Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Capital Builders 2: Project: Location

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

2 Capital Builders

BAR BENDING SCHEDULE


Project: Construction of Warehouse for TB,HIV & Malaria Programs at NIH, Islamabad.
Consultant National Engineering Services Pakistan (Pvt)Ltd. (NESPAK)
Location: BBS of Columns Top of Footing to upto 2nd Lap Dated: 15-11-19

Length in Rft
S. Ø Total Cut Length
Description Nos of Bars Grade 40 Grade 60 J Shape
No Bar Nos (Ft)
#3 #4 #5 #6 #8

C-1a(24''x24'') - - - -

Dowels from top of foooting


1 #8 1 x 6 x 12 72 15' - 8.5'' - - - 1,130.40
to upto 2nd lap

Dowels from top of foooting


1 #6 1 x 6 x 8 48 13' - 3'' - - 636.48
to upto 2nd lap

T2 (outer)P.beam area @ 9''


2 #3 1 x 6 x 6 36 7' - 6'' 270.00 - -
c/c

T2 (inner)P.beam area @ 9''


3 #3 1 x 6 x 12 72 5' - 1'' 365.76 - -
c/c both ways

18

T1 (outer)from +0'-0'' to
4 #3 1 x 6 x 13 78 7' - 6'' 585.00 - -
upto 2nd lap lenth @ 6'' c/c

T1 (inner)from +0'-0'' to
5 upto 2nd lap lenth both #3 1 x 6 x 26 156 5' 1'' 792.48
ways @ 6'' c/c

C-1b (24''x24'')

Dowels from top of foooting


6 #8 1 x 36 x 8 288 15' 8.5'' 4,521.60
to upto 2nd lap

Dowels from top of foooting


7 #6 1 x 36 x 12 432 13' 3'' 5,728.32
to upto 2nd lap

T2 (outer)P.beam area @ 9''


8 #3 1 x 36 x 6 216 7' 6'' 1,620.00
c/c

T2 (inner)P.beam area @ 9''


9 #3 1 x 36 x 13 468 5' 1'' 2,377.44
c/c both ways

T1 (outer)from +0'-0'' to
10 #3 1 x 36 x 13 468 7' 6'' 3,510.00
upto 2nd lap lenth @ 6'' c/c

T1 (inner)from +0'-0'' to
11 upto 2nd lap lenth both #3 1 x 36 x 26 936 5' 1'' 4,754.88
ways @ 6'' c/c
C-1c (24''x24'')

Dowels from top of foooting


12 #6 1 x 50 x 24 1200 13' 6'' 16,212.00
to upto 2nd lap

T3 (outer) for 42 columns


13 from lap lenth to bottom of #3 1 x 42 x 11 462 7' 6'' 3,465.00
P.B @ 6'' c/c

T3 (inner) for 42 columns


14 from lap lenth to bottom of #3 1 x 42 x 22 924 5' 4'' 4,934.16
P.B @ 6'' c/c

15 T2 (outer) @ 9'' c/c #3 1 x 50 x 3 150 7' 6'' 1,125.00

T2 (inner)both ways @ 9''


16 #3 1 x 50 x 6 300 5' 4'' 1,602.00
c/c

T1 (outer)from +0'-0'' to
17 #3 1 x 50 x 8 400 7' 6'' 3,000.00
upto 2nd lap lenth @ 6'' c/c

T1 (outer)from +0'-0'' to
#3 1 x 50 x 16 800 5' 4'' 4,272.00
upto 2nd lap lenth @ 6'' c/c

C-2a (21''x21'')

Dowels from top of foooting


19 #6 1 x 6 x 16 96 13' 6'' 1,296.96
to upto 2nd lap

T3 (outer) from lap lenth to


20 #3 1 x 6 x 10 60 7' 6'' 450.00
bottom of P.B @ 6'' c/c

T3 (inner) from lap lenth to


21 bottom of P.B both ways @ #3 1 x 6 x 20 120 5' 8'' 679.20
6'' c/c

22 T2 (outer) @ 9'' c/c #3 1 x 6 x 3 18 7' 6'' 135.00

23 T2 (inner) @ 9'' c/c #3 1 x 6 x 6 36 5' 8'' 203.76

T1 (outer)from +0'-0'' to
24 #3 1 x 6 x 8 48 7' 6'' 360.00
upto 2nd lap lenth @ 6'' c/c

T1 (inner)from +0'-0'' to
25 upto 2nd lap lenth both #3 1 x 6 x 16 96 5' 8'' 543.36
ways @ 6'' c/c
C-2b (21''x21'')

Dowels from top of foooting


26 #6 1 x 82 x 16 1312 13' 6'' 17,725.12
to upto 2nd lap

T3 (outer) from lap lenth to


27 #3 1 x 82 x 18 1476 7' 6'' 11,070.00
bottom of P.B @ 6'' c/c

T3 (inner) from lap lenth to


28 bottom of P.B both ways @ #3 1 x 82 x 36 2952 5' 8'' 16,708.32
6'' c/c

29 T2 (outer) @ 9'' c/c #3 1 x 82 x 3 246 7' 6'' 1,845.00

30 T2 (inner) @ 9'' c/c #3 1 x 82 x 6 492 5' 8'' 2,784.72

T1 (outer)from +0'-0'' to
31 #3 1 x 82 x 8 656 7' 6'' 4,920.00
upto 2nd lap lenth @ 6'' c/c

T1 (inner)from +0'-0'' to
32 #3 1 x 82 x 16 1312 5' 8'' 7,425.92
upto 2nd lap lenth @ 6'' c/c

C-3 (9''x18'')

Dowels from top of foooting


33 #5 1 x 2 x 8 16 13' 8'' 218.72
to upto 2nd lap

T3 (outer) from lap lenth to


34 #3 1 x 2 x 13 26 4' 0'' 104.00
bottom of P.B @ 4.5'' c/c

T3 (inner) from lap lenth to


35 #3 1 x 2 x 13 26 2' 6'' 65.00
bottom of P.B @ 4.5'' c/c

36 T2 (inner) in beam @ 9'' c/c #3 1 x 2 x 5 10 2' 6'' 25.00

T2 (outerer) in beam @ 9''


37 #3 1 x 2 x 5 10 4' 0'' 40.00
c/c

T1 (outer)from +0'-0'' to
38 upto 2nd lap lenth @ 4.5'' #3 1 x 2 x 8 16 4' 0'' 64.00
c/c

T1 (outer)from +0'-0'' to
39 upto 2nd lap lenth @ 4.5'' #3 1 x 2 x 8 16 2' 6'' 40.00
c/c
C-4 (9''x18'')

Dowels from top of foooting


40 #5 1 x 2 x 8 16 13' 8'' 218.72
to upto 2nd lap

T3 (outer) from lap lenth to


41 #3 1 x 2 x 12 24 4' 0'' 96.00
bottom of P.B @ 4.5'' c/c

T3 (inner) from lap lenth to


42 #3 1 x 2 x 12 24 2' 6'' 60.00
bottom of P.B @ 4.5'' c/c

43 T2(outer) @ 9'' c/c #3 1 x 2 x 5 10 4' 0'' 40.00

44 T2(inner) @ 9'' c/c #3 1 x 2 x 5 10 2' 6'' 25.00

T1 (outer)from +0'-0'' to
45 upto 2nd lap lenth @ 4.5'' #3 1 x 2 x 9 18 4' 0'' 72.00
c/c

T1 (inner)from +0'-0'' to
46 upto 2nd lap lenth @ 4.5'' #3 1 x 2 x 9 18 2' 6'' 45.00
c/c

Total Length 80,478.00 - 437.44 41,598.88 5,652.00 G-40

Prepared by : Weight Per Rft Kg 0.170 0.302 0.473 0.681 1.210 13.681

Weight Kg 13,681.26 - 206.91 28,328.84 6,838.92 G-60


35.375
Grade G-40 G-60
TON
Approved By : Total Weight Kg 13,681.26 35,374.67
2 Capital Builders
BAR BENDING SCHEDULE
Project: Construction of Warehouse for TB,HIV & Malaria Programs at NIH, Islamabad.
Consultant: NESPAK
Summary Of Steel Date._30/10/19_
Length in Rft
S.
Description Grade 40 Grade 60
No
#3 #4 #5 #6 #8
1 Footings Drwg. 3948/323/c/02G02 177.67 36759.45 58750.8
2 Columns Drwg. 3948/323/c/02G03 4793.06 76.38 13512.42 3954

Total weight in Kgs 4793.06 177.67 36835.83 72263.22 3954


Grand Total Weight 4793.06 113230.72

Prepared By._______________ Verified By._______________

You might also like