Time Schedule Program Pamsimas: NO. Uraian Pekerjaan Biaya (RP.) BOBOT (%)
Time Schedule Program Pamsimas: NO. Uraian Pekerjaan Biaya (RP.) BOBOT (%)
Time Schedule Program Pamsimas: NO. Uraian Pekerjaan Biaya (RP.) BOBOT (%)
Desa : Masoso
Kecamatan : Bambang
Kabupaten : Mamasa
Propinsi : Sulawesi Barat
2 PEMBANGUNAN BAK RESERVOAR Rp 51,008,000.00 13.41% 2.68% 2.68% 2.68% 2.68% 2.68%
3 PEMBANGUNAN KRAN UMUM (KU) Rp 13,752,000.00 3.61% 0.72% 0.72% 0.72% 0.72% 0.36% 0.36%
4 PEKERJAAN PENGADAAN PIPA + ACCESSORIES PIPA Rp 170,330,000.00 44.77% 4.48% 17.91% 17.91% 4.48%
6 PEKERJAAN JEMBATAN PIPA Rp 4,846,000.00 1.27% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13% 0.13%
B SARANA SANITASI
2 PEMBANGUNAN SARANA CUCI TANGAN (SCT) Rp 14,504,000.00 3.81% 0.95% 0.95% 0.95% 0.95%
C KESEHATAN
1 KEGIATAN KESEHATAN Rp 11,660,000.00 3.07% 0.61% 1.53% 0.92%
D KELEMBAGAAN
1 PENINGKATAN KELEMBAGAAN Rp 4,536,000.00 1.19% 0.24% 0.36% 0.60%
E ADMINISTRASI PROYEK
1 BIAYA OPERASIONAL KKM/BKM/LKM & SATLAK Rp 14,000,000.00 3.68% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.23% 0.00%
Rp 380,421,000 100.00%
Jumlah Bobot 0.47% 6.54% 25.82% 28.24% 13.76% 4.68% 4.68% 5.63% 4.72% 1.67% 1.67% 0.36% 0.36% 0.36% 0.83% 0.23%
Total Bobot Rencana 0.47% 7.01% 32.82% 61.06% 74.82% 79.50% 84.18% 89.81% 94.53% 96.20% 97.87% 98.23% 98.59% 98.94% 99.77% 100.00%
Realisasi Progress 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Deviasi Progress 0.47% 7.01% 32.82% 61.06% 74.82% 79.50% 84.18% 89.81% 94.53% 96.20% 97.87% 98.23% 98.59% 98.94% 99.77% 100.00%
Rp 36,146,000.00