MOPO 2019 Updated Rev. 10 PDF
MOPO 2019 Updated Rev. 10 PDF
MOPO 2019 Updated Rev. 10 PDF
10 March 2019
Helicopter Operations
SIMOPS at location
Nightime Operations
Crane operations
Platform Status
Visibility < 250m
Squall Warning
This MOPO does not override
Non-Routine
Safety Systems
Wind >25kts
Live platform
the
generation
than 50%
BMS RP)
Master's decision to STOP a
grinding)
job if he thinks it is unsafe
2.0m
2.5m
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Vessel Activities
1 SPM Operations */12 1 2 1 * * 20 25 1 1
2 Anchor Handling */12 6 20 20 4 * * 20 26 20 7 8 20
3 GP Launch Operations */12 9 20 20 4 * * 26 20 7 8 20
4 Area/Standby Boat */12 20 4 * * 20 7 20
5 USV & IUV Vessels */12 20 10 20 4 * * * 20 7 20
6 Supply operations (inc. skip & ship) */12 * 3 20 20 4 * * 26 * 20 7 20 20
7 Cargo Barge (Dumb barge heli deck) */12 28 4 * * 20 20 20 20 20
8 Lifting Operations */12 20 * 5/20 5/20 5/20 5/20 5/20 4 * * 20 20 * 20 22 20 20 20 */12 20 20
9 Survey Operations */12 20 20 20 20 20 4 * 20 20 20 20 */12 20 20 20
10 Towing Operations */12 20 20 20 20 20 20 4 * 20 20 20 */12 20 20 20
11 Towing Dumb Barge Operations */12 20 20 20 20 20 4 * * 20 * 20 20 */12 20 20 20
12 Bunkering operations */12 * 20 20 20 4 * * 20 * 20 * 20 22 20 20 */12 20 */12 20
13 Workboat - anchored or moored at location */12 * 14 17/18 17/18 17/18 17/18 17 4 * * 26 * 20 20
14 DP mode at location */12 *19 *19 14/19/20 19 19 19 19 19 19 4 * 19 19 26 * 20 11 20 20 14/19/20 19
Passenger Transfer
15 Conventional Gangway */12 N/A 20 20 20 20 4 * * 24 * 23
16 Motion Compensated Gangway */12 20 20 20 20 20 4 * * 24 * 23 7
17 Rope transfer (swing) */12 20 20 20 20 20 20 4 * * 24 * 23 7 20
18 Frog/Basket transfer */12 20 20 20 20 20 4 * * 20 24 * 23 7 23 23 23 23
MO(D)U Moves
19 Work Barge (Moored) */12 13 14 15 15 15 15 * 20 16 26 * 20 20
Jack-up/MOU/MODU approach/depart to open
20 */12 N/A N/A 21 21 21 21 21 21 20 * * 20 20 20 N/A
location
Jack-up/MOU/MODU approach or Depart fixed
21 */12 N/A N/A 21 21 21 21 21 21 20 * * 20 23 26 20 20 20 20 N/A
structures
Self propelled rig approach/depart fixed
22 */12 N/A 21 21 21 21 21 21 16 * 20 23 27 20 20 20 20
structures