Plant Modification Request Flowchart PLTU
Plant Modification Request Flowchart PLTU
Create Cancel
PMR Request PMR Request
(WACCEPT) (CANCEL)
rework
* Originator ENG, will assign to
Section Head /
Shift Manager
rework
* PMM is Engineering Manager
SH & Originator
Manager
(PMM)
Create
PMR
Plant Modification Request (PMR), PMR Module
Originator
Section Head
Nominate NRE:
rework * Maximum 3 NREs could be
nominated
(SH)
Create
PMR
Manager
(PMM)
Plant
Approve
Detail Design
Register PMR (PMMAPPR)
(REGISTER)
Cancel PMR
(CANCEL)
Document
Controller
rework
(DC)
Manager (OM)
Operation
Nominate ONP
(ONPNOMINATE)
rework
Person (ONP)
Review
(ONPREVIEW)
Planning
Leader
Team
(PTL)
rework
* Approving PMR will notify to:
PMM, SH, NRE
* Cancelling PMR will notify to
Manager
(SMAPPR) (SMAPPR)
Cancel PMR
(CANCEL)
Jawa Power Jawa Power
(JPMGR)
Manager
rework
Approve
(JPAPPR)
PMM
Close PMR
(CLOSE)
Document
Controller
(DC)
Update Drawing
(UPDATEDRAW)
Manager (OM)
Operation
rework
rework
Person (ONP)
Nominated
Operation
ONP Verify to
Implement & Testing
(ONPIMPLEMENT)
Team Leader
* Notify to Planner
Planning
(PTL)
KKS Updated
(PTLIMPLEMENT)
Nominated
Resp. Eng
Drawing Complete
(INPRG)
(NREIMPLEMENT)
PMR
Implemen
tation
Manager
Station
(SM)
Jawa Power Jawa Power
(JPMGR)
Manager
(JPDIR)
Director