Barrier 65: Technical Data Sheet Application Guide

Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Technical Data Sheet

Application Guide

Approved 26760;26940 1,2 26760 zinc epoxy ^(ValidationDate) 1

Barrier 65

Product description
This is a two component polyamide cured zinc rich epoxy coating. It is a zinc dust containing product. It
conforms to the compositional requirements of SSPC paint 20, level 3. It provides good corrosion protection as
part of a complete coating system. To be used as primer in atmospheric environments. Suitable for carbon steel,
repair of inorganic zinc silicate coating and damaged galvanised steel substrates. This product complies with
ASTM D520 type II zinc dust.

Scope
The Application Guide offers product details and recommended practices for the use of the product.

The data and information provided are not definite requirements. They are guidelines to assist with efficient and
safe use, and optimum service of the product. Adherence to the guidelines does not relieve the applicator of
responsibility for ensuring that the work meets specification requirements.
Jotuns liability is in accordance with general product liability rules.
The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet
(TDS) and Safety Data Sheet (SDS) for all the products used as part of the coating system.

Referred standards
Reference is generally made to ISO Standards. When using standards from other regions it is recommended to
reference only one corresponding standard for the substrate being treated.

Surface preparation
The required quality of surface preparation can vary depending on the area of use, expected durability and if
applicable, project specification.

When preparing new surfaces, maintaining already coated surfaces or aged coatings it is necessary to remove all
contamination that can interfere with coating adhesion, and prepare a sound substrate for the subsequent
product.
Inspect the surface for hydrocarbon and other contamination and if present, remove with an alkaline detergent.
Agitate the surface to activate the cleaner and before it dries, wash the treated area using fresh water.
Paint solvents (thinners) shall not be used for general degreasing or preparation of the surface for painting due
to the risk of spreading dissolved hydrocarbon contamination. Paint thinners can be used to treat small localized
areas of contamination such as marks from marker pens. Use clean, white cotton cloths that are turned and
replaced often. Do not bundle used solvent saturated cloths. Place used cloths into water.
When the surface is an existing coating, verify with technical data sheet and application guide of the involved
products, both over coatability and the given maximum over coating interval.

Process sequence

Surface preparation and coating should normally be commenced only after all welding, degreasing, removal of
sharp edges, weld spatter and treatment of welds is complete. It is important that all hot work is completed
before coating commences.

Soluble salts removal


Soluble salts have a negative impact on the coating systems performance, especially when immersed. Jotun's
general recommendations for maximum soluble salts (sampled and measured as per ISO 8502-6 and -9)
content on a surface are:
For areas exposed to (ISO 12944-2):
C1-C4: 200 mg/m²
C5: 100 mg/m²

Date of issue: 9 November 2018 Page: 1/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.
Application Guide
Barrier 65

Carbon steel
Initial rust grade

The steel shall preferably be Rust Grade A or B (ISO 8501-1). It is technically possible to apply the coating to
rust grades C and D, but it is practically challenging to ensure specified film thickness on such a rough surface,
hence risk of reduced lifetime of the coating system. When steel of Rust Grade C or D is coated, the frequency of
inspection and testing should be increased.

Metal finishing

Surface preparation and coating should normally be commenced only after all metal finishing and degreasing of
a specific area is complete. It is important as much hot work as possible is completed before coating commences.
For areas in corrosivity category C1 to C4 (ISO 12944-2) all irregularities, burrs, slivers, slag and spatter on
welds, sharp edges and corners shall conform to minimum grade P2 (ISO 8501-3) Table 1, or as specified. All
edges shall have a rounded radius of minimum 2 mm subjected to three pass grinding or equally effective
method. For areas in corrosivity category C5 the requirement is conformance to grade P3 (ISO 8501-3) Table 1.
Defective welds shall be replaced and treated to an acceptable finish before painting. Temporary welds and
brackets shall be ground to a flat finish after removal from the parent metal.

Abrasive blast cleaning

Cleanliness

After pre-treatment is complete, the surface shall be dry abrasive blast cleaned to Sa 2½ (ISO 8501-1) using
abrasive media suitable to achieve a sharp and angular surface profile.

Surface profile

Recommended surface profile 30-85 µm, grade Fine to Medium G (ISO 8503-2).

Dust contamination

At the completion of abrasive blasting the prepared surface shall be cleaned to remove residues of corrosion
products and abrasive media, and inspected for surface particulate contamination. Maximum contamination level
is rating 2 (ISO 8502-3). Dust size no greater than class 2.

Hand and Power Tool Cleaning

Power tool cleaning

Minor damage of the coating may be prepared to St 3 (ISO 8501-1). Suitable method is disc grinding with rough
discs only. Ensure the surface is free from mill scale, residual corrosion, failed coating and is suitable for painting.
The surface should appear rough and mat. Overlapping zones to intact coating shall have all leading edges
feathered back by sanding methods to remove all sharp leading edges and establish a smooth transition from
the exposed substrate to the surrounding coating. Consecutive layers of coating shall be feathered to expose
each layer and new coating shall always overlap to an abraded existing layer. Abrade intact coatings around the
damaged areas for a minimum 100 mm to ensure a mat, rough surface profile, suitable for over coating.
Mechanical repairs are only accepted for minor areas of damage where abrasive blasting is expected to create
more damage to the coating system than actual benefit to the performance of the coating system.

Water jetting

If the coating has previously been abrasive blasted a hydrojetted is a suitable surface preparation for this
product. This product is suitable for DC A, DC B and DC C surfaces prepared to Wa 2½ (ISO8501-4). For DP Z
surface Wa 2 is accepted. Maximum accepted grade of flash rust is FR L.

Galvanised steel
This product is not intended for full over coating of galvanised surfaces or inorganic zinc coated surfaces.
However, for damages of the surface to bare metal the following surface preparation should be carried out
before applying this product to the damaged area:
Remove all rust, loose paint, grease or other contaminants by using one of the above approved surface
preperations for carbon steel. Feather edges of surrounding intact galvanised or inorganic zinc coated surface
and over coat with this product to the edge of the feathering.

Date of issue: 9 November 2018 Page: 2/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.
Application Guide
Barrier 65

Coated surfaces

Shop primers

Shop primers are accepted as temporary protection of steel plates and profiles. Refer to the technical data sheet
for the generic types accepted. Certain standards require pre-approval of the shop primer as part of a complete
system. Contact your nearest Jotun office for specific system compatibility. Before being overcoated the shop
primer must be fully cured, clean, dust free, dry and undamaged. Inorganic zinc shop primers must be free of
zinc salts (white rust). Corroded and damaged areas must be blast cleaned to minimum Sa 2½ (ISO 8501-1).

Inorganic zinc silicates

This product may be used to repair damages on an inorganic zinc silicate surface. Surface preparation as
described under the section of galvanised steel.

Application
Acceptable environmental conditions - before and during application
Before application, test the atmospheric conditions in the vicinity of the substrate for the dew formation
according to ISO 8502-4.

Air temperature -5 - 60 °C
Substrate temperature -5 - 60 °C
Relative Humidity (RH) 10 - 85 %

The following restrictions must be observed:

• Only apply the coating when the substrate temperature is at least 3 °C (5 °F) above the dew point
• Do not apply the coating if the substrate is wet or likely to become wet
• Do not apply the coating if the weather is clearly deteriorating or unfavourable for application or curing
• Do not apply the coating in high wind conditions

Product mixing

Product mixing ratio (by volume)

Barrier 65 Comp A 4.5 part(s)


Barrier 65 Comp B 1 part(s)

Induction time and Pot life

Paint temperature 23 °C

Pot life 2.5 h

The temperature of base and curing agent is recommended to be 18 °C or higher when the product is mixed.

Thinner/Cleaning solvent

Date of issue: 9 November 2018 Page: 3/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.
Application Guide
Barrier 65

Thinner: Jotun Thinner No. 17

Application data

Spray application

Airless Spray Equipment

Pump ratio (minimum) : 42:1


Pressure at nozzle (minimum) : 150 bar / 2100 psi
Nozzle tip (inch/1000) : 15-21
Nozzle output (litres/minute) : 0.9-1.9
Filters (mesh) : 70

Several factors influence, and need to be observed to maintain the recommended pressure at the nozzle. Among
factors causing pressure drop are:
- extended hoses or hose bundles
- extended hose whip-end line
- small internal diameter hoses
- high paint viscosity
- large spray nozzle size
- inadequate air capacity from compressor
- incorrect or clogged filters

Film thickness per coat


Typical recommended specification range

Dry film thickness 50 - 100 μm


Wet film thickness 75 - 150 μm
Theoretical spreading rate 13.2 - 6.6 m²/l

Film thickness measurement


A zinc epoxy should be applied in a smooth and even film. Too rough film could give risk of popping when the
subsequent coat is applied. Film thickness exceeding recommended maximum may cause mud cracking and
poor film integrity.

Wet film thickness (WFT) measurement and calculation

To ensure correct film thickness, it is recommended to measure the wet film thickness continuously during
application using a painter's wet film comb (ISO 2808 Method 1A). Use a wet-to-dry film calculation table to
calculate the required wet film thickness per coat.
A wet to dry film thickness chart is available on the Jotun Web site.

Dry film thickness (DFT) measurement

When the coating has cured to hard dry state the dry film thickness can be checked to SSPC PA 2 or equivalent
standard using statistical sampling to verify the actual dry film thickness. Measurement and control of the WFT
and DFT on welds is done by measuring the wet and dry film thickness adjacent to and no further than 15 cm
from the weld.

Ventilation

Sufficient ventilation is very important to ensure proper drying/curing of the film.

Date of issue: 9 November 2018 Page: 4/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.
Application Guide
Barrier 65

Stripe coating

The stripe coat sequence can be either of the following:


1. Surface preparation, stripe coat, full coat.
2. Surface preparation, full coat, stripe coat. This sequence can be used when a large substrate area has been
prepared and leaving the substrate exposed for a long time while doing stripe coating could lead to surface
deterioration. It is important to pay special attention to edges, openings, rear sides of stiffeners, scallops etc.
and to apply a stripe coat to these areas where the spray fan may not reach or deposit an even film.
When applying a stripe coat to bare metal use only a stiff, round stripe coating brush to ensure surface wetting
and filling of pits in the surface. Stripe coating shall be of a different colour to the main primer coat and the
topcoat colour and should be applied in an even film thickness, avoiding excessive brush marks in order to avoid
entrapped air. Care should be taken to avoid excessive film thickness. Pay additional attention to pot life during
application of stripe coats. Jotun recommends a minimum of one stripe coat. However, in extremely aggressive
exposure conditions there may be good reason to specify two stripe coats.

Coating loss

The consumption of paint should be controlled carefully, with thorough planning and a practical approach to
reducing loss. Application of liquid coatings will result in some material loss. Understanding the ways that
coating can be lost during the application process, and making appropriate changes, can help reducing material
loss. Some of the factors that can influence the loss of coating material are:
- type of spray gun/unit used
- air pressure used for airless pump or for atomization
- orifice size of the spray tip or nozzle
- fan width of the spray tip or nozzle
- the amount of thinner added
- the distance between spray gun and substrate
- the profile or surface roughness of the substrate. Higher profiles will lead to a higher "dead volume"
- the shape of the substrate target
- environmental conditions such as wind and air temperature

Drying and Curing time


Substrate temperature -5 °C 0 °C 10 °C 23 °C 40 °C

Surface (touch) dry 2h 45 min 15 min 10 min 5 min


Walk-on-dry 28 h 12 h 4h 2h 1h
Dry to over coat, minimum 28 h 12 h 4h 2h 1h
Dried/cured for service 14 d 10 d 5d 3d

Drying and curing times are determined under controlled temperatures and relative humidity below 85 %, and
at average of the DFT range for the product.

Surface (touch) dry: The state of drying when slight pressure with a finger does not leave an imprint or reveal
tackiness.

Walk-on-dry: Minimum time before the coating can tolerate normal foot traffic without permanent marks,
imprints or other physical damage.

Dry to over coat, minimum: The recommended shortest time before the next coat can be applied.

Dried/cured for service: Minimum time before the coating can be permanently exposed to the intended
environment/medium.

Date of issue: 9 November 2018 Page: 5/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.
Application Guide
Barrier 65

Maximum over coating intervals


Maximum time before thorough surface preparation is required. The surface must be clean and dry and suitable
for over coating. Inspect the surface for chalking and other contamination and if present, remove with an
alkaline detergent. Agitate the surface to activate the cleaner and before it dries, wash the treated area by low-
pressure water jetting to Wa 1 (ISO 8501-4) using fresh water.

If maximum over coating interval is exceeded the surface should in addition be carefully roughened to ensure
good inter coat adhesion.

Areas for atmospheric exposure


Average temperature during -5 °C 0 °C 10 °C 23 °C 40 °C
drying/curing

epoxy 3 mth 2 mth 1.5 mth 1 mth 7d


epoxy mastic 3 mth 2 mth 1.5 mth 1 mth 7d
polyurethane 10 d 7d 6d 5d 2d
acrylic 3d 1d 20 h 16 h 4h

Other conditions that can affect drying / curing / over coating

Repair of coating system

Damages to the coating layers:


Prepare the area through sandpapering or grinding, followed by thorough washing. When the surface is dry the
coating may be over coated by itself or by another product, ref. original specification.
Always observe the maximum over coating intervals. If the maximum over coating interval is exceeded the
surface should be carefully sanded removing the top of the surface followed by thorough fresh water washing in
order to remove zinc salts. Alternatively the surface can be abrasive swept.

Damages exposing bare substrate:


Remove all rust, loose paint, grease or other contaminants by spot blasting, mechanical grinding, water and/or
solvent washing. Feather edges and roughen the overlap zone of surrounding intact coating. Apply the coating
system specified for repair.

Repair of damaged areas

Sags and runs can be caused by too high wet film thickness, too much thinner added or the spray gun used too
close to the surface.
Repair by using a paint brush to smooth the film when still wet.
Sand down to a rough, even surface and re-coat if the coating is cured.
Dry spray can be caused by poor atomization of the paint, spray gun held too far from the surface, high air
temperature, thinner evaporating too fast or coating applied in windy conditions.
Sand down to a rough even surface and re-coat.

Quality assurance
The following information is the minimum required. The specification may have additional requirements.

- Confirm that all welding and other metal work has been completed before commencing pre-treatment and
surface preparation
- Confirm that installed ventilation is balanced and has the capacity to deliver and maintain the RAQ
- Confirm that the required surface preparation standard has been achieved and is held prior to coating
application
- Confirm that the climatic conditions are within recommendations in the AG, and are held during the application
- Confirm that the required number of stripe coats have been applied
- Confirm that each coat meets the DFT requirements in the specification
- Confirm that the coating has not been adversely affected by rain or other factors during curing

Date of issue: 9 November 2018 Page: 6/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.
Application Guide
Barrier 65

- Observe that adequate coverage has been achieved on corners, crevices, edges and surfaces where the spray
gun cannot be positioned so that its spray impinges on the surface at 90° angle
- Observe that the coating is free from defects, discontinuities, insects, abrasive media and other contamination
- Observe that the coating is free from misses, sags, runs, wrinkles, fat edges, mud cracking, blistering, obvious
pinholes, excessive dry spray, heavy brush marks and excessive film build
- Observe that the uniformity and colour are satisfactory

All noted defects shall be fully repaired to conform to the coating specification.

Caution
This product is for professional use only. The applicators and operators shall be trained, experienced and have
the capability and equipment to mix/stir and apply the coatings correctly and according to Jotun's technical
documentation. Applicators and operators shall use appropriate personal protection equipment when using this
product. This guideline is given based on the current knowledge of the product. Any suggested deviation to suit
the site conditions shall be forwarded to the responsible Jotun representative for approval before commencing
the work.
For further advice please contact your local Jotun office.

Health and safety


Please observe the precautionary notices displayed on the container. Use under well ventilated conditions. Do
not inhale spray mist. Avoid skin contact. Spillage on the skin should immediately be removed with suitable
cleanser, soap and water. Eyes should be well flushed with water and medical attention sought immediately.

Accuracy of information
Always refer to and use the current (last issued) version of the TDS, SDS and if available, the AG for this
product. Always refer to and use the current (last issued) version of all International and Local Authority
Standards referred to in the TDS, AG & SDS for this product.

Colour variation
Some coatings used as the final coat may fade and chalk in time when exposed to sunlight and weathering
effects. Coatings designed for high temperature service can undergo colour changes without affecting
performance. Some slight colour variation can occur from batch to batch. When long term colour and gloss
retention is required, please seek advice from your local Jotun office for assistance in selection of the most
suitable top coat for the exposure conditions and durability requirements.

Reference to related documents


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet
(TDS) and Safety Data Sheet (SDS) for all the products used as part of the coating system.

When applicable, refer to the separate application procedure for Jotun products that are approved to
classification societies such as PSPC, IMO etc.

Symbols and abbreviations


min = minutes TDS = Technical Data Sheet
h = hours AG = Application Guide
d = days SDS = Safety Data Sheet
°C = degree Celsius VOC = Volatile Organic Compound
° = unit of angle MCI = Jotun Multi Colour Industry (tinted colour)
µm = microns = micrometres RAQ = Required air quantity
g/l = grams per litre PPE = Personal Protective Equipment
g/kg = grams per kilogram EU = European Union
m²/l = square metres per litre UK = United Kingdom
mg/m² = milligrams per square metre EPA = Environmental Protection Agency
psi = unit of pressure, pounds/inch² ISO = International Standards Organisation
Bar = unit of pressure ASTM = American Society of Testing and Materials
RH = Relative humidity (% RH) AS/NZS = Australian/New Zealand Standards
UV = Ultraviolet NACE = National Association of Corrosion Engineers
DFT = dry film thickness SSPC = The Society for Protective Coatings

Date of issue: 9 November 2018 Page: 7/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.
Application Guide
Barrier 65

WFT = wet film thickness PSPC = Performance Standard for Protective Coatings
IMO = International Maritime Organization
ASFP = Association for Specialist Fire Protection

Disclaimer
The information in this document is given to the best of Jotun's knowledge, based on laboratory testing and
practical experience. Jotun's products are considered as semi-finished goods and as such, products are often
used under conditions beyond Jotun's control. Jotun cannot guarantee anything but the quality of the product
itself. Minor product variations may be implemented in order to comply with local requirements. Jotun reserves
the right to change the given data without further notice.

Users should always consult Jotun for specific guidance on the general suitability of this product for their needs
and specific application practices.

If there is any inconsistency between different language issues of this document, the English (United Kingdom)
version will prevail.

Date of issue: 9 November 2018 Page: 8/8

This Application Guide supersedes those previously issued.


The Application Guide (AG) must be read in conjunction with the relevant specification, Technical Data Sheet (TDS) and Safety
Data Sheet (SDS) for all the products used as part of the coating system.
For your nearest local Jotun office, please visit our website at www.jotun.com.

You might also like