Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Bar Bending Schedule For Pile Foundation With Calculations

Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

Welcome

⌂ Home  VIP $ Earn Money Type Search Words 🔍 Jayesh Jagtap


Bar Bending Schedule for Pile Foundation with Calculation


⌂ Home / Structural Engineering / Foundation Design

 VIP 📖 Popular Articles

Concrete Mix Design


$ Earn Money
Calculation for M20, M25, M
Concrete with
 Shop Merchandise
To clearly understand the bar bending schedule of a pile foundation, it is
Calculate Quantities of
📖 Questions  necessary to be familiar about the typical reinforcement details of a pile Materials for Concrete -Cem
foundation. Pile foundation is a common type of deep foundation, used for Sand, Aggregates
 Ask Question supporting heavy loaded structures when the site under consideration have
Quantity of Cement and San
✎ Write Article a very weak soil that is compressible in nature.
Calculation in Mortar

Building 
Ad Preparation of Bar Bending
Schedule (BBS) and Its
Concrete 
Advantages

Construction 
Civil Engineering Tips - Poi
to Remember for Civil Site
How To Guide 

Geotechnical  Liquid Crystal Optics


UV to MWIR, High Contrast, High Speed, High Polarization 📖 Recent Articles
Purity, Analog Modulation
Structural  What are the Safety Measur
Engineering meadowlark.com Visit Site followed for Formwork
installation? [PDF]

Surveying
Layout of a Typical Pile Foundation How to Perform Powers

Tips Remolding Test on Concret


A typical pile foundation arrangement have the load structure supported by [PDF]

a pile cap, which is in turn supported by several piles as shown in the plan
Are Smart Contracts the ne
and front view arrangement in the below gures.
Big Thing in Construction?
[PDF]

& Ad Free! EXPLORE VIP Membership


What is Job Safety Analysis
(JSA) ? [PDF]

How to Pour Concrete


✎ for P
Foundation? ×
Get Noti[PDF]
cations
Popular Answers

What is the di erence betw


Tender and Contract
Fig.1: Pile Foundation Arrangement – Superstructure, Pile Cap and Piles Documents?

Ad How to calculate the quanti


water for a given concrete m

What Software are used to


Estimate Project Time and
Quantity in Construction?

Liquid Crystal Optics


What are Bearing Capacity
UV to MWIR, High Contrast, High Speed, High
Values of Di erent Types of
Polarization Purity, Analog Modulation
Soil?
meadowlark.com Visit Site

y Ash Percentage in PPC


Cements

Structural Speci cation and Reinforcement


Details of a Pile Foundation
The gure-2 shows the typical reinforcement details and drawing of a pile
foundation. The details of pile cap are not explained in this article.

Fig.2: Pile Foundation Details



Get Noti cations ×
The whole arrangement is clearly understood from the gure-2. The pile
cage has vertical reinforcement held together by outer and inner rings. The
Reinforcement in pile construction include:

1. Vertical Reinforcement

2. Outer Ring Reinforcement

3. Inner Ring Reinforcement

The above details are mentioned in the gure-3 below. The Outer rings are
provided as helical rings and the inner is circular or spiral ties.

Fig.3: Cross-section details in section A-A of gure-2

The development length ‘Ld’ is provided outside of the column piercing into
the pile cap. The anchorage length to the recommended amount is provided
to the bottom of the column as shown in gure-2.

From the Figure:

1. Length of Pile = 20m

2. Diameter of Pile = 0.6m

3. Diameter of:
a. Vertical Reinforcement = 20mm – 12nos

b. Outer Helical Ring = 8mm @ 200mm c/c
Get Noti cations ×
c. Inner spiral ties = 16mm @ 2000mm c/c

4. Bottom Length of Anchorage = 300mm

5. Development Length = 40d

6. Clear Cover = 75mm

Calculation for Bar Bending Schedule of Pile


Foundation
Step 1: Length of Vertical Reinforcement

In the case of bar bending schedule of a column or a pile, there comes need
for lapping the rods so that the length of pile (20m) is attained. Hence, a
lapping length equal to 5Dd is provided in extra. Therefore,

Total Cutting Length for Vertical Reinforcement = Anchorage Length at


the bottom of the pile + the height of the pile + development length (40d) +
Lap length (50d) – clear cover provided at the bottom.

i.e. Lv = 300 + 20000 + 40d +50d -75 = 300 + 20000+ (40 x 12) + (50 x 12) – 75

Ad

Liquid Crystal Optics


UV to MWIR, High Contrast, High Speed, High Polarization
Purity, Analog Modulation

meadowlark.com Visit Site

Total length of vertical reinforcement, Lv = 21.3m

Note: During tying the bar, it is recommended to tie at the middle, as tying
at the ends of the bars will be subjected to higher stress values.

Step 2: Inner Spacing Ring – Number and Length of each


Ring

Here, we have to determine the length of each inner ring along with their
numbers arranged.

The number of rings (Nr) = [Length of the Pile / Spacing] + 1

= [20000/2000] +1 = 11 No’s

The circumference of the ring gives the length of each ring. For this the
radius of the ring has to be determined. Given the radius of the pile, the
clear cover, outer ring radius:


Get Noti cations ×
The radius of the ring = [Radius of the pile – clear cover – diameter: of
outer ring – diameter: of vertical reinforcement:]/2

= [600 – 75 – 8 – 12]/2= 252.5mm

Hence, Length of ring = 2xpixr

= 2 x 3.147 x 252.3 = 1584.4mm = 1.58m

Step 3: Outer Helical Ring – Number and Length of each


ring

For every speci cation of outer helical ring, the radius of the same have to
be determined.

Radius of Helical Ring Outer = [Diameter of Pile – Clear Cover]/2

= [600 -75]/2 = 262.5mm

Length of ring = 2xpixr

= 2 x 3.147 x 262.5 = 1648.5mm = 1.65m

The number of rings (Nr) = [Length of the Pile / Spacing] + 1

= [20000/200] +1 = 101 No’s

Step 4: Bar Bending Schedule

Diameter of No. of Length of Total


Speci cation
Bars (m) Bars (m) rods (m) Length (m)

Vertical Bar 12 12 21.3 255.6

Inner Ring
16 11 1.58 17.4
bar

Outer ring
8 101 1.65 166.65
bar

 Share This Article  Facebook   


Get Noti cations ×
Ad

Liquid Crystal Optics


UV to MWIR, High Contrast, High Speed, High Polarization
Purity, Analog Modulation

meadowlark.com Visit Site

Neenu Arjun ✓

EDITOR

Neenu is a Civil and Structural Engineer and has experience in Design of Concrete and Steel
Structures. She is an Author, Editor and Partner at theconstructor.org.

suitable for25mm Footing Bar Bellows in India - Bar Bending


joint gap Bending Schedule Expansion Joints Schedule for
(BBS) –… - India Reinforced…
Ad MEISHUO theconstructor.org Ad indiaflex.com theconstructor.org

AMCAT Test for How to Calculate Reinforcement Reinforcement


Fresher Jobs Steel Quantity for Detailing of Detailing of
Slab, Footing… Isolated Footing Reinforced…
Ad AMCAT theconstructor.org theconstructor.org theconstructor.org

← Previous article Next article →

Checks for Fixing Reinforcements in Types of Loads Causing Vibration


Formworks of Concrete Structural Serviceability Issues in Buildings
Members

Related Posts

Get Noti cations ×
How does a Steel Structure Fail? Steel Piles - Types, Advantages,
[PDF] and Disadvantages [PDF]

📁 Know More 📁 Connect With Us Search ...

⌂ Home  Ask Question


Articles
 About Us ✎ Write Article

 Contact Us  VIP Subscriptions


Search
 Privacy Policy  Popular Questions

 Our Team

© 2009-2020 The Constructor. All Rights Reserved.


×
Get Noti cations

You might also like