This document provides a summary of items and costs for a precast concrete panel construction project. It includes 19 line items with quantities, units, rates, and amounts for tasks like dismantling an existing surface, concrete work, rebar, dowels, transportation, lifting, and grouting. The total amount for all 19 line items is Rs. 15,17,7030.74.
This document provides a summary of items and costs for a precast concrete panel construction project. It includes 19 line items with quantities, units, rates, and amounts for tasks like dismantling an existing surface, concrete work, rebar, dowels, transportation, lifting, and grouting. The total amount for all 19 line items is Rs. 15,17,7030.74.
This document provides a summary of items and costs for a precast concrete panel construction project. It includes 19 line items with quantities, units, rates, and amounts for tasks like dismantling an existing surface, concrete work, rebar, dowels, transportation, lifting, and grouting. The total amount for all 19 line items is Rs. 15,17,7030.74.
This document provides a summary of items and costs for a precast concrete panel construction project. It includes 19 line items with quantities, units, rates, and amounts for tasks like dismantling an existing surface, concrete work, rebar, dowels, transportation, lifting, and grouting. The total amount for all 19 line items is Rs. 15,17,7030.74.
Download as XLSX, PDF, TXT or read online from Scribd
Download as xlsx, pdf, or txt
You are on page 1/ 2
Sr No Item Of Work Prestressed Precast Concrete Panels
Quantity Units Rate Amount
1 Dismantling of existing BT surface to a 7000 sqm 6 42000 depth of 50mm by milling 0 Construction of DLC subbase over prepared subgrade(required only if available surface has less modulus of subgrade reaction) 1050 cum 3400 3570000 2 M40 Grade of concrete 1500 cum 4500 6750000 3 Mistri 250 Nos 539 134750 4 Labour 555 Nos 493 273615 Provide HYSD in both direction of 8mm dia@300 & 200 spacing 30 MT 39202 1176060 6 Binding Wire 1.2 MT 66840 80208 7 Cutting Blade L.S LS L.S 7000 8 Liftng Rod 16mm dia 1.42 MT 39202 55666.84 9 No Of Dowels 5376 NOS 60 322560 10 Vibrator 60 NOS 992.25 59535 11 Curing L.S LS L.S 500000 12 Electricity L.S L.S 100000
Transportation of panels from storage
yard to placement site assuming lead 13 30km 223 no of trip 4407.3 982827.9 14 Hydra for Lifting and placing 60 days 4000 240000
Preparation of base levelling course
having nominal thickness and having strength 15MPa over milled surface 15 140 cum 4000 560000 Grouting of dowel slot using suitable 16 grout (0.03x0.22x0.1)5376 3.6 kg 780 2808 Bed grouting to ensure complete 17 support to laid precast panels 7000 sqm 100 70000 Mould Required for casting of PCP 18 panels L.S LS L.S 250000 19 15177030.74 0 7