Intermediate Well Control Equipment Inspection Criteria

Equipment Group : Choke line Coflexip type hose


Drilling Contractor :
Rig Unit Number – Contractor :
Rig Unit Number – PDO :
Present Well Location :
Date

Choke line Coflexip type hose ( Yearly )


Make/Brand :
Type :
Serial Number :
Pressure rating
H2S resistance:
Fire resistance :
Year of Manufacturing
Date into first service
When : Conducted by :
Last Major Maintenance
Last Intermediate Maintenance
Note :
1. No heating, welding, or cutting is allowed on any part of this equipment.
2. Welding repair work to be certified by 3rd party.
3. 3rd party is required for NDT, US and pressure testing.
4. PTW is required for pressure tests in the field.
5. Hammer unions to be inspected as per EP 2006-5393
6. When hard-piped choke line is used the hard-pipe inspection criteria are applicable
Visual Correct / Comments
Inspection Done ?
YES NO
1 Disconnect from attached equipment
2 Flush complete unit and clean outside surface
by HP Gun
3 Carry out visual external inspection of hose,
check for any deformation of the body.
4 Check Hammer unions (Ref EP 2006-5393) or
flanges and sealing areas
5 Carry out visual and physical (calliper)
internal check of end connections and liner for
damages, corrosion and erosion.
6 Check flanges and ring groves
7 Touch up coating if damaged
8 Check safety clamp condition and position
(around hose)
9 Carry out pressure test to full WP

Well Control Equipment Intermediate Inspection: Choke line Coflexip type Generated by : WCF
Page 1 of 2
Hammer Union
Note : ref: EP 2006-5393

Visual Correct / Comments


Inspection Done ?
YES NO
1 Visual and dimensional check of male wing
half
2 Visual and dimensional check of female union
thread half
3 Visual and dimensional check male hub
4 Visual and dimensional check of segment

All above Name : Company : Date : Signature :


Inspections &
Tests conducted
by :
(Authorized Third
Party Inspection
Company)
Agreed by :
(Contractor Rig
Manager)
Verified by :
(PDO Site
Representative)
Authorized by :
(Contractor DS)
Seen by :
(PDO SWE)

Well Control Equipment Intermediate Inspection: Choke line Coflexip type Generated by : WCF
Page 2 of 2

You might also like