Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Flood Management and River Engineering (Ce 805) 8

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 5

FLOOD MANAGEMENT AND RIVER ENGINEERING (CE 805) 8th sem (for secA &B )

Date: 12/5/20

Draw the figure for better understanding of different technical term of dam or reservoir.
.

You might also like