Site Visit Shah
Site Visit Shah
Site Visit Shah
CONVOCATIONAL HALL
EAT357
CONSTRUCTION MANAGEMENT
The project that we visited is located at Universiti Malaysia Perlis campus Pauh Putra.
This convocational hall started at 30 October 2017 and expected to be completed by
September 2019 but this project delayed about 70 days because not enough worker and will
complete by February 2020. This project cost approximately RM26.5 Million. The size of
this convocational hall is around 50m x 60m and can enter 3000-4000 capacity. The height of
this convocational hall is 22m. This project have complete 60% and 40% is not complete.
This project use 95% conventional system and 5% IBS system.
DETAILS OF CONTRACT:
BUILDING WORKS
• MAIN HALL BLOCK
• MAIN SUPPLY BASE HOUSE
• PUMP HOUSE
• CHILLER ROOM
EXTERNAL WORK
INTERNAL COLD WATER SUPPLY
SYSTEM
PRIME COST