Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Annual Work and Financial Plan Shs

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Republic of the Philippines

Department of Education
Division of Surigao del Norte
Sison District
MAYAG NATIONAL HIGH SCHOOL
Mayag, Sison, Surigao del Norte

ANNUAL WORK AND FINANCIAL PLAN FY 2018

Financial Requirements
Activity Eligible Items Performance Indicators/MOVs Total
Q1 Q2 Q3 Q4

Conduct Orientations to stakeholders


and students on SHS
Tarpaulin, Brochures, Tokens Work outputs, Attendance and
Program/Curriculum for the school- 5,000.00 5,000.00
Meals ans Snacks Documentation
based trainings, meetings or LAC
Sessions support expenses

Send Teachers to trainings/seminars to


Travelling expenses,
upgrade level of Teaching Profeciency to Registration, and other Certificate of Completion and
acquire Teaching Methodology and NC Appearance 1,000.00 5,000.00 2,000.00 2,000.00 10,000.00
incidental expenses
requirements

Program of Activities,
Fund programs and activities to improve
Attendance and
learning outcomes on SHS Curriculum Bond Paper, Computer inks 2,000.00 2,000.00 2,000.00 6,000.00
Documentation

Send SHS students for Work immersion


Certificates, Travelling
to enhance skills and prepare students Ceritificate of Completion 3,000.00 3,000.00
for future job preference expenses

Procure materials and other items


Items identified by the Purchased Request, Official
needed by the SHS teachers and 2,000.00 2,000.00 2,000.00 6,000.00
teachers Receipts
students
To be identified by the Program of Works, Purhase
Minor repair of doors and windows of
Physical Faclities Request, Certificate of 3,000.00 3,000.00 3,000.00 9,000.00
SHS Classrooms. Coordinator Completion Documentations

Program of Works, Purhase


To be identified by the
Maintenace of the school ground and Request, Certificate of
Physical Faclities 2,000.00 2,000.00 5,000.00 5,000.00 14,000.00
other physical facilities Coordinator Completion Documentations,
Hired Contract Labor

Minor and major repairs of tools and To be identified by the


equipment necessary in teaching Physical Faclities PR and OR 5,000.00 5,000.00 5,000.00 15,000.00
process Coordinator

Production of Teacher made test and To be identified by the


activity sheets Teacher concerned PR and OR 1,000.00 1,000.00 1,000.00 3,000.00

Finance expenses on Completion and To be identified by the


Graduation Rites (Medals, Card, PR and OR, Documentation 3,000.00 3,000.00 3,000.00 9,000.00
Teacher concerned
Diploma)

Pay for utilities, electricity, water, and


Electric and water bills, Load PR, OR 1,000.00 1,000.00 1,000.00 1,000.00 4,000.00
internet connectivity

84,000.00

Prepared by:

ROLLY L. ALAPAG
Head Teacher III
Approved by:

NELIA S. LOMOCSO, Ph. CESE


Schools Division Superintendent

You might also like