Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Notes:: Typical Details of Expansion Joint

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

NOTES:

SECTION B-B

LEGEND:-

SECTION A-A

TYPICAL DETAILS OF EXPANSION JOINT


B B

DIMENSION SCHEDULE

REINFORCEMENT PLAN OF TOE WALL

A A

REINFORCEMENT SCHEDULE

DIMENSION PLAN OF TOE WALL

SCALE : - STATUS :- CLIENT:- EPC:- CONSULTANTS:- PROOF CONSULTANT:- TITLE:


NATIONAL HIGHWAYS DWG NO.: -
AUTHORITY OF INDIA
DETAILED DESIGN INDIAN TECHNOCRAT
LIMITED DIMENSION AND REINFORCEMENT DATE:- SEPTEMBER 2017 PAPER :- A2
PURPOSE :- PROJECT: Development to Four Laning of Varanasi Gorakhpur AECOM India Private Limited DETAILS
AS SHOWN Section of NH-29 from KM 88.000 (Design Chainage AECOM India Pvt. Ltd. 2014
AUTHORITY ENGINEER: FOR TOE WALL DRAWN (A) DESIGN (B) CHECKED (C) APPROVED (D)
84.160) to KM 148.000 (Design Chainage 149.540) The information contained in this document produced by AECOM is solely for the use of the Client
R0 20-09-2017 INITIAL SUBMISSION REVIEW [Package-III Birnon Village to Amilla Village] in the State
identified on the cover sheet for the purpose for which it has been prepared and AECOM undertakes
no duty to or accepts any responsibility to any third party who may rely upon this document.All rights THEME ENGINEERING
reserved. No section or element of this document may be removed from this document, reproduced, SERVICES PVT. LTD.
REV DATE DESCRIPTION OF REVISION of Uttar Pradesh under NHDP Phase-IV on EPC Mode electronically stored or transmitted in any form without the written permission of AECOM. MANISH VERMA S. YADAV S. P. SINGH S. RASTOGI

You might also like