails
to result you intended, and, secondly, how to improve continually and adapt to key
stakeholders and market needs. This is important, as one of the main benefits of
undertaking a radical Business Re-Engineering progra)nme is that it allows the
organization to become flexible, responsive, and able to change and react quickly.
An organization needs to be able to change rapidly not just once, but continually
in order to keep up with the changing market.
10
attention to the current way of doing things may constrain the likelihood of
identifYing radically different approaches. Perhaps this is a question of achieving
an appropriate level of understanding of current processes. However, if the action
is not thought out, both the what and the how, the chance of failure is high: So, it
is useless re-engineering a process when the output for that process is not wanted.
There are three stages, to this first step of' Know what you want'.
• ClarifY the need for, and the organizational ability to, change.
• ClarifY how to serve the needs of stakeholders (customers, employees,
suppliers, shareholders) better.
• Construct a' framework for success' to assist communication and planning.
Bearing in mind the four variables needed as a background for a re- engineering
programme (Figure2.1), it needs to analyze, how much the organization is willing
to change, and how much pain is associated with the status quo. This will help to
formulate tactics later on. It is also needed to understand how well the
organization has managed to change in the past, and if lesson have been learnt.
This will help decide what, if any, outside consultancy will be required -what the
likely support for change is going to be across the leadership.
There are various tools and techniques for analyzing stakeholders' needs, some of
which will be discussed latter. The process for gathering this infonnation should
include small cross-functional project teams from the organization who can work
and share together their findings, and lay the foundation for decision-making. The
project team should include not only the key decision makers, but also some of the
people who will likely be involved in future implementation.
During this stage of analysis, a high level-look is to be given at the key processes,
which the organization employs to meet the needs of the customers. How much
effort is spent on the activities that make up the process, and how long the overall
duration of the process is. Hovi much of the effort is 'value added' (i.e. directly
serves the customer) versus non-value added (Le. administrative routines)? Do the
outputs of the process meet the needs of the customers? Are all the inputs
necessary? One can either do such analysis by using process mapping techniques
1I
('brown' fields approach) or by identifying the required outputs and starting with a
clean slate ('green' fields approach) or ideally by using a mix of both approaches.
The analysis of the key stakeholders should give a clear answer to 'Where are we
now, and what direction are we heading in?' The next question to answer is.:
'where should we be going?' To do this some additional analysis on the external
environment needs to be done- 'competitors strength and weaknesses arc key. By
now the analysis will give some indications where change is necessary, and what
potential solutions may be.
By the end of this first stage one should have a full understanding of the
organization and its environment, and the overall mission, strategic goals, general
initiatives and their detailed objectives. What future behavior is needed by
individuals in the organization to move from the current state to the future state?
This is the basis of the change that needs s to be carried out.
2.8.2Make A Plan
During the first stage of the change process ('Know what you want'), one will
have to define the overall mission or vision statement for the organization, backed
up by strategic goals to meet the needs of the key stakeholders. Each goal will
have been broken down into general initiatives, with each initiative supported by
detailed objectives. These objectives should be 'SMART'-a mnemonic for
Specific, Measurable, Achievable, Results-oriented and Time deadline.
,
The second stage of the change process ('Make a plan') is to detail the action and
resources, which are going to turn these objectives into reality. Each objective
should be backed up by a project plan. Each project plan should be drawn up by a
small core cross-functional project team given the responsibility and authority to
deliver the change, led by a project manager. The team should be trained in project
management as well as in the team dynamics.
The best approach the team can use to plan the implementation is to employ
project management planning techniques, possibly backed by a simple computer
programme such as Microsoft project. They should also use workshops and
meetings with those affected to ensure the implementation gains consensus. Each
project should have a strict definition, which should include a specific project
12
objective, clear deliverables, and measures of success and definition of
completion. Theproject plan should include tasks, deadlines, resource schedules, a
critical path analysis, a clear programme, and a work-to -list' for those involved to
follow. There should also be a clear understanding regarding the cost of the
project, and the budget should be agreed in advance.
As there may well be several projects running at the same time, a transition team
can be formed to oversee the planning, and subsequent implementation. However,
change requires action, and action requires people. If all these people for the
project team and the transition team come from within the organization, then one
need to understand what action should be stopped to release the people. Too often
re-engineering programmes. fails because all the time is spent planning what
should be done, and no thinking is devoted to what should not be done, (Or what
current activities should be stopped immediately to release resources for the
change teams).
At the end of this planning stage, it is worth having 2-3 days workshop with the
project managers and their senior sponsors to check that everyone is signing from
the same hymn sheets. Workshops are useful way to both plan the change and
deliver training to give people the skills they need to implement the change.
At the end of this stage the action is planned, and all the players are in place. Next
comes the hardest part-do it!
2.8.3 Do It
This section is split into two. The first part is the technical techniques that can be
used to ensure some success in implementation. The second part is the cultural
technique that can be used to help the organization deal witli the trauma of change.
a. Technical techniques: The delivery of the change programme by project
teams is an effective way of making it happen. Using senior executive as the
project directors/sponsors ensures that top management does not lose control,
and that the project teams get the support they need. The transition team
should be tasked with the day-to-day management of the change. This will
include communicating progress, resolving conflict about resources, making
decisions about changing the methods employed - in short managing the
13
unforeseen exceptions to the planned approach, which was established in the
planning phase. The transition team should report to the highest authority
group in the organization (Le. the board), and meet at least twice a month.
The important thing to remember is that the transition from the current state
to the future state should be viewed as a separate state in itself. The use of a
'Project Coordination Center' (PCC) can also h~lp success. The technical
techniques involved are not magical, and are based on common sense.
However, they need a background to operate within to ensure that political
behavior does not upset the change being introduced. This backgrounct"can be
provided by the cultural techniques.
b. Cultural techniques: Any change programme will run a series of
issues revolving around resistance, power and control. Change causes
uncertainty and fear, and especially if it is imposed it causes a perceived loss
of autonomy. Resistance should be overcome in a compassionate, empathetic
and positive way. In order to combat resistance it IS necessary to motivate
constructive behavior. The second issue is power. In times of changes, the
level of ambiguity and uncertainty increases, and individuals and groups take
action based on their perception about how the change will affect their
relative power in the organization. So, positive steps
. .
to be taken to ensure
.'
that key power groups support the change rather than block it. The third
issue revolves around control.' The transition should be seen as a separate
'!
state, and managed as such. The business should be managed separately from
the change programme. This demands a high degree of control, as there is a
real risk that if the change programme is not achieved, the wasted effort will
adversely affect the business. To ensure control, the transition must be
managed.
2.8.4 Monitor
Monitoring needs to concentrate on two things monitoring the progress of action,
and monitoring the results. This monitoring should be done in a 'project
coordination center' (PCC) set up specially for the process. The use of maps and
14
planning boards can assist both in revealing what is gOing on, as well as in
communicating to people in the organization who comes in for information. pee
should be staffed by a small full-time team, headed by a change managcmcnt
director. He should report direct to the top of the organization and be a member of
the Transition Team.
a. Monitoring progress of action: The pee should monitor the progress of
each project and report weekly to the transition team. The progress can be
tracked via project managers. Any problems should be solved by the small
PCC team, and brought to the attention of the Transition Team or the senior
management. The PCC team should, with time, get a full understanding of
where the blockages to change are, and what is needed to remove them. The
overall monitoring of the project budget should also be undertaken, to ensure .
that the projects are not over spending.
b. Monitoring Result: The results should be directly linked to the individual
projects' measures of success. These need to be quantifiable, and these
should include just more than financial results. The monitoring should also
include such measures as employee attitudes, customer's perceptions.
When things go wrong during implementation- and wrong they will go -then there
Make a plan').
• Change what is wanted - major surgery, but only in dire emergency! This
involves either scrapping the project (always an option), or changing the
objectives.
15
2.8.6 The change process
Cross-functional project teams, transition management system, and the use of
participative planning and action will, for many hierarchical organizations, be new
and threatening. On top of that there will be the need for new skills such as
competitor and market analysis, teamwork skills and project management
techniques.
There are a variety of techniques, which can be employed to facilitate the process
of change. The first simple step is to give the change programme an overall name,
and even a logo- this gives it an identity, facilitates understanding and allows for
the vital separation of the change programme from the day to day running of the
organization. In addition there should be a variety of other elements employed,
either all or some depending on the size of the programme:
• Use of culture change programme
• Use of cross-functional project teams
• Workshops
• Use of facilitators
• Training seminars etc.[Nick 1994)
16
between each step. Typically the need for the process goes unchallenged and there is
little critical appraisal of the overall process. Such initiatives can yield improvements of
five to twenty per cent but rarely have a noticeable impact on overall business
performance.
Sustainable
tep Change
Paradigm
Shift
Transformation
Mindset Gains
Change
Incremental
None
redesign of an end-to-end process and may start with the question 'should we be doing
it all?' such projects are usually targeted to deliver step change improvements of fifty
per cent or more in critical'measures of process performance such as cost, perceived
17
quality and cycle time.
Process re-engineering should only be adopted if the desired improvements cannot be
achieved using less painful and demanding approaches. The impact of successful
initiatives can show through on the bottom line. However, if only one or two processes
are redesigned then much of the business remains untouched and there will be only a
marginal overall improvement in the organisation's performance.
2.9.3Business Re-Engineering
Firms that are seeking step change improvements across all of their processes typically
adopt this approach. Hence, there is usually greater emphasis on appraisal and redesign
o f the entire business architecture. Such approaches usually demand significant top-
level commitment and active involvement. Success wiii be demonstrable through step
change improvements in both the performance of individual processes and of the
business as a whole.
2. 9. 4 Transformation
A small but growing number of organizations are recognizing that there is a need to
'reinvent the business'. Such firms start by asking why they exist and what they are
trying to achieve. Only then do they go on to look at how they actually run their
processes to achieve those goals. The tests of genuine transformation might include:
• Step change improvement against all critical measures! benchmarks of business
performance.
• The perceptions amongst staff that the business IS a dramatically better place to
work than 3-5 years ago.
• A belief amongst customers, suppliers and other business partners that the
organization has become far easier and far better to work with and has helped them
save time and cost.
• Organization- wide clarity of purpose, direction, business architecture, capabilities
and true mission.
2.9.50ngoing Renewal
Those that have completed successful transformations recognise that the process never
actually stops. The techniques and newly shaped mindset have to become part of the
organization's DNA so that it can continue to refocus and reinvent itself as the world
18
around it changes.
In practice, the majority of initiatives currently being labeled as reengmeenng sit
somewhere between process improvement and process re-engineering. There is no implicit
criticism or praise associated with being at any point on the spectrum. The important thing
it brings out is the need for honesty and clear communications between all involved. There
is little point in the chief executive talking about transformation and expecting equivalent
performance gains if those running and designing the initiative are actually focused on
achieving more humble performance improvements. Similarly there is little point
attempting transformation if the techniques used are only ever likely to deliver more limited
gain[Colin, I994].
-
START POINT BREAK THROUGH OUTCOME
• Function/Hierarchy PROCESS • Customer led
driven organizations BASED • Added value focus
• End to end management
19
the organizations that have tried to apply it, re-engineering has failed to live up to its
initial promise. The reason in many cases is that the latter have not made the necessary
breakthrough to new ways of thinking and working.
The experience of those that have realized dramatic gains suggests that there are six
critical areas in particular in which attitudes and approaches need to be overturned
completely. As can be seen from the diagram given below, the emphasis is on forcing
the organization to tackle head-on many of the complexities and inefficiencies that have
evolved over time and now act as a major hindrance to progress. (Colin,1994].
I ,
Corporate
Anorexics
Commitment to
Outcomes not
Process Determine 'Gap'
with Current
Opc~i:ltions
20
treating re-engineering as just the next wave of corporate anorexia. Obviously,
enhanced customer service will always be a motivation, but the underlying cost
concerns tend to dominate.
The problem in such cases is that the overriding concern for cost reduction forces
to focus on historic cost information as starting point. The risk is that to create a
redesigned process to meet the needs of yesterday rather than tomorrow.
Furthermore, those at the top tend to be concerned solely with achieving the
desired outcomes and have little commitment to the change process itself.
The second, more optimistic, but currently less popular, motivation is that of
rethinking the organization and creating a platform froin which to grow and shape
future success. This normally involves a four-stage process:
This involves creating the organization's blueprint or road map that sets out how
the organization will achieve the strategic direction. The rationale is that,
traditionally, one has to start with the organization's structure and then try to map
work on it. The architectural blueprint works to a different premise. The thinking
21
here is that infrastructure should actually be designed to enable the efficient
STRATEGY
INFRASTRUCTURE
CAP ABILITIES
• Process roles
• People and CULTURE
competencies • Competitive
• Information • Values • Managerial
system • Shared beliefs • Organisational
• Physical locations • Conditioning • Operational
• Organizational and aui tudes • Administrative
structures • Behavioural
• Performance Styles
measures
• Business controls
PROCESSES
• Strategic
• Managerial
• Organizational
• Operational
• Administrative
22
2.11.5 Engineer the changes
After assessing the size of the gap one can decide how best to close it and whether
using a series of discrete steps will do it or a big bang- 'total change' approach.
Engineering the change for most companies is typically an iterative process, which
involves a series of discrete steps through which, rethinking and reinvention of the
organization is done.
• Ask the naIve and challenging questions about why the business exists, what it is
trying to achieve, whether we would pay for the activities that went on if we
were the customer or o'>'mer,and how we would do things differently if starting
again?
• Examine where, how and why we add more or less value than our competitors
and assess how this matches up to customer needs and expectations.
• Go beyond the often bland and manipulable concept of customer surveys, and
engage all levels of the organization In regular face-to-face contact with
customer- possibly through focus groups.
• Understand the different segmentations of customers that we serve and assess the
priorities and trade-offs between service, functionality, quality and price for each
23
segment.
• Assess the organization's capacity for, and openness to, continuous learning.
innovation and a diversity of ideas and opinions.
b. Redesigning business processes
The objectives and outcomt:s of any fundamental reappraisal of business processes
should be to:
• Concentrate the responsibility for end-to-end tasks into single roles (eg case
handlers in insurance) or small workgroups; automate the flows of work to
minimize delays between processing stages where multiple participants are
involved.
• Reduce the amount of paper handling and rekeying of data by promoting the use
of electronic documents, by minimizing the storage of paper copies of
electronically generated documents and by encourag1l1g electronic
communications both internally and with customers and suppliers.
• Equip staff with the tools and techniques to allow them to take responsibility for
the continuous review and refinement of the processes they work on
24
• Reduce duplication of effort and investment by fonning stronger partnerships
with customers and suppliers, sharing key information (eg point of sale data vs.
sales forecasts), undertaking joint developments and entering into quick response
networks which help eliminate multiple storage points in a supply chain, cut total
inventory costs within the chain and reduce replenishment cycles.
• Improve cross-functional communications to speed up issue resolution and the
development of new products and services.
• Give staff the freedom and authority to execute the responsibilities with which
they have been empowered.
25
2.12.1 Tools For Customer Aiialysis
a. Five 'es' and 'Ps'
The five Cs and Ps (Figure2.8) are just a checklist of things one should look at and
understand when considering the needs of customers, the environment in which
they exist, and how well their needs are matched by the organization. ( both by the
products and people) and by other competitors. They are useful tools for
comparing with the competition, and also for comparing with current state to the
future state the organization wish to achieve. The gap between the two will
indicate the scale of the change the organization needs to achieve.
Context Product
Customers Place
Company Price
Competition Promotion
Costs People
b. SWOT analysis
A SOWT analysis (Figure2.9 ) is a good summary of research into how customers
and others view the organization. The use of SWOT should be done with care, as
-Strengths
-Weaknesses
cOpportunities
-Threats
it gives perceptions (which may not be facts). However, assuming that people's
perceptions are their reality, it is a useful tool. It is worth using across a variety of
26
groups so comparisons can be made-for example, compnting senior management's
perceptions to those of customers in a SWOT format may show how 'in tune' the
top of the organization is with the customers! And further comparisons with staff
perceptions may highlight internal issues as well.
~ ~
..
- -
High Pre-emptive
i
'"':I
...•
'"
(l
'"
:;;:'
'<"
0.-
Pro-active
2:.
c
,
'" Low I
~
High Delivered cost Low
try to achieve a degree of each. There is also the option of moving from being an
LDC operator to an HPV position, whilst maintaining an LDC base (Figure2.l 0).
d. Market versus Product
27
To expand market share and increase revenue the tO\ll' options shown in figurc
2.11 arc possible. Moving into riCW markets with new products straight away is the
riskiest, and should bc avoided.
Low
.
Low High
Quality Of How You Sell
(structured questionnaires that can be scored) and qualitative means (focus group
discussion with customers using trained external facilitators/market researchers).
One can plot using bubbles to denote market share, and shading to denote
profitability .
28
system can construct a value chain.
Once a value chain is constructed it is useful to see eXilctly what 'value added' is
provided by the various parts ofthe business system. There are two ways of using
this information:
Low High
Value Added
The fact that one is using an outside supplier implicitly suggests that he has made
the make/buy decision. This decision should be revisited if the value added is low
and supplier availability is limited. Integration is always an option. If there are
many suppliers then either quality or cost (depending on the value added)would be
the primary concern (although both need to be borne in mind!), and it is worth
29
spreading the risk to guard against supplier failure.
2.12.3 Tools For Employee Analysis
Employee analysis can be broken into two areas: 'Hard' analysis, and 'Soft'
analysis. The later is often ignored, but is no less important. The tools which one
can use in both areas, and which are detailed below, are as follows:
.:. Hard Analysis: employee turnover, days sickness, employee productivity,
organizational structure, process analysis and business process re-engineering .
•:. Soft Analysis: Culture, competitive energy, strategic acceptance, values versus
strategy, behavioural influences, leadership style, ect.
30
consultants are placing great emphasis on competing on speed, as this is an
area in which significant and measurable improvements can be made.
• Concentrate on outputs rather than inputs, and link performance measures
and rewards to customer related outputs. Customer and employee
satisfaction surveys now provide key inputs into many corporate
management processes.
• Give priority to the delivery of value rather than the maintenance of
management control. The role of the manager is being redefined and an
emphasis on command and control is giving way to empowerment, and the
notion of the coach and facilitator.
• Network related people and activities. Various surveys undertaken in the
late 1980s (summarized in Coulson-Thomas, 1992) revealed that the
majority of the chief executives aspired to a network form of organization.
• Move discretion and authority closer to the customer, and re-allocate
responsibilities between the organization, its suppliers and customers.
• Encourage involvement and participation.
• Ensure people are equipped, motivated and empowered to do what IS
expected of them.
• Wherever possible, people should assume responsibility for managing and
controlling themselves
• Work should be broadened without sacrificing depth of expertise In
strategic areas.
• Avoid over-sophistication.
• Keep the number of core processes in an organization to a minimum.
• Build learning, renewal, and short feedback loops into processes.
• Ensure that continuous improvement is built into implemented solutions.
31
factors that are considered: [Colin, 1994].
• How well is the organization perfonning, and how big is the gap between
where it is and where it would like to be? Could the gap be bridged by
improving or building on what already exists? Alternatively, is the gap so
large that the organization needs to 'throwaway and start again?
32
undertake fundamental transformations are insecure.
The critical decision is whether the organization is ready for re- engineering. They can
then assess whether they have or can build the necessary capability and leadership to
make a success of it. The assessment of these factors will always be more of a
subjective than objective exercise. While a number of people advocate the use of some
form of scoring mechanism, the real. value lies in the discussion and discovery process
that those in leadership positions go through to determine their readiness for re-
engineering. To help start that process Colin J Coulson offered his own non-exhaustive
checklist:
33
Rethink re-engineering provides an opportunity to look at the organization through a
new lens. By challenging the prevailing mindset we can help the organization
understand the need for change and unleash the skills, learning, creativity and
innovation required to bring about radically new process designs.
Support the process cannot and should not be led by external consultants but they can
perform valuable roles such as design adviser, coach, facilitator, catalyst and devil's
advocate.
Communication the critical challenges here are to ensure that we test the
interpretation of those to whom we communicate- both inside and outside the
organization- to surface and discuss residual concerns, fears and doubts and to maintain
an open dialogue throughout the change process.
Measurement the performance indicators used should assess both the change process
itself and the resulting achievements against targets. The outcomes- positive and
negative-need to be shared openly if the organization is to learn and make progress.
Technology information technology (IT) should be viewed as an enabler not the driver
of change or the guardian of past practice. The challenge is to decide firstly what the
organization wants from the application ofIT in the business and then determine how to
manage IT as a business in order to achieve those objectives.
Passion a change of this scale needs to be seen as something more than business as
usual-particularly by those not directly involved. The passion of those leading the
change and their ability to enthuse others can help to generate and sustain momentum
and support-particularly during the difficult stages.
Humanity the most critical assessment of the organisation's performance in managing
any accompanying people changes will be made by its own staff. Any suspicion of
heavy handedness or dishonesty will undoubtedly reflect in the morale and commitment
of the work force. [Colin,1994].
34
CHAPTER 3
c. All types of foundry works, ferrous casting upto I0 tons (single casting), all
types of non- ferrous casting up to 400 lbs.
d. All types of machine works, engineering works such as manufacture and
fabrication of various industrial parts, pumps, steel structure etc and wood works.
Shipbuilding is an ancient profession in this part of the world and Bangladesh
35
excelled in the skill from early days. Though Shipbuilding, ship repair was the
main function of KSY. But in the early sixties a good number of industries like
sugar mill, jute mill, power st?,ion, newsprint mill, hardboard mill etc had been
growing in the southern part of the country. Subsequently they also became
important customer of KSY for different engineering works. One of the most
important facts is that the company started construction works with significant
amount of Bank loan. Moreover the project started openition with loss and could
not make any profit during the first five years of its operation. So the Bank loan
could not be paid in time and the loan started increasing with the interest, which
became one of the major causes of turning into losing concern. From 1962-68 the
company showed a little profit margin. Again from 1969 to 1973 it had suffered
loss. After independence of the country, the ownership of all shares was
transferred to the Government of Bangladesh in May 1972 and the company was
placed under Bangladesh Steel and Engineering Corporation (BSEC). The period
from 1973 to 1984 can be termed as the golden period of Shipyard where it
suffered no loss and highest amount of profit was shown inI976-77 fiscal year.
After 1984 the company started suffering and there had been no profit. The annual
production capacity of KSY was about 5500 tons of steel equivalents, which
actually could never be achieved. With the elapse of time the plant machinery
started getting older and older. The heart of illl activities of KSY is the slipway
carriage, which broke down 3 to 4 times. Every time due to lack of working
capital it's repair work was delayed. These breakdown interrupted production
activities and subsequently caused late delivery of the vessels to the customer's
alongwith liquidity demurrage. Bank loans started increasing with high amount of
interest rate. All these problems were augmented by the inefficient management
system in a volatile environment of Collective Bargaining Agent (CBA).
Moreover, most of the regular customers like sugar mills, jute mills, power station,
newsprint mill, hardboard mill, etc became mostly sick industries so they hardly
place any work order to KSY. As a result KSY turned to a burden of the
Government and at its age of 41 years, the Government declared it as a sick
industry. Then the Government was looking for a capable private entrepreneur to
36
handover KSY, but finding no other alternatives finally it was decided to handover
KSY to Bangladesh Navy (BN) to run it commercially. Bangladesh Navy took
over the responsibilities of KSY since 09 May, I999.During handing over of KSY
total liabilities of 93.36 crore Taka were shared by Bangladesh Navy, BSEC and
Bank. Out of which only BN paid Tk. 61.46Crores.( Zaman2000, Baten 2000 &
Haresh,200 1).
37
The present organization structure of KSY is shown in the following diagram
••
General Manager
~
General Manager
1
(Ship Building & (Design
General Manager
Engineering) &Planning) ."
(Administration)
Deputy General
Manager
(Finance)
Deputy General
Manager (Design
Finance
& Planning)
Accounts
Pay
Bills
Audits Deputy General
manager (Admin
Internal Admin
Deputy General Deputy General Labor Welfare
manager Manager (Engineering)
(Shipbuilding) Medical
Machine Shop (Indoor) Security
Palter Shop
Machine Shop Purchase
Carpentry Shop
(Outdoor) Store
Civil Engg.
Electrical Shop
Section
Yard service
Docking Section
Maintenance
38
~ ••••
W....l W
::JO t""
FOUNDRY SHOP OFFICERS RESIDENTIAL AREA 0'0
r/l - '<,
:>0
0c:J o
c
;:>:r/l ..•.
"0
;;;
POWERHOUSE ::;
COMPRESSOR
PLATER SHOP.
>-
z
...,
o
WOOD STORE 0 :;:::
---'. ...l :::r
I I 0 c
U 5"
<Jl :>0
CENTRAL c:
CARPENTRY [J)
STORE
.......... ......... ....... - ..
......m.'I ... ~I~~I~;~~ .........mmmlj '"c:
~
=.
SHOP
I SIDE TRACK
II 0
"0
'<
::: ..,
:>0
CRANE WAY
II .11 CRANE WAY II Q.
SCRAP YARD
SIDE TRACK
II II SIDE TRACK II riM/:& LABOR
WELFARE OFF
II SIDE TRACK
II II SIDE TRACK
II
MAIN GATE
(INDOOR)& II CRANEWAY
II II CRANE WAY
II ~
u -
(OUTDOOR)/ 'LI ) 'J1 A' 0 ;~~
~. -
II SIDE TRACK
II II II
...l
;2~~
ELECTRICAL SHOP I:...•..,;,...•. j, •••••. ii .•..•• ';;':1
SIDE TRACK
'"z 2~=
D :_
tP
, .•. ••••••••••••••
~~•..•... ~ ....... ~~.••••.• 1T •••.•.• -j~
.1 ::E
Q
...:
CA~TI]:N II DESIGN &
I'LA\'\'ING SrCI"IOi\'.
39
3.4 PERSONNEL EMPLOYED IN KSY (AS ON JUNE 2003)
Khulna Shipyard Limited is run by almost 650 personnel of different rank, trade
and grade. A brief statement of personnel employed in KSY is listed below.
SI Description Qty
No, , ,: I
a. Naval Officers II
b. Naval Personnel 18
c, Permanent Civil Officers (Class 1) 26
d. Permanent Civil Officers (Class II) 18
e. Permanent Civil Staff (Class III) 67
f. Permanent Civil Staff (Class IV) 43
g. SMT&MT 38 I
h. Workers 216
1. Casual Workers 200
J. TOTAL 637
40
3.6.1 SHIPBUILDING SHOP
41
• Air-cooled welding set
• Spot welding machine
• Siemens Arc welding machine
The listed machineries are .operational, non-operational, and scrap type. All
machineries are very old, and no preventive maintenance is carried out. Only
corrective maintenance policy is followed.
a. Plate that can be rolled or pressed is 3/8 in. thick and 20 ft. long.
b. Plate can be sheared is 1/2 in. thick and 10 ft. long.
c. Stiffener size that can be handled is 2 in. x 2in. X 3/8 in. x 20 ft.
d. The well-designed lofting floor of size 78 ft x 25 ft. helps to construct the
ship in the finest possible way.
The sub -sections of plater shop are
a. Welding section
b. Plater section
c. Gas-cutting section
d. Machine section
e. Loft -floor and
f. Blacksmith.
Personnel employed (permanent)
Mechanical Engineer & SATO 04
Clark, MT &SMT 06
Fitter 34
Shipwright 03
Gas cutter 26
Welder 27
Machine man 07
Crane man 04
Blacksmith &Cocker man 02
Total: 113
42
Raw materials used and outputs:
The shop basically uses different sizes of Mild Steel (MS) plate, MS angle bar,
welding electrodes, Oxygen gas, Acetylene gas, and LP gas mainly as raw
materia!. They mainly fabricate I repair the ships hull, structure, frames and all
other components of steel plate, aluminum plate.
Limitation
43
• Vertical milling
• Horizontal milling
• Planning machine
• Radial grinding machine
• Surface & Universal grinding machine
• Up-right drilling machine
• Engraving machine
• Pedestal grinding machine .
• Metal cutting bend saw
• Heavy duty folding machine
• Flanging machine
• Cutting out & nobbling share machine
• Vertical hydraulic press
• Electric dynamic balancing machine
• Heavy-duty pipe bending machine
• Centrifugal re-metalling machine
• Blast metalling furnace
• 5 Tons hoisting equipment
• Zib crane
• Traveling crane overhead
The listed machineries are operational, non-operational, and scrap type. Moreover
difficulty arises in case of precision works as; almost all machineries are old and
lagging in sel f-accuracy.
Personnel employed (permanent)
Mechanical Engineer 0I
SATO 01
Junior Clark, MT 02
Office Assistant 01
SMT 03
Worker (machine man &turner) 29
Total: 37
44
Raw Materials used and Capacity: Different types and sizes of MS, SS,
Brass rod, shaft, plates eet are used as raw material to manufactures
engineering items, different spare parts of machineries of various internal &
external customers as per their requirements. Moreover machining of propeller
shaft, boring of bush, trueness checking of shafts, propeller balancing are some
of the examples of some specialized field of engineering works.
Limitations
}- On the existing lathe machines maximum length of 27 ft shafts can be
worked. But sometimes more than 27 ft long shafts are also required to
work, when it becomes difficult.
}- Shortage of skilled manpower in different machines.
}- High precision works is difficult to carryout.
}- At least one new shaper, planner and milling is essential immediately as
these are very old and accuracy can not be achieved with those.
45
);> Steering system installation, repair and maintenance
);> Main engine and gearbox alignment
);> All auxiliaries installation & repairing
);> All pipe line installation & repairing and maintenance.
);> Yard maintenance like mobile crane, dredger, powerhouse etc.
Limitations
);> Pipe bending IS done by heating, hydraulic pipe bending machine IS
essential.
);> Shaft temperature measuring instrument is essential.
);> Pipe cutting is carried out by handsaw or gas cutter, for quality work
pipe cutter may be introduced.
);> Pipe pressure test facilities are not available at present.
46
Li III ita tio liS:
Sundarban has made the finest source of wood. Usually required wood is
purchased through tender. Those woods are generally used by Carpentry shop to
carry out the fabrication of different wooden components of the ship as well as all
types of wooden furniture as required by the customer. In addition they carryout
sandblasting, painting of ships, fixing paneling and also manufacturing of different
canvas covers. Mostly following raw materials are used in the workshop.
a. Wood(marine Type)
• Garjan
• Sundari
• Shal
• Kerosene
b. Wood (furniture)
• Shegun
• Mehagani
c. Painting and sand blasting
• Different paints
• Thinners
• Pig Gribbles
47
• Shylet sand
d. Polishing
48
Limitation of the workshop
Following equipments are essential at the moment for better productivity of the
workshop
~ Auto screw setting machine for fixing paneling
~ Carpentry Lathe
~ More Spray painting machine
~ Portable Crane
~ Seasoning Plant
49
• Coarse sand mixing machine
• Clay mixing machine
• Graphite powder mixing machine
• Punching and shearing machine
• Column drill machine
• Short blasting machine
• Portable sand preparing machine
• Molding box of different sizes
Besides the said machineries and equipments there are good number of tools like
various sizes Hammer, Spanners, Screw drivers, Allen keys, wrench, different
types and sizes of spoons and shovels (used for shaping the molds). Most of them
were acquired from Germany during the primary installation of the shipyard. It has
been known from the user of the shop that most of tl1" loose tools of the shop,
especially those related directly with molding were not used from the beginning.
At present the life of those tools are found to be from 5- 25% for different items.
Steps may be taken to ascertain the tools actually required for the shop in future
and the rest tools may be disposed off as per regulation. Again few tools are found
to be very essential for the shop, which can be purchased and supplied in the shop.
Limitations:
i.) Initially total Manpower of the shop was about 85 but gradually it
decreases to 12 at present. Most of them have retired and some others were .
. transferred to other depaltment like security, as the shop is running almost
idle for long. Majority of the personnel are illiterate but have long
working experience. One major shortcoming of the shop has been felt that
there is only one ATO, acting as the incharge of the shop who is only
educated and technically sound on foundry. But thb'e IS no one to replace
him at present in the shop and the incharge is supposed to retire in next
year. As the molding works are not very easy and it requires lot of
experience to complete defect free mould in the first chance. So, producing
replacement of the said ATO is felt very essential.
ii.) One induction furnace is very essential
50
iii) No testing lab facilities like metal composition test, hardness test,
compressive test, tensile test eel.
iv) Necessary facilities for surface treatment, electroplating, galvanizing
. is essential.
v) Few of the requirements are fulfilled by some innovative ideas,
which cos! money and time.
51
workers.
3.6.10 MEDICAL CERTRE
There is a medical center in KSY consisting one MBBS Doctor and four other staffs.
They always gives service in accidents and also for normal patients. The system is a
bit different depending on the situation.
All the permanent workers and all other employees are authorized to get first aid
treatment and medicine for any accidents during working in the concerned fields.
All the casual workers are authorized to get only first aid treatment but no
expenditure of medicine is borne by KSY for accidents during working in the
concerned fields. Otherwise for all other normal patients the doctor prescribes the
medicine and that is to be purchased by the individual at his own cost from outside
pharmacy. In case of major accidents while working, victims used to get full free
treatment. They also maintain the Medical Leave for workers up to j 4 days with full
payment, and beyond that if required without payment.
52
2002 is not available for the complete year.
Sl. Fr. July 200 I Fr. July 2000 FrJuly 1999 Fr. July 1998
No. Description to June 2002 to June 2001 to Jun 2000 to June 1999
man-hour man-hour man-hour man-hour
BSEC control period and present period )is shown in the following table.
53
production in KSY. KSY is run by the electricity supplied by PDB.A typical load
consumption breakdown as shown in the following table.
Load consumption chart
SIno Description Average Maximum
Consumption Consumption
(KW) (KW)
a. Machine shop 52 223
b. Foundry shop 20 88
c. Carpentry shop 35 88
d. Platter shop 90 750
e. Berth crane 40 135
f. Power house 80 90
g. Slipway, Fresh Water, Seawater 135 140
h. Yard light 8 20
l. Officer's colony 10 165
j. Labor colony 10 25
k. Admin wing 10 20
1. Total consumption 490KW 1744KW
3.11PRODUCTS OF KSY
Khulna Shipyard can construct! fabricate following different products, and also
many more ..
a. Inland and Coastal Work boats.
b. Harbor, Coastal and Seagoing Tugs.
c. Pusher Tugs and Barges.
d. Ferries, Landing Craft, Crane Barges.
e. Hydrographic Survey Vessels,
f. Buoy Handling Vessels.
54
g. Utility and Offshore Supply Vessels.
h. Pilot Boats; Fire fighting Vessels, Search and Rescue Boats.
\. Crew Boats and Fast Ferries.
J. High Speed Patrol Boats.
k. Dredgers.
I. Fishing Vessels
m. Cargo vessels and Tankers.
n. Pontoons
o. Design & fabrication of chimney, Hot and cold duels.
p. Design & fabrication of oil tanks.
q. Fabrication of steel structure and pipes.
55
CHAPTER 4
4.1 INTRODUCTION
The word Quality is a relative entity. There is no unit to measure it, but it can be
defined as, "The degree to which a product meets the requirements of a customer
". In other words "The fitness of a product or service for its intended use" is
quality. So, the concept of quality does not always means costly. Actually Quality
is a multifaceted entity, having at least eight dimensions:
a. Performance
b. Reliability
c. Durability
d. Serviceability
e. Aesthetics
f. Features
g. Perceived quality
h. Conformance to standards [Douglas, I990]
The quality control conveys an idea about determining and maintaining that
quality of product or service, which will satisfY the customer by its performance;
cost, delivery, reliability etc. Customer satisfaction is therefore the key to effective
quality assurance. Because an )tem, even it produced to a level of quality higher
than that demanded by the customer will not be appreciated if its cost is too high
or if it is delivered too late. It is not simply a question of controlling the quality of
product as it rolls out from the production lines, but more so, it has become
necessary to manage the quality of the entire system responsible for manufacturing
the product. This system is composed of materials, machines and manpower as the
three vital resources. Quality of every resources has to be ensured at every stage,
right from the product design, planning, material handling, material processing,
production, delivery to the last stage of product performance at the customer's
premises. To be competitive in the market, the motto of a producer is to be "to
56
produce at the first time, every time,. on time and at a cost reasonable to the
customer."
With the advent of the industrial revolution, manufacturing was broken up into
small parts. Craftsmen became inspectors and standards started to emerge. Thus
gradually three or four classes of workmen were formed; the highly skilled,
skilled, semi-skilled and un-skilled. The two world wars demanded a further
expansion in manufacturing. Mass production methods of manufacturing were
developed in all areas of engineering and technology. Mechanization and later
automation were introduced for faster production. With these changes the demand
for skills reduced and industries relied more on inspectors to ensure quality of the
product.
In 1924, W.A. Shewhart of Bell Telephone Laboratories developed a statistical
chart for the control of product variables. This chart is considered to be the
beginning of statistical quality control. Later during and after Second World War.
57
statistical quality control became an essential technique to assist in quality control
and production. The era of 'Quality control' changed to 'Quality assurance'.
Deming and Juran contributed to a large extent in the late forties by introducing
statistical practices and ushering in the modern concept of quality assurance.
Analyze
consumer needs and focusing the resources of all departments (research, design,
production, marketing) in a cooperative effort to meet those needs. The Deming
cycle proceeds as follows:
a) Conduct consumer research and use it in planning the product (plan).
b) Produce the product (do).
59
c) Check the product to make sure it was produced in accordance with the
plan (check).
d) Market the product (act).
e) Analyze how the product is received in the marketplace III terms of
quality, cost, and other criteria (analyze)
Deming's philosophy is both summarized and operationalized by his fourteen
points. [Goetsch,1997]
60
Everyone in the organization, including the union, must be involved in the
quality journey and change his or her attitude about quality. The supplier must
be helped to improve quality by requiring statistical evidence of conformance
and shared information relative to customer expectations.
c. Understand the Purpose ofInspection
Management must understand that the purpose of inspection is to improve the
process and reduce its cost) for the most part, mass inspection is costly and
unreliable. Where appropriate, it should be replaced by never-ending
improvement using statistical techniques. Statistical evidence is required of self
and supplier. Every effort should be made to reduce and then eliminate
acceptance sampling. Mass inspection is managing for failure and defect
prevention is managing for success.
d. Stop Awarding Business Based on Price Alone
The organization must stop awarding business based on the low bid, because
pricc has no mcaning withcul quality. The goal is to have single suppliers for
each item to develop a long-tenn relationship of loyalty and trust, thereby
providing improved products and services. Purchasing agents must be trained
in statistical process control and require it from suppliers. They must follow
the materials throughout the entire life cycle in order to examine how customer
expectations are affected and provide feedback to the supplier regarding the
quality.
c. Improve Constantly and Forever the System
Management must take more responsibility for problems by actively finding
and correcting problems so that quality and productivity are continually and
permanently improved and costs are reduced. The focus IS on preventing
problems before they happen. Variation is expected, but there must be a
continual striving for its reduction using control charts. Responsibilities are
assigned to teams to remove the causes of problems and continually improvc
the process.
f. Institute Training
Each employee must be oriented to the organization's philosophy of
61
commitment to never-ending improvements. Management must allocate
resources to train employee~ to perform their jobs in the best manner possible.
Everyone should be trained in statistical methods, and these methods should be
used to monitor the need for further training.
g. Teach and Institute Leadership
Improving supervision is management's responsibiiily. They must provide
supervisors with training in statistical methods and these 14 points so the new
philosophy can be implemented, instead of focusing on a negative, faultfinding
atmosphere. Supervisors should create a positive, supportive one where pride
in workmanship can flourish. All communication must be clear from top
management to supervisors to operators.
h. Drive out Fear, Create Trust, and Create a Climate for Innovation
Management must encourage open, effective communication and teamwork.
Fear is caused by a general feeling of being powerless to control important
aspects of one's life. It is caused by a lack of job security, possible physical
harm, performance appraisals ignorance of organization goals, poor
supervision, and not knowing the job. Driving fear out of the workplace
involves managing for success. Management can begin by providing workers
with adequate training, good supervision, and proper tools to do the job, as
well as removing physical dangers. When people are treated with dignity, fear
can be eliminated and people will work for the general good of the
organization. In this climate, they will provide ideas for improvement.
i. Optimize the Efforts of teams, Groups, and Staff Areas
Management must optimize the efforts of teams, work group, and staff areas to
achieve the aims and purposes of the organization. Barriers exist internally
among levels of management. Among departments, within departments, and
among shifts. Externally, they exist between the organization and its customers
and suppliers. These barriers exist because of poor communication, ignorance
of the organization's mission, competition, fear, and personal grudges or
jealousies. To break down the barriers, management will need a long-term
perspective. All the different areas must work together. Attitudes need to be
62
changed: communication channels opened; project teams organized; and
training in teamwork implemented. Multifunctional teams, such as used in
concurrent engineering, are an excellent method.
j. Eliminate Exhortation for the Work Force
Exhortations that ask for increased productivity without providing specific
improvement methods can handicap an organization. They do nothing but
express management's desires. They do not produce a better product or
service. Because the committed to the long-term success of the organization.
Improvements in the process cannot be made unless the tools and methods are
available.
k.(i). Eliminate Exhortations for the work Force
Instead of quotas, management must learn and institute methods for
improvement. Quotas and work standards focus on quantity rather than quality.
They encourage poor workmanship in order to meet their quotas. Quotas
should be replaced with statistical methods of process control. Management
must provide and implement a strategy for never-ending improvements and
work with the force to reflect the new policies.
k(ii). Eliminate Management by Objective
Instead of management by objective, management must learn the capabilities
of the processes and how to improve them. Internal goals set by management,
without a method, are a burlesque. Management by numerical goal is an
attempt to manage without knowledge of what to do.
I. Remove Barriers That Rob People of Pride Workmanship
Loss of pride in workmallship exists throughout organization because (I)
workers do not know how to relate to the organization's mission,(2) they are
being blamed for system problems, (3) poor designs lead to the production of
'Junk," (4) inadequate training is provided, (5) punitive supervision exists, and
(6)inadequate or ineffective equipment is provided for performing the required
work. Restoring pride will require a long-term commitment by management.
When works are proud of their work. They will grow to the fullest extent of
their job. Management must give employees operational job descriptions,
63
provide the proper tools and materials, and stress the workers understanding of
their role in the total process. By restoring pride everyone in the organization
will be working for the common good. A barrier for people on salary is the
would be its cost of production. For instance, reasons are better quality of raw
material used, higher degree of skills required and greater cost incurred in
controlling or improving quality. All the cost elements which affect the total cost
of maintaining and controlling quality can be grouped together as 'quality costs' or
a. Prevention costs
b. Appraisal costs
a. Prevention costs
Prevention costs are those costs associated with efforts in design and
64
IlUllllllactllring that are direeted toward the prevcntion of 1l0llCOll
f(mnallcc.
That is to 'make the product right the first time.
b. Appraisal costs
Appraisal costs are those costs associated with inspection, measuring,
evaluating or auditing products, components, and purchased materials to
ensure conformance to the ~~andards that have been imposed.
c. Internal failure costs
Internal failure costs are incurred when products, components, materials and
services fail to meet quality requirements, and this failure is discovered prior
to delivery of the product to the customer. These costs would disappear if
there were no defects in the product.
65
CHAPTER FIVE
Thc ISO 9000 conccpt was born in 1958 by US Military as MIL-Q-9858, latcr it was rcviscd
in 1963. In 1968 NATO adopted the concept as AQAP-I.Later on U.K. Defensc Standard in
1970-73 and U.K.British Standard BS 5179 in 1974 superseded it. By this time QA Systems
dcveloped. In 1979 BS 5750 was developed, followed by TC176:1S0 in 1983.]n 1987 the
first set of standards was published and adopted by International Organization for
Standardization (ISO). A revision of this standard was made in 1994 on the basis of
worldwide experience gained through implementation. Another major revision to the 1994
version was made in November 2000. And the revised version, which is known as IS09000:
2000 was published as standard in February200 I.
a Greek word, isos, meaning equal and lor uniform, in order to establish a uniform standard
for a widc range of functions and activities. In order to mean uniformity, the lOS was
The standard describes and defines the Basic Elements of the system needed to ensure that a
company's products and or a facility's services meet or exceed customer's need and
expectations. It is a group of generic standards, which spell out clearly what should be a
company's quality system regardless of its nature. ISO is not only doing what you say you do
and documenting it, but also really doing what you claim you do, all the time. ISO 9000thus
ensures that you say what you do and do what you say.
in product, consistent with professional standard, ethics and excellence.To create and on a
continuous basis, to improve the means by which the organlzation'meets customers stated
66
and implied needs, leading to customer satisfaction and in success for the enterprise.
5,4 HOW DOES THE SERIES WORK?
The ISO series provides the users with guidelines for selection ~mduse ofIS0900 1, 9002 and
9003. ISO 9001,9002 and 9003 are Quality system models for External Quality and
Assurance. Of the three, ISO 900 I is the most comprehensive covering Design,
Development, Production, Installation and SerVicing Systems. ISO 9002 covers only
Procurement, Production, Installation and servicing. Both standards require the same degree
of conformance to their respective scope of activity. In the new ISO 9000:2000 version there
is only one standard, ISO 9001. Almost all the requirements of the previous standards of
ISO 9001, 9002, and 9003 are there in the new IS09001 standard along with some stringent
new requirements.
5.5 IMPORTANCE OF ISO CERTIFICATION
ISO 9000 is morc than just a standard. It reflccts a well-organized opcration with traincd,
motivated and committed people. It is the challenge. ISO certification will advise one about
creating a sound business, one that will satisfY one's customers. IS09000 is one of the tools
that can be used in the TQM (Total Quality Management) joumey.Tfie certificate is the seal
of approval that makes the customers feel better when they do business. At present
customers use the certification as a means of evaluation [QIA].
5.6 IMPLEMENTATION PROCEDURE
The ISO 9000 system is designed as simple system that can be used by construction.
engineering, health care, legal, and other professional services as well as the manufacturing
industries. There are number of steps to implement a Quality Management
System. [Besterfield, 1999]
a. Senior Management Commitment: The most important step in implementing a
quality system is to acquire the full support of top management. The chief executive
officer (CEO) must be willing to commit the resources necessary to achieve
certification. This is most critical to the success of the project.
b. Appointment of Management Representative: Once the commitment has been
made. the process can proceed by adopting a project team ~pproach. The next step is to
appoint a management representative who will be able to ensure that the quality system
is effectively implemented and maintained irrespective of other responsibilities. This
67
person IS responsible for coordinating the implementation and maintenance of the
quality system and is the contract person for all parties involved in the process, both
internal and external.
c. Awareness: The awareness among every member of the organization is required to
grow as it is going to affect every member of the organizations as well as their input.
Moreover they need to know how it will affect day-to-day operations and the potential
benefits. This information can be relayed through short, two-hour awareness training
program.
d. Appointment of an implementation Team: When every member of the
organization became aware of the intentions to develop the quality system, an
implementation team from all areas and levels of the organization is to be formed.
e. Training: The implementation team, supervisors, and :intemal audit team should be
trained. This activity can be accomplished by sending team leaders for training and
having them train
f. Time schedule: A time schedule for implementing the system and registration is to
be developed which may be about 18 months or so.
g. Selection of element owners: The implementation team will select owners for each
of the system elements. Owners may be assigned more than one element. Each owner
has the option of selecting a team to assist in the process.
h. Review the present system: Existing quality system is to be reviewed. Copies cif all
the quality manuals, procedures, work instructions, and forms presently in use are to be
sorted to detennine what is available and what is needed to complete the system. This
activity is known as gap analysis, which can be performed by the element owners and
their teams or by an external consultant.
i. Writing the documents: Quality policy and procedure tnanuals are to be written. To
maintain the quality of specific functions appropriate work instructions is to be written.
j. Installing the new system: Policies, procedures, and instructions into the day-to-day
workings of the organization and documents to be integrated.
K. Internal audit: Internal audit of the quality system is to be conducted to ensure that
the system is working effectively and also to. provide the information's to the
management for the comprehensive management review.
68
I. Management review: Management review is to be carried ol,lt to determine the
effectiveness of the system in achieving the stated quality goals.
m. Preassessment : In the previous steps if good job is accomplished, then this step is
not mandatory.
n. Registration: An accredited registrar company is to be hired by the company
seeking registration to examine its system, processes, procedures, Quality Manual and
related items. If everything is in order, registration will be granted. Otherwise the
registrar will infonn the company of which areas require work (but wi II not inform the
company specially what must be done), and a second visit will be scheduled. [Goetsch,
1997].
5.7 ADVANTAGES AND BENEFITS OF ISO CERTIFICATION
The primary objective of implementing an effective quality management system IS to
enhance the productivity of an industrial manufacturer and the quality of its
products/services. Suppliers are also benefited, because it enables them to achieve
customer's satisfaction in a cost-effective way. Effective quality management systems of an
organization bring the following benefits to its customers.
a. It enables them to identify and plan tasks and their method of perfonnance with
a view to yield good results.
b. It provides the means of identifying and resolving problems and suggesting their
recovery.
c. It provides a means of documenting company's experiences. It can serve as the
basis of training stafffor improving their performances.
d. It provides a basis continual improvement in the process, Improves delivery.
increase speed and at the same time it decreases the cost of production.
e. It generates objective evidences to demonstrate the quality of products and the
effectiveness of the system and thus builds confidence among customers.
f. It improves the image, credibility, and acceptability of an organization in the
industrial business market, and boosts up export development.
g. Finally it provides an increased market share.[QIA]
69
T Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: Revision:
Preoared by: IAooroved Bv: IPaoe No. Date issued:
70
I Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: Revision:
Preoared bv: IAooroved B~~ IPaoe No. Date issued:
71
I Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: . Revision: .
Preoared by: IAooroved Bv: IPaoe No. Date issued:
procedure shall be established to define the controls needed for the identific:
storage, protection, retrieval, retention time and disposition of records
The management shall ensure that customer requirements are detennined and are
72
I Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: .
Revision:
Preoared by: IAooroved Bv: IPace No. Date issued:
73
Khulna Shipyard ltd., Bangladesh QM-Q- 00l:Quality Manual
Element: .
Revision:
Preoared by: IAooroyed By: IPaae No. Date issued:
Managing Director(M D)
74
1 Khulna Shipyard Ltd., Bangladesh T QM-Q- 00l:Quality Manual
Element: Revision:
Preoared by: TAooroved Bv: TPaae No. Date issued:
75
Khulna Shipyard Ltd., Bangladesh QM-Q- 001:Quality Manual
Element: Revision:
76
Khulna Shipyard Ltd., Bangladesh QM-Q- 00l:Quality Manual
Element: Revision:
Preoared by: IAooroved Bv: tPaoe No. Date' issued:
5.9.5.2Management representative
Top management shall appoint a member of management who, irrespective of
responsibilities, shall have responsibility and authority that includes
a. Ensuring the processes needed for the quality management systen
established, implemented and maintained.
b. Reporting to the top management on the performance Of the ql
management system and any need for improvement and
c. Ensuring the promotion of awareness of customer requirements throu)
the organization.
5.9.5.3 Internal communication
Top management shall ensure that appropriate communication processes are establ
within the organization and tbe communication takes place regarding the effectiv,
of the quality management system.
5.9.6 Management review
5.9.6.1General
77
I Khulna Shipyard Ltd., Bangladesh I QM-Q- OOl:Quality Manual
Element: Revision:
Preoared by: IAooroved Bv: IPaoe No. Date issued:
The output from thc managcmcnt review shall includc any decisions and aclions
related to
Element: Revision:
Preoared by: IAooroved Bv: IPace No. Date issued:
79
I Khulna Shipyard Ltd., Bangladesh I QM-Q- OOl:QualityManual
Element: Revision:
Preoared bv: IAooroved Bv: I Pace No. Date issued:
The organization shall review the requirements related to the product. This review
shall be conducted prior to the organization's commitment to supply a product
to the customer (e.g. submission of tenders, acceptance of contracts or ordcrs .
. Acceptance of changes to contracts or orders) and shall ensure that
a. Product requirements are defined,
b. Contract or order requirements differing from those previously expressed
are resolved, and
80
I Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: Revision:
Preoared by: IAooroved Bv: IPaae No. Date issued:
The organization shall plan and control the design and development of product.
During the design and development planning, the organization shall determine
a. The design and development stages
b. The review, verification and validation that are appropriate to each design
and development stage, and
c. The responsibilities and authorities for design and development.
The organization shall manage the interfaces between different groups involvl
design and development to ensure effective communication and clear assignme
responsibility.
81
Khulna Shipyard Ltd., Bangladesh QM-Q- 00l:Quality Manual
Element: Revision:
Preoared by: IAooroved Bv: I Paoe No. Date issued:
82
Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: Revision:
Preoared by: TAooroved Bv: TPaae No. Date issued:
83
I Khulna Shipyard Ltd., Bangladesh QM-Q- 00l:Quality Manual
Element: Revision:
5.11.4Purchasing
84
I Khulna Shipyard Ltd" Bangladesh I QM-Q- 00l:Quality Manual
Element: Revision:
85
I Khulna Shipyard Ltd., Bangladesh ! QM-Q- 00l:Quality Manual
Element: Revision:
Where appropriate, the organization shall identity the product by suitable means
throughout product realization. The organization shall identify the product status
is a requirement, the organization shall control and record the unique identification
of the product
5.11.5.4Customer property
The organization shall exercise care with customer property while it is under
shall identity, verity, protect and safeguard customer property provided for use
or incorporation into the product. If any customer property is lost, damaged or other
-wise found to bc unsuitablc for usc, this shall be reported to the customer and
records maintained.
5.11.5.5Preservation of product
The organization shall preserve the conformity of product during internal process-
ing and delivery to the intended destination. This preservation shall include
identification, handling, packaging, storage and protection. Preservation shall also
apply to the constituent parts of a product.
and the monitoring and measuring devices needed to provide evidence of contor-
The organization shall establish processes to ensure that monitoring and measure-
-ment can be carried out and are carried out in a manner that is consistent
86
I Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: Revision:
storage.
In addition, the organization shall assess and record the validity of the pre
measuring results when the equipment is found not to conform to requirements.
organization shall take appropriate action on the equipment and any product aft,.
Records of the results of calibration and verification shall be maintained.
When used in the monitoring and measurement of special requirements, the abili
computer software to satisfy the intended application shall be confirmed. This sh,
undertaken prior to initial use and reconfinned as necessary.
5.12.1General
The organization shall plan and implement the monitoring, measurement, analysis
and improvement processes needed
a. To dcmonstrate conformity of the product.
b. To ensure conformity of the quality management system, and
c. To continually improve the effectiveness of the quality management system.
87
I Khulna Shipyard Ltd., Bangladesh I QM-Q- 00l:Quality Manual
Element: Revision:
'As one of the measurement of the performance of the quality management syystem,
the organization shall monitor information relating to customer perception as to
whether the organization has met customer requirements. The methods for obtaining
and using this information shall be determined.
5.12.2.2 Internal audit
The organization shall conduct internal audits at planned intervals to determine the
quality management system
a. Conforms to the planned arrangements, to the requirements of this interna-
tional standard and to the quality management system requirements established
by the organization, and
b, Is effectively implemented and maintained.
An audit programme shall be planned, taking into consideration the status and
importance of the processes and areas to be audited, as well as the results of
previous audit. The audit criteria, scope, frequency and methods shall be defined.
Selection of auditors and conduct of audits shall ensure objectively and impartially
of the audit process. Auditors shall not audit their own work.
The responsibilities and requirements for planning and conducting audit, and for
reporting results and maintaining records shall be defined in a documented procedure.
The management responsible for the area being audited shall ensure that actions are
taken without undue delay to eliminate detected nonconformities and their
causes. Follow-up activities shall include the verification of the actions taken and the
reporting of verification results.
88
1 Khulna Shipyard Ltd., Bangladesh -I QM-Q- 00l:Quality Manual
Element: Revision:
following ways:
a. l3y taking action to eliminate the detected nonconformity;' .
b. By authorizing its use, release or acceptance under concession by a rei<
authority and, where applicable, by the customer;
c. By taking action to preclude its original intended use or application.
89
Khulna Shipyard Ltd., Bangladesh QM-Q- 00l:Quality Manual
Element: Revision:
Preoared by: IAooroved Bv: IPaae No. Date issued:
nonconformities encountered.
A documented procedure shall be established to define requirements for
a. Reviewing nonconformities (including customer complaints)
b. Determining the causes of nonconformities
c. Evaluating the need for action to ensure that nonconformities do not recur.
90
I Khulna Shipyard Ltd., Bangladesh I QM-Q-001:Quality Manual
Element: Revision:
5.12.5.3Preventive action
The organization shall determine action to eliminate the causes of potr
91
CHAPTER SIX
INVENTORY ANALYSIS
6.1 INTRODUCTION
Inventories are those materials and supplies carried on hand by a business or
institution eitherfor sale or to provide inputs or supplies to the production process. All
businesses and institutions require inventories. They are often a substantial part of total
asscts. Financially, inventories are very important to manufacturing companies. On the
balance sheet they usually represent from 20 to 60% of total assets. From the Balance
sheet of301h .Tune2001 of Khulna Shipyard Limited, total inventory (including Goods-
in- Transit) found about 25% of the Current assets.
When inventories are reduced, their value is converted into cash, which improves cash
flow and return on investment. Also there is a cost to carrying inventories, which
lI1creases operating costs and decreases profits of the company. Therefore good
inventory management is very essential.
Inventory must not be managed at the aggregate level but also at the item level. To do
so, management must establish decision rules about inventory items so the staff
responsible for inventory control can do its job effectively. These rules involve the
following:
• Deciding on the importance of individual inventory items and how they are to
be controlled.
• How much to order at one time.
• When to place an order. [Tony, 1991]
92
Total inventory eost=( Pu reha sing eost)+ (Ordering cost)+(Holding
Purchasing cost
The value of an item is its unit purchase price. It becomes an important factor when
the commodity unit price becomes dependent on the size of the order. That situation is
normally expressed in terms of a quantity discount or price break.
Ordering cost
These are the cost associated vvith the fixed cost of maintaining an order (purchase)
department and the variable cost of preparing and executing purchase requisition of an
order either with the factory or a supplier. The elements Ordering cost are summarized
below:
a. Prcparation of purchase requisition
b. Preparation of purchase order
c. Mail
d. Expedition (te1ephone& telegraph)
e. Transportation
r. Receiving
g. Inspeetiun
h. Put away
l. Updating inventory records
J. Paying invoice
k. LC
l. Customs [Hossain, 2002]
Holding cost
These are the costs /expenses incurred by the company because of the purchasing
materials in advance and maintaining those materials in inventory. Costs originated
from many sources are consolidated under the heading of holding cost. In general,
93
holding costs remam fixed to a certain inventory capacity and then vary with the
Shortage cost
It is a penalty incurred when any company run out of stock of a needed commodity. It
generally includes costs due to loss of customer's goodwill as well as potential loss in
Total cost
Per year
Minimun
Cost
cost
94
components of the general inventory model as a function of the inventory level. The
optimum inventory level corresponds to the minimum total cost of all four
components. However in inventory model need not include all four types of costs
either because some of the cost are negligible or will render the total cost function too
complex for mathematical analysis. [Douglas, 1990& Jain,200 1]
95
[List of 50 inventory items with assumed quantity and cost used in a given time
period of one year.]
SI. Name ofltems Quantity Annual Taka %of total
NO. Usage Taka
Usage
I MS Platc (all sizcs) 305 tons 6633750/00 38.362%
2 MS Electrode (total) 121250m 1817000/00 10.508%
3 Diesel ( Dredging and Generator) 79560 ltrs 1611090/00 9.317%
4 Oxygen gas 33825cu m 1182000/00 6.835%
5 Wood Gorgon 1170cuft 678600/00 3.924%
6 Plastic wood (All sizes) 550 Sq m 610600/00 '3.531%
7 Wood Mehagani 725 cu ft 580000/00 3.354%
8 Wood Shale 645cu ft 516000/00 2.984%
9 LP Gas 910 Bottles 394000/00 2.278%
10 Acetylene Gas 1800 cu m. 381000/00 2.203%
11 Wood Sundari 580 cu ft 325000/00 1.879%
12 Wood Shegune 210 cu ft 304500/00 1.761%
13 PVC Tiles 2350 pcs 258500/00 1.495%
14 MS Angles (all sizes) 6.5 tons 180375/00 1.043%
15 Gl pipe (all sizes) 12000 m 180000/00 .1.041%
16 Disc Grinding Stone (all sizes) 4500 pcs 146000/00 0.844%
17 Taper roller bearing 502 pcs 145000/00 0.839%
18 Sylhet Sand 196 cu m 143500/00 0.830%
19 Leather hand gloves 1120pcs 139000/00 0.804%
-
20 Welding Cable 660 m 135000/00 0.781%
21 Aluminum Plate (8ftx4ft) 29pcs 130500/00 0.755%
22 Pig iron 115000/00 0.665%
23 Ply wood 275sq m 95500/00 0.552%
24 Glass wool 82500/00 . 0.477%
25 Synthetic fiber cloths /6400/00 0.442%
26 Electric Cable 2500 m 62500/00 0.361%
27 Aluminum chequared plate ]Opcs 50000/00 0.289%
28 Acetylene/ Oxygen /LP gas hose 805 m 47050/00 0.272%
29 Hard coal 37500/00 0.217%
30 MS solid pipe various dia. 28330/00 0.164%
31 CopperPipes(hollow)various sizes 124 ft 26800/00 0.155%
32 Bathroom fittings 25600/00 0.148%
33 Rubber insertion sheet 310 kg 23600/00 0.136%
34 Copper 160kg 20000/00 0.116%
35 Stainless steel solid pipe 19750/00 0.114%
36 Glue 19250/00 0.111%
37 Zinc II0kg 1')100/00 0.070%
96
.,
38 MS wire nail 360 kg 10800/00 0.062%
39 GI union socket 2100cs 8000/00 0.046%
40 Lime stone 7800/00 0.045%
41 Welding torch 6800/00 0.039%
42 Tin 10kg 6000/00 0.035%
43 Fire Brick 5500/00 0.032%
44 Graohite 4500/00 0.026%
45 Manganese 16kg 2500/00 0.014%
46 Nickel 2450/00 0.014%
47 Files(Flat, Round, Triangular) 60ocs. 2400/00 0.014%
48 Antimony 1000/00 0.006%
49 Molasses 18kg 860/00 0.005%
50 Lead 10 kg 500/00 0.003%
TOTAL 17.292,405/0 100.000
TK. %
97
attempt is require to made to keep a running account of the stock level. A periodic
review, perhaps once a year, physically checks to be conducted the amount in storage.
[Tony, 1991]
-+- Series I
120.000%
~
j 100.000%
[
f-
~ '"
80.000%
"
-=
•...'">o 60.000%
-...
-r-
c 40.000%
I
"
" 20.000%
"
il..
0.000% ' I I I
0 20 40 60 80 100 120
Percent of items
The ABC analysis is usually the first step that must be applied in an inventory control
situation. Once the important inventory items are identified, the total inventory
management system becomes easier.
98
The economic order quantity can be calculated using following formula
EOQ= Q = ,j {2AS/ic}
Where, A = Annual usage rate in units or Annual Demand
S = Ordering cost in Taka per order.
i = Annual carrying cost rate as a decimal of a percentage.
c = Cost (purchasing price) per unit in Taka.
Q = Economic Order quantity in units.
a. Calculation of economic order quantity ofMS Plate
KSY uses about 300 tons of MS Plate per year (it is variable as the number of work
orders varies), which is purchased at an average cost ofTk.24000/00 per ton.
99
800 x 2 = 24,000/00. [Considering TK.800/00 per inches] For practical calculation
• Transportation
• Receiving
• Inspection
• Putaway
• Customs
For calculating the EOQ for MS plate ordering cost is considered = Tk.25000/00
So,
'"60 tons.
6.6 ECONOMIC ORDER INTERVAL (EOI)-CALCULATION SINGLE ITEMS
Economic order intervals (EOI) for single items can be calculated by using the
100
To = ~2C/RFP
Where, To = Order interval in years
C = Ordering cost
R= Annual requirement
F= annual holding cost fraction.
P= Purchase cost of item.
Considering the above data for MS plate,
Where, C= Tk.25000100
P= Tk.24000100
R= 300 tons
1"= 0.17
To = ~2x250001 300xO.17x24000
=0.202 Years [Considering 365 days a year]
= 73 days.
ECONOMIC ORDER INTERVAL for MS plate is 73 days in the context stated above.
In retailing and wholesaling, a separate order is rarely placed for each item.
Frequently, a supplier provides numerous items, and it is more economical to place
joint order. When all items from the same source are ordered jointly, the stock level
rcview for thesc items ean be coordinated and inventory maintenance ean bc kcpt to a
minimum. Furthermore, the monitoring of stock levels often is less frequent and can
be scheduled to fit comfortably with other organizational activities. Logistics and
transportation cost savings also may be possible because of smaller materials handling
costs and weight breaks in the transportation rate structure.
In preparing joint order, the quantity of each item to order depends on the time interval
between orders for the entire group. The basic problem in this situation is the
determination of the time interval T that will minimize inventory costs for the group as
a whole. Once the optimum time (order) interval is established, the desired maximum
101
inventory level E1 for each item can be set in relation to it. From there, the individual
order quantities can be calculated as the difference between each item's maximum
inventory level and its stock position at the time of the order revicw.
The economic order interval can be obtained by minimizing the total annual cost.
Neglecting stock out cost, the formulation is
Total annual cost = (purchase cost)+(order cost)+(holding cost)
Thus the Economic Order Interval (EOl) for multiple items IS obtained
as..(Richard,1988]
Assuming the order cost for the joint order C = Tk.2000/00 and for individual order c
= Tk.1 000/00 and annual holding cost as before, ie. F= 0.17
Economic order interval in years.=
102
To =-v 2(2000+4x 1000) / O. J 7 x 3673000
= 0.138 Years [considering, 365 days a year]
= 50 days.
Maximum Inventory level is calculated by using the following formula.
Ei = Ri To / N + Ri L/ N
Where, Ei = Maximum Inventory level
Ri = annual requirement for item i
To = Economic order interval in years
N = Operating days in the year
L = Lead time
= Ri ( To+ L) / N
Ei = Ri (50+ 10)/365
= Ri / 6
So, the Maximum inventory level is obtained as shown in the following table
103
CHAPTER 7
7.1 INTRODUCTION
Bangladesh is a riverain country and its water transport plays an important role in its
economy. On the other hand with about 700 km coastline Bangladesh has sovereign
right to explore and exploit resources up to 200 NM towards the sea from the basc
line. More than 80% import and export are carried through sea route, as still it is the
cheapest way of communication. So, shipbuilding industry in Bangladesh has still
great importance and sufficient attention is to be given to improve it to certain
standard.
The study was undertaken to m?ke an overview of the present status of KSY and
Business Process Re.engineering (BPR) in KSY. As Business Process Re.engineering
deals with change. But most people dislike having to change. They like to think that
what they are doing is right, and that if they need to change it because they have been
wrong . and nobody likes to think they've been wrong. The' problem remains.
however, that in this fast moving world, old actions frequently fail to.meet new needs.
In nlCt it seems that only time people really like change is either when other people
ch'ange, or when outside circumstances change to the individual's benefit.
It is worth mentioning that KSY is about 49 years old industry. Even though it is a
well laid out yard, whose capabilities are remarkably high. The capacity has gone
down because its machinery and equipment are old, as well as good number of
permanent customers like Khulna newsprint mill, few jute mills, sugar mills,
hardboard mill etc. became sick and closed. So, yearly number of work orders has
bccn rcduccd. However, they arc reliable and still can be used if propcrly maintained.
But, in the past due to ill management, nosedive financial condition and lack of
discipline, the workforce turned into an inefficient, irresponsible and self.controlled
104
group. Moreover, they were locked into an outdated working system, which made
them unsuitable to operate under the present market environment. [Zaman 2000] That
is why KSY was handed over to BN to run it commercially. New management of BN
has definitely brought discipline among the workforce; added. few outmost required
tools, equipment and made the KSY as a profitable organization. Still the great
limitation is that the management of BN does not have the experience of running a
commercial organization. So, it may take longer time to change the overall outlook of
KSY.
However, whatever the longer-term goals may be, re-engineering should be seen as
part of the process through which it is ensured a strong alignment between strategic
direction, business objectives, capabilities, processes, physical infrastructure and
culture. Progress can then be measured through a balance scorecard of performance
measures, which reflect critical aspects of business progress- externai and internal,
financial and non- financial.
105
• 2/3/4 in nO. sliping rail just on the river side,
• Few welding and gas cutting machine,
• Few unskilled welder & gas cutter,
• Electricity supply with local made transformer and open cables,
• One office room of 8ft. xl Oft. size with one manager and one peon.
Cost of production in this type of yards is very less. When the ship owner supplies the
MS Plate then, for one ton of steel the cost of production 'is not more than Taka ten
thousand (10000/00). Another categories of private dockyard are there which have a
good infrastructure and facilities than the stated one like Highspeed shipbuilding,
Ananda Dockyard.
As a result it is seen that every year number of accident occurs in the river route causes
huge lives. On investigation, in most cases the prime fault found is in design. Although
the occurrence is repeating every year, but still no remarkable improvement has been
found. Although KSY is the biggest shipbuilding industry of Bangladesh, but still
there is no record of constructing a single launch by KSY.
inadequate.
c. The yearly workload of KSY is getting stagnant, and remarkable new customers
106
d. The most important asset of any organization is its customer. An organization's
success depends on how many customers it has, how much service they buy,
and how often they buy. Satisfied customers will increase, buy more, and buy
more frequently. So, understanding the customer's needs and expectations IS
essential to winning new business and keeping existing business.
f. Riverside quay walls were broken severely and great threat for KSY was there
due to erosion of river. Renovation of quay walls has been carried out by BN to
protect KSY from erosion of river. Still the yard goes under tidal water in every
monsoon hampering production. Moreover during rainy season due to rain the
production specially welding, cutting of ships hull and other outside works are
hampered.
g. KSY is situated 011 the bank of the river Qazi Bacha, and thc river is severely
affected by the deposition of silt. Two dredgers of KSY are in constant
operation alternatively, especially in front of the slipway, which increases the
cost of production as well.
107
h. Khulna shipyard is runnIng by the directives of Naval Headquarters. BN
officers are holding the top management post of KSY. BN Officers are very
good leaders but they are grown up in defense environment which is not
basically a commercial organization. So, when they are posted on deputation in
KSY. it takes time to understand the technique, policy and calculation of
costing in every step and way of controlling quality with optimum cost. Again
there is a question of adjustment with civilian personnel. So as a whole when
one officer is coming to be in balance he is transferred due to various service
requirement or his personal requirement and another new officer is again
posted. Sometimes frequent transfer of officers also takes place,
k. KSY is trying to participate in all possible tenders to get maximum work orders.
But it is difficult to be the lowest bidder as KSY has huge amount of overhead
cost (about 250%). This overhead cost is determined through a committee every
year. So the work orders per year cannot be optimized, and sometimes-idle
man-hour is produced. Which is one of the problems of increasing profit. In
this connection it is to be added that sometime KSY authority try to bid tenders
even out of their capabilit.y to receive works and complete it by subcontract to
maximize profit.
108
1. To achieve an optimum production rate, the machinery and other accessories
are to be technically appropriate for the purpose and are to be sufficiently
reliable. In view of that Machinery limitations are becoming prominent day by
day, as they are getting old, moreover with changing world the technology is
also changing. For example Lathe bed, chucks wear out. So centering of
jobs/works is carried out in improvised way, which is time consuming and
reduces productivity. On the other hand few private competitors are enjoying
the fruit of the modem machinery.
m. Sometimes tenders are floated to purchase raw materials, equipments, tools etc.
either from local or foreign market. But it is found that only one or two
suppliers are participating in the tender and quoting very high price from which
it becomes difficult to make any choice, as a result fresh tender or re-tender
requires to float. In this way purchase is delayed and production is hampered.
n. Every workshop there is few machineries; equipments and tools, which is not
actually required at present scenario but is in working condition. Again few
machineries; equipments and tools which is beyond economic repair and also
not necessary for the workshop. On the. other hand few new machineries;
equipments and tools felt very essential which has been mentioned in chapter
three.
o. Electric cable: electricity transmission lines are aged more than 47 years. It has
been learned that, several problem already took place in the cables, which
indicates the requirement of replacement of the total transmission lines within
the shipyard. That may not be feasible at a time, due to involvement of huge
budget. Again if any severe defects arise that results major rep8ir / replacement
of the cables then without any preparation that repair works may cause huge
109
loss of production, increase in large amount of idle man hours and liquidity
demurrage to the customers.
p. During handing over of KSY to BN there was allocation of funds for payments
of all dues and liabilities. But no allocation of money was there as working
capital. So it was very difficult for the management to carryout production
works who were there at the initial stage of taken over by BN. Still sometimes
necessary inventory cannot be raised due to required capital, as the payment of
bills by some customers are delayed due to administrative pilferage.
110
should enter into a nonadversarial contract with rcspcct to quality, quantity,
price, delivery method, and terms of payments. [ Besterfield, 200 I]
t. KSY was a state owned company, and most of the rules ®ulations were set
many years back. But the world has been changed a lot, private competitors has
been increased. So market share is decreasing due to few regulatory
inconsistencies and constraints.
111
v. KSY currently procures raw materials on the basis of thumb rule instead of
following any formal method of calculation of lot size, which may not be
economical all the time as discussed about the different inventory costs.'
w. Employee involvement, empowering them, and bringing them into the decision-
making process provides the opportunity for continuous process improvement.
The Manufacturers' Alliance for Productivity and Innovation stated that:
"Organizations that empower employees as part of their total management
effort are twice as likely as other firms to report signilicant product or service
improvement."[ Besterfield, 200 I].
y. KSY was running in very little profit or loss for last many years, so there was
no opportunity of providing incentive bonus scheme to the employees. But
according to the Ministry of industry reference number-Shilpalaa-3/1 5/87/1 30
dated 30-7- 87 there is provision for incentive bonus scheme. KSY was handed
over to BN with huge amount of accumulated loss and still it exists but most
part has been recovered. At present KSY can fulfill up to certain major
percentage of its production target and yearly profit is also significant.
112
section. Many renowned shipyards around the world are practicing similar
system and performing well. A well-equipped ship may have items starting
from simple furniture and end with very high tech equipment. Thus
shipbuilding yard is never a composite factory and has to shop around to get
machinery, high tech equipment and various other materials. [Zaman, 2000].
aa. CBA was disbanded and a labor welfare committee with representatives from
all trades of workers was formed in 2000 to ensure the right and welfare of the
workers on temporary basis. According to the Government circular, the final
decision is to be made regarding CBA activities by discussion among the
Ministry of defense, Ministry of law and Ministry of labor and employment,
which is yet to be linalized.
bb. The cost of MS plate in the world market has gone up to almost double during
last about one year. Again the import tax and other duties arc also sufficiently
high. Elements of a typical structure for tax, Vat, and other related charges for
purchasing machinery, equipment and raw materials from foreign countries are
stated below (where the percentages are based on the C& F value):
.:. Custom Duty ---------------25%
.:. Supplementary custom duty ---------------10%
.:. Insurance ---------------3%
.:. Landing cost ---------------1 %
.:. VAT ---------------15%
113
Moreover the income tax on finished product (selling price) is to be paid
separately. Thesc may be considered a great barrier in flourishing shipbuilding
industries.
The impact of globalization of trade, free market economy and liberalization of trade
has been significant on the industrial sectors in general. On the other hand the state
policy for developing industrial sectors (especially heavy industries) in the country,
r
114
c. Customer satisfaction, not increasing profits, should be the primary goal of the
organization.!t might be the most important consideration, because satisfied
customers will lead to increased profits.
d. Case study and feedback is very essential in case of previous loosing tenders
as, KSY bid in different types of tenders to obtain work order.
f. As the success ofKSY mainly depends on management and that is hold by BN.
So the loss of KSY due to frequent transfer of top management officers may be
evaluated. In this regard BN can think in a bit different way, what is actually
practiced in foreign defense oriented dockyards /shipyards, ie. Carrier planning
offew officers for dockyard & shipyard only.
1. Efforts to be continued to utilize all dead items in the central store held for long
time, if not possible should be disposed off as SOOI1 as possible to reaiize the
unused capital and also make room for new inventory.
115
J. Customer (KSY) and its supplier have limited resources, they must work
together as partners to maximize their return on investment. That can only be
achieved having very good relationship, which is based upon trust, dedication
to common goals and objectives, and an understanding of each other's
expectations and values. That will definitely improve quality, increase
efficiency, lower cost, increase opportunity for innovation, and continuous
improvement of products and services.
1. For commercial necessity logistical linkage or good liaison with at least one
reasonable cost offering steel mill, engme manufacturer, generator
manufacturer, and other prime equipment manufacturer or dealer is essential.
p. Reward scheme for excellent works may be introduced, which will also
116
r. Block modular construction concept (where applicable) may be introduced to
take advantage of down hand welding as well as envi,onmental protection
available at present by ensuring the maximum unit weight within the capacity
of the mobile crane.
efficiency.
v. Necessary steps are essential to replace the total electric cables 111 KSY as
deemed viable by the concerned authority at the earliest.
w. At present context gas generators are much more economical but as there is no
gas supply at KSY so, feasibility of installing diesel generator at the range of
over 2 MW may be carried out to overcome the hampering of production during
power failure/disruption.
117
y. Recruitment of mid level pasonnel as per requirements as nientioned earlier
may be considered.
aa. Jt is felt that the repair works of those ARC Welding Reactor machines arc no
more economical. Those welding machines can be gradually replaced with new
one.
7.4 CONCLUSION
The main objectives of this project work were:
a. Study the current state of Khulna shipyard, along with its business
processes.
b. Identity critical processes for re-engineering.
c. Evaluate the inventory status and policy of KSY.
d. Suggest for re-engineering the processes
118
The total work was developed in different stages and each stage is conclusive in itself.
It is felt that, sooner the re-engineering can be done in Khulna Shipyard is better for
the organization.
119
BIBLIOGRAPHY
I. AI- Maslwri M.and Zaire.(2000) " Revisiting BPR: a holistic review of practice
and development," Business Process Management JournaL VoL6 NO.I,pp 10-
42.
2. Baten, ASMA. Commander, (E), psc, BN, General Manager "Khulna Shipyard
Limited-Its Past And Present", Khulna Shipyard Limited "Sharonika 2000",
pp6-11.
3. Besterfield, Dale H, (2001) "Total Quality Management ",2nd Edition, Pearson
Education, Inc.
4. ColinCoulson-Thomas,( 1994)." Business Process Re-engineering" Kogan
Page Limited, London.
5. Coulson-Thomas, C. (1992), " Transforming the company: Bridging the gap
between management myth and corporate reality." Kogan Page, London.
6. Douglas C. Montgomery (1990),"Introduction to Statistical Quality Control".
Second Edition.
7. Gerard Burke and Joe Peppard, (1995) " Examining Business Process Rc-
engineering" Kogan Page Limited, London
8. Goetsch, David L.and Davis Stanley 8., " Introduction to Total Quality"
Second Edition, 1997.
9. Hammer, M (1990), "Re-engineering work-Don't automate obliterate."
Harvard Business Review, July-August, pp"104-112.
10. Hammer, M.(lIld C/wmpy, J. (1993), "Re-'engineering the corporation: a
manifesto for business revolution", Harper Business, New York, NY.
II. Hares" Uddin, A KM. Commander,(E),psc, BN, General Manager. Khulna
Shipyard Limited " A Commercial Challenge to the Bangladesh Navy,"
"Khulna Shipyard Limited Sharonika 200 I" pp 13-14.
12. Hasin, Dr. M.Ahsan Akhtar, (200 I) " PracticalExamp!es of Quality ManuaL
Procedure, Work Instruction, ISO 9000 Quality Standard",
120
, 13, Hossaifl, Md,Tanvir, (2002),"Application of MRP in industries of Bangladesh:
case of an electronics appliance manufacturing plant". A Master's thesis
submitted to the Department ofIPE, BUET.
14,ISO 9001,Geneva, quality management systems- requirements. International
standard, ISO 9001: Third edition 2000-12-15,Publication of ISO, Geneva,
2000.
15.Jaifl PL, (2001),"Quality Control and Total Quality Management."
18. Majed al- Mashari, Zahir Irani. Zairi, Mohamed. " Business Process Re-
engineering: a survey of international experience."
19. Nick Obolensky (1994) "Practical Business Re-engineering" London, Kogan
Page Limited.
20. QIA (Quality Institute of America) www.qi-a.com
2l.Ricllard J.Tersine (l988),"PRINCIPLES OF inventory AND materials
Management, Third edition, North-Holland Elsevier Science Publishing Co.
22. Talla, Hamdy A.(l996) "Operation Research", Fifth edition.
121