Apollo 5 Mission Report
Apollo 5 Mission Report
Apollo 5 Mission Report
HOUSTON, TEXAS
MARCH 1968
• ° • • • ° ° °
°°,°•.•
• . ......
• . , • • . ,
° .......
• • .....
o.o .....
• . • .....
APOLLO SPACECRAFT FLIGHT HISTORY
AS-101 BP-13 Nominal launch and May 28, 1964 Cape Kennedy,
exit environment Fla.
AS-102 BP-15 Nominal launch and Sept. 18, 1964 Cape Kennedy,
exit environment Fla.
PA-2 BP-23A Second pad abort June 29, 1965 White Sands
Missile Range,
N. Mex.
A_prove_
by:__ _ _,_r---
George MI Low
_-_7
Manager
Apollo Spacecraft Program
HOUSTON, TEXAS
iii
CONTENTS
Section Page
TABLES ........................ ix
FIGURES ....................... xi
Section Page
Section Page
Section Page
Section Page
Section Page
TABLES
Table Page
f
X
Table Page
FIGURES
Figure Page
Figure Page
xiii
Figure Page
Figure Page
Figure Page
Figure Page
Figure Page
Figure Page
Figure Page
Figure Page
Figure Page
amps amperes
D down firing
dB decibel
dBm decibels
deg degree
o F degree Fahrenheit
f xxiii
o R degree Rankine
E East
F force
f fore/aft firing
fd doppler frequency
fig. figure
FM Frequency Modulation
ft feet
ft 3 cubic feet
hr hour
i
xxiv -
in. inch
k kilo-, ]000
ib pounds
lh-sec pound-seconds
LH 2 liquid hydrogen
LM Lunar Module
M mega-, 1,000,000
m milli-, 0.0001
min minute
msec millisecond
XXV
N North
N2H 4 hydrazine
n. mi nautical mile
P chamber pressure
c
PM phase modulation
q dynamic pressure
R radius
f
xxvi
rad radian
ref. reference
RF radio frequency
s side firing
sec seconds
T time of lift-off
U up firing
v volts
xxvii
V ac volts
X, Y, Z axes
angle of attack
AV change in velocity
I--
i-i
i. 0 SUMMARY
Midway through the third revolution, the first descent engine firing
was initiated. The planned duration of this firing was 38 seconds; how-
ever, after only 4 seconds, the guidance system shut down the engine.
Both the guidance system and the propulsion system operated properly, and
the premature shutdown resulted from incomplete systems coordination.
After the first ascent engine firing, the primary control system was
reselected to control the spacecraft attitudes and rates. Because the
primary system had been passive during the abort staging sequence, the
computer program did not reflect the change of mass resulting from stag-
ing. Therefore, computations of control engine firing times were based
on the mass of a two-stage vehicle and resulted in an extremely high pro-
pellant usage by the control engines, eventually causing propellant
1-2
The overall performance of the lunar module was good and met all
requirements for manned orbital flight. All operational systems were
successfully verified, and the abort staging sequence was demonstrated.
r
2-1
I
Mission elapsed time_ |
Event hr:min:sec I
Planned Actual t
Launch Phase
Orbital Phase
Planned Actual
Planned Actual
Planned
_1 Abort
staging I EZZ7-1
/ Second First [ Iascent [
--4 descent ascent _--4 enqine I= _ Extended
|engine engine I Ima-neuver I ---- mlsslon
(38-sec) I maneuver _laneuverl Irma _.... _I activity
I
j Ic734-sec)
CS-sec,
J_
(22:48:08['--=I Lunar module/l'---1Maneuver to Initiate first
G.m.t. I IS-r_Bstage
I Ic°ld-s°ak descent
Jan. 22, _ separation _ attitude engine
1968) J I I I maneuver
I
End first
ldescent engineI ISecond
.
descentl
. .
I Abort staging ] I
I [-----[eng,ne f,nng _ Third descent t Firstascentll Second ascent
i___s%_,
er i l_-sec, i leng'nef'r'ng
(28-sec) engine firingF"_
(60-sec) I I engine firing
-- CYI
-- -- RKV
i -- 00:30:00 --01:30:00
-- -- BDA
CSQ
"_ , 00:53:50
00:53;55 First separatio_
Primary S-band onfiring on
-- 00:53:56 LM/S-IEB separation --
00:54:00 First separation firing off
00:54:05 Second separation firing on
00:54:10 Second separation firing off
00:54:52 Maneuver to cold-soak
-- -- 01:00:00 attitude -- --02:00:00
,_ • Ground command
(a) 00:00:00 to 02:00:00.
NASA-S-68- 1924
Rev Time Rev Time
--
I2
TEX
MIL
BDA
-- CSQ
-- CRO
2 -- 02:30:00 -- @3:30:00
CSO
-- -- 03:55:10 Initiate maneuver to descent
CRO engine firing attitude
j/05:59:34 +X translation on
RKV _ _ 03:59:42 Descent engine start for
-- -- 03:00:00 -- --04:00:00103,59 • •42 +X
first translation
firing off
-_ Ground command /k03159146 Descent engine shutdown
(b) 02;00:00 to 04:00:00,
Figure2-2.- Continued.
_f
TEX
-- MIL
BDA
-- ANT
f
2-10
NASA-S-68- 1926
Rev Time Rev Time
ASC
C_t06:21:56 C°ntr°l
depleted
engine system Bfuel
I,,06:22:20 Control engine system B
oxidizer depleted
_ 06:30:00 -- -- 07:00:00
2-11
NASA-S-68- 1927
Rev Time Rev Time
--07:00:00 -- --07:30:00
-- CRO -- HAW
oxidizer depleted
i07:50:03 Second ascent engine
,Jl firing thrust decay
-- -- |107:52:10 Final communication with
Ix ascent stage
/
------ 07:230:00 I08:00:00
Ground command
(e) 07:00:00 to 08:00:00.
3-1
The earth model for all trajectories and analyses of the trackers
contained geodetic and gravitational constants representing the Fischer
ellipsoid. The state vectors for the events are based on results from
the orbital analysis in section 3.2. These vectors are _n the Geographic
Coordinate system defined in table 3-1. The ground track of the orbit
and the location of the tracking network sites for this mission are shown
in figure 3-1.
3.1 LAUNCH
The actual cutoff times for the inboard and outboard engines were
within 0.3 second of the planned times. The conditions at outboard en-
gine cutoff_ as presented in table 3-11, were ii ft/sec low in velocity,
2339 feet high in altitude_ and 0.23 degree high in flight-path angle,
when compared with the planned conditions. The S-IVB stage engine cutoff
was 5 seconds earlier than planned but was within the 3-sigma limits.
The velocity and flight-path angle were low by 2 ft/sec and 0.01 degree,
respectively, and altitude was high by 766 feet, when compared with the
planned conditions in table 3-11. Orbital insertion occurred i0 seconds
after S-IVB stage engine cutoff. The insertion conditions listed in
table 3-11 were based on launch vehicle powered-flight data and S-IVB
stage first-revolution tracking data.
3-2
3.2 ORBIT
During the pre-separation phase, the data from the two Bermuda track-
ers and Tananarive provided a usable fit, although not as good as desired.
However, at Tananarive there appeared to be a 0.06-degree azimuth bias,
which was subsequently rejected (fig. 3-3). S-band data were not avail-
able for this phase; therefore, no comparisons can be made between the
S-band and C-band state vectors.
good fit was obtained with data from Grand Bahama, Merritt Island, Car-
narvon, and White Sands. The converged S-band and C-band state vectors
agreed within 420 feet in position and 0.62 ft/sec in velocity.
Tracking data which were available but not used in the best estimate
trajectory were deleted for various reasons. Canary Island data in the
pre-separation phase were inconsistent with the other three stations. In
phase i, the Carnarvon range data degraded the solution, and White Sands
appeared to be locked on a side-lobe of the antenna during the second
pass. In phase 2, the Hawaii data were inconsistent with the fit, and
Ascension data contained discontinuities in range and azimuth similar to
the range discontinuity exhibited for the high ellipse portion of the
-- Apollo 4 mission.
3-4
The actual event time history of the maneuvers performed during the
two mission programmer sequences is shown in table 2-1. Figure 3-6 shows
space-fixed velocity, flight-path angle, and altitude for mission pro-
grammer sequences III and V. Figure 3-1 shows the simulated ground track
for entry of the ascent stage. Table 3-1V presents a comparison of state
vectors reconstructed from guidance and navigation accelerometer data,
radar tracking data (best estimated trajectory), and the simulated tra-
jectory program. Table 3-V includes state vector comparisons between
the onboard guidance computer_ the real time computer complex, and the
best estimated trajectory. The three times chosen for the comparisons
in table 3-V were (i) orbital insertion, (2) immediately prior to the
onboard-computed first descent engine firing, and (3) the state vector
time for the navigation update sent prior to the second ascent engine
firing.
The position and velocity vector at gimbal lock obtained from the
guidance and navigation accelerometer reconstruction program was inte-
grated to ascent stage impact, assuming a ballistic entry. Another pro-
file was reconstructed, using the position and velocity vector from the
trajectory simulation program results at gimbal lock, by integrating a
tumbling non-thrusting ascent stage to thrust decay and then a ballistic
entry to impact. The results of these two cases, representing the con-
ditions at thrust decay, entry (400 000 feet), and the impact coordinates
are shown in table 3-1V. The impact coordinates are within approximately
ii0 n. mi. The ground track of the second ascent engine firing and the
entry of the ascent stage that immediately followed are shown in fig-
ure 3-1. The solid line represents the maneuver profile based on the
guidance and navigation accelerometer reconstruction of the program and
the dashed line shows the simulation from gimbal lock to impact.
Altitude, n. mi ............... 32 32
Altitude, n. mi ............... 34 34
Altitude, n. mi ............... 88 88
Altitude, n. mi ............... 88 88
Altitude, n. mi ............... 94
Altitude, n. mi ............... 94
__ABLE 3-1V.- MISSION PROGRA!,[[_[ER SEQUENCES III AND V STATE VECTOR CO_@PAR!SON
Impact
Inertial
Time, Flight-path Heading Latitude_ Longitude_ Altitude,
Vector description hr:min:sec velocity,
ft/sec angle, deg angle, deg deg deg n. mi.
Insertion 00:10:03.3
Real time computer complex 25 685 -0.001 85.94 31.55 -61.80 88.1
(instrument unit)
Real time computer complex 25 656 0.152 107.62 26.87 -66.24 92.3
complex a
aThis real time computer complex vector was the navigation update.
CO
I
CO
3-14 --
Perigee, n. mi ....... ; • • • 88 88
ApogoTrackingNetwork
8B
Station Station
40
30
20
N °to
2o
30
4o
50
6o
70 I
90 IO0 110 120 13O 140 150 IdP 170 180 170 160 150 140 130 120 110 log go go 70 60 50 dO 30 20 10 0 10 20 30 40 SO 60 70 80 gO
East West Longitude,dog West East
Figure
g-L-Apollo
B mission
ground
track. L_)
I
F-'
3-16
:: ! )
NASA-S-68- 1930
48x I03
I
36 44
32 40
28 36
24 / 32
20 __ 28
&
i ios
_: ]6 _ 24
= ]2 20
8 16
4 12
g 8
-4 L 4
0
00:00:00 00:01:00 00:02:00 00:03:00 00:0.4:00 00:05:00 00:06:00 00:07:00 00:08:00 00:09:00 00:10:00 00:11:00
Time, hr:min:sec
LO
I
(b) Space-fixed flight-path angleand velocity.
Figure 3-2.- Continued. -4
LO
NASA-S-68-1931 I
H
Co
48×1°3 ' I I I I I I I I
S-IB stageoutboard Actual
enyme-'cutoff .... Planned--
90 r 44 -_- ,
80 - 40
\ II
i:
i
I \ \
,
70 36 i i
IS-IB stageinboard S-]:#Bstagecutoff
60 32 ,, 1,1'en0,ne
\ I li'
_'
,_ 50 I- _ 28 \_ I Earth-fixed
.,-F ' 'flight-Datha gle
_
_: 40 _ 24I_II II \_%1 , I l 1I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I
x
_ ,,_ Earth-fixedvelocity
_' _ Insertion
20 16 .7 i
_, ./ ; i
g _ _ _ / / _ i I i
10 12 f I _--_ 7- _ i
I i _ J" I
II
Earth-fixedvelocity_, i- P" _ _ Earth-fixedflight-path angle-_
-ioL 4 f/
O0:OO:O0 0_01:00 00:02:00 00:03:00 O0:(YI:OG 00:.05:00 00:06:00 O0:O7:OO 00:.08:00 00:09:00 00:10:00 00:11:00
Time, hr:min:sec
(c)Earth-fixedflight-pathangleandvelocity,
Figure3-2.-Continued.
NASA-S-68-i1932
12
800 ]
700
600
500
40o ==
.-
E
300 5
200 4
i00 3
0 L 2
0
00:00:00 O0:OhO0 00:02:00 00:03:00 00:.04:00 00:05:00 00:06:00 00:07:00 00:08:00 00:09:00 go:lO:.OO 00:11:00
Time, hr:min:sec
(d)Machnumberanddynamicpressure, b°
i
F-J
Figure3-2.- Concluded. _0
3-2O
NASA-S-68- 1933
i
Radars ....... Theot:etical limits
FPS-]6: BDA-], TAN, WHS IRejec!ed
FPQ-6: BDA-2, PAT, ANT, CRO I
0.04 TPO_18: MLA, GB!, ASC I
o O O _ O 4>
e3 L 0 .......... L ..... _>-
-0. O4 i
I
I
I
.o-!f
.__
_
_&
I00
e a
•
I
I
i
1
[] E a D [] [] [] []
[]
=
_-
-10 _
0
o I '
0 .............
@
T
I
I
• LPhasel
Qt
--Pre-separatl°n--4-----ibeparadon
I ©
I
(3
to first
<>-'---_5 .......
................
i
I
I
I
----4--_to
11 O
© i
_'(_'--'-'_
Phase 2
(First descent
engine firing
second
.......
i
_
I Phase 3
1....
II 0
I (First ascent
lengine firing to
----if'second ascent
0
""
o,o
o_- [
_'-'-0 "-'_c>-'r-_ .....................
<i> 0 0 _ ..... _-'-6 ......... _>
.....
"5 [] []
m-
_ °.°2I
E
_, 0
[] _
r3
_ [3 I []
j 0 I,D _Q
= so[
0 d) Q 0 I _ o Q l
I I I
1 I 1
i I 11 I J_ I I t ! I I I I l I I
BDA-] BBA-2 TAN WHS MLA PAT BDA-2 ANT WHS MLA GBI CRO ASC TAN
26.4x 103
PI sal 1
--Actual 1 p ce-fixed __
- Planned
' \ velocjity i_
4 26.0- I_---J ..... I \ I Missi°n
_Space-fixedvelocity i _ / programmer_ __
] _,,j sequence_T
3200 2 25.2 , -
j i
2,0g
___: 24, I r I ....
2400
=
_ 0 ,_ 24.4 /
Space-fixed flight-path angle
" -f _ %-,.
.... im
,/ V I_
Time, hr:min:sec bo
I
I",3
Figure 3-4. - Space-fixed velocity, flight-path angle, and altitude during the orbital phase. _'
3-22 -"
NASA-S-68- 1935
520
480 I
44O
4OO
360
E
E 320
_- 280
240
200
160
120
80
00:00:O0 Oh00:.
O0 02:00:O0 03:00:.O0 04:00:O0 05:00:O0 06:00:O0 07:013:.
O0 08:00:O0
Time, hr:min:sec
6.1 STRUCTURES
-. 6.1.1 Loads
Lateral loads during thrust buildup are caused by the steady drag
load from ground winds and vehicle dynamic excitation from wind gusts,
vortex shedding, and unsymmetric S-IB engine thrust buildup. These ex-
citations result in a large constraining shear and moment at the base of
the launch vehicle before release. The lateral loads after lift-off are
caused primarily by the sudden removal of the constraining shear and mo-
ment at release. Typically, large axial dynamic oscillations result
from the S-IB engine thrust buildup and the release of tension in the
launch vehicle hold-down arms.
The winds aloft (fig. 6.1-1) during the boost phase were not severe,
and the maximum calculated angle of attack due to winds was 1.92 degrees
in the maximum dynamic pressure region.
Adapter loads.- The adapter loads were calculated from the lunar
module accelerometer data at lift-off and at the end of S-IB boost
(figs. 6.1-2 and 6.1-3). These loads were well below the limit load
capabilities and agree closely with the predicted loads.
6.1-2
The critical loads for ti_e ascent engine support structure are a
function of the engine start-up transient. The chamber pressures for
the first and second ascent engine firings were 164 and 178 psia, res-
pectively, as compared with the design value of 178 psia. The thrust
rise times for both firings are shown in table 6.13-1 in section 6.13.
These times are longer than those used for design (0.013 second); conse-
quently, the loads experienced were less Severe than the design condi-
tions.
outrigger strut load time history is shown in figure 6.1-8. The measured
strut loads for the end of S-IB boost, which were the maximum loads ex-
perienced on any strut during this flight, are shown in table 6.1-11. A
comparison of the measured, predicted, and design loads for the struts
shows that in all cases, the measured loads were less than allowable
loads. The predicted outrigger strut loads based on data from the six
linear accelerometers agree well with the measured strut loads; this im-
plies that the analytical model used for the design analysis was reason-
ably accurate. These predicted values were determined for inertia
effects only. The apex-fitting reactions determined from the strut loads
are shown in table 6.1-111, which is a comparison of the calculated and
design interaction loads. All of the significant calculated loads were
less than the design loads. Two of the calculated reaction loads slightly
exceeded the design loads for the end of S-IB boost condition. However,
the difference between the calculated and design loads for the -Y apex Ry
and RZ reactions was within the accuracy of the instrumentation used
for the measured loads. In any event, a greater design load does exist
for another end-of-boost design condition.
6.1.2! Vibrations
test_ a response at 150 Hz was also noted at the same measurement loca-
tion. Since this response far exceeded the LM-I response, no further
testing is required.
Lift-off
Maximum lateral
acceleration Longitudinal load factor, g . . . -- 1.20 1.60
Maximum longitudinal
acceleration Longitudinal load factor, g . . . 1.60 1.48 1.60
Calculated Design
Apex Reaction loada_ load (70 ° F),
klb klb
+Y RX 35.98 41.19
Ry -2.70 -4.42
RZ -0.37 -1.18
+Z RX 32.45 36.55
Ry -0.66 -1.62
-Y RX 34.77 41.06
Ry 3.78 3.75
RZ 0.45 -0.43
-Z RX 32.53 36.72
Ry -0.12 -0.88
RZ 2.O5 -5.09
s _
6.1-10
GB0801P 69 1.33 --
GB0802P 0 28 1.49 --
GB0803P 21 2.26 --
GB0804P 82 2.02 --
-y
GB0806P !.17 1.56 --
GB0904P 5 0.63 --
I GB09OIP 3 2.34 0.77
I GB0907P
GB0902P 7
5 1.85
0.90 1.07
1.56
GA360ID Vibration, ascent stage aft equipment bay, X axis 20 i000 Yes
GA3602D Vibration, ascent stage aft equipment bay, Y axis 20 i000 Yes
GA3603D Vibration, ascent stage aft equipment hay, Z axis 20 !000 Yes
Test level
Component at 210 Hz,
g2/Hz
NASA-S-68- 1938
70×
13o
\
<
60 _ _'_
50 I _
= 40 /
;_ /
to _ I I
I I I I I , , I __@@__
0 20 40 60 80 10O 120 180 270 0 90 180
South West North East South
Wind speed, ft/sec Direction, deg
(a) Magnitude. (b) Direction. o-_
I
Figure 6.1-1.- Launch winds. _'
t.O
NASA-S-68-1939
I
5o,1o
_ I I [ I
0 Lift-off (calculated)
I ]
_, Lift-off (predicted)
/.,' Maximum qc_(calculated)
40 Z'_,Maximum qc_(predicted)
L. End of S-ZB boost (calculated)
End of S-IB boost (predicted)
•" _o I I I
_ I I ! I I I I I I
° i
_
:5 20
J "_"
/ .,
-600 -500 -400 -300 -200 -I00 0 I00 200 300X 103
Axial load, lb
50 _ 106
0 Lift-off (caLculated)
[] Lift-off (predicted)
Maximum q_ (calculated)
40 ,_ Maximum q_ (predicted)
['& End of S-TB boost (calculated)
/_ End of S-IB boost (predicted)
i
•_ 30
E /
o
-600 -500 -400 -300 -200 -lO0 0 100 200
\. 300 400 × 103
Axial load, Ib
o'x
I
Figure 6.1-3 .- Comparison of adapter body loads at the adapter/instrument unit F_
interface with limit design body load capabilities, ",.n
6.1-16
NASA-S-68-1941
2000
\
.... Measured
-- P Predicted
1800
1600
1400 \\
looo
1200 \
1
8OO
\\
600
4O0
\
200
% \ \
o 0 20 40 60 80 100
I 120
Til/le, sec
NASA-S-68- 1942
-8 - X-axis translation i
- I
I
-4 --
I
="
0 - I
0 -:. -- _ _
- Lift-off
< 4 - 22:48:08.36 G.m. t.
8-
16 - X-axis rotation I
I
I
8- I
-o I
.o_ _ I
L_
- I
< -16 - !I
I
¢_) I
0.8 i
I
I
1.6 i
I I l I I I I I i I I l l
-2.5 -2.0 -1.5 -1.0 -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
Time from range zero, sec
NASA-S-68-1943
16 F i
-8 - Y-axis rotation II
"_ -- I
0
8 - Lift-off
o 22:48"08.36G.m.t.
16-
1.6 --
C 0.8 - Z-axistranslation
0
_,2 -- I
< -0.8 - I
I
- I
-1.6 I
I
I
-]6 i
% ,I
-_ -8 Z-axis rotation I
<
16 -
I I I I I I , I I I I [ ,
-2.5 -2.0 -1.5 -I.0 -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0
Timefrom rangezero, sec
NASA-S-68-1944
-8-i iI i
X-axis translation
!- i !
-4 i Inboardenginecutoff I Outboardenginecutoff
="
._o I I
0 I J,
'_
(__
- I -- --
¢_)
< 4- ....... i
- I I
8- i i
i !
16- i I
_ X-axis rotation I II
-= 8- I I
I I
- J w
"_ -8- I II
,-,
,-, !
< - I I
-16 - I I
I
1.6- I
I I
_ Y-axis translation I I
0.8- I i
U I !
._o - I I
I
o
e
co
o --_ _ f% ..,---,.
_ _/%_w-
< -0.8 - I
I
I
-1.6 I
I
i I I I I I -----J
138 139 140 141 142 143
Timefrom rangezero, sec
(a) X-axis translation and rotation, and Y-axis translation.
Figure6.1-6. - S-IB shutdown.
6.1-20
NASA-S-68- 1945
i I
¢M -16 - I I
G) Y-axis rotation I I
I Inboard engine cutoff I Outboard engine cutoff
-o,_ -8- I I
- I I
E i
.o 0 -- r -- _ .... : T_,_,7777 ,,,,,;,,,,,,,_,,,_ - - -- _ .....
"_ I I
<
I I
- I I
16- I I
1.6 .- I I
Z-axis translation I I
- I I
, 0.8 - ! I
=
0 I I
"-- I I
-- I I
I I
< -0.8 - I I
- I I
-1,6 - I I
-16 - J I
Z-axis rotation I I
- I I
-8 - I I
I I
o 0 _ ,, v
A v -
c_)
16 -
I I I I I , I I
138 139 140 141 142 143 144
Time from range zero, sec
Rx
R. Ry RZ , Ry
Allloads
shown positive
P LM/adapter interaction
load sign convention
RZ
F1
F_
F2 Typical outrigger
strut identification
°
NASA-S-68- 1948
-Z
GBO816P
GBO809P •
GBO622P
-y GBOE GBO808P +y
• GBO807P
DGBO815P
D GBO81OP_• GB0623
GBO8OIP
GBO802P GBO803P
• • II1P
eGBO621P_
• GBO817P • GBO812P
-_GBO818Pe
GBO813P
Nodataobtained +Z
GBO814P
o_
NASA-S-68-1949
-Z
GBO_.O_ GBOgO_P.
GBO904P • _ GBO907P
GBO902P
+Y GBO903P \ •
GBO906P_
+Z
NASA-S-68-1950
o.i I !
+" I
-+ ----
0.01
IIIII
_ Measured on Apollo
(-4ol Corrected to design
>_ limit level
._- Actual quail ficatatio_
test level
o.ooi
o_
g
_ ---
0.0001
0.00001
10 100 1000 10 000
Frequency, Hz
y
6.1-26
NASA-S-68-1951
0.001
0.0001
i0 i00 I000 i0 000
Frequency,Hz
6.1-27
NASA-S-68- 1952
0.1
LM flight
vibration
0.01
-- N 0.001
0.0001
0.00001
i0 I00 1000 I0 000
Frequency, Hz
NASA-S-68- 1953
0.i
0.01
_7
0.001
o
0.0001
0.00001
i0 I00 i000 i0 000
Frequency, Hz
NASA-S-68-1954
I I I _ I
06:i0:27 06:i0:28 06:10:.
29 06: i0:30 06:.i0:31 06:10:.32
Time, hr:min:sec
(a) Instrumentation/telemetry noise floor (enginesnot operating).
Lunar module.- During the launch phase, all LM structural and thermal
protection temperatures remained within 5° F of predicted values, based
on 15 measurement locations for water and propellant tank temperatures
and 47 locations for structural and thermal protection temperatures.
Adapter.- The thermal environment for the adapter during the boost
phase was determined from the response of 12 thermocouples on the inner
and outer skin of the adapter. The maximum recorded temperature was
185 ° F and occurred at 00:02:07 on the outer skin at longitudinal station
XA670, 7 degrees from the +Y axis. This peak temperature was considerably
less than the design limit of 490 ° F.
No correlation was made between flight data and the analytical pre-
dictions for the adapter temperatures because the aerodynamic configura-
tion was unique for this mission and because the temperature levels were
well below design limits.
The effect of the control engine plumes impinging the descent stage
thermal protection during thrusting of down-firing engines was determined
by the temperature sensors located as shown in figures 6.2-1 and 6.2-2.
The predicted temperatures were higher than the actual temperatures dur-
ing withdrawal of the lunar module from the adapter (fig. 6.2-3). This
was attributed to the following conditions:
a. The thermal mass of the sensor was not considered in the pre-
dictions.
s
6.2-2
Maximum
Time,
Sensor number temperature, hr :min :sec
o F
GB3025 85 06:12:00
GB3021 40 06:12:12
Temperature data for the abort staging sequence were reviewed for
the following areas: the descent stage blast deflector and top surface,
and the ascent stage heat shield, ascent engine compartment, and cabin
cover.
Data were lost about 8 minutes after initiation of the second ascent
engine firing. This did not allow sufficient time to assess engine fir-
ing effects on the ascent stage heat shield, engine compartment, or
cover.
6.2-6
NASA-S-68-1958
GB3025T__
I.J,ay,erOt5 m,.ll __--8 layers Kapton
z r-- _IO.Smil
GB3o33T
nZ:::o'r°'es_t/
_
_--_ _il
T221ayers
j_ammn zeo
--GB3025T Mylar
F---Sensor
_/ , _ / \ /GB3023T
1 _ \ 0.5 rail nickel foil /
_ I / _ and Inconel mesh _1........ 1._ 1.25 rail Inconel
I _ / ._ / I _ap j..v_vv_v__
"'_'_'><'<'<Xvvvvvw__. --r13 layers 0.5 mil
NASA-S-68-1959
1.25 railIncone[foil
---,_,_ GB303IT
/_
--/ ""_ /__ 2layers0• 5 rail -'_
I........ • IF
....... j 8 layers 0.5 rail
/ _ _ n,cko,
fo,iaad - T alom
n_zed
_ \ Inconel
mesh_ _ __Kapton
_ /1 j_aluminized
_ fSpot weld
NASA-S-68-1960
700
oo_ -- III
II
600 -- Iil
III D SensorGB3033T
500 -- _ Sensor GB3025T
200 --
ool-
_ 1 0
o
0 J I I I LS
00:52:00 00:54:00 00:56:00 00:58:00 01:00:00 01:30:00
Time, hr:min:sec
800 -
[] GB3031T
100
o _-_ u
-i00 L I I I
00:52:00 00:54:00 00:56:00 00:58:00 01:00:00
Time, hr:min:sec
NASA-S-68-1962
1500 --
,. II
8oo-
\ [] SensorGB3023T
I-.-
400 -
200 --
o I I I I I
00:53:00 00:54:00 00:55:00 00:56:00 00:57:00 00:58:00
Time,hr:min:sec
800 -
Preflight prediction
700 - 0 Sensor GB3027T
[] Sensor GB3029T
Location of sensors shown on figure 6.2-1
600 -
.o 400 -
/'4
, \
I000 -
-
-zoo I I I I I I
00:53:00 00:54:00 00:55:00 00:56:00 00:57:00 00:58:00 00:59:00
Time,hr:min:seo
Flange
heat
- Bellows
(H-film)
GA2OO6T
Engine backface
Titanium
nozzle _,_ GA2OO5T structure
extension.-_" _ GA2OO8T
Nickel-fiberfrax
insulation _ 9
Radiust in.
r_
Figure 6.2-4.- Descent stage base heat shield sensor locations. I
NASA-S-68-1964 M
Blast deflector
GBO522T
-- _ O-- --'-0---- Q-
GBO402T IGBO521T GBO403T
I
I
I
1
I
TGBO4OZT
NASA-S-68-2094
400 -
d GB0401
© GB0402
[] GB0403
Maximumoperatinglimi[
300 ------
u- 200
o _2_
E
_ 100
0 --
: _, _,
LM/S-1VB separation _First descent Abort staging_
}engine firing
A
_ 1 0 0
I I I i I /I
/ / I I I
00:00:00 01:00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:12:00 06:12:10 06:12:20
Time, hr:min:sec
I
Figure 6.2-6.- Temperaturemeasuredon uppersurface of descent stage. L.O
NASA-S-68-1965
i
-Z _
GBO603T
GBO
GAlll3T. • GBO304T _+Y
-Y GBO3OIT--
GBO306T
NASA-S-68-2095
90 -
Maximum allowable temperature
(including soak-back after long- 0 GBO201T, engine cover
duration ascent engine firing): [] GBO203T, cabin floor
Data reading +4°F
130 ° F Floor
80 200 ° F Cover
=.
E
60
I--- ', r _
50
40 I I I I I I I I
0 1 2 3 4 5 6 7 8
Time, hr
o_
ro
Figure 6 , 2-8.- Cabin floor and ascent engine cover temperatures, i
_-_
xJ]
C7_
NASA-S-68-2096 L_
I
Oh
90 -
Maximum allowable temperature _ GBO204T
(including soak-back after long- A GB0205T
duration ascentengine firing): Data reading +4°F
130 ° F
80 -
o 70 -
qJ
K
60
50
40 I I I I t I I I
0 1 2 3 4 5 6 7 8
Time, hr
80 -
o 0 --
-40 - OGPO201T
GPO202T
-80 -
[]
-120 I I I I I I I I
0 1 2 , 3 4 5 6 7 8
Time, hr
o",
b,)
I
Figure 6.2-10.- Ascent stage helium tank temperatures. -.q
NASA-S-68-2098 o_
h3
l
Co
160 - : ::
! L M/S-]]ErB separation Second descent-'i
engine firing =
First descent -:Abort
m
staging
°
_-
_
40
[]IIN
%
-40
01 0
I
1
I
2
I
3
"
4
Time, hr
I
5
I
6
I
7
I
8
240 -
: Second descent=i
:LM/S-]]ZB separation engine firing =:iAbort staging
Ii
(_ GB37_33T
160--
LL
120 -
E
F-
_o _ ___ _
I I I I I I I I
0 i 2 3 4 5 6 7 8
0",
Time, hr ro
I
IJ
f
6.5-1
The ac voltage remained between 117.6 and 118.1 volts at 400 Hz for
a no-load condition. The ac voltage transients shown on figure 6.5-2
were associated with the inverter response to the load variations of the
descent engine gimbal motor, the only load on the ac bus. These transient
rms voltages corresponded to peak values of 145 to 188 volts and were
within the specified peak transient limits of 90 to 225 volts.
Figure 6.5-3 shows the battery load sharing during mission programmer
sequence III. One of the two ascent batteries was commanded "on" prior
to abort staging, at which time this battery shared approximately 40 per-
cent of the total load with the descent stage batteries. The ascent bat-
teries were cooled to approximately 38 ° F before abort staging; the
predicted temperature was 40 ° F. After abort staging, the ascent battery
temperatures rose to approximately 49 ° F, as expected. The descent
battery temperatures were controlled within a range of 55° F to 60 ° F by
the coolant system as expected.
NASA-S-68- 1966 om
x.n
119 ' I
r ! i 1 i l ',
o2 1
< I
117
m
_ 29
I I h I |
c_ i : i
I
28
I
i00 I
Abort
I staging [
8o b I /
40 _ --_ I
I
20 1 ',1
00:00:00 01:00:00 02:00:00 03:00:00 04:00:00 05:00:00 06:00:00 07:00:00 08:00:00
Time, hr:min:sec
, ]
NASA-S-68-1967
L26 ]
124
122
120
>
118
<
116
114
112
Ii0
06:10:00 06:10:40 06:11:20 06:12:00 06:12:40 06:13:20
Time, hr:min:sec
o'-,
Figure 6.5-2.-AC voltage transients. ,,.n
I
bo
5°1 r ! i ! r jI !I i r
40 j _
0 I i i
06:00:00 06:02:00 06:04:00 06:06:00 06:08:O0 06:10:O0 06:12:00 06:I4:00
Time, hr:min:sec
Sequence Function
elapsed time, Functions Remarks
min:sec description
00:05 +X translation on
00:15 +X translation off Separates itu_ar module Lunar module was sepa-
from the adapter if rated from the adapter
00:20 +X translation on not already accom- prior to this sequence
plished
00:31 +X translation on
00:39 Descent engine start First descent engine Second descent engine
firing firing accomplished by
this sequence
Sequence Function
elapsed time Functions description Remarks
min:see
01:44 Descent engine start Second descent engine Third descent engine
firing firing accomplished by
this sequence
02:12 Abort stage fire Abort staging and Abort staging and first
first ascent engine ascent engine firing
accomplished by this
sequence
if
6.6-4
Sequence Function
elapsed time, Functions description Remarks
min:sec
01:13 +X translation on
01:24 Ascent engine start Second ascent engine Engine kept burning by
firing ground comlaand (engine
on)
6.7 INSTRUMENTATION
with ignition for the first ascent engine firing; immediately thereafter,
the ascent stage bottom surface measurements (GBO302T through GB0305T)
also failed. The most likely cause of these failures was detachment of
the thermocouple mounting tabs or breakage of the small thermocouple
wires as a result of flexure of the heat shield material. Delicate
mountings are inherent in high-response thermocouple installations; how-
ever, the installations on LM-3 will be improved.
Data obtained during the ascent engine firings and the remainder of
the mission were satisfactory.
6.7-4
99.68 percent while the usable S-band data quality was only 98.07 percent.
This difference was probably caused by variations in the received S-band
carrier power that was obserw_d. The usable S-band data quality for the
Hawaii station during revolution 3 pass was 94.60 percent while the usable
VHF data quality was only 90.00 percent. The reason for this poor PCM
data quality at this station is under investigation.
6.7.3 Calibration
The required LM/adapter events data transmitted from the S-IVB in-
strument unit were satisfactory, except for the adapter panel deployment
monitor. The deployment event was transmitted through the instrument
unit with other adapter data. Indications were received from the relays
which fire the pyrotechnics to separate the four panels. However, no
indication was received from the four series-connected limit switches
which monitor the deployment. The instrumentation was verified to be
operating satisfactorily several times at the launch site. Other meas-
urements show that the spacecraft separated from the S-IVB stage without
any abnormal disturbances, thus indicating that the panels were, in fact,
deployed. The panel deployment monitors were used for the first time on
this flight and will not be installed for manned missions.
F 6.7-5
TEL IV 1 98.84 X
(launch)
Carnarvon 3 99.47 X
Carnarvon 4 99.93 X
Guaymas 4 99.72 X
Antigua 4 98.93 X
Antigua 5 98.68 X
Hawaii 4 99.06 X
Hawaii 5 99.24 X
Goldstone 4 X 99.17
6.8 COMMUNICATIONS
Computed bit error probabilities for the S-band and VHF pulse code
modulation (PCM) telemetry channels for three station passes indicated
good data reception during periods of adequate received signal powers.
The selected S-band receiver automatic gain control and static phase
errors were nominal. The S-band power amplifier operated satisfactorily,
although the telemetered measurement was inaccurate. The requirement for
this measurement was waived prior to flight.
No degradation of transmitted power, from either the S-band trans-
ceiver or the power amplifier, was detected; therefore, breakdown caused
by corona effects was not apparent.
6.8-3
The range code acquisition sequences for 31 station passes were ex-
amined. The majority of the data reviewed showed good acquisition se-
quences. Typically, range code acquisition was initiated as soon as
the exciter was locked to the synthesizer and the ranging receiver ac-
quired lock; acquisition of range code was obtained approximately 5 sec-
onds later. A typical ranging code acquisition sequence is shown in
figure 6.8-22. Some of the sites had initial difficulty but obtained
range code acquisition after adjusting an attenuator within the ranging
receiver. This adjustment was determined to be necessary at the Merritt
Island station prior to launch.
During the first orbital pass over the Texas, Merritt Island, and
Bermuda stations, uplink combination 6 (table 6.8-11) was transmitted.
Downlink coverage by the Merritt Island station was from 01:35:25 to
01:42:21. The Texas station transmitted the uplink S-band signal from
01:35:25 to 01:38:00, Merritt Island transmitted the signal from
01:38:08 to 01:41:00, and Bermuda transmitted the signal from 01:41:09
to 01:42:21. The predetection signal-to-noise ratio of the turned-around
up-voice subcarrier did not fall below i0 dB during this downlink cover-
age by Merritt Island. The signal-to-noise ratio was consistent with a
word intelligibility greater than 90 percent. Predetection signal-to-
noise ratios of the 70-kHz subcarrier were also measured for the periods
of Merritt Island coverage when Texas and Bermuda were transmitting the
uplink S-band signal. The signal-to-noise ratio of the unmodulated
70-kHz subcarrier was greater than 12 dB during the pass (fig. 6.8-24).
Based on command module communication system performance test results,
this signal-to-noise ratio was above that required for up-data message
_cceptance.
6.8-4
The bit error probabilities shown in figure 6.8-29 were better than
design goals for the periods when the received downlink carrier power
level was adequate (see figure 6.8-21 for comparison). Exact time cor-
relation of the bit error probabilities and the received carrier powers
cannot be obtained because the error probabilities represent an average
computed over a 10-second interval.
_- 6.8-5
VHF PCM telemetry.- The probability of a bit error for the VHF PCM
telemetry channel was computed utilizing the technique described pre-
viously. The results of these computations for Carnarvon (revolution i),
Guaymas (revolution 4), and Hawaii (revolution 5) are presented in
figures 6.8-32, 6.8-33, and 6.8-34, respectively. As shown in fig-
ure 6.8-32, the bit error probability for the Carnarvon pass was satis-
factory throughout the pass. Signal strength records show a recurrent
spike appearing on all traces on that particular stripchart recording.
The spikes which occur before, during, and after the presence of a signal
are coincident with most of the degraded bit error probabilities. The
distribution of these spikes indicates that spurious external signals
were imposed on the magnetic tape at either the receiving or the playback
station. The spikes appear to be affecting all data taken from this
particular tape. A bit error probability greater than the design goal
was experienced for a total of 80 seconds for Guaymas coverage of revolu-
tion 4. If the bit error probabilities associated with acquisition and
loss of signal are discarded, there were no periods when the bit error
probability was worse than the limit for usable real-time data.
--1
6.8-6 -
Data from Hawaii (revolution 5) indicate that the bit error prob-
ability for the S-band telemetry exceeded that for the VHF. The VHF
system on the spacecraft used a pair of antennas with nearly spherical
coverage, while the S-band system on the spacecraft used a single antenna
providing only unidirectional coverage. This condition explains the
difference in S-band and VHF performance at Hawaii.
Carnarvon i I_/S-IVB separation 00:53:53.6 00:54:23 6.8-2 IReceived uplink carrier power level was at transceiver automatic
and primary S-band gain control saturation level for pass. Downlink carrier power
transceiver activa- level was good during pass
tion
Texas i Secondary S-band 01:33:13 01:33:48 6.8-4 6.8-5 Primary S-band transceiver com_manded "off" at 01:.33:12 (see
transceiver and fig. 6.8-3). Secondary S-band transceiver and power amplifier
power amplifier combination commanded on at 01:33:29. Two-way lock reacquired
activation at 01:33:34 and power amplifier warm-up cycle completed at
01:33:47. Handover from Gua_as to Texas required 9 seconds to
complete. Abrupt change in received downlink carrier frequency
caused Texas receivers to lose lock when handover from Guaymas
was initiated (see fig. 6.8-3).
Merritt i - 2 Turn-around S-band 01:38:00 01:38:20 6.8-6 6.8-7 Single omnidirectional spacecraft antenna did not provide good
Tsland up-voice and coverage for complete pass. Spacecraft antenna nulls caused
up-data tests received uplink and downlink carrier power level variations from
01:39:00 to loss of signal.
Redstone 2 - 01:46:13 01:46:19 6.8-8 6.8-9 Some variations in received carrier power level because of
inopportune spacecraft antenna patterns, but overall signal
quality was good.
Guaymas 2 Turn-aroused S-band 03:06:02 6.8-10 Received do}_link carrier power level variation observed from
up-voice tests 03:05:10 to 03:07:00.
Merritt 2 - 3 Turn-around S-band 03:11:00 6.8-11 6.8-12 Abrupt changes (20 to 35 dB) in received downlink carrier power
Island up-voice tests level during the pass. Abrupt changes caused by spacecraft
antenna gain variations.
Carnarvon 3 First descent 03:57:50 03:58:34 6.8-13 6.8-14 Received uplink carrier power leve_ would have supported good
engine firing S-band communications. Received downlink carrier power levels
were consistent with a good communications channel from 03:58:10
to 04:03: 40. Downlink communications would have been inter-
mittent from 04:03:_0 to loss of signal.
Goldstone 4 Second and third 6.8-15 Received carrier power variations observed during third descent
descent engine engine firing and abort staging. Received carrier power level O_
firings and abort dropped off 7 dB at abort staging only_ variation attributed to
staging propulsion system activity. Co
I
_4
Oo
I
Co
Guaymas 4 Second and third 06:08:28 06:08:51 6.8-16 6.8-1'[ Received uplink and downlimk carrier power levels good during
descent engine fir- pass. A received downlink c_rrier power level drop of spproxi-
lngs, abort staging mately ]3 dB observed at abort staging.
and first ascent
engine firing
Texas 4 Third descent 06:12:04 6.8-18 6.8-19 A drop in received uplink carrier power level of 9 dB detected
engine Tiring, at abort staging. Received uplink and dowr_link carrier power
abort staging, and levels dropped sharp]y at 06:15:00. The abrupt drop caused
first ascent engine Texas receiver to lose lock. Intermittent two-way lock was
firing obtained between 06:15:18 and 06:17:]0. Variations in received
carrier power levels were cause_ by spacecraft antenna gain
variations.
Hawaii 5 Second ascent 07:88:48 07:38:59 6.8-20 6.8-21 Received nplink and downlink tarrier power level variations
engine Tiring observed from acquisition of signal to 07:48:00. Dowr±link
communications would have been intermittent until 07:43:00.
TABLE 6.8-11.- NETWORK/LMS-BAND TRANSMISSION COMBINATION SUMMARY
i Carrier
oo
NASA-S-68- 1968 co
I
-Z and +Z VHF/U
(paralleled) ',Adapter/LM) _ __.-_
237.SMHz \ S-band
241.5 MHz \ A up-voice
247.3
_i4_
_._ \
0.9 MHz\
MHz /__.
_1 I up-data
-40 I I i
--- Actual
.... Predicted
-50 --- " _---
1
-60 --
-7O
-80 ..............
--go> ,_ /_
_ S-bandtransceiver
---activation _i U \
l \I.___
-110 _I---
-120
-130 ....
-140
00:53:00 00:54:O0 00:55:00 00:56:011 00:57:00 00:58:OO 00:59:O0 01:00:O0 o'_
Time,hr:min:sec Co
I
Figure6.8-2.- Received
unifiedS-banddownlinkcarrier power,Carnarvon,revolution1.
NASA-S-68- 1970
Primary transponder Secondary S-band Poweramplifier o'-,
S-band OFF transponder ON warm-up completed CO
(01:33:14.7) (0h33:29.O) I I
I-1
-40 i I I CO
I I
_ -5.
t.......... f..........
fd (one-way Doppler)
Downlink unified S-band
_ around receiver
1received
carrier power,
no. _ Transponder power onlY_l
E -85 r- / " " I (-90 dBm approximate) I
,\
-130
.-i15_ improvement to
" %-Approximate15dBm
__ -145 approximate -75 dBm
receivedpower
Receiver no. i
15oF frequency
sweep---
X _-centerfrequencyl
-lsoL
°r-__"_____7_--,,
I I I
I I I
I I I
I I I I I I I I I I
0h33:00 01:33:10 0h33:20 0h33:30 0h33:40 01:33:50 01:34:00
Time, hr:min:sec
Figure 6. 8-3. - Primary to secondary unified S-band system switchover, Texas, revolution I.
NASA-S-68-1971
-40 I i
i
-50
-70 //-- ,, _ I ,
/
E fl j " ,
_ __GYM_EX'_
! l, ,
TE×/MIL
-110
-120
Note:
-130 Arrows indicate data are --
off scale
-140 I
01:52:00 01:55:00 01:54:00 01:35:00 01:36:00 01:57:00 01:58:00 01:39:00
Time, hr:min:sec O_
(33
I
Figure 6.8-4. - Receivedunified S-band uplink carrier power, Texas, revolution 1.
Do
oo
I
,
7--
\ _ ..
t ' i
¢'2,.
<<>_ I
_ _ <_
!
I
[
_ I
_ tlll]p 'Ja_od JSlJJ_3 pa^la3al:l
i
NASA-S-68- 1973
-ii0
-120
-130
-140
Figure 6.8-6.- Received unified S-band uplink carrier power, MILA, revolution 1-2. .1__
OA
NASA-S-68-1974 Co
-40 I
l-J
O_
-50
-60
-70
E
_= -80
_2
-- -90
-100
-Ii0
j
-130
: I
140 - _
01:B5:00 01:B6:00 0h37:00 01:B8:00 0h39:00 01:40:00 01:41:00 0]:42:00 01:43:00
Time, hF:min:sec
Figure 6. 8-7. - Received unified S-band downlink carrier power, MILA, revolution 1-2.
NASA-S-68-1975 -40 !
I
I
-50
-60
-7O
E
e_
_= -80
g_
® -90
-I00
-110
-120
-140
01:46:00 01:47:00 01:48:00 01:49:00 01:50:00 01:51:00 01:52:00
Time, hr:min:sec
co
I
Figure 6.8-8.- Receivedunified S-band uplink carrier power, Redstone, revolution 2. -.1
I_
NASA-S-68- 1976
-40 co
I
Co
-50
-6O
-7O
-8o
-- -90
N -lOO
-II0
-120
-130
-140
01:44:00 01:45:00 01:46:00 01:47:00 01:48:00 01:49:00 01:50:.00 01:51:00 01:52:00
Time, hr:min:sec
Figure 6.8-9.- Received unified S-band downlink carrier power, Redstone, revolution 2.
NASA-S-68-1977
-40
-110
-120
-130
-140 j_
NASA-S-68:1979
-40 i
-50
, A
-70 I'v \
-80 ' i
__- / ' i
o_ "_ / tt J
-I00 , 7
-120
-ii0 /
I TEX/, It
_ i MIUBDA
7 1
,_'_ hanc ver _./ handover
-130 /
-140
03:08:
OO 03:
og:
O0 03:1
_.O0 03:1
I:OO OB:
12:
OO 03:1
B:O0 03:14:O0 03:15:0g 03:16:O0
O_
Time, hr:min:sec
CO
I
ro
Figure 6.8-]2.- Received unified S-band downlink carrier power, MILA, revolution 2-3. I_
First descent engine firing
-130 , i
r I
-140 III
03:57:00 03:5&00 03:59:00 04:00:00 04:01:00 04:02:00 04:03:00 04:04:00 04:05:00 04:06:00 04:07:00
Time, hr:min:sec
-4O
-- Actual
-50 ..... Predicted
_60
-7O
°
E -9o
AI/
i
I/lllll/;,
_ -i00
, VV
I ,z ,
First descent engine firing
-12o Ii
-- r !,,l
-130 .- iI _i
-140 [
03:57:00 03:58:00 03:59:00 04:00:00 04:01:00 04:02:00 04:03:00 04:_:00 04:05:00 04:06:00 04:07:00
o'x
Time, hr:min:sec
(30
I
Figure 6.8-14. Receivedunified S-band downlink carrier power, Carnarvon, revolution 3. bo
NASA-S-68-1982
CO
-40 t
h_
-50
-60
-7O
-80
o
._- -90
g -100
c_
110
I
i
-120
-130
-140 t
06:07:00 06:08:00 06:09:00 06:10:00 06:I h 00 06:12:O0 06:13:00 06:iz_:00
Time, hr:min:sec
-ii0
-120
-130
-140
06:08:00 06:09:00 06:10:00 06:11:00 06:12:00 06:13:00 06:14:00
Time, hr:min:sec 0",
(Do
I
ha
Figure6.8-t6.- Received
unifiedS-banduplink carrier power,Guaymas,revolution4. ',..n
NASA-S-68- 1984 0"_
Co
r_
-50
GYM/TEX ......
kl._/ handever
-60 I
I
-70 ......
_ -_o /
\
•-_ -go /
-I00
-Ii0 1
Seconddescentengine firing
I' I
-120 l
_--
I Third descent engine firing
-_llm,,-
n I
/ , ,L,
illF
I
rst ascent engine firing
-130 I
i
I I
I I
-140 I I
06:08:00 06:09:00 06:I 0:0O 06:1I: 0O 06:12:00 06:13:00 06:14:00 06:15:00 06:16:00
Time, hr:min:sec
t
6.8-27
NASA-S-68- 1986
O'_
.... _! -":!.,_
;- J r [i>l' .... --- -'
...... ± I [ _j i
-70 --- :.irst ascent engine fi-ri_ ...... ' ' _
= I
..... I GY I/TEX+_ -- ' p r
ha_ bver - . _.
-80 ....... I , ,
i I\"
-90-- --- /] [I
_._ " L/ I Jl I
o
-100 ....
J
'\ iil1_ --
-110 ...... --
i
-120 / IIII
/, ....... rlli
I
" Vl I
, lIt,
-i50 l , , [
06:1
O:O0 06:1
h O0 06:12:O0 06:13:O0 06:14:00 06:15:O0 06:16:O0 06:17:O0 06:18:O0 06:19:O0
Time, hr:min:sec
-40
-ii0
-120
-130
-140
07:38:00 07:39:00 07:40:00 07:41:00 07:42:00 07:43:00 07:44:00 07:45:00 07:46:00
Time, h r:min:sec o',,
Co
I
Figure 6. 8-20. - Receivedunified S-band uplJnk carrier power, Hawaii, revolution 5. IX)
NASA-S-68- 1988
Co
-4°I i ' I _ r I _ I 1 p I i
I
I
---] i I
-50 I L -- -Antennalpatterns and I_
I Secondascent-!engine firing
_ ---
I _ -- lookangles poor __ .._.....
-60 _
-711
E
N -8o ....
•_- -go
I L I i
>
-100 ' '
c_ /
-120
i
-130
Step 1 r--Step 2
(states I (state P3)
PI and I F Step .3
P2)_ / |(state P4) _r-100 percentdata
correlatiOnvalid
from thisachieved
point)
] | Step 4 Step 5 j(ranging
o
ioo-
125-,., (stateP5) ] (state P6) i_um._. (state
,--um,_,.,,
P7) _'"
50 _ Range
_' code
o off
-¢2
"o 25-
"_
o
.,_ 5.5 seconds typical
o - Initiate
I I I I I I I %
0 i 2 3 4 5 6 7
Reference time, sec
o_
co
I
Figure 6.8-22.- Typical range code acquisition sequence (128 integrations persLep).
NASA-S-68- 1990 o_
Oo
l
Do
Center _a
frequency
2101.8 MHz
Center
25
F
,
TEx/MIL,III handover
I
I
MtL/BDA
Subcarrier of] with phase-
shift keyed modulai:ion
I
JJ
,
handover
I
I
/"1 I GYM/TEXII bandover
I
I
MIL/BDA
,'
Ilhand°ver
I
I
I-.,, =1 /
I I
I / I
o is I /_ I
°
,-_ '
I / / v '
I
s I I
-_ IO I I
b i i /
I I I IJ
I
I
I
I
I
I
I
I
I
I
I
I
V
I I I I
I I I
I I I
I I I /
5
0
I
II
I
II _
I
II t
01:35:20 01:37:20 01:39:20 01:41:20 01:43:20 03:06:00 03:06:40 03:07:20 03:08:00 03:08:40 03:12:00 03:14:00 03:16:00 03:18:00
Time, hr:min:sec Time, hr:min:sec Time, hr:min:sec
Figure 6.8-24.- Turned-around unified S-band up-data Figure 6.8-25.- Turned_-arouudunified S-band up-voice Figure 6.8-26.- Turned-around unified S-band up-voice
signal-to-noise ratio, MILA, revolution 1-2. signal-to-noise ratio, Guaymas, revolution 2. signal-to-noise ratio, MILA, revolution 2-3.
6.8-34
10_6 Apollo desig_ goal Apollo design goal Apollo design goal
10 -5
&
o i
C_3 _A
10-4
10- 3 Limit of usable real-time data Limit of usabie real-time data Limit of usable real-riffle data
;
00:52:00 00:54:00 00:56:00 00:58:00 01:00:00 06:08:00 06:10:00 06:12:00 06:14:00 06:16:00 07:38:00 07:40:00 07:42:00 07:44:00 07:46;00
Time_ hr:mi_]:sec "FJlne_hr:min:sec Time, hr:nlin:sec
-5O
-60
-70
E
cc_
-80
o_
F> 40
N
-i00
-ii0
120
-130
-140
06:08:00 06:09:00 06:10:00 06:1I: 00 06:12:00 06:13:00 06:14:00 06:15:00 06:16:00
Time, hr:min:sec o_
co
I
Figure6.8-30.- TotalreceivedVHFpower,guaymas,revolution4. bo
NASA-S-68-1996
-40 o",
Seconddescent
(20
_ngine firing I
L,O
I O_
-50
-60
-10
"_ -80
> -90
"_ -190
5-
-ii0
-120
-]30
-140
06:i h00 06:12:00 06:13:00 06:14:00 06:15:00 06:16:00 06:17:00 06:18:00
Time, hr:min:sec
10-°° I-
I
10-6
1
10 -5
10 -4
10-3
10-2
___
_,
_
____
....
______
.................
...............
....
_
Limit of usablereal-time data Limit of usablereal-time data Limit of usable real-time data
00:51:00 00:53:00 00:55:00 00:57:00 00:59:00 06:08:00 06:10:00 06:12:00 06:14:00 06:16:00 07:37:0 07:39:00 07:41:00 07:43:00 07:45:00
Time,hr:min:sec Time,hr:min:sec Time,hr:min:sec
Figure 6.8-_32.- VHF PCM bit error probability, Carnarvon,revolution 1. Figure 6.8-33.- VHF PCM bit error probability, Guaymas,revolution 4. Figure 6.8-34.- VHF PCM bit error probability, Hawaii, revolution 5.
o_
NASA-S-68- 2000 Co
I
-40 L,o
co
-50 ---
-60 ---
-
_iI i '\ -_ _ i/ /
' V I ReceivedVHF
\\/
',' ,.-_
/L
/ _ p/--carrier
_"
power
f__{
,_- -90 UHFpower -- %_ /_\ /_,/ J
r
\j /
/
' ReceivedVHF X/\
-120
-140
00:.51:00 00:.52:00 00:.53:00 00:.54:00 00:.55:00 00:.56:00 00:.57:00 00:.58:00 00:.59:00 01:00:00
Time, hr:min:sec
6.9 RADAR
6.10.1 Summary
The primary guidance, navigation, and control system and the stabi-
lization and control system functioned as designed throughout the mis-
sion. Navigation errors at insertion were commensurate with the system
alignment errors existing at lift-off. LM/S-IVB stage separation, the
maneuver to cold-soak attitude, the subsequent attitude hold, the maneu-
ver to the attitude for the first descent engine firing and the initia-
tion of the firing were all performed nominally by the primary system.
The first descent engine firing was ended prematurely by the LM guidance
computer because the descent engine thrust buildup did not meet the pro-
grammed velocity/time criteria. The subsequent attitude hold and ground
commanded maneuver to the attitude for the second descent engine firing
were also performed under primary system control. The second and third
descent engine firings and the first ascent engine firing were performed
by the stabilization and control system with mission programmer sequenc-
ing and were nominal for that system. Control was returned to the pri-
mary system after the first ascent engine firing, and an abnormal limit
cycle occurred because the digital autopilot was configured for control
"_ of an unstaged vehicle. The second ascent engine firing was controlled
by the stabilization and control system and the mission programmer with
nominal results until control engine propellant depletion, when con-
trol authority was lost and the vehicle tum01ed.
meet a minimum perigee constraint for the second ascent engine firing.
Total velocity at insertion agreed within 2 ft/sec. After sensing S-IVB
stage shutdown, the guidance computer entered an idling mode until the
progrs_mmed LM/S-IVB stage separation sequence was initiated.
and the gimbal angle comparisons are shown in figure 6.10-7. Performance
was nominal.
Coast between first and second descent engine firings.- The descent
engine shutdown sequence initiated a wide deadband attitude-hold period
controlled by the digital autopilot at the first firing attitude. The
typical limit cycle was unsymmetrical but differed from that during the
cold-soak period. The pitch and roll axes were uncoupled and all firings
were near minimum impuls e duration in all three axes. The asymmetry ex-
perienced is typical of that caused by an external disturbance torque.
The maneuver to the second descent engine firing attitude was initi-
ated by a series of ground commands and was controlled by the digital
autopilot (see figures 6.10-8 and 6.10-9). Response was nominal.
g. Staging dynamics
j-
Table 6.10-11 contains selected performance characteristics extracted
from figures 6.10-10 and 6.10-11.
6.10-4
The control engine duty cycle was higher in each case during the
+X translations preceding the descent engine firings than it was after
ignition, indicating that the disturbance torque due to center-of-
gravity offset was greater than that due to thrust vector misalignment.
Body rates remained close to the deadbands during all the firings with
a substantial control margin. One second before the end of the second
+X translation, the descent engine was armed, enabling the engine gimbal
drive actuators to drive in response to the +X translation disturbance
torque. Each time the actuators drove, the ac voltage fluctuated as
shown in figure 6.10-10. This figure and table 6.10-11 show that the
direction of actuator motion reversed after ignition and indicate that
the activity during the +X translation introduced an out-of-trim condi-
tion. The trilmming action during the lO-percent-throttle period reduced
the thrust-vector/center-of-gravity offset to an acceptable level before
the increase to full throttle_ consequently, the resulting disturbance
torques were well within the control engine capability. It would be pos-
sible to exceed the available control authority at full throttle if a
large thrust-vector/center-of-gravity offset was introduced during the
+X translation_ and an insufficient time at 10-percent throttle was
allowed to trim the engine. Measures are being taken to prevent this
problem from occurring on future missions.
The descent engine thrust during lO-percent throttle was 1221 pounds
as determined from the inertial measurement unit accelerometers_ which
compares reasonably well with 1180 pounds as determined from the thrust
chamber pressure. The ascent engine thrust was 3551 pounds based on the
accelerometers and 3480 pounds based on the chamber pressure. Dynamics
of the staging event are discussed in section 6.17.
Coast period between the first and second ascent engine firings.-
Mission programmer sequence Ill was interrupted after the ascent engine
shutdown, and spacecraft attitude control was returned to the digital
autopilot. High-rate limit cycle operation occurred immediately, causing
excessive propellant usage. This abnormal performance occurred because
the digital autopilot was still configured for control of an unstaged
vehicle. The moments of inertia and predicted angular accelerations
used by the digital autopilot to compute control engine '_on" times are
calculated based on the current value of vehicle mass contained in the
6.10-5
computer erasable memory. For this mission, the current value of mass
(and, therefore, inertia and acceleration) was to be periodically updated
during descent and ascent engine operation and automatically reinitial-
ized at staging. Because of the premature shutdown of the first descent
engine firing, the computer entered an idling mode and the mass update
process did not occur during the second and third descent engine firings
and the staging sequence. Therefore, the control engine "on" times com-
puted by the digital autopilot for a given rate and attitude error were
to correct an unstaged, fully loaded vehicle. The result was rapid os-
cillations of the vehicle as the digital autopilot overcontrolled in an
attempt to keep attitudes within deadband limits. (See section 12.2 for
further discussion.) The oscillations and resultant propellant usage
have been reproduced in simulations.
Rate damping during the ascent engine firing was nominal although
the 4-up control engine had failed, and rates in all three axes held near
the deadbands. A second +X translation (fig. 6.10-13) occurred 58.6 sec-
onds after engine ignition. This was caused by the mission programmer
sequence V, which included two ascent engine firings, each preceded by
a +X translation. Because an engine start override ground command was
sent after the first ignition, only one firing occurred. The second +X
translation, therefore, occurred while the engine was on. Further,
sequence V called for closing the propellant interconnect valves. The
rates began to diverge and the vehicle began to tumble when the control
propellant was depleted (see fig. 6.10-13). Rates in all axes periodi-
cally exceeded the rate gyro instrumentation saturation level of +25 deg/
sec. Gimbal lock occurred at approximately 07:47:30, as verified by the
gimbal lock alarm.
S-IVB/instrument unit
Position Spacecraft guidance best estimate trajectory
Velocity
R = retract Oi
E = extend _o
6.10-10
:ERROR SOURCES
6.1O-ll
Merritt Island, passes 1/2 and 2/3 0.095 -0.356 0.019 5 994
(one revolution)
*Program initiation times are not corrected for word position in the 2-second downlist.
6.10-13
NASA-S-68-2001
L M/S-]3ZB separation program initiate.." _ N_x_ _x_ ,_N_ _,x_N_ _ _,_'N_ ,_'_ _,'_'_ x_x-,N_xN,_
_"_ ,_N-N_N,_
,_N_ _NN_ _N_'_ X_N'N'_'N_
,N_ N,N_ _x_ _x-_'N_X_NN_x
_ ,x_ _ .N_x_ ,_N_ _ .................
00:49:30 00:50:00 00:50::30 00:51:00 00:51:30 00:52:00 00:52:30 00:53:00 00:53:30 00:54:00 00:54:30
Time, hr:min:see
Off r_ On Jet ]U
r_ On Jet 2U i i i• I' I' : E-;.,- [
Oft
Oil _J_-On Jet3U JI II I[ II II " _I "'- ......... ._I
I I I I I I --. I
Off _On Jet4U 10 _- I I I I ..... --
o_ Begin lEnd +X IiBegin +X lEnd maneuver to IIEndmaneuver to
5 -- I translation IIseparation IItranslation Iitranslation I translation iceld-soakattitude Icofd-soakattitude
I I I [
_.-5 -- ll ll lI il l
l I } l l
Off _On JetID dO --' I , t I I
Off f-OR Jet20 .... I --
Off _On Jet3D
Off J--On Jet4D 10 ............... " °.
_ 5 I J ' I
: I
_.-0 l
Off _l_On Jet ]F
Off _J--On Jet 2F dO
Off _-On Jet3F
Off _--On Jet4F 10
Yaw rate I
>_-5 l
l
__-On Jet 1S I
Off _On
Off Jet2S -10 I
"- --
340 ---_\
o; 320 _ ...,,,.,,._..,,,-"
E
r-_ 300
8o IIIIActual
60 -'_ Commanded:--
_
40
20
\ '
-_ 360
-
>-
340 \
320 \
30O
160
o_ 140 ------
--_,
N
c 120 i
x 100 !
80
00:53:50.9 58.9 54:06.9 14.9 22.9 30.9 38.9 46.9 54.9 00:.55:02.9
Time, hr:min:sec
O_
Up
Down
Right
>-
Left
Right
2.
Left
g%
_m 0.2 t
_; o.1
i
i I l
_ 2
0.3 i_
0.2 _ _-°-_ "h-
I
[
-0.2 Stop
-5 -4 -5 -2 -i 0 1 2 3 4 5 6 OA
Attitude
error,deg F_
0
I
i iii
!i I _i
6.10-18
NASA S 68 2006
Oft On Jet IU
Off _ On Jet2U -- ............
Off _--On Jet3U - -.........
Oil _ On Jet4U lO-- - ---
Ii Beginmaneuverto firing attitude EndmaReuver
M
5 I
I Pitch rate
o; 0 --_ I
....
_.-5 II II
_ On JetIS II II
Off Yawrate
Off --J-- On Jet2S -10
Off --_ On Jet3S
Off _On Jet4S
I _ I I ±.......... I I I I __._._.L I _ _ ..._. __I I I I........ I I ] I I L L I ....... I I I I I I J
03:55:0903:55:10 03:55:15 03:55:20 03:55:25 03:55:30 03:55:35 03:55:40
Time, hr:min:sec
NASA-S-68- 2007
g, 36° I _ I
_' _ ---1
340 "_-- --
._ _ .....
_Actual Cqremanded
N 320
40 -- --
_ _,_ ,,lm_,,,,_ _
2O
J,
g. 360
_
E 340
,4,.
o
>"
320
__
_ _
/ 4
300
i
NASA S 68_ 2008
Off _ On JetiU
Off r_ On Jet 2U .... _ ..
Off _On Jet3U
Off -J_ On Jet 4U IO , .................
g ! Begin laaneuver to firing attitude End maneuver
I
I Pitch rate
_-s i i
I I
Off -J_- On Jet 1D -10 ......... ..,I
Off _On Jet2D -- ' ....
Off -J_ On Jet 3D .............
Off _On Jet4D 10
5 _ _ _ I
I R011rate \ I
o-5
Off _On Jet 1P
Off _On Jet2F -]0
Off _j---On Jet3F
j---On ]et4F 10
Off --
g5
Yaw rate
Figure 6.10-8. - Spacecraft dynamics - maneuver to attitude for seconddescent engine firing.
6.10-21
NASA-S-68-2009
40 I_ ' .........
. i
320
160 ...............................................
07 120 ..........................
--'_
•_- 80 ........................................
x
40 .............
04:51:20.8 28.8 36.8 44.8 52.8 52:00.8 08.8 ?.6,8 04:52:24.8
NASA-S-68-2010
2B •_=
c -
_ -5 iArm descent ngine iI Comman 10percentthrottle IComm
I ,o,t.rot.e
nd II Commandi0 percentthrottle II
iI II I II I tI I I il
_On JetIF O _ -10 ; l . .; I Roll
gimba,
drive _7__:-[
actuator I I I
Off _- On Jet2F _ -:- a,,:_-----<t .........".-....... :-_
Off _iOn Jet3F ":"J""" ......... _*_"":'_'-" ""
Off _On Jet4P -i
Off lO
I i I I End+Xtranslation I I I i I_ Commandfull throttle i
I End+X translat on IEnd+X translation I I Descentengine off I End+X translation I
I iI i I' I I I
I II II
I1 I
0 _ i I i I Yawrate I I i:"---- Abort stagecommand 1
.___
]
i0 _ I_ ' '
} 0 F 900 r- _
-.... O F
_
----_
tO .........
_" _ _
_
-....
212, --
_
_
" --
"
_
]
..... rate_-
rate_
[ / _- _ ' I
-
x- i
- _ - _ aw
ztitude
_- , _ itch
300 - -80 80 ..... // "_ titude--
I00200-0
- -1OO_ __ 402060 ........... _/_ _ _ -- // _" chamber pressure____chamberDescentj
_enginepressure _//--chamber
pressureASCent
engine _ tit
ui_ --"
-i00 - O / \ ....
06:]0:00 06:10:]5 06:IO:gO 06:10;45 06;ii:00 06:lhlg 06:lhgO 06:lh4P 06:12:00 06:12:15 06:12:50 06:12:45 06:13:00 06:15:15 06:15:30 Oh
Time, hr:r;lin:sec
_J
o
I
Figu re 6.1O-ii.- Mission programmer sequence 11I. FO
L*)
6.10-24
6.10-25
I I I I l
5 I I I I I
o_ I I I I I
I I I , I
Off -J_ On Jet 1D -10 L ........................................................................................................................................... I
_ 0 --
"I i.............. ;I ..... I
, '
................................ I
, I ! , I '
_- 0 -- "_ _ _-_ .... Roll rate I
I I I
off -Y-- On Jet 1F I I I I
Off _.r_ On Jet2F -]0 --
Off _j_On Jet3F
Off _On Jet4F i0 --
I
I I
l Yaw rate I
I
l I I I I -- i --
_-5 I i I I I
I I I I I I
Off-]_ On Jet 1S I I I I I
I I
I
Off _j_On JetgS -lO i
Off _On JetBS
Off -J_ On Jet 4S
I I I I J J l I L
07:44:O0 0h44:I0 01:44:20 07:44:30 07:44:40 07:44:00 07:45:00 07:45:lO 07:45:20 07:40:30
Time, hr:min:sec
(a) Ignition and initial portion of firing, with rate control.
NASA-S-68-2014
j
20 _
o_ -I0 ]
J !
I -- : \
_. 0 I _ R0ll rate
= 20 ' ------ -- _ _"
>- -5
1.2
1.0
0.8
0.6
_ 0.4
0.2
1000
0
8OO
-0.2
6OO
E
P_ 400
__ 200
m
0
-200
-400
760 720 680 640 600 560 520 480 440 400 360 320 280 240 200 160 120 80 40 0
Timebefore
lift-off,
days
(a) X-axis accelerometer. O'x
0.4
2OO
-600
-800
760 720 680 640 600 560 520 480 440 400 360 320 280 240 200 160 120 80 40 0
E -40
-80
4
==
0
< -4
-8
760 720 680 640 600 560 520 480 440 400 360 320 280 240 200 160 120 80 40 0
Timebeforelift-off, days
(d) X-axiscjyro.
Figure6.].0-14.- Continued.
!
6.10-31
O'x
NASA_SoS 2020
O
I
L_O
rX)
8 J] _ IZ ,r
.......
8
:_Ji [ I
coefficienl Flig ,t
I,t t J / _ ADIA- Accelerationdrift, input axis
(ADOAremoved) Ioa(/- J OADSRA- Accelerationdrift spin referenceaxi!
-2.1 -2. _• • • Values usedto calculateflight load
<>Countdowndemonstrationtest value
4
-80 -0.6 - _
-49. ".... _ (ADOA-Acceleration drift, output axis)
!
760 720 680 640 800 560 520 480 440 400 360 320 280 240 200 160 120 80 40 0
Timebefore lift off, days
if) Z-axis gyro.
}
r
6.10-33
NASA-S-68- 2021
X I (along ]ocaJ vertical
at launch instant)
XSC
XSM _
1..
/ \\ \_ AX,._.__Z Launch
"2;222'
XI' YI' ZI - Launch inertial axes
XsM'YsM' ZSM - IMU stable member axes
XSC' YSC' ZSC - Spacecraft axes
AZ - Launch azimuth = 72 deg
14o •
I
. _
L .... i 'I I
LMguidanceminusS [_B .instrument unit, totalerror
120 ! o LN_
guidanceminusGlotracIfinal) i*'"
LMguidanceminusS-EZBinstrumentunit correctedfor gravitycomputationerror /'
LMguidanceminusS-_ZBinstrumentunit compensated
for LMguidanceerror , _
IO0 _
= ...o,_ I
20_ I '
I [
i " I i I
: ! I
---..,1_--___1
-20 I
0 413 8r) 120 160 200 240 280 320 360 400 440 480 520 560 600
Time,sec
(a)X-axis•
Figure6.10-16.- Launchphasevelocitycomparisons.
NASA-S-68- 2023
4O
-40
Datadropout "_'2 _ _
-12o I
-- ..... LMguidance minus S-]]ZB instrument unit corrected for gravity computation error \,,
LMguidance minus S-WB instrument unit compensatedfor LMguidance error ", ,.
! "".
i2_ 0
I
0 40 80 120 160 200 240 280 320 360 400 440 480 520 560 600
Time, sec
(b) Y-axis.
o_
o
NASA-S-68- 2024 I
L,o
28O
: I !
200
F i I i ..-'""
__ ],,!........
L_] ,.
160 .
_ 120 i ..................
° i _S
i Datadropout
40 i : _/ _
o , ...........
0 40 80 ]20 ]60 200 240 280 320 760 400 440 480 520 560 600
Time, sec
(c) Z-axis.
At 108 hours before launch, the two helium tanks were serviced with
1.05 pounds of helium, providing the preactivation conditions of
3099 psia at 74 ° F in tank A and 3168 psia at 73.2 ° F in tank B. A re-
versed differential pressure of 38 psi was applied across the check
valves to increase the valve seating force and thereby prevent the flow
of propellant vapors into the regulator where they could form corrosive
residues. There was no evidence of external helium leakage.
6o11-2
to 180 psia (fig. 6.11-6). However, the A system oxidizer manifold pres-
sure decreased to 80 psia, and the B system oxidizer pressure increased
to the same value. This resulted from the main A oxidizer valve inad-
vertently becoming unlatched and essentially closing at that time. Cur-
rent had been continuously applied to the valve for almost an hour,
supplying sufficient heat to vaporize the oxidizer in the valve. When
the valve was opened, oxidizer vapor was trapped above the upper magnet.
The vapor pressure forced the valve to unlatch when the downstream pres-
sure decreased after the crossfeed valves were opened. Oxidizer leakage
through the valve is indicated by the gradual oxidizer manifold pressure
rise to 115 psia from 80 psia. The oxidizer manifold pressure again de-
creased to about 50 psia as engine firings reduced the manifold pressure
to the oxidizer vapor pressure.
After the main A valves were reopened, the A system was commanded
to fire only about 8 pulses of 15 milliseconds duration until the cross-
feed valves were opened. The first two pulses usually exhibited less
than nominal chamber pressure, but by the third pulse, all A system
engines were indicating nominal chamber pressure. After the crossfeed
valves opened, B system engines required about i0 pulses before chamber
pressures above i0 psia were produced. This delay occurred while the
helium was being purged from the manifold. The chamber pressures of
engines in both systems were equal, but because the oxidizer pressure
remained between 50 and 115 psia until the ascent propellant interconnect
valves were opened, engine performance varied between 30 and 70 percent
of nominal. When the interconnect valves were opened and manifold pres-
sures had returned to normal, engine thrust (except for 4-up) returned
to normal. Because of a mass error in the guidance computer, the engines
f_
6.11-7
again were commanded to fire a very heavy duty cycle until vehicle control
was switched from primary guidance to the backup control path. The char-
acteristic instability indicative of gas ingestion occurred twice during
this period but existed for only about i00 milliseconds. When the second
ascent engine firing began, the reaction control system fuel and oxidizer
manifold pressures dropped approximately 6 and 12 psi, respectively. En-
gine chamber pressures were nominal during the interconnect operation
with the ascent engine firing. At this time, the effect of the slightly
lower inlet pressures should have decreased the chamber pressure by about
2 percent; however, the resolution of the data was not adequate to provide
confirmation.
high activity periods, the injector temperature would have rapidly drop-
ped below 300 ° F because of the regenerative cooling effect of the pro-
pellant within the injector.
,._a_ A ..... s .... e_ _ .45.00 I 7.8 8.0 I 3.8 4.0 11.6 12.0 23.6
Crossfeed and A interconnect 07:46:43
valves closed, main A valves
From To Hin. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max. Min. Max.
Separation and cold-so_k 00:52:00 01:46:00 147 225 142 171 138 225 138 161 142 171 147 225 138 156
First descent engine 03:54:22 04:28:42 142 225 142 161 142 215 142 171 142 165 134 205 134 1161
firing
3eeond and third descent 06:10:00 06:25:52 142 322 138 200 137 220 137 306 132 176 142 218 138 220
engine firings and first
ascent engine firing a84 a130 a93
_econd ascent engine 07:38:42 07:52:02 134 322 142 195 142 205 142 249 142 239 134 217 134 156
firing
b125 b130 ci03
eThis temperature achieved from heat transfer to engine 4-up, through which propellant coldflowed throughout the second
ascent engine firing, and from venting B system propellants.
i-J
I
F-,
6.11-12
NASA-S-68- 2025
5o
0I 200 - " i ' "" /22psla
.5_= 50-
150- system /34psia
pressure / J '' "" ......................
x
o 0 ...................
200--
100
A systemoxidizer manifoldpressure
L
250
50-
._ / B2psia
_ 200 ....... --
o _ ................. -....
150- 2-sec
00.'50::}4.
9 00:50:36.9 00:50:B8.
9 00:50:40.
9 00:50:42.
9 00:50:44.9 00:50:46.9 00:50:48.9 00:50:50.
9 00:50:52.9 00:50:54.9
Time, hr:min:sec
NASA-S-68-2026
300 -
200 ,,,_.._ ' ,",t"._,._^_'",,_': ....... _ ' ._ .... ,, . .., ...... . .... .,
-----' ' ',v.--,',,,.',, ,_..... V_,_z_'" _ '_',_"' ,'_,_',' ,¢w,,, ,,/,, ,_,v_,*_ ...... ,,_;,,,',_,_,_%-_,, _, .:_,_,, ,¢X_.,-- ,,,, _,,,;,,r_,._ ;_._ .... ,,_,<av.,,_
150- , , ," , , + ' , .
0 I - 200
I
1
tCIose main A valves
250 - _ 50 • : A systemoxidizer manifold pressure ; !
_ 200- 0 .;: , ' :' "" "
_- I00-
o_
I
.N
__ 100 ',
_- 50
I---- I-sec • I| _.._ ...... ,.
_" 0 I I I I I I l I
06:17:07.9 06:17:08.9 06:17:09.
9 06:17:10.9 06:17:1i, 9 06:17:12.
9 06:17:13.9 06:17:14.9
I I
! i
I i
I, 1 f t. tt .... _ : :4
N. 250
E 200
150
100
cm. i I I I
N 50 I
'_ 0 _ 1B systemoxidizerOeDletion
o I
I
I
I
i
I I
I I
l ,
•_ 250 i Bsystemfuel depletion I
. 200
150
i00
=- 50
-_ Pressureincreasedueto helium
0
eakagethrough tank bladder
= 8 sec _I
I ............. L .... 1.................................... I 1 I _ I
06:21:49.9 06."21.57.9 06"22:05.9 06"22:I3.9 06:22:21.9 06-22:29.9 06:22-37.9
lime, hr:min:sec
1800
Fueldepletion
1600 I] I B system main valves closed t
p,--......
I I
i
1400 _-_
12oo "-,
m
lOOO
80O
600
400 1
06:23 06:30 06:40 06:50 07:00 07:10 07:20 07:30 07:40 07:50 08:00 08:10
Time, hr:min
I
Figure 6,11-4.- Hel iuta B tank pressure (corrected to 70°F) during period of propellant depletion, krlH
NASA-S 68- 2029 O'x
H
]0g
2 " "/'
I00 i
/
A system fuel manifold pressure
_
o
0L
I I
B system fuel manifold pressure
200 F
W
1-sec
= 1oo
I
=
I
ohi I I I I I I I
07:10:53.9 07:10:54,9 07:10:55,9 07:10:56.9 07:10:57.9 07:10:58.9 07:10_5g,9
Time, hr:min:sec
NASA-S-68-2_O
i
!
Reopenmain A valves I Opencrossfeedvalves
I
I
250 I
A systemfuel manifoldpressure II
o_ 200 ........ .........
E 150
100
"= 50
d 50 .......
_ 5o ...........
] i
..... X
'__ :6 ....
-- / N_
_200 8 systemfuel manifold pressure 1_ #_'
"_
= 150_- o Close main B valves I '
lOO
|-
kL
50
0
I
L I ,I I I I I I I I I I
07:09:59,9 07:10:39,
9 07:11:19.g 07:11.59.9 07:12:39.9 07:13:19.9 07:13:5g.9 07:14:39.9 07:15:19.9 07:15:59.9 07:16:39.9
Time. hr:min:sec
NASA-S-68- 2031
Ascent propellant
depletionoccufred
after 07:50:00
B interconnect valvescfosed
A systemoxidizer
200 depletion
K 150 _e%_
I00
200 -- 0 -- ,! : _ ; ""
i_ Ul qrn! ,pk _, , _
t50 %
_I00
:_
_ 50 '" , "_ B systemoxidizer
manifold
pressure '
c_ 200 -- ...... ' ......
..........., ......
m.
150 i
= ! A systemoxidizer manifold pressure
i00 I
A interconnect and crossfeedvalvesclosed_
_, 50 man A valvesopened _ ,-,--_
I
200 -o 0 '
150 - "Y!
_ Approximately64 poundsof oxidizer wascold
= k k_ ___ ..... flowedthrough enginesbetween07:4&42and
_100 - [ I
8-sec O7:48:06
-_
= 50 - A systemfuel manifold pressure . .....
/
8O
3O
20
10
0 i 2 3 4 5 6 7 8
Time, hr
NASA-S-68-2034
i I
Engine 1-down I I
1oo ,_ >.....';,_.._,:,_
....... ....... ...... ', , _I,_ _
_6o
40
! _ Approximately300Hz combustioninstability, Ill
___ 20 characteristic of two.phaseflow; probablyhelium I _ _, i _,,
0 - _'# evacuated
releasedfrom
manifoldsat
propellantswhen
activationflashed into Engine 2-down I Off time, msec 125 5 5 45 5 5 5 5 55
-_ 8o[- , I_ 1
I
80 t !
•-- ]
60-- I i
_, 40 - '. I
o_ 20 - Engine&down t I
120 0- _ I I
80 I i [
60 I i
4(] : I ..... ,
I
"_ l
I Off time, msec 125 5 5 45 5 5 5 5 55 ii0 65 55 10 40 55 i0
I
LMIS-TVBstage
1 second I I
_ separation
I I
I I I I I I I I I I J
00.53:50 00:53:51 00.53:52 00:53:53 00:53:54 00.53:55 00.53:56 00:53:51 00:53:58 00:53:59 00:54:00 00.54:01
Time, hr:min:sec
NASA-S-68- 2035
i00 --
75
13-
25
I
I Enqine comlnanded on ] Engine commanded Oll
I
I 0.Isec _
1 '
I
I
I
I I I I I I
06:17:10.8 06:17:10.9 06:17:11.0 06:17:11.I 06:17:11.2 06:17:11.3
Time, hr:n/Jn:sec
NASA-S-68-2036
100 _ (oxidizer)
e4_ F
pproximat - 1.5psia
but increasedto approximately45 _ 20 psiawithin
10secondsas oxidizer manifold pressure increased
from 35to 50psia
/
--, isec _-]
I , I I I J
06:22:1.
8.5 06:22:ig 06:22:19.5 06:22:20 06:22:20.5 06:22:21 06:22:21.5
Time, hr:min:sec
24O
I I
- - Estimated
-- _ Cluster 1-- /
220 -- oCluster 2 / \ /
DCluster 3-- / / Cooling I
OCluster4 I i / from A-_
I I '_ system -
200 Tem)eraturesensor _ oxidizer I
up_erliiit _ _ coldflow'_
260 ! y _3
O",
24O
220
LL
o 200
E
_- 180
160
140
120
00:50:00 01:00:00 01:i0:00 01:20:00 01:30:00 01:40:00 01:50:00
Time, hr:min:sec
Figure6.11-15.- Cluster landeng[nes 1-downand 1-forward injector head temperaLures
at LM/S-]3ZB stage separation.
NASA-S-68-2040
..L_,{
duty cycle
N..,
/ _ _
s_r__L____
,, Heatingfrom IDI
_ - _- - 4- -- -m-
C_
NASA-S-68- 2041 H_
I
Co
32O i • i
ascent
First II B system fuel depleted
--engine- . I i #g" ,_ Estimated __
firing Main A valve closed I /C3'" " ... (Z) Engine 2D injector head
280 _ I I r-
?. \ ", []
Z_ Engine
Cluster 2U
2 injector head --
-from +X.
U- 240 translat,ons
Heat soakback _
/7.,! _.N. y 1...[Z1."
° o ol -/ng
20o duty
cycle
duty cycle
Cooling from .f .i
jz venting system _
120 Switch to
----guidance
primary _ '_ Amani_ \S
Time, hr:min:sec
Figure b.ll-17.- Cluster 2 and engines 2-down and 2-up injector head temperatures
during mission programmer sequence TIT.
i
2
6.zl-29
NASA-S-68-2042
340 I i
I I I I ! [
__ - ........ Estimated i ,.
0 Engine 1Dinjector head ] I
[] Engine 1Finjector head _,
320 --A Cluster 1 cf \
• !
\
J
i ! i _[
300 iI Heatsoakback \\
from moment _ \
i imbalancefiring ",,
/ \
260
280 / (
Heatingfrom moment ./
during second
240 engine firing
E imbalancefiringscent _ k_
- _ c/ /- -
220 Cooling /
r- tf .during +X /
translations z Sensor upper limit,
,8o f
_/m _/mJ /L..__
Heatingfrom /
II
200
160 -- high
-from
activity]
high_'_
activity= _! // _ II
/
-//tJ_--Z_[ // JI
[3" II
140 __._'i | A and B
.. ©-_ II I interconnects
-A interconnects B interconnects closed
120 opened opened ill
07:38:00 07:40:00 07:42:00 07:44:00 07:46:00 07:48:00 07:50:00 07:52:00 07:54:00
Time, hr:min:sec
"_
_ ,oo 0
!
_-_ 0 I _
+_
<
LU 0
lgO i II II OCluster
[]Cluster 3
4
I I
,I ,
180 i
li
II
'
I
I
+X translation
/
/
I
I
/
/
170
Primary guidance ,_ / Backup
_- control l -- control
160
/
E
150 /
i //
140 . _ _-
_- - A and B
Secondascent interconnects
_ engine firing closed
130
i Jl
I II
: I II
I II
120 I i J I I
07:40:00 07:41:00 07:42:00 07:43:00 07:44:00 07:45:00 07:46:00 07:47:00 07:48:00
Time, hr:min:sec
The first planned descent engine firing was shut down after 4.17 sec-
onds by the guidance computer. Alternate mission C, which included two
descent engine burns, was then implemented. Each of these firings be-
gan with 26 seconds at 10-percent throttle, followed by 7 seconds at
full throttle during the first firing and 2 seconds at full throttle dur-
ing the second firing. The original mission plan required approximately
782 seconds of engine firing time, which included various throttling
activities, and 374 seconds at full throttle. The descent propulsion
system appeared to operate satisfactorily to the extent exercised; how-
ever, the firing times were not of sufficient duration to permit an
accurate determination of the performance of the descent engine or super-
critical helium pressurization system.
Figure 6.12-1 shows the variations in chamber pressure for the three
descent engine starts. A nominal start curve, obtained from tests under
normal regulated pressures of 242 psia, is also shown for comparison.
-_ The regulated tank pressures for the second and third firings were about
242 psia and show close agreement with the nominal curve. The quicker
start noted for the third firing may have resulted from the fuel injector
manifold still being partially primed because of the short 32-second
coast period. At the start of the first firing, oxidizer and fuel tank
pressures were essentially as planned, approximately 127 and 132 psia,
respectively. About 1.3 seconds after the "engine on" command, the he-
lium pressurization isolation valves were opened and the tank pressures
started to increase. This pressurization activation delay was designed
into the system to prevent fuel freezing in the heat exchanger. The
pressures were still increasing at the time the computer issued an "en-
gine off" command. The engine was shut down because the impulse re-
quired by the computer was not obtained; the computer required 1440 ib-sec
impulse over a 2-second interval. The engine had obtained a total of
only 1075 ib-sec at the time of cutoff. From the figure, it is evident
that nearly all the 1075 ib-sec impulse was accumulated in the last
2-second interval. The engine-delivered impulse before shutdown was as
_ expected for the existing start conditions.
The transient characteristics for the second and third firings, along
with the corresponding ground test and specification values, are shown
in table 6.12-1. Because the steady-state thrust was not achieved during
the first firing, the shutdown impulse was not computed. For the second
firing, the shutdown impulse at cutoff was 1727 ib-sec from "engine off"
initiate to 10-percent thrust. The time to 10-percent thrust from "en-
gine off" was 0.26 second as compared with the specification value of
0.25 second. All other data show the engine transient characteristics
to be satisfactory. The oscillations of chamber pressure were essentially
nonexistent during 10-percent throttle operation, and only insignificant
oscillations were present during full throttle operation (fig. 6.12-2).
During the second and third firings, mission progran_ner sequence III
commanded the descent engine from the 10-percent throttle to full throttle
at a constant rate. Throttle response of the engine was within the
1.0-second allowable time. Figure 6.12-2 shows chamber pressure and in-
jector actuator position during the transition to full throttle for the
second firing. The engine reached the full thrust level 0.40 second after
the command was initiated for the second firing and 0.46 second for the
third firing. The chamber pressure was within 5 psia of the full chamber
pressure in 0.34 second after the command for the second firing and in
0.4 second for the third firing as compared with acceptance test time of
0.35 second.
6.12-3
essentially the same. The following table presents some of the parameters
within the engine feed system.
Full - - -
throttle
The flight data show that the quantity gaging system was not indi-
cating correctly for the number 2 fuel and oxidizer tanks; however, this
condition was known prior to flight. A failure investigation has attrib-
uted the effect to a faulty transistor within the gaging system. The
descent engine firing time was not sufficient to permit a full assessment
of system accuracy.
Because of the short duration of the engine firings and the lack of
long-duration full-throttle data, it is not possible to evaluate the per-
formance of the supercritical helium pressurization system. Figure 6.12-5
presents the flight data for the first descent engine firing and also data
from a simulation performed at White Sands Test Facility.
Figures 6.12-6 and 6.12-7 show flight data and predicted pressures
from a computer program simulation for the second and third firings,
respectively. The figures indicate that the measured tank pressure was
less than had been predicted by the ground simulation computer program.
The computer simulation accuracy is not known for short firings because
empirically derived coefficients from ground test data were used in the
f
6.12-5
Temperature, fuel tank no. i, fuel bulk, OF (b) 70.5 70.5 70.5
Temperature, fuel tank no. 2, fuel bulk_ oF (b) 70.5 72.0 72.0
bspecification constrains difference between fuel tank temperature and fuel engine inter-
face temperature to be no less than 5° F.
o_
!
6.12-8
NASA-S-68-2044
16
14
F Nominal
Third firing
Shutdown
12 I
__ First firing
/
Engine test at White Sands __
// Test Facility
__- Second firing
5 i
4 /
/
2
/ t! / ,
Nominal is based oil acceptance test data
/- [
0 i 2 3 4 5 6 7
Time from start signal, sec
6.12-9
NASA-S-68-2045
_g_=_ 10_ I
o _-100 _ f Injector actuator throttle position
225 ---'--"'-"-----._,_ [I /-
j Engine fuel interface pressureJ
. _
=_
_ I
o_ 150 I
5O0 I
I Engine oxidizer interface pressure;
,_=
_ 225 _1 _- ,
_= I
Q- I
150 I _- Engine fuel injector inlet pressure
r
_E, 75
O_
o I
I
I ._-f Engine oxidizer injector inlet pressure
150
o_ 75 I
I
I I_-
r
Engine thrust chamberpressure
_ 50
0-
_,_ 100 /_
0 I I J I I "1 I I I
200 400 600 800 1000 1200 1400 1600
Referencetime, msec
I
NASA-S-68-2046 H
o
120
.......... L
i00
i L
80
i
_ L i i L
_ 60
_ i I ' I I i
40
i i i i i
I L
o /
06:10:38 06:10:42 06:10:46 06:10:50 06:10:54 06:10:58 06:11:02 06:11:06 06:11:10 06:11:14 06:11:18
Time, hr:min:sec
Fuel
" - _ 2
Pintle Fuel
Oxidizer control
orifice actuator _pellant
supply
o-,
Pintle shaft Oxidizer
Figure 6.12-4.- Descent engine schematic, r_
i
(Th
NASA-S-68- 2048
hD
I
i000 I I ro
980
J
._ 960 _ _ < Actual
_- 940
900
....,
880 "--"-
-2 0 2 4 6 8 i0 12 14 16
Figure 6.12-5.- Supercritical helium supply pressure during first descent engine firing,
i p
'I '!
NASA-S-68- 2049
1180 I I I I I I i I I I
_Actual /
1160 .... Predicted / /
/
/'
/
1140 -"
/
/
/
/
1120 --- /
/
[/// ,/
eN Ii00 /
, /
N 1080 /" /
I
1060 _" /
/" /
., /
d , /
1040 _" /_
/"' /
1020 !//1
if /
1000
6:10:40 6:10:44 5:10:48 6:10:52 6:10:.56 6:1L00 &lI:04 &II:08 6:1h12 6:1h16 &11:20 &11:24
Time, hr:min:see
o'x
Figure 6. 12-6. - Supercritical helium supply pressure during seconddescent engine firing.
FJ
ro
I
L,O
NASA-S-68- 2050
OA
1260
Actual
1220 jJ
1200 -"
f
= /
f
1180 W'
& I
:_ 1160
1140 /
/
1120
Ii00
06:11:44 :48 :52 :56 06:12:00 :04 :08 :12 :16 06:12:20
Time, hr:min:see
Figure 6.12-7.- Supercri[ical helium supply pressure during third descent engine firing.
NASA-S-68- 2051
1160
1140
1120
I10O
1080
1060
= 1040
E
:z 1020 i
1000
98O
960
94O
3:50:004:00:004:10:004:20:004:30:004:40:004:50:005:00:005:]0:005:2&00 5:30:005:40:005:50:006:00:006:10:006:20:.00
Time, hr:min:sec
Figure 6. 12-8. - Supercritical helium supply pressure during coast period belween secondand third firings. rx3
I
_Jq
f
6.13-1
The propellant tanks were serviced with 3170 pounds of oxidizer and
1993 pounds of fuel leaving an ullage volume of 0.5 ft 3 per tank at 90 ° F.
The propellant sample analysis showed the oxidizer density to be 90.22 Ib/
ft 3 at 67.7 ° F and ambient pressure and the fuel density to be 56.40 ib/
ft 3 at 71.4 ° F and ambient pressure.
The performance of the ascent engine has not yet been verified to
have been within the expected accuracy; however, the engine pressure
measurements and the vehicle velocities obtained indicate that the ascent
engine performance was within the nominal predicted tolerances. Chamber
pressure during the two firings is shown in figure 6.13-1.
The oxidizer and fuel propellant tank low-level sensors were un-
covered at 07:49:59.7 and 07:50:00.7, respectively, during the second
firing. Under nominal operating conditions, the low-level sensors are
uncovered when approximately i0 seconds of usable propellant remain in
the tanks; however, thrust decay began at 07:50:01.5. The timing of
these events indicates that propellant slosh resulting from high vehicle
attitude rates caused the propellant tank outlet ports to be uncovered.
An oxidizer-depletion shutdown had been expected. However, when the
propellant in the feed lines (sufficient for approximately i second of
mominal operation) was depleted, as indicated by the engine interface
pressures, helium was ingested into the oxidizer and fuel lines almost
simultaneously, causing thrust decay.
f-
The total ascent engine firing time for the mission was about 40 sec-
onds less than predicted. At least 20 seconds of this time descrepancy
can be attributed to higher-than-expected propellant usage by the control
}
6.13-2
Another difference in the two starts was that the fuel line between
the two parallel engine actuator isolation solenoid valves and the four
engine actuator solenoid pilot valves was dry prior to the first start.
The time required to fill this line causes the first start to be slower
than subsequent engine starts.
The engine valve position indicators showed that the engine valves
started to close at 07:51:25.8 (85 seconds after the thrust decay) but
were not completely closed when the telemetry signal was lost by the
ground station at 07:52:23. System pressures and temperatures indicate
that some blockage of fluid flow occurred between the propellant tanks
and the engine after the initial thrust decay. This blockage was most
likely caused by small amounts of propellant frozen by cold helium that
was ingested into the feed lines. Although it was not a normal depletion
shutdown, no hazardous or detrimental effects were apparent after the
initial thrust decay.
Helium flow occurred during the coast between the first and second
firings amounting to approximately 2.5 percent of the total helium
loaded. This helium flow is evidently the result of opening the propel-
lant interconnect valves. During this time, the control engines used
approximately 200 pounds of propellant from the ascent tanks. The amount
of helium flow during the coast would be sufficient, in normal system
operation, to expel approximately 180 pounds of propellant.
TABLE 6.13-1.- ASCENT ENGINE TRANSIENT ANALYSIS SUMMARY
I
Condition Specification First Second Engine Average of 194-1
value firing firing acceptance test type engines
Time from engine start signal to 90-percent 0.400 maximlun 0.47 _ 0.01 0.27 * 0.01 0.351 + 0.016 0.355 4 0.032
steady state thrust, sec ............. - ....
Oh
Time from engine shutdown signal to zero
thrust, sec ................... --- 3.0 ......... to
I
kT]
NASA-S-68-2052
I
2OO
160
120
c_
a_ 80
40
0
06:12:10 06:12:20 06:12:50 06:12:40 06:12:50 06:13:00 06:13:10 06:13:20 06:13:30
Time, hr:min:sec
200
160
.__ 120
a_ 80
4O
07:44:10 07:44:50 07:45:30 07:46:10 07:46:50 07:47:30 07:48:10 07:48:50 07:49:30 07:50:10 07:50:50
Time, hrmfin:sec
NASA-S-68- 2054
_mtia_'iiiiiiiiiiiliiiiiiJiiiliiiiiiiiiiiiiiiiiiimm .......
0
(a) Start transient (typical),
150
<_ 0
_ (b) Steady-state (typical).
t_
o9
o_ 150
150
Figure 6.15-1 shows the cabin pressure and the cabin relief valves
internal pressures for the first 30 minutes of the flight. Preflight
ground tests revealed the two cabin pressure relief yalves would open at
slightly different cabin-to ambient pressure differentials;'the forward
hatch relief valve at 5.7 psid and the upper hatch relief valve at
5.5 psid. About 47 seconds after lift-off, the upper hatch relief valve
started to relieve cabin pressure. One second later, the forward hatch
relief valve cracked momentarily then shut because the cabin-to-ambient
pressure differential across the valve was no longer great enough to
cause the valve to open. The upper hatch relief valve continued to re-
lieve pressure until the cabin was sealed-off at 5.6 psia after 00:02:13.
Eighteen minutes later, the internal pressure of the upper hatch valve
was equal to cabin pressure, verifying the valve had closed. The inter-
_- nal pressure of each valve remained slightly above cabin pressure (within
0.3 psia) for the rest of the flight. Each relief valve operated normally.
The requirement that one valve relieve cabin pressure was demonstrated.
Figure 6.15-2 shows the cabin pressure decay for the mission, which
did not remain constant. The calculated equivalent flow area increased
from 0.0014 to 0.0044 square inch at 03:27:00, when the vehicle was in
a quiescent state and had just passed through the dark side of the orbit.
The internal pressure of each cabin pressure relief valve was slightly
above cabin pressure, verifying that the valves did not open. At about
04:38:00, the flow area began to decrease to 0.0026 square inch.
After launch, the upper cabin wall temperatures near the tunnel de-
creased from 60 ° to 52 ° F by 03:10:00. The upper wall temperatures then
slowly increased to about 63 ° F by the end of the mission. The temperature
of the cabin floor remained at about 56 ° P during most of the mission but
increased to about 76 ° F during the last revolution (see section 6.2.5).
NASA-S-68- 2055
16
14
!I
12
10
8
-- Forward hat.ch relief valve a.d cabin pressure
o i /
/
/
0 4 8 12 16 20 24 28 50
Tilue, iI/il]
Figure 6.15-1.- Presstlre of cabiJl amt int.ema[ pressktre of cabin pressure re[ief va[ves.
NASA-S-68-2056
10
%_....,.,... __ 03:27:00
(/)
_
=
(z)
_04:38:00
I1
2
I Equivalent leakage areas I
I J i I I
I 0.0014 sq in. 0.0044 sq in.I 0.0026 sq in. [
l I I i I I
0 i 2 3 4 5 6 7 8
Time, hr
o_
Figure 6.15-2.- Cabin pressure profile.
KJq
I
XJq
NASA-S-68-2057 c_
60 T
I I
Launch o-,
i
56
52
LL
o
48
_ 44
z
36
32
-1 0 1 2 3 4 5 6 7 8
Time,hr
6.16-1
6.16 CONSUMABLES
The total usable prelaunch power was 1400 amp-hr in the descent
batteries and 492 amp-hr in the ascent batteries. The actual power
usage during the mission was 264 smp-hr in the descent batteries and
91 amp-hr in the ascent batteries. The predicted and actual power usage
is shown in figure 6.16-2. The difference between predicted and actual
can be attributed to power variations within specific components compared
with predicted values. The higher usage of ascent power was caused by
activity of the control engines.
Only 2.7 percent of the total descent engine propellants were used
for the three descent engine firings. (See fig. 6.16-4.) The calculated
consumption for the actual mission profile, as based on nominal perform-
ance data, agrees with the actual consumption within the accuracy of the
propellant quantity gaging device.
Fuel Oxidizer
I00
\ \
80 _... _' _._. usage rate minimum
F.Predicted
Tank _ _ _ _ ' _ I_
E _ "' Tank2
_ 4o • _
N Predicted maximum "_
usagerate "_,,
20
0 1 2 3 4 5 6 7 8
Time, hr
6.i6-5
NASA-S-68-2102
i00
90
8O
7O
60
.E
_ 5o
o
N 40
30
2O
10
0
I 2 3 4 5 6 7 8
Time,hr
Figure6.16-3.-Ascen[engine;):opel
lantusage.
NASA-S-68-2103
l
ZOO
92
90
0 i 2 3 4 5 6 7
Time, hr
i00
8O
.o
•-= 60
E
r_
2 4O
_ 20
0 i 2 3 4 5 6 7 8
Time, hr
o'x
o_
Figure 6,16-5,- Reaction control propellant usage. --4
6.17-1
(
6.17 ABORT STAGING
Figure 6.17-1 shows the parameters associated with the staging event
and certain mission programmer events. The abort stage "fire" and engine
"on" were instrumented events. The other events shown in figure 6.17-1
were derived from the logic times-of-sequence system in figure 6.17-2.
The event times for the two instrumented events are known within 20 milli-
seconds and were within allowable limits. Other event times were within
specification, as demonstrated by the proper functional responses.
The descent engine was shut down at 06:12:14.3, and as the chamber
pressure decayed to about 5 psia, the instrumentation channel was switched
to the ascent engine chamber pressure as shown by the logic sequence.
' Figure 6.17-1 shows the overlap of ascent engine chamber pressure rise
and the descent engine tailoff and was determined by extrapolating the
descent chamber pressure to zero, based on the tailoff characteristics
obtained from the second descent engine firing. The staging bolts were
severed during the thrusting overlap period of the descent and ascent
engines, 30 milliseconds after ascent engine "on." No disturbances were
sensed by angular rates for this event. The ascent engine chamber pres-
sure rose sharply to the start transient peak. At that instant, the
change in pitch rates showed a disturbance torque that was trimmed out by
the control engines. This disturbance torque is discussed in more detail
in section 6.10. The resulting angular rate in pitch and roll was damped
within i second to within the deadband limits. The rates (fig. 6.17-1)
indicate that only a single disturbance occurred which was at the point
of peak chamber pressure. No recontact of the two stages was indicated
at any time.
NASA-S-68-2060
• 2D
3U
10 nuts;umbilical deadfaced_ N 2U
_ 10 g initiate 4U
"t_ =Q _ 0
. _: _ ---I
0 -10 180
r_
_=_lO t
•= _
_ 0 >- -10 I_ 3D
_- -I0 [_ 16 160 I I I I I J I I P
14 140
2- 0 20
0 0
06:12:14.0 06:12:14.2 06:12:14.4 06:12:14.6 06:12:14.8 06:12:15.0 06:12:15.2 06:12:15.4 06:12:15.6 06:12:15.8 06:12:16.0 06:12:16.2 06:12:16.4 06:12:16.6
I second " I Time, hr:min:sec
Commander's
I O
I
O"
=
I
t
= K2
: measorements
OEI
bus q_-o_
.o II
bus +28V II +28V ' IF°-_
= bus ---o il
K13
bos
+28v , _L--_
M'_° I'1 i
9 •
Pyro bus A _ c---- 121
PyrosystemA
- "arm
K1 Master I GH1283
I
Commander's .. ,I .---o_'c--- -.o_l o---.-_ _ Staging I Staging K circuit
bus +28V _ -- I -- I KSt bolts KSA: bolts 6_ Electrical
Stagin'_ K2 I _ (systemB : (systemB = interrupter
Pyro _ .o I
bus "°I -- "--_ _ I I
-h [ 1
A ,I I Time Time l
-o-.,.o I I 15
delay
msec K3 delay .......
_ Umbilical
I.._O_O__
I
I
I
'I
I
I
I
=
Note:
Pyrotechnic systemB
is redundantto systemA
= 15 msec
'
J-cutter
=
TK I TK 2 Open
isolation
Helium valves
pressurization
f_
_- 8-1
First revolution.- Venting of the S-IVB stage was nominal after cut-
off with a slightly greater rat@ of oxidizer ullage decay than had been
expected. The nose cone was jettisoned at 00:10:38. Attitude control
after jettison was nominal; rates and errors were held to dead-band
limits. A nominal pitchover to a posigrade earth rate attitude was ini-
tiated and proper attitude and rates were achieved. The measurement for
the environmental control gaseous nitrogen sphere indicated an off-
nominal pressure decay attributed to a system leak. As the mission pro-
gressed, the pressure decay rate was observed to decrease and ultimately
the pressure followed closely the minimum predicted value for the system.
The Canary Island station acquired telemetry from both the launch
vehicle and the LM at 00:16:59. Deployment of the adapter panels was not
observed at the programmed time. The Booster Systems Engineer sent the
adapter deploy command at about 00:21:11. Command verification was re-
ceived, but no telemetry confirmation of the event was received. Sub-
sequent tape playback and readout verified that the adapter deploy relays
A and B were closed, and the panel deploy monitor indication was not
present. The Coastal Sentry Quebec confirmed that both panel deploy re-
lays A and B had actuated but without a deploy indication. Based on the
two out of three indications, the Flight Director elected to permit the
separation sequence to proceed.
noted that throughout the mission, the Rose Knot Victor was the only
Manned Space Flight Network station with consistently good telemetry and
command capability. During this pass, all clocks were synchronized.
The Rose Knot Victor also reported reception of intermittent data from
the S-IVB stage.
The Mission Control Center transmitted the primary S-band OFF com-
mand at 01:33:12. The secondary S-band ON command was transmitted at
01:33:28. Secondary S-band data (high power mode) were of good quality
throughout the remainder of the mission. Command sequence to close the
reaction control propellant crossfeed valves was initiated at 01:34:17.
At completion of the command, there was a crossfeed valve OPEN indication
which had not been observed prior to that time but was probably caused
by power being on the valve coils. The Guidance Officer started the
crossfeed valve CLOSE reset command sequence from the Texas station at
01:36:01 and the proper telemetry confirmation was received. During
the pass over the United States, the control cluster i temperature
(156 ° F) was about 18 ° F higher than that of clusters 2 and 3 (137 ° and
138 ° F, respectively) and 8 ° F higher than that of cluster 4 (148 ° F).
This difference was believed to have been caused by exposure to the sun.
Water, electrical, and reaction control propellant usage had been near
nominal through the end of revolution i. 0peration.of the guidance com-
puter had been satisfactory.
The S-IVB stage had been following a nominal time line through the
end of the first revol_ion. The only apparent anomalies were the leak
in the environmental control gaseous nitrogen sphere, the poor telemetry
received, and the fuel ullage pressure indicating zero. The zero fuel
ullage pressure was caused by more fuel being vaporized and vented than
had been expected. The prediction of the lifetime of the gaseous nitro-
gen supply was extended to 05:30:00.
The Redstone tracking ship, which had a telemetry computer that had
been faulting since early in the countdown_ had acquisition at approxi-
mately 01:46:40. The UHF signal strength was again marginal. An eval-
uation was made of the available data in an attempt to predict the com-
mand coverage of the firings.
9-5
During the pass over the Redstone, Canary Island, Carnarvon, and
Hawaii stations, the guidance system status was checked.
The handover from the Rose Knot Victor to the Texas station was com-
pleted at 03:05:45. UHF signal strength was poor. The scheduled self-
test of the digital cormmand assembly was postponed until after the pre-
dicted time of signal strength improvement, i_mmediately prior to the
initiation of mission programmer sequence V.
Near the time of Merritt Island loss of signal, the Mission Control
Center reported that the S-IVB stage oxidizer vent valve had not closed.
The oxidizer vent valve CLOSE command was transmitted twice at 03:15:05.
It appeared, however, that command had been handed over to Antigua and
that Antigua had not yet acquired the signal. After the mission, it was
reported that the telemetry discrete had dropped out properly.
r •
9-6
Based on the prefiring events reported from the Coastal Sentry Quebec,
it was confirmed that the guidance computer had entered mission phase 9
at the nominal time of 03:55:04 and the predicted time of ignition for
the first descent engine firing was 03:59:40. Normal operation of the
vent valves on the S-IVB stage was confirmed.
The UHF received-signal strength was -99 dBm when the prime relay
reset command was transmitted unsuccessfully at 04:01:18 and again at
04:01:39. At 04:02:19, the prime relay reset command was transmitted
and was accepted; the descent engine ARM discrete was removed. Trans-
mission of the colmmand sequence Verb 15-Noan 50, to enable display of
the error codes, was started at 04:03:34 and completed at 04:04:26. The
error codes received were 1405, DELTA V MONITOR ALARM, and 315, FORGETIT.
These codes indicated that the guidance computer had commanded shutdown
of the engine because of failure to sense adequate acceleration.
After engine shutdown, the actual orbit was i00 by 119 n. mi. At
04:06:50, the Mission Control Center reported that there were no system
problems that would affect vehicle lifetime. The Flight Dynamics Officer
recommended waiting until the next revolution before starting an alternate
mission. Figure 9.1-1 shows the subsequent real-time logic. The two
prime alternates for this type failure were C and L. There were targets
for L at the Hawaii station, if they had been required for execution
during this pass over the United States. However, they were based on
prelaunch nominal data with no descent engine firing and may not have
been valid. If used, a manual abort staging sequence would have been
required.
/-
9-7
The active part of the S-IVB mission ended with the ambient helium
dump during the pass over the continental United States.
The abort guidance select command was selected as the mode for in-
terrupting, because if cuing of another sequence were required this com-
mand would have to be transmitted anyway. If failures should prevent
continuing the mission for another revolution, the sequence could be
resumed by sending the mission programmer start command.
The Rose Knot Victor commanded the LM to the abort guidance mode
at 06:05:34 and commanded mission programmer start at 06:10:00; the se-
quence proceded normally. The Mission Control Center was monitoring the
sequence through the Goldstone and Guaymas stations. Rates were low,
and the sequence continued normally. The abort staging sequence occurred
at about 06:12:14. The resultant orbit, based on White Sands data, was
93.4 by 526 n. mi.
After the cutoff of the first descent engine firing, it was decided
not to continue with the ascent engine propellant depletion firing part
of the sequence. The vehicle had approached within about 8 degrees of
gimbal lock but had returned to a nominal condition. The abort guidance
select command was sent to stop the sequence before any further commands
were executed by the mission programmer. The first command was trans-
mitted at 06:13:40, and a second command was initiated i second later;
both commands were accepted. The primary guidance select command and
the prime relay reset command were sent at 06:14:03 and 06:14:15, re-
spectively. Shortly afterward, an extremely high reaction control pro-
pellant usage rate was reported, but was believed to be the result of _
9-9
the primary guidance control with the digital autopilot using the full
vehicle mass for its control engine command calculations. This had been
discussed before the mission and was expected but not to the extent ob-
served. The Guidance Officer prepared mass update loads, but these were
not available for immediate transmission because the mass values required
would have been a function of the vehicle state and how far sequence III
had progressed.
The guidance computer had been updated with the proper attitude for
the mission programmer controlled engine firings and an erasable memory
update was sent to reenable the proper computer routine, if further
guidance computer controlled firings were to be accomplished. This was
started at 06:16:47, and completed by 06:17:43.
At this time (06:28:10), the mass update, target update, and a timer
update for mission phase 13 was still required, and an update to lengthen
the guidance computer acceleration sample period was highly desirable.
The exact cause of the descent engine shutdown was still unresolved, and
if the vehicle were unable to complete the maneuver as planned because of
a similar problem, there would be little range coverage left for subse-
quent attempts. Further, attitude control would be lost when the re-
action control B system propellants were depleted_ consequently, it was
decided to open the A system and the control engine crossfeeds as soon
as possible after the mass update was completed. Tracking data confirmed
a 91 by 532 n. mi. orbit, indicating a fairly long pass at Carnarvon.
However, the time available for all the updates was marginal.
During the load attempt to the erasable memory unit, high control
engine activity and occasional high rates were observed. Also, the re-
action control oxidizer pressur@s were low, and it was recommended that
the ascent feed valves be opened prior to executing any firing sequence.
The mass update previously transmitted did not restore normal digital
autopilot operation, because the design of the system is such that the
current mass is ignored until the guidance computer is in an average g
routine.
The firing was normal and attitudes were steady. At the time the
ascent feed and reaction control valves were confirmed to be in the nor-
mal configuration for the ascent feed test_ the abort guidance select
command was transmitted. However, Hawaii had loss of signal and the
command was approximately 12 seconds too late. If the first mission pro-
gram_ner start command had been accepted, confirmation could have been
made in time.
real time. The Rose Knot Victor received approximately 5 pulse code mod-
ulation counts on the chamber pressure measurement after ascent engine
cutoff.
NASA-S-68-2104
Alternate mission L
3)
q OverUnited States(revolution
Alternate missionL Rejected
(a) Extensive computer uplink commanding reguired:
_rget update, liar(ant(oil vector update_ timer
(1) Computer-controlledmission update, andchange-in-velocitymonUor time change
phase11(seconddescentengine (h) Ahort stage ground command required via UHF
Allowsresumption
of nassionunderconlputer
control Rejected continued through ascentengine phase13(secondascentengine (twoascentengine firings, second continued, closing interconnects
-Accepted q
(a) Extensive
targetOver
con/purer
United
update_
upLink
navigation
commanding
States(revolution
required:
4)
vector update, timer
update, and changed(n-velocity monitor Ume change
[____[
firing to depletion(revolution 4)
Mission programmersequence1"11 /
___.]
firing to propellantdepletion)
Computer-controlledmission ii_
extendedto propellantdepletion)
Mission programmersequence_Z ..---t Mission programmersequencer
(h) Ahort stage grouila command requirea via UHF Rejected Rejected _( Rejected Rejectea
during firing (a) No firings unde_ computer control (a) Extensive computer upHnk commanding reqttired Additional ascent engine restart Might ieopardize Loss of attitude control
(c) Experiellce with poor UHF signal strength (b) Marqiaal gromld station coverage aL ascent (b) Poor coveraqe over MerriLL island (revomtioll 4) tile ascent engine ruing to depletion
(d) Lunar module retrograde attitude required change propellant depletion because of low elevation angle
during pass over United StaLes (revomLion 3) in (c) Short period of coverage only over Camarvon
prep,lration for altenlate inissioll C. CoMputer (revolution 5)
uplink for miss(ca phase 11 complicated by {d} Excessive use o[ reaction control propellant
this altitude change requirenlenL during sequence ]_[ requireg additional ground
(e) New targets [or computer mission phase 11 commands wllich complicated computer uplink
(second descent engine fiUnq) Give Itlaxilritllll plan for mission phase 13
firing of 60 seconds wire possible {hie(mum (el Experience with poor UHF signal sLreltgth
perigee violation. (Mininlum perigee = 100n. mi.
if commands not accepted)
(n Descent ella(lie firing Lime iioL long enough to
Alternate missionC satisfy requirements
_remature shutdownof Mission programmersequence]33 Mission programmersequencelit Mission programmersequencer Real-timecommandfor engine on Real-timecommandto prevent closure
gme (minimum requirementssequence) stoppedafter first ascent engine (secondascentenginefiring to after ignition for first firing of propellant interconnects
firing (revolution 4) ti ring propellantdepletion) (extendfiring to propellantdepletion)
Accepted Accepted Accepted Accepted Accepted
Use as backup to alternate i/ass(on L Allows I ossibdiLy of executhlg ascent engine Comguter-conLrolled firings not pracUcal One long ascent engine firing Lo depletion I[ ascent/reaction control propenanL interconnects
firing under computer control satisfies mission objective are anowed to close_ attituae control will be lost
Rejectea Rejected ,'K This was tile primary plan unLa Lime over Carnarvorl (revoluno. 5)
{a) Experiellce with poor UIfF signal strength (a) Grotmd colnmal/aing too Lime critical (7 sec) was not sufficient to complete uplinks
(b} Extensive computer uplink commanding requirea (b) Experience with poor UliF signal strellgth
(c) Poor grou_ld stance coverage aL Carnarvon (of Descent propenant depletion it all colnlilands
low elevation all(lie) not accepted _ eeal-Unle Colll{lland transmission unsuccessful
(d) No capability at Coastal Sentry Quebec for (d) Marqinal ground sLat(on coverage [or ascent
computer uplink colnmandin9 ellgifle progellanL aepleUo, firing
(e) Sequence could not he rally covered by
Coastal Sentry Quehec
9.2.1 Telemetry
9.2.2 Tracking
The Canary Island station had a range bias of 2000 yards during the
first revolution. The problem was caused by a drifting fine-range ad-
justment, which was corrected before the second revolution. During the
first revolution_ data from the White Sands station were not accepted at
the Mission Control Center because of a tagging error by Goddard. During
the second revolution, the California and _ite Sands stations tracked
an antenna side-lobe signal because of erroneous acquisition messages
from the Mission Control Center. The California station could not sup-
port the mission during the third revolution because a malfunction in
the computer affected the high-speed data.
9.2.3 Command
9-16
i0.0 EXPERIMENTS
ii.0 CONCLUSIONS
The analysis of the mission data has resulted in the following con-
clusions:
i. The overall performance of the lunar module was good, and based
on the results of the LM-I flight, the lunar module is acceptable for
manned orbital flight.
i0. The vibration analysis indicated that the lunar module can sat-
isfactorily withstand vibrations which are expected during launch on a
Saturn V.
proper rate control through the descent and ascent engine firings and
the abort staging sequence.
b. Two bottles in rack i were empty, even though rack i was shut
off at T minus 2.5 hours. All other bottles in rack i were full.
The two empty bottles in rack i may have inadvertently been left
open when the rack was isolated during the hold at T minus 2.5 hours.
If this was the case, at the time these two bottles emptied, a nitrogen
flow path was opened; the freon was again mixed with nitrogen, resulting
in coolant temperature fluctuations.
Conclusion - The analysis has shown that the reduced cooling capacity
by the freon supply was caused by nitrogen pressurization gas mixing with
the freon. Two factors contributed to the gas mixing: broken standpipes
in two of freon bottles, and depletion of freon in two other bottles.
The helium which was used to pressurize the propellant tanks after
activation was stored supercritically in a cryogenic storage vessel. The
vessel was isolated by the three explosive valves which were fired auto-
matically by the pyrotechnic system 1.3 ± 0.3 seconds after the "engine
on" command was given. Therefore, the firing was begun with less than
normal propellant tank pressures, causing a slower thrust buildup.
Conclusion - All data indicate that the guidance system and the
descent engine functioned as designed. The slower than normal thrust
buildup, caused by the start at less than full tank pressure, resulted
in failure of the engine to meet the thrust/time criteria programmed in
the guidance computer.
All logic and circuits that could issue any engine cutoff or
inhibit any engine start will be evaluated to determine which should be
eliminated or altered and which should be retained within the software.
Conclusion - At the time the leak area first changed, the vehicle
was in a quiescent state, and the available data provide no indication
as to the cause of the change.
Conclusion - The fuel depleted first and the fuel bladder collapsed.
Fuel depletion was obscured by the effects of bladder leakage and the
manifold pressure sensor sensing helium pressure.
THERMAL SHIELD
Statement - During the abort staging sequence_ one of the two de-
scent engine blast deflector temperature measurements and four of the
seven ascent stage bottom surface temperature measurements failed. This
is discussed in further detail in section 6.2. Six interstage pressure
measurements did not show any detectable pressure increase.
13-1
The space vehicle (fig. 13,0-1) for the Apollo 5 mission consisted
of an Apollo lunar module (LM-I), a spacecraft/lunar module adapter
(SLA 7)_ a nose cone, and a Saturn S-IB launch vehicle (AS-204). The
combined space vehicle was approximately 181 feet long.
F
13-2
NASA-S-68- 2062
1
Nose cone
135
t _ Spacecraft
Adapter 471
t
Instrument
unit
36 Space
S-11ZB vehicle
701 2172
Launch
vehicle
, [] 1701
S-IB
964
f
13-4
The lunar module (LM) is designed to land two men on the lunar sur-
face and return them to a lunar orbit where the LM will rendezvous and
dock with the command and service modules. The _ is composed of the
ascent stage and the descent stage (figs. 13.2-1 and 13.2-2). The first
flight configuration lunar module (LM-I) was flown on the Apollo 5 mis-
sion. _-i was significantly different from subsequent lunar modules.
Many of the differences resulted from the Apollo 5 mission being an un-
manned flight. The following systems were aboard the LM-I and were op-
erational for this mission:
b. Electrical power
c. Reaction control
d. Ascent propulsion
e. Conmlunications
f. Operational instrumentation
j. Pyrotechnics
i. Descent propulsion
a. LMmission programmer
c. C-band transponder
13-5
e. Scimitar antenna
b. VHF transceivers
c. Landing gear
d. Crew provisions
e. Tracking lights
o
13.2.1 Structures
Two canted beam assemblies secured to the bottom of the lower deck
and to the +Z27 and -Z27 bulkheads formed the ascent engine compartment.
The engine support members were bolted to the lower deck.
Aft equipment bay: The main supporting structure of the aft equip-
ment bay (fig. 13.2-6) consisted of tubular truss members fastened to
the -Z27 bulkhead. The vertical box beams of the equipment rack assembly
contained integral coldplates for cooling electronic equipment.
The base heat shield protected the entire bottom of the ascent stage
from the staging pressures and temperatures.
The five compartments formed by the descent stage main beam assem-
blies housed the major components of the descent propulsion system. The
center compartment housed the descent engine, and compartments in the
X and Y beam housed the oxidizer and the fuel tanks, respectively.
The large thermal mass of the propellants and structures was en-
closed by multilayer radiation superinsulation to reduce the heat loss
to the space environment. This superinsulation was basically a composite
of 25 layers of 0.15-mil aluminized Mylar sheets encapsulated with 0.5-
mil aluminized Kapton (H-film) sheets. A maximum of up to thirteen
layers of 0.5-mil aluminized Kapton was added to the 25-1ayer superinsu-
lation depending on the applicable heating rates in areas exposed to
13-8
The base heat shield thermally insulated the bottom of the descent
stage from engine plume radiation. This insulation was a composite of
alternate layers of nickel foil and Fiberfrax.
13.2.3 Pyrotechnics
f. Deadface relay
g. Control panel
low voltage-select contacts were tied together and connected to only the
high-voltage battery tap. Instrumentation for measuring battery current
and voltages was included in the descent electrical control assemblies.
4CB17
4CB18
Battery feed tie
4CB25
4CB26
AC power.- The 400-Hz 117 V ac power was supplied from one of two
solid-state inverters (fig. 13.2-10). Both inverters were supplied with
dc power through the mission programmer from the Commander's bus.
13.2.5 Instrumentation
13-11
Each frame contained 128 eight-bit words and 50 frames of pulse code
- modulation data were transmitted per second. Synchronization and timing
signals to other spacecraft systems and a serial time code for mission
elapsed time was also generated within the pulse code modulation and
timing electronics assembly.
13.2.6 Cormmunications
c. Antenna equipment.
The circuit breaker for the primary power amplifier power supply re-
mained open during the LM-I mission. This provided a low-power primary
mode and a high-power secondary mode. During the portion of the mission
when the primary mode was selected, the power m_plifier was used in the
feed-through mode, resulting in an insertion loss of 3.2 dB, maximum.
When the secondary system was selected, 28 V dc was supplied to the sec-
ondary power supply. The transmitter output was supplied to the power
amplifier input and was amplified through the secondary power amplifier.
The diplexer, connected directly to the output of the power amplifier,
permitted duplex transmission and reception using one antenna.
13-15
The computer was used for primary guidance, navigation, and control
system data processing and computations and performed the following major
functions:
The rate gyro assembly measured the spacecraft rates. When operating
in the backup control path, the control electronics section provided
rate damping for vehicle stabilization.
13-18
A second squib valve was fired 1.3 seconds after engine start. This
delay provided time for the fuel to circulate through the heat exchangers
and prevent fuel freezing by establishing fuel flow prior to helium flow.
A pressure relief valve in each helium supply line prevented tank over-
pressurization; a burst disk upstream of each relief valve prevented
helium leakage during normal operation. Each pair of oxidizer tanks and
each pair of fuel tanks was manifolded into a common discharge line.
Total propellant capacity was 17 800 pounds. The propellant tanks were
interconnected by a double crossfeed piping arrangement (fig. 13.2-19)
to maintain positive pressure halance across the helium and the propel-
lant portions of the tanks. A capacitance-t_pe quantity gaging system
provided propellant quantity information during thrusting.
The fuel and oxidizer were piped directly into the flow control
valves and then into a series-parallel ball valve assembly controlled by
four actuators. After engine start had energized the solenoid operated
pilot valves, fuel was introduced into the valve actuators and caused the
ball valves to open, allowing propellant flow to the injector. For en-
gine shutdown, the solenoid-operated pilot valves were de-energized, the
spring-loaded actuators closed the ball valves, and residual fuel from
the actuator cavities was vented overboard.
13-21
There were two titanium storage tanks for the ascent engine, one for
oxidizer and one for fuel. The tanks were spherical and had a combined
capacity of approximately 5000 pounds of propellant. Each tank was
equipped with a helium diffuser at the inlet to provide even pressuriza-
tion at the helium/propellant interface. A series of vanes were arranged
at the tank outlet of each tank. These devices allowed unrestricted pro-
pellant flow from the tank to the engine under normal pressurization but
would not allow reverse flow of propellant from the outlet line back into
the tank under zero g conditions or even at the maximum negative g-load
expected. The propellant tanks did not have a quantity gaging system
but did have low-level sensors to monitor propellant quantities when
propellants were depleted to a level equivalent to approximately i0 sec-
onds of burn time.
The outflow from each tank was divided into two paths. The main
path passed through a trim orifice and a filter to the engine shutoff
valve. The other path led to normally closed solenoid valves intercon-
necting the ascent and reaction control propellant systems. Opening
these valves would permit the use of ascent propellants by the control
engines.
The gaseous helium that was used for pressurization of the propellant
feed system was stored in two tanks at approximately 3500 psi and ambient
temperature. A normally closed squib valve in the line immediately down-
stream of each storage tank isolated the heliu_rlsupply until the initial
ascent engine start.
13-23
Each parallel helium flow path contained a filter to trap any debris
resulting from squib valve actuation. After the filter, each helium flow
path contained a normally open latching solenoid valve and two pressure
regulators or reducers. The upstream regulators in each flow path were
set to a slightly lower pressure than the downstream regulators, and the
two series regulators in the primary flow path were set to a slightly
lower pressure than their corresponding regulators in the redundant flow
path. The pressure settings of the four regulators varied from 172 psi
to 194 psi with the primary-path controlling regulator set at approxi-
mately 184 psi. In normal operation, the upstream regulator in the pri-
mary flow path was the controlling element. Downstream of the pressure
reducers, the helium flow paths were manifolded together and then divided
into two separate tank pressurization paths, each having a quadruple
check valve.
The design of the water p_essure regulators and ascent oxygen tanks
was modified from the manned configuration. During sublimator operation,
water flowed from both ascent water tanks through the primary water pres-
sure regulators to the sublimator. The redundant water pressure regulator
could have been selected through the mission programmer. The two ascent
oxygen tanks provided a reference of about 4.0 psia to the water pressure
regulators.
The capability to select either of two glycol pumps had been deleted
from the mission programmer, and to preclude loss of cooling in the event
of a single glycol pump failure, both pumps were operating.
13-24
GG2137V
O82140C _id_l_
MLddl_ gLmbal
gLObal to_ue
_ervo e_ro_
motor in
_urre_t.
_hase, A
V _s 12O1O5 15H
12O1O3" G_O_OIT
G_O202T _Ee_L_
1_e _a_k 2
_:k i _e_ra_ure.
_empera_ve. cF
_F _03510±_5_
00_3( _SH_CI_
G62142V Middle gimb_l resolver outp_a_s_:e, V _s I02034-15H+046 G_0318X _ei_ _] val_e i closed 10_gC96EI5E
GG_2143V M_d_le gLmbal resolver ou_p'_t I_P0718'_Fu_l 1_em_erature, °F -032_C5-15H+12>
eo_Ll_e,V rm_ !L02_56 ±_N GP0908X Fu_l low _0291C_H_5E+I_4
GO2151¥ Middle gLmbal IX reso±ver s_e GPI21_T OxL_er ten_pera_ure,°F I03L_37-!5_I_4
_:_anded, V rm_ i201018_L5H GPL408X OxL_er low -0291COGI5E+I94
GG216_V 0ute_
CG2170C S_t_r gi_al
glObaL torque
s_r_o error
motc_ in
c_rrent,
p_ase, A
V rms 22O1O2 151_
-201G23 15H ,_PL5_I_ ©xL_i_r.
_P1503_ Fuel _re_ure.
_s±a psia i0!7037-151_
-0-70C5 15_I+065
GG2172V O_ter giffoaLr_solwr output s_ne, V rms 2103067-15H+0_I GP_OlC_ _h_u_t eh_be_ pre_u_e, p_L_ L0_5037-]5_+_7_
G_2173V 0_t_,_gLObal revolver output _P2997U P_opell_t v_Ives _e ta _o_iticn _20L34CH_5E
co_in_ V rms ZIC4C33 1511
O_218!V O_ter gi_oal _ _e_olver sine Deaf.on _b_vstem
expande_, V _ 12@i0_4-15_
GG22±gv Pitch attitude e_rcr, V _ms _]C4068 1511 GQ_018_ ile _ _gul_o_ pressure, _La _!0_2005-±_H+3-_5
GG2249V Yaw a_itude _ror. V r_ !]02100_15H I_Q330_X H_I_ _ank i el¢_ed IO_409Q_I_E
GG2279V Rol_ _t_tud_ _rr_r. V r_ !]03066-15_ ,_Q330±x _e i_ t_nk 2 _pe_ I04409_EISE
G_,_4_p Hcl[u:_ pre_succ, psia _I002069_!5H+007 GR6OO3T Quid 2 tenpec _ure_ °F *i022005_15H+0_5
_;:_602Q Fuel _a_:k i quantity. _ I028005-15H+!0_ GR600_T Quad • temperanure, °F i023005-15H+089
_:i_6_4_ Fue_ tank _ quantity, _ 1O27O37 15H+I06 OR9609U RCS main A closed IOI3098FISE+I22
:_:i_611P Fue pressure, p3ia !024069-15H+O95 0_9610U RCS main B closed 1013098EI5E+I22
:]:_Ii_- L Fue _n_:k i _emperature. °F I002G05 15H G_9611U A_eent feed A o_en IOI3098DI5E+I22
_:'_" [9_' Fue: _ank 2 _e:r,pe_'ature. _F !031037-15H GR9612U Ascent feed _ o_en I013098_15E+122
_Q_,i07_I O_[:_zer _ank ± qu_nti_y, _ !04_037_15H+170 GR9613U Crossfeed ope_ IOI3098BI5E+I22
_:_I0_Q Oxi,_!zer t_k 2 :_uanti_3', _ !035037-15H+i3_ 0_9661U _A i_ola_ion valve closed I04809_HI5E
_4111_' Oxi,_zer pre_ure, psia i005101 15H+02_ GR9662U 4B isolation .i_Ive closed I04_O9_15E
j_,_21_![ _ 0xl,i!zer t_nk i _em_erature_ CF 1001101-15H GR9663U 3A isolation valve c!o_ed 104_09_FI5E
_.219T Oxi,_izer t_nk 2 _emnerature, CF 100_101 15E GR9664U 3B isolation valve 21osed 1048098EI5E
_:_J,_.55X Fro_l±ant io_ IO3_098CI_E GR9665U 2A i_olat_on valve _Iosed 1048098DI5E
J_6515_' rhr:_ cha_,_ber pressure_ l_ia 1O2O1O1 15_+38C GR9666U 2B isolation valve cl_sed I048098C15E
_li6_J_H '7ar!_L_le i,_ectcr a_tua_or _osi_ion, _ _05C037-15H+198 GR9667U IA isolation valve _!o_e& I048098B15 E
:_If_6_I 1:ro_ll_nt '.ra_v_ delta p_iticn 1038098E:!SE GR9666U IB i_olat!cn valve _l_se_ I04_096AISE
_i_'_gu Pro_ellant _alves del_a position !33809_C15E
Cor_uni¢ at ions _3_ _l
_!C_'f _y_._ A h, ii_:;, t_,_k surface OT9992B S-band sta_e phras±ng errcr, de_ II01066-15H
t,:_:erat _re. °F IC35069-._5H+139 GT0993E S-band transmitter _F power, W 1050101-15H+20G
_IG_O _ys_m B _ro_eiian_ quantity, _ IC3!I01 !5H G'f099nV S-band receiver si_,a!, V dc II01067-15H
Ui_IC9_' Sy_t_ _ _.i_ tank s_rf_ce
t_er_l_ure_ _F I040069-.!5H+!59 Stabili_a_ion _id control (L!.'_)
_!!Ii0i?
_i_llO:_ System,_mB
Sy_T A he!
h,i _ pre_sure_
um pres_ure_ _sia
p_±a i033037_15H
1033'305 !5_I+!29 G_51_IV PRA compare _510!08_HISE
_Z_2OI_ Sys_m A regulator pressure, p_ia I030005--15H+I±7 GW5!537 PRA clock on II0510CHI5E
,_1202P System _ regulator _re_ure, ps±_ I036069..15H+I_3
OE_I_± S_'s.en A f_e_ temperature, °F ]01_037.-15H+070 rotechnic _u_sy_em
_E_2122i System '_ fuel temperature, _F 1O2OO37 15H+OY8
L_220IP $3-_m A f_el ma_ifold _re_u_'e, Fsia i00_069 15H+015 GY035:)X Abort comm_nds _I01_096EI_+!23
_2202P S¥_L_m _ f_e[ manifold pressure, _ia ±00410!--15_+016 Gy0111X Emergency detection arm A cn IOIL098OI5E+I23
;_32OIP System A oxidizer m_.ifo!d pressure, _sia !006C69 15E+023 GY0112X _ner_,_ncy dete_tion arm B ¢n !014098FI5E+I23
:_202p S "s_e:_ E o>:i_izer m_,ifoLd pressure, p_a !01CIO1--15H+_40 GY012LX Sta_i_g relay _'_f±,'_ L014C98EI5E+I23
,_60011 ¸ Qu_ 4 _e_,_rature, o_ 1003E05--!5H+_09 GY0!22X Sta_ing relay B fi_'e 1014098DI5E+I23
L_6032_' _u_i: 3 _emperatl,re. OF I01CC05 15H+037
_.OC_3_ _" ±_._ing ,-i_ i t_n_r_ure, °_' _D _XX_O5 GA20061' D_seent stage h_a_ _ie±d
_A_C_L:[ _ ±_nding rig 2 temperate-e, _F C-14X- _ _emperature 6_ °F
(_A0065[ Z _,,_d!ng _pex ! _em_era_ure. °F C I_X 14 GA200_T D_,_ee,_t stage hea_ shiel_
_AO2OI_ De_:ent engi e c_vi_y _empera_ure i. °P C I_X 20 _e_era_ure 7, o _C 14X-33
_..C202L De_,:e_t e_gine cavity _emper_ture 2, oF C 14X 21 GA200BT _escen_ st_g_ hea_ _hie!d
G_C20_' De_nt e_g_e cavity temperature 3. °F C-14X-2_ _em_era_ure 8, c_ C 14X-35
(_C204T De_:ent engine cavity _em_era_ure _, °F C_II_X_24 GA23C_JT _e_cent stage _,eat _hield
_AO6Olg 3e_,. oocst strut I +Z_ k±_ C-05X/I temperature 9, °_ C 14X-36
GACd02S Be:,1_ boos_ stru_ 2 +Z, kl_ C_06X/I GA231_T De_ce_t stage _eat shield
(_',C603S Be_ boost _trut 3 +Z_ klb C 09X/! temperature I0. _F C-14X-38
(_4G60_S Be,,,_ _o_s_ strut 4 +Z, klb C O7X/! GA2524S De.cent e_gine su_or_ strut n_ klb E-15M/l,2
_¢605S Be_,_ bo_st strut i -Z klb • 05X/! GA2681D DPS _.gen t_nk 1 vibraticn X, g E-fIX
O'0606S Be_:_ bo_s_ strut 2 Z_ k±_ D-O6X/I GA2682D DPS o_rge_ _ank I _!bratf_n Y. g C-fIX O_
G_060/S Be_m boo_ _trut 3 Z, kl_ D-07X/__ GA2683D DPS _.gen tank i vibration Z, g D-fIX-03
G'._60_S Be_,. boost _trut L -Z, klb D-08X/I GA300_ X-a×is a¢ceieration i. g C-1OX
_'._609S Beam boos_ strut i +Y. kl_ D 09X/I GA3302A X a:_is acceleration _. r_/sec/_ec C-15X
_061OS Beam boost ,_trut _ +Y_ klb D_IOX/! GA30_A Y-axi_ acceleration i, g D-10X/2,3
(;'._611S Be_,m boos_ _trut 3 +Y, klb _-05X/± GA300_IA Y-a×is acce!era_ion 2, rad/see/sec D-15X
CA0612_ Be_L_ boos_ strut L +y, klb E-O6X/! GA_OO5A Z-a×is acceleration i. g D-O6X/2,3
_AC6!3S Be_:, bo_st _trut i Y. kl_ E OTX/! GA3DO6A Z-axis acceAer_tion 2. ra_Jsec/sec E-14X
:_061_+S Be_,:, bo_s_ strut 2 -Y, klb E-08X/i GA36¢ID Af% equipment bay _ibraticn X, g A-O2C-OI
(;AG6!5S Be_. boost _trut 3 _Y, kl_ _-09X/! GA3602D Aft equipment bay vibratien Y. g A 02C O2
G_C616S B_,,_ bo_ _trut 4 -Y. klb C-08X/! GA3603D Aft equipment bay vibration _ g A-02C-O3
(_,'_Ii13[ A_nt _age he_t shield top OA3661D Tunnel equipment area vibration i_ g A-03C-01
t,_:_pe_atur_, _F C 14X-26 GA3662D Tunnel equi_oi_en_ area vibration 2_ g A-03¢-02
(_ALI33_ AScE_nt _tage hea_ _h_eld to_ GA3663D Tunnel equi_i_en_ a_'ea vibration 3, g A-03¢-03
_,ressure, _sla E EXX 2_
GAI_O!D As_,_nt engine support vibration I. g A-10C-OI n_r_Lo_ ¸n_mi_s
GAIS02_ As_:_t e_g_ne support vibration 2. g A-IOC-O_
OAI_0J_J A_n_ engine support vi_ranion 3. g AwlOC-O_ OB02OIT A$_ent engine cone _emperature !_ °F _-14X-44
I_,',I_TLI_ f_S o_yge_ t_nk v_bration X, g E-12X GBO203T Cabin tunnel temperature, °F C-14X-47
GAI572t AE_ oxygen tank vibration Y, g C-fIX O2 GB0204_ Cabin skin temperature i, °F D-EXX-69
_AI573D APS oxygen t_k vibration Z. g D-IIX 0_ G_0205T Cabin skin temperature 2_ °F C-!_X 50
_.2001_ Descent stag,, hea_ shield GB03OIT Ascent _age _otto:_ surfac_
t,_m_erature i_ _' C 14X 43 _em_erature !, °l_ D-EXX 19
(;A2002_ _ De ,_,,nt st_ hea_ shield GBO302r Ascent _ag_ bottc:_ surface
t.:_pe_.ature 2, _F D-EXX_I_ temperature 2. °IL' D-_XX_21
:_20_3f J_es,:_n_ _t:ig_ neat shie!_ G30305T As_ent _t_ge bottc:_ surface
t,,_pe_'_ur_ ]. _F C-14X _ temperature 3. °F D-EXX-23
:;A_O_4T Ee:_n_ st_g_ n,,_t _hie!d GB030_T Ascent stag_ bottof_ surface
t_m_erature 4. °F D-EXX-7_ temperature _. oF D-EXX 25
_2:_5'7 De_ ent _tag_ h_at _hie!d GB_305'-' Asc_n_ stage bottom surfa_e
_ _pe_._ure 5. °F _ ±4X 27 temperature 5, °7 D EXX-26
13-27
CBC306T As_ent stage bottom surface G33035T Aft _qu_pment bay nkin t_peratu_e, _F *_-1_X-25
te_eratur_ 6, o_ *D_EXX_28 9_3936T Dese_nt s_age _2 panel skin
_B0307_ A$_ent _tage bottom surface te?Jperature,°F 8-14X-66
temi:erature7, o_ D-E×X-30 _E3102_ Znt_rstage separation distance
GB0_gIT Descent stag_ top surface monitor i_ ft C-EXX-09B05172
temperature i, _ • EXX 36 GB3103_ interstage separation distance
GBC4G2T Descent stage top surface mcnitor 2, f_ C-EXX-I0315273
temperature 2, °v D-EXX-_4 G_3_04H _nters_age sep_atlon distance
GBO_OBT Descent s_age top surface mcnitor 3, ft C-EXX-11325374
temt:era_ure3, o_ D-EXX_32 G_3105]I _n_eratage separation distance
GB0521T Descen_ stage bla_ _eflect_ monitor 4, _t C-EXX-12335_75
temperature l, _ D EXX 4O G_3727T _tenna suppor_ boom _e_erature l, °F C-±_X-57
GB0522T Descent sta_e blast _eflect_r G_3728T Steeraol_ S_band _r_tennatemoerature 2, _F D_EXX_87
temperature 2, _ D EX_42 G_B(29T Steerable S-b_nd anteuna temperature 3_ °F D-EXX-80
GBC691_ Ascent engine _omfartmen_ G_3703T $-bana _i antenna _empera_ure. _F _ -4X 6O
temperature l, o_ D EX_46 G_B733T VHF infli_ht a_enna temperature, cF D-EXX-76
GBO602T As_ent _ngine compartment G_6G01T Electronics package c¢_d plates
temperature 2, c_ D EX_48 _emne_a_ure l, °F C-±_X-63
GBO60_T A_cent engine co_partment G_6002T Electronics _ackage cold plates
_em_eratur_ 3, CF D-E×X-53 _p_ra_ur_ 2_ °F D-EXX-82
GBO621P Ascent engine ccnpartmer.t
Free,
sure !_ psla C-08X/2_ Eiec_ _
GBO62_P A_e_t engine comoart_nt
pren_ure 2. psla C 0_Y GC35_lT Battery 1 te_erature. °F *C l_X O3
3BO623P Ascent e_gine conpartm_,_t GC3502T Battery 2 te_Ferature. _F C-14X O4
p_e_sure 3. p_la C 03X _C35CBT Battery B temperature. _F C-I_X-07
GBOSOIP Ascent stage bottom s_rface GC3504T _at_e_ r 4 temgerature, _F C-I_X-!0
pressure _, psla E_OSX/2,3 GC3595T Ba_t_r_-5 temperature, °F C-I_X_I3
GBOSO2P A_ent stage bottom surface GC3506T Battery 6 te_eratu_e, °F C I_X 16
prensu_e 2, _s_a D-07X/_,3
GBO_03P As_ent s_age bottom s_rfac_ Env±rc_mental c_nt_ol _ub_yntem
pressure 3_ psla D_O2X
GB0_04p Ascent _tage bottom _hrfa_e _252_T Frimary water boiler gZyco_
pre_u,'e 4, _la D-O3X _e_perature, CF *D EXX_85
GBOBO5P Ascent stage bottom surface GF2621T Cabin heat exch_.ngerglycol
pressure 5_ psla E 03X in-et tenperatar_, _F C-1LX-69
_-- 8BO_06P A_cent s_age bottom surface GF278_T _ege_er_tive he_t ex_ha_ger
p_e_ure 6, p_a C-02X _lycol outlet temperature, _F C 1LX-73
GBOS07P Ascent _tage bottom _urface GF2_41T Regenerative he_t exchanger
pressure 7, psla C-05X/2,3 _ycol inle_ te_perature_ °F C-1LX-$2
GB_808P Ascent stage bottom surface GF287±T Cabin neat exchanger glycol
pressure 8_ psla C-96X/2_3 o_tle_ temperature, °F D-EXX-52
OBO_0_P Asce_ stage bottom _urface CFLI09_ Redundant water regulators (_S)
pressure 9, p_a C-OIX/2,B _ dif_e_e_t±al pressure, p_d E EXIT1
C_9_IIP Ascen_ stage hot_c_ surface GF456_T De_c_t w_te_ tank outlet
pressur_ ll, _sl_ D 04X temperature, °F C-14X-75
G_0812p Aseen_ stag_ bottom surface GF4562T Ascent water _a_k 1 outl_
pressure 12_ _sla D-05X/2,3 tezperature_ _F D-EXX-SL
OBO_13P Ascen_ sta_e bottom surface GF456BT Ascent water _a_k 2 outl_
pressure 13, _la C EXX 13345576 te_perature_ _F
OBO_I4P A_ce_ sta_e bottom surface GF_996U Glycol pu_E1prate _lect, kx_L E_EXX_I9
pressure 14, p_ia C _X_14355677
CB0_ISP As_en_ sta_e bot_c_ _urface Gu_d_Jee and _vi_ation
_ressure 15_ _sla C-E×X-15365778
OB0816P Ascen_ sta_ bottom surface GCllllV DFI telemet_ bian voltage, V dc *E-EXX-97
pressure 16, psia C-EXX-16375879 OG222OV Inner gii_ibal
CDU fine error, V rr'_ C-EXX-27
OB0817P Ascen_ stage oottcm surface 0_2259V _i_le gi_bal CDU fine error, V rms C-EXX-29
_ressure 17_ _la C EXX_l'I3_59_0 GG2289V Outer gi_b_l CDU fine error_ V rms E-EXX-O9
OB0818P Ascen_ stage bottom _urface GC2303X IMU blower off/on E-EXX-11
pressure 18, psia C-E×_-!839608_ GC_llV Radar shaft CDU fine, V rms E-EXX-28
OBC_0_p Descent _tage _o_ _urface GC332!V _ad_r _runnlo_ CDU fine, V rms E-EXX-87
pressure l, p_a C EXX 19406182 OC6O0iD _av_ga_ion ba_e roll vlbratlo_, g A-95C 91
OB0902P Descent s_age to_ _urfa_e CC6C92D Navi_atio_ base pitch vibration, g A-05C-O2
pressur_ 2, psia C-EYD_-20416283 O_6COBD Navi_ion ba_e yaw vib_atlon, _ A_05C-9_
OBOg0_P _es_ent stage toF surface
pressur_ 3, psla C-EXZ-21_L26381_ $ta_i=i_ation and control
G_09OLF Desce:,t_tage to_ _urface
_re_ure _, paia C EX_224_6485 O_14_OV •Pitch t_m error, V d_ *D_EY_70
GB0905P Descent s_age t_ surface GE1452V Rol_ trim error, V dc D-EXX-71
pressure 5, psla C-E_X-23_46586
GB0906_ De_t _age _o: surface In_ru_m_n_ation
_ressu_e 6, _sla C_EXX-244566_(
GBog_TP Jescent s_a6e top surface GL02B6× 50-Fp_ star_ signal *C-14X-58
_ressure 7_ psia C_E_ 254667_8 GLG237X 2_kpps blt synchorniza_ion signal C 1_X_59
GB302±T De_ce_t _ta_e blanke_ interna_ GLO2B_X 59-ppn stop signa_ C-I_X-6!
tei1_eraturei, _F D-EXX-72 GL02_IV 1200-_p$ syach_oni_a_ion signal C-l_X_
GB3023_ Descent stage _ianke_ surface GL02_2V 50-pps s_op signal C-l_X-49
_emoerature i, °F C-_4_-51 GLO251U Timing electronics synchronization
3B30_5_ Descent stage _!_:_ke_±_tern_i _o-go/go C-14X-62
temperature 2. _ D EXX _14 GL0802X LGC serial data to FC_EA C 14X 65
_B_O_7_ De,cent stage blanket _urface
_e_,eratu_c 2_ °F D EX_ B8 _uic_nce and navigation (radars)
8_BO2_T _esce_t stage bla:_ke_internal
_empera_ur_ 3_ _F D-_XX-66 G_7559D La_din_ _adar antenna v±bratJon, g *D-11X-O1
_B303_T _es_e_ stage b!anke_ surface G_7564T Landing _adar antenna temperature, _F C-14X-55
_em_,er_tur_3. _ C_14X_54 G_7565T Landing radar antenna temFerature, _F C_14X-56
G_O_T Descent stag_ blanke_ surface GN7691D Rendezvous radar an_e_ua dish vibration, g C-llX-O1
r _empero.ture_, °F C-14X-29 G_7721T _endezvous radar antenna _enperature 3_ _F D-EXX-75
G_:77__ _en_ezv_u_ radar antenna te_era_ur_ _ _F C-lhX-52
*Loading nu_,ber formats are ahown on pmge 13-29.
13-28
(b) Develo_r,lenz
Flight In_trm_e_t_tlo_ - Co_iclu_ed
3PO01_i _eg_ator I i_le_ _res_ure, p_ia *E-ICX/3 GR43221 4B _ue! injector surface
_o02J_ _ _egu_ator 2 ±n!e_ _res_ure_ p_=a _O4X/3 tm_pera_re, o_ *C-_LX 79
_P0025_¸¸ Heli_'E.
regulator _r_s_ure_ _sla C-12X/3 GR4_23_ 3A _u_ injector surface
_050!? Fuel t_nk ullage _ssure, p_ia _-EXX-72 temperature, _F D _: 61
_0616_ _ue! t_nx/enginc diffe_enti_l G_4325T 2B _uel inject.orsurface
pressure, _s±_ E-EX_-24 tem_eratur,,_oF D EXX 17
GPI00_: O.K%'g_tu_ ul ag_ ore_sure, _s_a E-E×X 2 GR4327_ ]A fu_! njector surface
GP!O04__ O_%'g_nre_ief va!w pressure, _sia E EXZ-2_ t_m_erature, oF D-FMX 6_
GPII_6_¸ O_g_n tan_/engine d±f_ere_ti_i G_424T 3_ o×_diz_r L_j_etor surface
_'_ss_re, psi_ E EXX 26 temperature, °F C-I_X-72
GPI5OIF Fuel i,res_ur_,_ia C.-13X/3 GRL435T 3_ _xld±_er valve temperature, _F C-I_X-_7
G_]50_ ¸ Oxidizer pressure, ps±a _ _3X/3 GR4h41T 4D fuel ±_e_or _r_ce temperature, CF C 14_7_
GF20011: Fuel _njee=or pressure, p_ia E-13X/3 GR4_4_T ID f_c! i_j_,_,_or sur_a_e te,,ipe_a_ure_
_ C 14X-_
GP201U? T_rus_ chamber _re_ure, _s±a E-!6X/3 GR457_T 4D injector _:_a__e_erature, o_ D-EXX-56
GP270_I T_ru_ _hamber wall _em_e_ature l, oF _-EXX-51 GR45{IT LF injector h_ad temperature_ _ D-EXX-_
GP270_' Thru_ _hal.berwall =emp_rature 2, OF D EXX 5_ GR4577T 2U ±_jector head t_moerat_re, _F D-_XX-_F
CP270_ Thr_ _h_m_er wall _emp_,_ature3, °F D Z<X 55 GR4_7_T 2D i_j_etor head temperature, _F • _×X-81
(]P270_.
¸' Thrus_ throbberwall _@_'a_ure 4, _F D EXX 57 GR_I5_T !D i_jector _ead te,L_at_r_ _F D-EXX-_8
GP_706' Ir:Jee_cr_urface temperature, °F _-E_X-5_ _45831' IF i_jec_or :_ad te_._erature,cF D-EXX 74
GP_80__ T_.ru_'_ _h_mbe_ vibration X. g A-04C/3 G_501__ _.Bfuel i_±e_ pressure, psia C-EXX O6
GP2802_ _hrus_ chamber v_bra=ion Y, g rm_ A 08C/3 GRSOI3_ 3A f_e[ inle_ pressure, p_±a C EXX-08
GP28C5_ _h_us_ eh_mbor v_br_io_l Z, g r_ A C9C/3 G_50!_P 3B f_el i_ e_ pressure, ps_a E-EXX-29
GI{50_5P 2A _uel z_!_ pressure, p_i_ E 09X/2_3
L___ent propul_i_,__ub_y_ten GR5OI6P 2B fuel inter pressure, ps_a C-EXX-26
GR50±TP L_ fuel i_ e_.pres_ure_ ps_a C-_ZXX-2_
(_Q3009_'_{eg_iator1 _nle_ pr_ssu_'e,psia *E-fOX/I,2 GR50!3P B fuel in-e_ pressure, p_a D O9X/2_3
_331C_ ¸ _,_g_i_tor2 inlet pressure, _sia E-C4X/I,2 GR5oIgP 4A _x±d!zer _nle_ _e_ur_ _a _-EXX 3O
GQ301_' H__i_m re_u!ato_ pressure, psia C-12X/I,2 0_5020F 4_ ox±d±ze_ _nlet pressure, psla E-EXX 31
_]Q345U='_eli_m _em_eratur_, °F J-EXX-6C GR5021P 3A _x_±zer _let _r_ssure, _sla E EXX __2
GQ345_ _ i_el!_ he_ e×_h_::gerinle_ C_502_F 3_ oxi_±zer !,_let_res_ur_, _la C-EXX-46
temperature, _F D EXZ O3 GR5023P 2A cx±_±zer !_let p_e_sure_ _la E-I_X/3
:_Q_45_:
¸ _e i_ h_a_ _xchan_e_ _utle_ GR502"P 2B oxidizer _nlet p_ess_e, _a E-EXX 51
te_<ue_atu_e._ D EXX 0_ _RSC2_P -A oxi_ze_ _nlet pressure_ psla E 3XX-_2
:_Q_!._:_Fue- heat exeh_nge_"ou_ et GR5C26p _B o×i_e_ _nlet pre_u_e_ psl_ C 09X/_,3
_mp_ature_ _F _-_XX O6 GRSC3±P 4U thrust chamber _re_ure, p_a A C6C
_Q34(6.' _elL_ =a_k _empe_ature, Op D EXX O_ GRSC32P 4D _hrust cL_mber pressure, ps-a A-C6C
<_50]:' Fue_ t_nk i ullage p_essure, p3ia E _XX-33 O_5033P 4F _hr_t cka_ber pressure, _sza D 16X/2,3
_3505_ _ Fue relic= va v_ pre3sure, p_ia E-E_X-3< GRS03_P 4S thrust chamber pr_ssur_ psla _ 06X/_3
_Q_611_¸ Paei pres_are_ p_ia C 13]<¸12,2 GR5335_ 3_ thrust ch_b_r _ressure, ps_ A 01C
G_666_' _uel t_nk 2/eng_a_ differe_ti_A GR5036P 3D thrust eh_,m_erpressure, _sza A-01C
pressure, FSi_ E _-35 GR5037P 3F thrust _han_er pressure, os=_ D-16X/2,3
G_dl]i ¸ Puel t_mpera_ure, °F D EXX 67 GRSO36P 3_ tarust chamber pre_sure_ _s=a E 07X/_,3
C_._O0]_
¸ Ox_d±z_- =a:ik i _ll_ge G_5039P 2U =h_ust ca_m_e_ p_e_ur_, ps=a D 12X
_r,ssur_, _sia E EXX-I_ _R_O40p 2D thrust ch,_er pressur,_,o_=a D-I_X
<_GOS_ ¸ ©xid_r relief valve ±_11et GR50_±? 2F Lhrust _h_er pressure, p_=a C 16X/2,3
pressure, _s_a E-EXX-41 G_>O42p 2$ t_rus_ chu_L_erpressure, p'_=a E 07X/2,3
G_411±i¸ O×_ize_ _r_ssur_, psia _-_3X/I_2 gRSO_3P ]U =_rust c_.oer pressure, ps_ A 07C
G:_'L_ Oxidizer _,ak ]/cn_e _f_er_ntial _ L_'X 36 GR_O_4P IE t_r_sL c_=_er pressure, ps a A-07C
_Q4311_ Ox_dlz_ =_z_erat_r_ _F _-EXX-6o GR>0LSP IF t_ru_t ch,_,_erFre_ure, p_=a C 16Z/2,3
G_5011 _ Fu_l !_jec_r _ressure, _si_ E_ 3X/I,2 G_5046P I_ t_ru_ c_E_er pr_ssur_ psza _06X/2_3
c_Q_5u£_
¸ Oxidize_ [_jee=or p_s_ur_, p_ia _ _X/l,2
Ex_%_le : I133"-!9_27H+121"
33 li_ - _ i + 127
E = Parallel digital
S = serial digital
4 = LN C_r-_%,-on [.(easuremen_s
6 = _i OgE Me_su=-ements
7 = LM Sup_lenen%al 14easu_,e_enss
Bit _oslticn within one $-bi% data woi'd whenever the m_.sui'ement apoe_rs_ (A-H) _ = t4gBLS3
First word position (time slot) within the first prime frame where the me__sarement appe_i's (l i26)
Ex_i_ple : A-16X-88/2,3
A 16X B8 /2,3
_4 _F 5ink K_bei" (A E)
P
13-30
NASA-S-68- 2065
Overhead
S-band steerable docking
Rendezvous \_j
radar g tunnel
S-band in[light
antenna -_ _ .------- Ascent stage
F- Control
antenna cluster
Ingress/
egress L_
hatch
Scimitar _._ _(_
iBm \_ eng,,e
Forward "_
(+Z) _ _1
Descent Descent
engine stage
skirt
13-31
NASA-S-68- 2066
I_ :ygen
(environmental control
system)
/ Ascent engine
"_ tank
Control _ Control engine
engine ' helium tank
cluster
engine
helium tank
Forward engine
oxidizer tank
hatch \ _.
tank
cove
Insulation
Fuel tank Descent
and micro-
Engine engine meteoroid shi.eld
ward
interstage
fitting
lizer tank
Oxidizer
Adapter attachment
point (
--uel tank
Descent l
engine
skirt
Docking tunnel
Midsection
Aft equipment bay
Control engine
cluster dew
Forward
Aft iriterstage fitting interstage
Ascent engine fiLLing
propellant tank Front face assembly
Crew compartment
L,O
I
NASA-S-68- 2069
Control
engine
NASA-S-68-2070
_, +Y
-Z 27.000 (red
glycol fittingsq _ % ,
/ ........
t
fWl.
I
I I
_i ,--
I
----
/
/
_•
""T
_-4 / ........
',,
i ...... I IF
......... 4-- I ,- / _"- _ ....
:-_-............
......
_ _::q, :-::: : ............
..., T" _+X 233.500 (red
.f
Fuel
NASA-S-68- 2072
i
Figure 13.2-8.- Descent stage structure (side views).
13-38
NASA-S-68-2073
RCS system
helium pressurization
Ascent propulsion system
helium pressurization valve
Three deadface
connectors
(circuit interrupter)
Interstage
umbilical
i cutters
I Inverter 1
1
Single phase
Commander's
28 V dc Inverter 2 o
Off _ t. To descent
control
Mission O il / 5amp engine control
programmer Inverter i _L_ assembly
i I
System
engineer's __f7 _:::_I
'nverter2_) 1
iI .[
bus
Inverter 19 I 5 amp
Lu°°Vdc
.
Inverter 2
AC bus
400 Hz
tt I15 Vac rms
I- ---- -I ,-----'1
I -_ I Re,ay
junction ' ""--¢
I I box System engineer's
Battery I Not used"l-_ 4ighl bus 28 V dc
Lowl
I
iControl
I'
ill Control
assembly 3
Control
assembly 4
el
=1
.....
lassembly11
l
I
I I
I I I
I .2.
--a
cGS]E
r programmer programmer
ol i_, Mission
control Control Mission
control
lassembly 21- --
owor,,lI ,og,e 100 ampl- _
I I I_. J
BaLtery 3 I FCo_L_"_-- 1
I GiE i "
-I-I
= I --4il "-'
I I,I Commander's bus "-I
I I Control
I Battery
4 II II logic _ ,', Dead
face 28 V dc
I I -(-.- relay
i I
L .... I ,
i
NASA-S-68-2077
I / I
Pulse code modulation I subsystems
'
[ Discrete and parallel digital data I _ Digital data
from LM
Transducers analog signals I -- guidance
and sensors (0 to 5 V dc) I ------] [ computer
Conditioned _ High level _ High L_ Analog to -- _ Digita _ Output --_51 200 bits
analog speed I digital multi- registc per second data
Eleotrical analog multiplexer gates I converter ptexer and to VHF and
signals signals (coder) i buffer_ S-band trans-
(0 to 5 V do) _,. [ iI mitters
Demodulators Coder
Amplifiers c°rnmands [ t
Converters Reference Analog commands I
Buffers [ multiplexer
voltage Gate and driver Programmer -- _ Command and
sync signals
calibrator [ drivers commands to other sub-
Caution and warning data systems
electronics assembly
Caution and waroing I Caution and warning status ]
k,o
I
Aerospace Response
Industries (Hz)
I transducers
Pressure Association
channel
Part of Vibration tC 1000
transducers
Vibration signal
main 2 (3 by 1 1/4:
commutator G rei 5C, 3C
2C 2000
1000
conditioner (b) and 10C 4C 2000
[ RPM F- Part of
_ 3
4
5
''
14
20
Stain
I signal
main _ _-_--Chanoel 5, 6, 7, 8, 14, and 15 7
6 35
25
8 45 _ To transmitter E
conditioner 9 60
Accelerationl (3) I0 80
vibration _ .---if I...l_--Channel 9, 11, and 12 11 110
12 160
current @ /9o
// by lOc)
( LChannel E 16
15E 2100
220
600
Temperature
signal
conditioner I Inter-range Response
Low level
(88 channel) commu[ator A I| lnstrumentatior
Group Hz
90 by l-l/4["a'- / Channel 14 2 8
Events (d) / 5 11
4 14
5 2O
Pressure I'm
---------'q
(66) conditioner
signal 2, 3, 4,12,and 15 12
15 220
160
High level 14 3.30
15 450
commutator B _ Channel E 16 600
90 by I0
(c) E 2100
i I l/2of
vibration -_,--Channel ii
J t commutator I
Tempereturel__
sensors I I :Temperature
iog:Id_lt
io,1er hi Low level I
commutatorD l,--,,l_-Channel
E
i
[AcceleretionJ._-
j Channel 8, 9, and 10
r Inter-range Response
lnstrumentatior Hz
Group
•"'I'-- Channel and 15 2 8
I Strain _
I 5, 6, 7, 12, 3 ii
Part of 4 14
main 5 2O
I Pressure /_ signal _Channel 2, 3, 4, 13, and 14 6 25
conditioner 7 35
Vibration 9 60
10 80
5 V dc 12 160
re ference
supply Channel 11 13 220
11 110
I 15 450
I 16 600
25 V dc | E 2100
reference
supply
Modulationpackage B (proportional
bandwidth)
Notes:
Figure 13.2-13.- DeveJopment flight instrumentation data conditioning and processing system.
_f
13-)43
NASA-S-68-2079
I UHF command
" Ii
Modulation package C I,_ Transmitter
257.3 /
aHz E L--=_-- --_ I--RF switch
I Modulation package
package B
A
Transmitter
241.5 MHz I o L,--m
r"-"---
plexer
C
I Modutation
......
P:q
247.8
Transmitter
MHz
D I
C ,_Transmitter BI
I[-----
I|
o1237.8
u
M.z/ 1 Adapter
I L._
I
,J
[
Figure 13.2-14.- Development flight instrumentation data transmission system.
NASA-S-68-2105
_7
[ Po_,er
divider
I rPower
divide,
I
I I
C-band r C-band 1
transponder A | transponder B I
r Figure 13.2-15.- Development flighLinstrumenLation ranging and tracking RFsysLem.
F_
-Z
]
/
II:Ece'ss_
I
III
I
- f
/
I - Freauency I 9 "_c_'_'imultiplier
I modulator _
1%1_
;
_ -_ _lr--
l' ......' I' l_ 4S-band iplex
V I
_ I Phase /
driver and Il,-.JI"
multiplier , _I II , I
To developmental _ modulator 2 r_ / ', Secondary Primary I
flightinstrumentation PCM/NRZ ' -- power power I
transmitter and timing _ i supp y supp y I
Pseudo random noiseranging,simulated'_ I
l____ up-voice and simulated up-data '
Vehicle d_
t Subsystem
Vehicle I ""
Manual throttle Descent
assembly I commands
actuator
commands
T 1'
control assembly I
I and control
assembiy
f-- Ascent engine on/off
Control
NASA-S -68-2083
_N GR2461X
1085Q _* Regulatorassembly_ L femperature transducer
Fuel propellant tank _
;RS025P
Helium source temperatu re L Restrictor
Helium source pres s-ur;-_'_lOlP I _ N.O. bar, sducererature
Oxidizer ,..,,_.,_ _ iniector head
Pressure bansdu_
GN12OIP
GRIOOIX
_; _ Cluster]][
Fuel ascent interconnect filter _ GR7002X
=_H_.
_N_
u._ " Right hand aft cluster assembly __...l_f
Oxidizer fill disconnect _ service disconnect Oxidizer isolation valve GR5020P L ......
P_opellant inlet filter Pressure transducer propellant inlet
NASA-S-68- 2085
•Helium _
filters
_ •_I_ Explosive
valves valves
Solenoid
reducers check
val yes
__3
Explosive
valves Explosive@
valves L[ '__
Fuel
Filter Filter
(fuel) (oxidizer)
Ball
Actuator valves
shown
closed
demonstrate
\ A\ /i\ / \ /iX /
/71\\ Combustion chamber /11_",,
water
tanks
(_ Ascent (_
Ascent
. Glycol _I
pump t__Power
package j_-supply
- • Freon I
Vent _
Fre°n--I boiler I
Ground
support _
q ..... I Critical
electronics
I
]1,-
-
,_e_no_'_o
_----_heatexchanger Cold plate _
ood
Ca_'_e_
t
exchanger
te
LD
I
MR
Figure 13.2-22.- Schematic of environmental control system. H
13-52
The flight of launch vehicle AS-204 was the fourth flight to qualify
and flight test the Saturn-IB vehicle. It was the first flight of the
lunar module with the Saturn-IB launch vehicle. The space vehicle
(fig. 13.0-1) was approximately 181 feet long and consisted of an S-IB
stage, an S-IVB stage, an instrument unit, an adapter, a nose cone, and
a lunar module.
The S-IB stage was 80.3 feet long and 21.4 feet in diameter
(fig. 13.3-1). A cluster of eight uprated H-I engines powered the S-IB
stage and produced a total sea-level thrust of 1 600 000 pounds. Each
of the four outboard engines gimballed in a ±8-degree square pattern to
provide pitch, yaw, and roll control. _e inboard engines were canted
3 degrees and the outboard engines 6 degrees outward from the vehicle
longitudinal axis.
Fuel (RP-I) and oxidizer (liquid oxygen) were supplied to the engines
from nine propellant tanks arranged in a cluster. Oxidizer and fuel tank
pressurization modules regulated the tank pressures during ground opera-
tion and S-IB stage flight. Nominal stage propellant loading capacity
was 884 000 pounds.
Eight fins attached to the base of the S-IB stage provided vehicle
support and hold-down points prior to launch and provided inflight sta-
bility. The area of each fin was 53.3 square feet. Each fin extended
radially approximately 9 feet from the outer surface of the thrust struc-
ture.
The S-IVB stage (fig. 13.3-2) was 58.4 feet long and 21.7 feet in
diameter. A single gimbal-mounted J-2 engine powered the vehicle during
f
13-53
the S-IVB stage portion of powered flight. The engine was mounted on the
thrust structure and could be gimballed in a ±7-degree square pattern.
The engine provided 200 000 pounds total thrust at vacuum conditions when
the propellant mixture ratio was a nominal 5:1.
The tanks, fuel forward and oxidizer aft, were separated by a common
bulkhead. The fuel (liquid hydrogen) tank consisted of a cylindrical con-
tainer with a bulkhead at each end. The oxidizer (liquid oxygen) tank
consisted of the section between the cor_Lon bulkhead and an adjacent bulk-
head and enclosed by the structural skin.
The instrument unit was located just forward of the S-IVB stage.
It was a three-se_aent, cylindrical, unpressurized structure 260 inches
in diameter and 36 inches long. The cylinder formed a part of the vehicle
load-bearing structure and interfaced with the S-IVB stage and the adapter.
Various launch vehicle telemetry and tracking antennas were mounted on
the instrument unit. The instrument unit housed electrical and mechanical
equipment that guided, controlled, and monitored vehicle performance from
lift-off to atmospheric entry of the instrument unit.
NASA-S-d8- 2088 I_
GO
I
/4, Fin
antenna Oxidizer fill and drain J
,,
'
radiation assembly e trunk Accessdoor f" //
3 places typical 8 places_ (corrugated)
line barrel
line Oxidizer intercennector line-
/,.
v vu_oa,u
._o niH_k rrl
" ] engine
...... "_ :cant angle
Spider _
beam_ © ,3 ° inboard
cant angle
:_ ' _ shield
Distributor '_ _ \/' \ manifold
assembl \ _ "
/-Lube oil drain
Vehicle '_./ _,' _-- Fuel manifold
erection d rain
/ lition monitor
target
/ valve drain
I _Anti-slosh baffles interconneetor line Oxidizer seal
t compartment F- 1O5inch oxidizer _Vehicle erection target cavity drain
-Fuel pressurization manifold containers Fuel fill and drain e from heat
Anti-slosh Outboard fuel suction ' II exchanger outboard
typical for eight Inboard fuel suction I
70 inch container_ Inboard oxidizer suction
-- Forward surface of
Outboard oxidizer suction
Corrugation
h Heat shield
J-2
V Maintenance
propulsion
i system
C2)
Forward skirt Tangent point i
aft bulkhead _. skirt
Hydrogen ,xidizer Common _ Ixidizer tank access
_ulkhead I vent platforms
I
I dizer
.... _ suction
..... l line
_ee
! '_ I D
"¢° ' F'_.: "
i , n tunnel \,
The two controllers were mounted 90 degrees apart within the adapter
below the panels. The sequencer logic was powered by a 5 amp-hr battery
and the pyrotechnic devices by a 0.75 amp-hr battery. A total of four
batteries were installed: one 5 amp-hr and orie 0.75 amp-hr battery to
power system A, and a duplicate of each to power system B.
The nose cone (fig. 13.4-2) was furnished by the Marshall Space
Flight Center (MSFC). It was a conical shell constructed of aluminum
skin, stringers, and ring frames with a cone angle of 25 degrees. The
nose cone was detached from the adapter by pyrotechnic devices and was
separated from the adapter by 16 springs.
f
13-57
NASA-S-68-2063
Separation cone
LM-1
Forward
Interface deadface
cable cutter
Panel hinge
Contro
at unit
,, command antennas
Launch vehicle
digital computer
S-T_TB
instrument
unit
Blast
shield
panels __ P .
i i
r
, I •
NASA-S-68- 2076
."ELF"
-I
Safelogicbus Imission I +28v
instrument
/ / /,l._
(ground support _ ' unit telemetry __0/I _ 0_' Fi4.5-._9£i-0 "J
, _ LM/adapter separaL on command power I I \ i',_'z_..'_. /
equipment) KI_K2 Jpr°grammerl
!
I ---'_"'
I o Ii
_ -- -- --I
+28V insLrument
unit teleX'
_K1
_'_i_mpfrv_
z.2
Logic
1___ [
i.j_
I
....
/ / Adapter panels deploy command
power _--0_1
I
0_0_10_
I
_'L_;_'_',a_l
\ '=_'=_' P'_"='°/ I
:
battery
(5 amp. hr)
I , _ O I
Nose cone +28V ,nstrument ,,_I Z7 _ _eploy A / I
_mmand unit telemetry __r,.*_l___ K2
I -_-
Arnllogicbus I , ll.stru_&tiK_lzl _K2 power /Inslrume0t\ I =
(ground support_j---_ , unit i "_1_11 -- / / / ,,nil- _l_m_f,,X I
I--____.--I I _ ', >-O'1 O"O/I O_ .... ___"T_"_
'_''' _1
eqmpment) _L_ I --- I / i "\ '.'_?,7%"_
-_""""'"" / "'I
KZ -T- K2 II 'I II II _1
I -'_ I
(ground support
1(o.75am-piN__'l I--"-_,
P I ,L- ,oJ
equipment KI____K2
separation _
HJ
Figure 13.4-3.- Nose cone jettison controller, schematic diagram of system A of a redundant A and B system, bo
I
kJq
',.o
13-60
The spacecraft mass properties for the Apollo 5 mission are summa-
rized in table 13.5-1. These data represent the actual conditions as
determined from postflight analyses of the expendable items loaded and
used during the flight.
The weight and the center of gravity were measured for each stage
prior to stacking. Inertia values were calculated for the actual weight
data obtained. All changes subsequent to measurement and prior to launch
were monitored and the mass properties were revised as required.
The mass properties and expendable items loaded at launch did not
vary significantly from the predicted values used to establish the opera-
tional trajectory. As a result_ updating of mass properties and trajec-
tory data was not required prior to launch.
Launch
engine firing
Total LM at first coast 31 457 186.5 1.2 0.2 20 086 22 371 22 971
Environmental control
-i0 301.8 0.0 0.0 2 0 i
consumables
r
13-62
Total LM at abort staging 30 861 186.2 1.2 0.2 19 732 21 998 22 628
Descent stage (jettison) -3 347 157.3 •2.8 0.7 2 359 1 487 l 642
Total LM at second coast 9 529 242.8 -0.5 0,4 5 849 3 063 5 382
Second ascent_irin_
to end of firin_
Environmental control
-1 300.2 0.0 0.0 0 O 0
consumables
Total _,] at end of second 4 798 255,3 -0.9 0.7 2 698 2 505 • 725
ascent stage firing
14-1
Figure 14-1 shows the history of the _-i at Bethpage, New York.
Figure 14-2 shows the history of the _q-i at Kennedy Space Center.
9
1)4-2
,!_<!
!
June July August Septenlber October November Decenlber 1966 1967 January February March April May JuRe July
5 12 19 20 3 lo 17 24 31 7 14 21 28 4 11 18 2s 21 9116123130161131201271411111812_I 11 81isl 221291sl 12119126121,_2119126121 9116123130171141211281411111812_I 21 9116123130
Spacecraft acceptance review ,_ CusLon]er acceptance readiness review •
Electrical continuity tests DFI renlove, Lest and install new harness
Manufacturing and system installation I Modifications and rework I Drain and dry I Retest and work off discrepancies
June
25 21 91 July 161 231 30 61 August
181 201 27 31 September
i0[ 17[ 24 ii 81 OcLober
151 221 29 51 Novelober
121 191 26 31 December
101 17I
1967 241 31 7[January 141
1968 2112_
APS modifications at contractor's Long Island facility __ APS reinstallation and leak checl< I Nose cone tnate
A
_
MSC flight
readiness review
_IL NASA headquarters
-- flight readiness review
• Ascent stage received and inspected I APS engine installation and APS he]lure regulator replacement I Mate stages [] Test preparation I RCS leak check
[] Torque check propellant sysLem and check gamma fittings _ Ascent stage leak checks [] Test preparation _ Integrated systems test I Data processing and evaluation
I Ascent stage ECS leak test _ Replace descent stage heat exchanger I Reverification test IMissionsimulation preparations | Emissivity and rel:lectivity test
_Ascentl)ropuJsion systenl (APS) leak Lest _Water managenlentsystem rework [] Prop e]jantjeak test I [] I MJssio'] simulation ISofLware ,ntegratJon LesL(MCC-H)
IDemate and ,,love stages I Mission simulation test (plugs in) | Move l:or SLA ,,,ate [] Overall Lest
11o. 2 preparation
I Polarity test I Remove and modify inertial measurement unit I Reconfigure and evaluation RP-I loading
(launch vel, icle
Descent stage rework and leak checks • Mission simulation test (plugs out) I SLA assembly Flight readiness test I I Inspection closeout I
(space vehicle)
Descent propulsion system (DPS)leak test • Problem resolution I SLA pyrotechnics installation Countdown demonstration test
• Descent stage ECS leak test I Descent stage leak check I Move preparation Recycle I
J
ITorque check propellant system a,d c]eck gannna fittings I Denlate stages I Move to launch complex 37 Countdown []
• Descent stage received and inspected I Remove DPS hardware I Move to polarity I:ixture Launch ,1_
/_ DPS modifications at contractor's Long Island facility DPS reinstallation and leak check
r
15-i
Responsible Expected
No. Subject analysis publication
manager date
16.0 REFERENCES
17.0 DISYRIBUTION
Addressee _ Addressee
Na=ional Aeronautics an_ Space A_,dni_ra_ion Natlona! Aeronautics ard _paee Ad_,tnistration
Washi_gton_ D. C. 205_6 i,lan_ed
S_aeeeraft Center
Houston, Texas 77058
_. O. _rawe,¸ _
:as C_-uc_s,_ew M_xic_ S80CI
Attent±_r1: _A/_. L. _a_nes 5
_ASA-Hf_PO
_assachus_tu_ in_t±t_t_ of Techno]o_
,'5Cam_rid_,,Parkway
;_ambridge,Xa_sa_husetts 02142
Attcnti_,_: E_442/A. C. Metzger 2
_A_A _SPC
_lilwa-_kee,
1,,'iscons±n
5323C
792_3-6_
APOLLO SPACECRAFT FLIGHT HISTORY