Bar Bending Schedule: DDU-HOS-STR-107a

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 21

Bar bending schedule

PSP Projects Ltd.


Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Beam
1 BR1 0.70 0.230 0.450 1.675 0.300 3
16 3 3 1 9 5.300
0.450 0.450

0.300

Ring 0.180 0.40 8 3 1 8 24 1.352 32.45


0.400

0.180
2 BR2 0.70 0.230 0.450 0.975 0.300 2
16 2 3 1 6 3.900
0.450 0.450

0.300

Ring 0.180 0.40 8 2 1 8 16 1.352 21.63


0.400

0.180
3 BR3 0.70 0.230 0.450 0.975 1
16 1 3 1 3 3.300
0.450 0.450

Ring 0.180 0.40 8 1 1 8 8 1.352 10.82


0.400

0.180
4 450mm wide Chajja 12.23 0.45 0.15
Main Chipiya 8 1 83 1 83 2.246
1.140

Page 1 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items

1.140
Dist. 8 1 5 1 5 12.190
Laps 8 0.170 0.430 1 5 1 5 0.400
0.110
Binder 10 0.170 1 2 1 2 12.190
Laps 10 1 2 1 2 0.500

5 SB3 13.61 0.300 0.250 0.350 0.350 1


Top Main 12 0.100 13.560 0.100 1 4 1 4 13.712 54.85
Laps 12 0.60 1 4 1 4 0.60 2.40
Bottom Main 16 0.100 13.560 0.100 1 4 1 4 13.728
Laps 16 0.80 1 4 1 4 0.80

Ring 0.260 0.210 8 1 1 130 130 1.020 132.60


0.210

0.260
6 SB2 1.20 0.230 0.250 0.300 0.230 2
Top Main 12 0.100 1.150 0.100 2 4 1 8 1.302 10.42
Laps 12 0.60 2 4 1 8 0.60 4.80
Bottom Main 16 0.100 1.150 0.100 2 4 1 8 1.318
Laps 16 0.80 2 4 1 8 0.80

Ring 0.190 0.210 8 2 1 8 16 0.880 14.08


0.210

0.190
Slab
1 Slab S1 at Grid E-N/13'-14' 56.198 10.700
Main Bar Bentup 2.660 10 11.84 1 268 1 268 11.84 3173.92

Page 2 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Main Bar STR 10 10.67 1 268 1 268 10.67 2859.56
Dist. Bar Betup 10 57.80 1 34 1 34 57.80 1965.30
Laps 10 0.50 1 34 5 170 0.50 85.00
Dist. Bar STR 10 56.17 1 34 1 34 56.17 1909.71
Laps 10 0.50 1 34 5 170 0.50 85.00
Extra Top II SS @ 13' 4.935 0.300 10 1.77 1 272 1 272 1.77 480.22
Binder 10 56.17 1 9 1 9 56.17 505.51
Laps 10 0.50 1 9 4 36 0.50 18.00
Extra Top II SS @ In Btwn 13'-
14' 4.935 0.230 4.935 10 3.18 1 272 1 272 3.18 863.87
Binder 10 56.17 1 17 1 17 56.17 954.86
Laps 10 0.50 1 17 4 68 0.50 34.00
Extra Top II SS @ 14' 4.935 0.300 10 1.77 1 272 1 272 1.77 480.22
Binder 10 56.17 1 9 1 9 56.17 505.51
Laps 10 0.50 1 9 4 36 0.50 18.00
Extra Top II LS @ E 5.930 0.300 10 2.06 1 35 1 35 2.06 72.24
Binder 10 10.67 1 7 2 14 10.67 149.38
Extra Top II LS @ F 5.930 0.350 6.530 10 4.07 1 35 1 35 4.07 142.56
Binder 10 10.67 1 15 1 15 10.67 160.05
Extra Top II LS @ G,J,K,L 6.530 0.350 6.280 10 4.18 1 35 4 140 4.18 584.92
Binder 10 10.67 1 15 1 15 10.67 160.05
Extra Top II LS @ H 6.280 0.350 6.030 10 4.03 1 35 1 35 4.03 140.98
Binder 10 10.67 1 15 1 15 10.67 160.05
Extra Top II LS @ I 6.030 0.350 6.530 10 4.10 1 35 1 35 4.10 143.61
Binder 10 10.67 1 15 1 15 10.67 160.05

Page 3 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Extra Top II LS @ M 6.280 0.350 3.983 10 3.41 1 35 1 35 3.41 119.48
Binder 10 10.67 1 13 1 13 10.67 138.71
Extra Top II LS @ E 3.983 0.300 10 1.48 1 35 1 35 1.48 51.79
Binder 10 10.67 1 5 1 5 10.67 53.35
2 Slab S1 at Grid 15'-16'/E-F 10.570 6.580
Main Bar Bentup 6.530 10 8.70 1 50 1 50 8.70 435.20
Main Bar STR 10 6.55 1 50 1 50 6.55 327.50
Dist. Bar Betup 3.430 10 11.94 1 21 1 21 11.94 244.85
Dist. Bar STR 10 10.54 1 21 1 21 10.54 216.07
Extra Top II SS @ E,F 5.930 0.300 10 2.06 1 50 2 100 2.06 206.40
Binder 10 10.54 1 10 2 20 10.54 210.80
Extra Top II LS @ 15 4.870 0.300 10 1.75 1 21 1 21 1.75 36.67
Binder 10 6.55 1 6 1 6 6.55 39.30
Extra Top II LS @ In Btwn 15'-
16' 4.870 0.230 4.870 10 3.14 1 21 1 21 3.14 65.88

Binder 10 6.55 1 12 1 12 6.55 78.60


Extra Top II LS @ 16' 4.870 0.300 10 1.75 1 21 1 21 1.75 36.67
Binder 10 6.55 1 6 1 6 6.55 39.30
Less Cut-out 0.930 2.770 10 2.77 1 10 1 10 2.77 -27.70
10 0.93 1 19 1 19 0.93 -17.67

3 Slab S1 at Grid 15''-16'/M-N 6.160 5.400

Main Bar Bentup 1.500 10 6.02 1 29 1 29 6.02 171.43


Main Bar STR 10 5.37 1 29 1 29 5.37 153.05
Dist. Bar Betup 3.315 10 7.32 1 17 1 17 7.32 120.77

Page 4 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Dist. Bar STR 10 6.13 1 17 1 17 6.13 101.15
Extra Top II SS @ 15'',16' 4.870 0.300 10 1.75 1 29 2 58 1.75 101.27
Binder 10 6.13 1 9 2 18 6.13 110.34
Extra Top II LS @ M,N 5.930 0.300 10 2.06 1 17 1 17 2.06 35.09
Binder 10 5.37 1 7 1 7 5.37 37.59

4 Slab S2 at Grid M-N'/13'-13'' 1.73 2.37

Main Bar Bentup 10 2.53 1 7 1 7 2.53 16.46


Main Bar STR 10 1.70 1 6 1 6 1.70 10.21
Dist. Bar Betup 10 1.90 1 4 1 4 1.90 6.64
Dist. Bar STR 10 2.34 1 3 1 3 2.34 7.01
Extra Top II LS @ N' 4.571 0.35 10 1.04 1 17 1 17 1.04 17.66
Binder 10 4.57 1 4 1 4 4.57 18.28

5 Slab S2 at Grid L'-M/15''-16' 9.27 3.32

Main Bar Bentup 10 3.48 1 10 1 10 3.48 34.80


Main Bar STR 10 9.24 1 10 1 10 9.24 87.78
Dist. Bar Betup 10 9.44 1 23 1 23 9.44 212.29
Dist. Bar STR 10 3.29 1 22 1 22 3.29 72.27
Extra Top II LS @ L',M 3.315 0.35 10 1.34 1 13 2 26 1.34 34.96
Binder 10 4.57 1 5 2 10 4.57 45.71
Extra Top II SS @ 15' 2.870 0.300 10 1.15 1 42 1 42 1.15 48.13
Binder 10 9.24 1 6 1 6 9.24 55.44
Extra Top II SS @ In Btwn 15'-
16' 2.870 0.230 4.870 10 2.54 1 42 1 42 2.54 106.55

Page 5 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Binder 10 9.24 1 14 1 14 9.24 129.36
Extra Top II SS @ 16' 4.870 0.300 10 1.75 1 42 1 42 1.75 73.33
Binder 10 9.24 1 9 1 9 9.24 83.16
6 Slab S3 at Grid E-L/14'-15' 49.440 6.920
Main Bar Bentup 4.935 10 8.75 1 162 1 162 8.75 1412.40
Main Bar STR 10 6.89 1 162 1 162 6.89 1112.74
Dist. Bar STR 8 49.41 1 33 1 33 49.41 1630.53
Laps 8 0.40 1 33 4 132 0.40 52.80
Extra Top II SS @ 14' 2.781 0.350 10 1.17 1 166 1 166 1.17 194.10
Binder 10 49.41 1 4 1 4 49.41 197.64
Laps 10 0.50 1 4 4 16 0.50 8.00
Extra Top II SS @ Btwn 14'-
15' 2.781 0.230 2.782 10 1.88 1 166 1 166 1.88 312.73
Binder 10 49.41 1 8 1 8 49.41 395.28
Laps 10 0.50 1 8 4 32 0.50 16.00
Extra Top II SS @ 15' 2.782 0.350 10 1.17 1 166 1 166 1.17 194.15
Binder 10 49.41 1 4 1 4 49.41 197.64
Laps 10 0.50 1 4 4 16 0.50 8.00
7 Slab S3 at Grid 15'-15''/F-I 20.240 2.940
Main Bar Bentup 3.430 3.550 10 5.38 1 66 1 66 5.38 352.32
Main Bar STR 10 2.91 1 66 1 66 2.91 190.61
Dist. Bar STR 8 20.21 1 15 1 15 20.21 303.15
Laps 8 0.40 1 15 4 60 0.40 24.00
Extra Top II SS @ 15' 3.430 0.350 2.410 10 2.09 1 68 1 68 2.09 141.92
Binder 10 20.21 1 7 1 7 20.21 141.47
Laps 10 0.50 1 7 4 28 0.50 14.00
Page 6 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Extra Top II SS @ Btwn 14'-
15' 2.410 0.230 3.550 10 2.00 1 68 1 68 2.00 136.20
Binder 10 20.21 1 8 1 8 20.21 161.68
Laps 10 0.50 1 8 4 32 0.50 16.00
8 Slab S3 at Grid 14'-16/L-M' 14.090 3.180
Main Bar Bentup 6.530 3.315 10 6.48 1 45 1 45 6.48 291.53
Main Bar STR 10 3.15 1 45 1 45 3.15 141.75
Dist. Bar STR 8 14.06 1 15 1 15 14.06 210.90
Laps 8 0.40 1 15 4 60 0.40 24.00
Extra Top II SS @ 15' 3.430 0.350 2.410 10 2.09 1 47 1 47 2.09 98.09
Binder 10 14.06 1 7 1 7 14.06 98.42
Laps 10 0.50 1 7 4 28 0.50 14.00
Extra Top II SS @ Btwn 14'-
15' 2.410 0.230 3.550 10 2.00 1 47 1 47 2.00 94.14

Binder 10 14.06 1 8 1 8 14.06 112.48


Laps 10 0.50 1 8 4 32 0.50 16.00
9 Slab S3 at Grid 15'-16/L-M' 10.090 2.465
Main Bar Bentup 4.180 10 3.88 1 33 1 33 3.88 128.17
Main Bar STR 10 2.44 1 33 1 33 2.44 80.36
Dist. Bar STR 8 10.06 1 12 1 12 10.06 120.72
Extra Top II SS @ M,M' 3.720 0.350 10 1.45 1 34 2 68 1.45 98.67
Binder 10 10.06 1 5 2 10 10.06 100.60
10 Slab S3 at Grid 15'-15''/M-N 6.410 1.500
Main Bar Bentup 10 1.67 1 21 1 21 1.67 34.97
Main Bar STR 10 1.47 1 21 1 21 1.47 30.87
Dist. Bar STR 8 6.38 1 7 1 7 6.38 44.66
Page 7 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Extra Top II SS @ M,M' 1.500 0.230 10 0.67 1 22 2 44 0.67 29.26
Binder 10 6.38 1 3 2 6 6.38 38.28
11 Slab S4 at Grid F-I/15''-16' 20.240 7.86
Main Bar Bentup 10 8.21 1 24 1 24 8.21 196.92
Main Bar STR 10 7.83 1 24 1 24 7.83 184.01
Dist. Bar Betup 8 20.77 1 66 1 66 20.77 1360.11
Dist. Bar STR 8 20.21 1 65 1 65 20.21 1313.65
Laps 8 0.40 1 131 1 131 0.40 52.20
Extra Top II LS @ F,I 3.665 0.30 8 1.40 1 28 2 56 1.40 78.37
Binder 8 4.57 1 5 2 10 4.57 45.71
Extra Top II LS @ G,H 3.665 0.30 3.665 8 1.40 1 28 2 56 1.40 78.37
Binder 8 4.57 1 6 2 12 4.57 54.85
Extra Top II SS @ 15' 6.530 0.300 10 2.24 1 66 1 66 2.24 148.10
Binder 10 20.21 1 8 1 8 20.21 161.68
Laps 10 0.50 1 8 1 8 0.50 4.00
Extra Top II SS @ In Btwn 15'-
16' 6.530 0.230 6.280 10 4.06 1 66 1 66 4.06 267.83

Binder 10 20.21 1 15 1 15 20.21 303.15


Laps 10 0.50 1 15 1 15 0.50 7.50
Extra Top II SS @ 16' 6.280 0.300 10 2.17 1 66 1 66 2.17 143.15
Binder 10 20.21 1 8 1 8 20.21 161.68
Laps 10 0.50 1 8 1 8 0.50 4.00

12 Slab S5 at Grid 14'-15'/M'-N' 6.150 3.510

Main Bar Bentup 8 3.64 1 24 1 24 3.64 85.52


Main Bar STR 8 3.48 1 23 1 23 3.48 80.04
Page 8 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Dist. Bar Betup 3.255 8 7.26 1 11 1 11 7.26 79.81
Dist. Bar STR 8 6.12 1 11 1 11 6.12 67.32

13 Slab S6 at Grid 15'-16'/M'-N' 3.255 3.510

Main Bar Bentup 8 3.64 1 12 1 12 3.64 43.67


Main Bar STR 8 3.48 1 12 1 12 3.48 40.02
Dist. Bar Betup 3.255 8 4.36 1 13 1 13 4.36 56.69
Dist. Bar STR 8 3.23 1 13 1 13 3.23 41.93
14 Slab S7 at Grid I-L/15'-16' 20.490 10.570
Bottom Main (u) 12 10.54 1 195 1 195 10.54 2055.30
Bottom Dist. (t) 12 20.46 1 68 1 68 20.46 1391.28
Laps 12 0.60 1 68 1 68 0.60 40.80
Top Main (x) 12 10.54 1 100 1 100 10.54 1054.00
Top Dist. (w) 12 20.46 1 35 1 35 20.46 716.10
Laps 12 0.60 1 35 1 35 0.60 21.00
Extra Top II LS @ J,K 6.530 0.350 6.280 12 4.18 1 35 2 70 4.18 292.46
Binder 12 10.54 1 15 1 15 10.54 158.10
Chair Pin as per Actual 12 0.00

Total Length 6100.59 28150.96 5801.50


Unit Weight/Meter 0.40 0.62 0.89
Weight in MT 2.410 17.377 5.157
Total Weight in MT 25.191

Page 9 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

47.70

23.40

9.90

Page 10 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

54.91
3.20

10.54
6.40

Page 11 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

Page 12 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

Page 13 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

Page 14 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

Page 15 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

Page 16 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

Page 17 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)

16mm 20mm 25mm 32mm

156.06 0.00 0.00 0.00


1.58 2.47 3.86 6.32
0.247 0.000 0.000 0.000
25.191

Page 18 of 21
3173.92
2859.56
1965.30 2:25 AM
85.00
1909.71
85.00
480.22
505.51
18.00
863.87
954.86
34.00
480.22
505.51
18.00
72.24
149.38
142.56
160.05
584.92
160.05
140.98
160.05
143.61
160.05
119.48
138.71
51.79
53.35
435.20
327.50
244.85
216.07
206.40
210.80
36.67
39.30
65.88
78.60
36.67
39.30
-27.70
-17.67
171.43
153.05
120.77
101.15
101.27
110.34
35.09
37.59
16.46
10.21
6.64
7.01
17.66
18.28
34.80
87.78
212.29
72.27
34.96
45.71
48.13
55.44
106.55
129.36
73.33
83.16
1412.40
1112.74
194.10
197.64
8.00
312.73
395.28
16.00
194.15
197.64
8.00
352.32
190.61
141.92
141.47
14.00
136.20
161.68
16.00
291.53
141.75
98.09
98.42
14.00
94.14
112.48
16.00
128.17
80.36
98.67
100.60
34.97
30.87
29.26
38.28
196.92
184.01
148.10
161.68
4.00
267.83
303.15
7.50
143.15
161.68