Tender Document: Installation of 20 KWP Stand Alone SPV SOLAR Power Plant at SBBJ STC Bikaner
Tender Document: Installation of 20 KWP Stand Alone SPV SOLAR Power Plant at SBBJ STC Bikaner
Tender Document: Installation of 20 KWP Stand Alone SPV SOLAR Power Plant at SBBJ STC Bikaner
TENDER DOCUMENT
1
Brief Details of the Tender
The Bank is not bound to accept the lowest tender/ offer/ quotation and
reserve the right accept or reject any or all the tenders/ quotations
without assigning any reasons whatsoever.
2
STATE BANK OF BIKANER AND JAIPUR
PREMISES DEPARTMENT, H.O. JAIPUR
Date:
19.08.2015
Dear Sir/s,
Sealed tenders on item rate basis are invited from the competent enlisted
CONTRACTORS with MNRE in the appropriate category, who has worked for
installation of solar power plants of similar nature in various organizations having
sound technical and financial capacity for the aforesaid work. The proof of the similar
works from the concerned organization must be submitted along-with the tender.
Tender document may be downloaded from Bank’s web-site
(http://www.sbbjbank.com) as well as Govt’s web-site (http.//www.tenders.gov.in) and
can also be obtained from the office of the undersigned. While submitting tender, a
crossed Demand Draft of Rs. 1000/- (One Thousand only) (Non – refundable) is to
be enclosed against cost of the tender in the favor of AGM(Premises),SBBJ HO
Jaipur.
3
LVsV cSad vkWQ chdkusj ,.M t;iqj
ifjlj foHkkx] iz/kku dk;kZy;] t;iqj
mDr dk;Z djus gsrq MNRE मे रजिस्टर्ड उपयुक्त Bsdsnkjksa ls eksgjcan fufonk vkeaf=r dh tkrh
4
GENERAL RULES AND INSTRUCTIONS FOR THE GUIDANCE OF
TENDERERS
1. Tenders are hereby invited on behalf of State Bank of Bikaner & Jaipur, Iaipur
for PROPOSED Installation of 20 KWP Stand Alone SPV SOLAR POWER
PLANT AT SBBJ STC BIKANER.
4. The time allowed for carrying out of the work will be 10 Days only.
5
filled in so that there is no discrepancy in the rates, figures and words.
However, if a discrepancy is found in the rates, which correspond with
the amount worked out by the contractor shall be taken as correct. If
the contractor does not work out the amount of an item or it does not
correspond with the rate written either in figure or in words then the
rates quoted by the contractor in words shall be taken as correct.
Where the rates quoted by the contractor in figures and in words tally
but the amount is not worked out correctly the rates quoted by the
contractor will be taken as correct and not the amount.
6. The tender document must be filled in English and all the entries must
be made by the hand and written in ink. If any of the documents are
missing or un-signed, the tender shall be considered invalid.
7. Issue of tender form will be stopped one day before the date fixed for
the opening of tenders.
10. The acceptance of tender will rest with the State Bank of Bikaner &
Jaipur which does not bind itself to accept the lowest tender, and
reserves to itself, the authority to reject any or all of the tenders
6
received without the assignment of a reason. All tenders in whom any
of the prescribed, conditions are not fulfilled or are incomplete in any
respect are liable to be rejected.
The Bank reserves the right to accept the tender in full or in part and
the tenderer shall have no claim for revision of rates or other
conditions, if his tender is accepted in parts.
12. All rates shall be quoted on the proper form of the tender alone.
7
16. Special care should be taken to write the rates in figures as well as in
words and the amounts in figures only, in such a way that interpolation
is not possible. The total amount should be written both in figures and
in words. In case of figures, the words "Rs." should be written before
the figures, e.g. Rs.2.15. and in case of word Rupees should precede
and the word ‘Paise’ should be written at the end, unless the rate is in
whole rupees and followed by the words 'only'. it should invariable be
up to two decimal places. While quoting the rate is in schedule of
quantities the word 'only' should be written closely following the amount
and it should not be written in the next line.
17. Sales Tax or any other tax on material or on finished works like work's
contract tax, Service Tax, Turn - over etc. in respect of this contract
shall be payable by the contractor and the Bank will not entertain any
claim whatsoever in this respect .
18. The contractor shall give a list of his relatives working with the Bank
along with their designations and addresses.
20. The tender for works shall remain open for acceptance for a period of
45 (Forty Five) days from the date of opening of tenders. If any
tenderer withdraws his tender before the said period, then the bank
shall be at liberty to forfeit Earnest Money paid along with the tender.
21. The tender for the work shall not witness by a contractor or contractors
who himself/themselves have/have tendered or who may and had/have
tendered for the same work. Failure to observe this condition would
8
render tenders of the contractors tendering as well as witnessing the
tender liable to summary rejection.
22. It will be obligatory on the part of the tenderer to tender and sign the
tender documents for all the component parts and that, after the work
is awarded, he will have to enter into an agreement for each
component with the competent authority in the bank.
23. The tender, apart from being a competent contractor must associate
himself with agencies of the appropriate class who are eligible to
tender for (i) electrical (ii) Air-conditioning work
24. The tenderer should visit the site to ascertain the working conditions
and local authority regulations / restrictions if any and other information
required for the proper execution of the work.
25. The quantities of various items given in the schedule of quantities are
approximate. The quantities of work may vary at time of allotment /
execution of work. Bank reserves the right to omit / delete any item(s)
of work from the schedule at the time of allotment / before. Contractor
will be paid for the actual work done at the site duly verified by the
concerned official of the bank.
26. The unit price shall be deemed to be fixed price. In case of extra items,
a record of labor charges paid shall be maintained and shall be
presented regularly to the Employers for checking. The settlement will
be made based on figures arrived at jointly and taking unit price given
in the contract assigned to the successful Tenderer. In case of extra
items where similar or comparable items are quoted in the tender, extra
rates shall be based on tender rates.
27. If the rate quoted by the contractor for any item / items are not
workable or abnormally lower than the market rate, the bank may
demand Bank guarantee from the contractor for satisfactory completion
of these work. The bank guarantee amount will be not less than 50% of
the estimated amount of the items for which the rates are not workable
9
or abnormally low. This bank guarantee will be released after
completion of these works (unworkable and abnormally low rated
items) to the satisfaction of the bank.
28. No employee of the Bank is allowed to work as a contractor for a
period of 2 years of his/her retirement from Bank Services without
previous permission of the Bank. This contract is liable to be cancelled,
if either the contractor or any of his employees is any time to be such a
person who had not obtained the permission of Bank as aforesaid
before submission of the tender or engagement in the contractor’s
service.
29. Sealed tenders in prescribed form in two envelopes (Envelope-1
should contain Earnest Money Deposit, in form of DD Drawn in favor of
State bank of Bikaner & Jaipur, Jaipur, Payable at Jaipur, Tender Fee
in form of DD of Rs.1000/- in favor of AGM Premises SBBJ HO .
Payable at Jaipur, Pre-qualification forms, conditions of contract and
technical specification. Envelope-2 should contain price bid. are to be
addressed and sent to The Assistant General Manager, Premises,
State bank of Bikaner & Jaipur, Head Office, Tilak Marg, Jaipur –
302005.
30. Estimated Cost: Rs.15,00,000/- -
10
TECHNICAL DETAILS
1. SPV MODULES:
The total Solar PV Array Capacity shall be 20 KWp. Mono/Poly Crystalline type
solar modules of desired nominal voltage or peak power rating which meet
specifications are considered appropriate for inclusion in this offer. Modules will
- Solar cells / modules used have a proven record for the performance in
certification.
Type : 250W60/300W72
2. MECHANICAL COMPONENTS
11
ARRAY SUPPORT STRUCTURE
suitable for site conditions. The inclination angle of the array support structure
for adjusting inclination angle is required. There shall be mild steel frame
structures (Hot dipped, Galvanized) for holding the PV modules to form the PV
Each panel frame shall be complete with a weather proof junction box as per the
vendor.
12
The power-conditioning unit will convert dc power produced by SPV array
The Inverter should have both grid tie and off tie functions built in. The
not shut down during power outages. The Vendor will arrange the
ELECTRICAL
INVERTER
seconds
THD <5%
consumption
centigrade
ENVIRONMENTAL
range
13
Ambient humidity range 5% to 90% condensing
Construction
Protections:
- Short Circuit
- Overload
Features:
Made of FRP
5. CABLES
Cabling will be carried out as per IE rules and all should be ISI Marked.
Cable Marking: All cables/wires shall be marked with good quality ferule for
Cable identification.
Cable Ends: All connections shall be made through suitable cable lugs/tags
14
All cables shall conform to BIS standards
6. CIVIL WORK
Civil work shall include work related with foundation for installation of module
mounting structures and other accessories. However the Bank shall provide
clear space for installation of SPV array and the control room for
installation of PCU.
8 LIGHTNING PROTECTION
The suitable lightning arrestors (ESE) installed in the array area. Lightning
protection be provided by the use of metal oxide arrestors and suitable earthing
such that induced transients find an alternate route to earth. Protection shall meet
the safety rules as per Indian Electricity Act 2003/IE rules.
9. EARTHING PROTECTION
Each array structure of the PV yard be grounded/ earthed properly. In addition
the lighting arrester/masts should also be provided inside the array field.
Provision be kept for shorting and grounding of the PV array at the time of
maintenance work. All metal casing/shielding of the plant be thoroughly grounded
in accordance with Indian Electricity Act/IE Rules when required after earthing by
calibrated earth tester. PCU and DCDB should also be earthed properly. Earth
resistance is not more than 5 ohms. It will be ensured that all the earthing points
are bonded together to make them at the same potential.
15
Internal surge protection are consist of three MOV type arrestors connected from
+ve and – ve terminals to earth (via Y arrangement) for higher withstand of the
continuous PV-DC voltage during earth fault condition. SPD have safe
disconnection and short circuit interruption arrangements through integrated DC
in-build bypass fuse (parallel) which get tripped during failure mode of MOV,
extinguishing DC arc safely in order to protect the installation against fire
hazards.
The fire fighting system for the proposed power plant for fire protection shall be
consisting of:
Portable fire extinguishers in the control room for fire caused by electrical
short circuits.
The fire extinguishers shall be provided in the control room housing the PCU.
The work of supply & installation shall be completed within 1 month from the date
16
Qty/Rate
The bill of material for 20 KWp Grid connected SPV Power Plant is as under:
Rate Amount
Sr. No. Description of item Unit Quantity (Rs)
(20 KVA)
requirement
Total
17
Terms & Conditions:
delivery.
year
warranty.
Scope of work:
- Shall provide shadow free roof top area for installation of SPV Power
commissioning of systems,
- Shall provide covered space of Size 12 feet x 12 feet for control room
18
(b) VENDOR:
- VENDOR shall provide power (from SPV Power Plant) at one point
& C of SPV Power system, on site training of customer for routine visit
Checklist:--
19