Bar Bending Schedule: DDU-HOS-STR-107a
Bar Bending Schedule: DDU-HOS-STR-107a
Bar Bending Schedule: DDU-HOS-STR-107a
0.300
0.180
2 BR2 0.70 0.230 0.450 0.975 0.300 2
16 2 3 1 6 3.900
0.450 0.450
0.300
0.180
3 BR3 0.70 0.230 0.450 0.975 1
16 1 3 1 3 3.300
0.450 0.450
0.180
4 450mm wide Chajja 12.23 0.45 0.15
Main Chipiya 8 1 83 1 83 2.246
1.140
Page 1 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
1.140
Dist. 8 1 5 1 5 12.190
Laps 8 0.170 0.430 1 5 1 5 0.400
0.110
Binder 10 0.170 1 2 1 2 12.190
Laps 10 1 2 1 2 0.500
0.260
6 SB2 1.20 0.230 0.250 0.300 0.230 2
Top Main 12 0.100 1.150 0.100 2 4 1 8 1.302 10.42
Laps 12 0.60 2 4 1 8 0.60 4.80
Bottom Main 16 0.100 1.150 0.100 2 4 1 8 1.318
Laps 16 0.80 2 4 1 8 0.80
0.190
Slab
1 Slab S1 at Grid E-N/13'-14' 56.198 10.700
Main Bar Bentup 2.660 10 11.84 1 268 1 268 11.84 3173.92
Page 2 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Main Bar STR 10 10.67 1 268 1 268 10.67 2859.56
Dist. Bar Betup 10 57.80 1 34 1 34 57.80 1965.30
Laps 10 0.50 1 34 5 170 0.50 85.00
Dist. Bar STR 10 56.17 1 34 1 34 56.17 1909.71
Laps 10 0.50 1 34 5 170 0.50 85.00
Extra Top II SS @ 13' 4.935 0.300 10 1.77 1 272 1 272 1.77 480.22
Binder 10 56.17 1 9 1 9 56.17 505.51
Laps 10 0.50 1 9 4 36 0.50 18.00
Extra Top II SS @ In Btwn 13'-
14' 4.935 0.230 4.935 10 3.18 1 272 1 272 3.18 863.87
Binder 10 56.17 1 17 1 17 56.17 954.86
Laps 10 0.50 1 17 4 68 0.50 34.00
Extra Top II SS @ 14' 4.935 0.300 10 1.77 1 272 1 272 1.77 480.22
Binder 10 56.17 1 9 1 9 56.17 505.51
Laps 10 0.50 1 9 4 36 0.50 18.00
Extra Top II LS @ E 5.930 0.300 10 2.06 1 35 1 35 2.06 72.24
Binder 10 10.67 1 7 2 14 10.67 149.38
Extra Top II LS @ F 5.930 0.350 6.530 10 4.07 1 35 1 35 4.07 142.56
Binder 10 10.67 1 15 1 15 10.67 160.05
Extra Top II LS @ G,J,K,L 6.530 0.350 6.280 10 4.18 1 35 4 140 4.18 584.92
Binder 10 10.67 1 15 1 15 10.67 160.05
Extra Top II LS @ H 6.280 0.350 6.030 10 4.03 1 35 1 35 4.03 140.98
Binder 10 10.67 1 15 1 15 10.67 160.05
Extra Top II LS @ I 6.030 0.350 6.530 10 4.10 1 35 1 35 4.10 143.61
Binder 10 10.67 1 15 1 15 10.67 160.05
Page 3 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Extra Top II LS @ M 6.280 0.350 3.983 10 3.41 1 35 1 35 3.41 119.48
Binder 10 10.67 1 13 1 13 10.67 138.71
Extra Top II LS @ E 3.983 0.300 10 1.48 1 35 1 35 1.48 51.79
Binder 10 10.67 1 5 1 5 10.67 53.35
2 Slab S1 at Grid 15'-16'/E-F 10.570 6.580
Main Bar Bentup 6.530 10 8.70 1 50 1 50 8.70 435.20
Main Bar STR 10 6.55 1 50 1 50 6.55 327.50
Dist. Bar Betup 3.430 10 11.94 1 21 1 21 11.94 244.85
Dist. Bar STR 10 10.54 1 21 1 21 10.54 216.07
Extra Top II SS @ E,F 5.930 0.300 10 2.06 1 50 2 100 2.06 206.40
Binder 10 10.54 1 10 2 20 10.54 210.80
Extra Top II LS @ 15 4.870 0.300 10 1.75 1 21 1 21 1.75 36.67
Binder 10 6.55 1 6 1 6 6.55 39.30
Extra Top II LS @ In Btwn 15'-
16' 4.870 0.230 4.870 10 3.14 1 21 1 21 3.14 65.88
Page 4 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Dist. Bar STR 10 6.13 1 17 1 17 6.13 101.15
Extra Top II SS @ 15'',16' 4.870 0.300 10 1.75 1 29 2 58 1.75 101.27
Binder 10 6.13 1 9 2 18 6.13 110.34
Extra Top II LS @ M,N 5.930 0.300 10 2.06 1 17 1 17 2.06 35.09
Binder 10 5.37 1 7 1 7 5.37 37.59
Page 5 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Binder 10 9.24 1 14 1 14 9.24 129.36
Extra Top II SS @ 16' 4.870 0.300 10 1.75 1 42 1 42 1.75 73.33
Binder 10 9.24 1 9 1 9 9.24 83.16
6 Slab S3 at Grid E-L/14'-15' 49.440 6.920
Main Bar Bentup 4.935 10 8.75 1 162 1 162 8.75 1412.40
Main Bar STR 10 6.89 1 162 1 162 6.89 1112.74
Dist. Bar STR 8 49.41 1 33 1 33 49.41 1630.53
Laps 8 0.40 1 33 4 132 0.40 52.80
Extra Top II SS @ 14' 2.781 0.350 10 1.17 1 166 1 166 1.17 194.10
Binder 10 49.41 1 4 1 4 49.41 197.64
Laps 10 0.50 1 4 4 16 0.50 8.00
Extra Top II SS @ Btwn 14'-
15' 2.781 0.230 2.782 10 1.88 1 166 1 166 1.88 312.73
Binder 10 49.41 1 8 1 8 49.41 395.28
Laps 10 0.50 1 8 4 32 0.50 16.00
Extra Top II SS @ 15' 2.782 0.350 10 1.17 1 166 1 166 1.17 194.15
Binder 10 49.41 1 4 1 4 49.41 197.64
Laps 10 0.50 1 4 4 16 0.50 8.00
7 Slab S3 at Grid 15'-15''/F-I 20.240 2.940
Main Bar Bentup 3.430 3.550 10 5.38 1 66 1 66 5.38 352.32
Main Bar STR 10 2.91 1 66 1 66 2.91 190.61
Dist. Bar STR 8 20.21 1 15 1 15 20.21 303.15
Laps 8 0.40 1 15 4 60 0.40 24.00
Extra Top II SS @ 15' 3.430 0.350 2.410 10 2.09 1 68 1 68 2.09 141.92
Binder 10 20.21 1 7 1 7 20.21 141.47
Laps 10 0.50 1 7 4 28 0.50 14.00
Page 6 of 21
Bar bending schedule
PSP Projects Ltd.
Site : Hospital Building ,DD University at Nadiad.
Structure : Slab/Beam /Part 2 (First Floor Slab Lvl +8100mm ) Ref. Drawings DDU-HOS-STR-107a R2
Beam/Slab Nom Cutting Total Cutting Length (In Meter)
Dia in No of No of Total
Sr.No Description Diagram of Length
L B D MM Beam Bars Nos Rmt 8mm 10mm 12mm
Items
Extra Top II SS @ Btwn 14'-
15' 2.410 0.230 3.550 10 2.00 1 68 1 68 2.00 136.20
Binder 10 20.21 1 8 1 8 20.21 161.68
Laps 10 0.50 1 8 4 32 0.50 16.00
8 Slab S3 at Grid 14'-16/L-M' 14.090 3.180
Main Bar Bentup 6.530 3.315 10 6.48 1 45 1 45 6.48 291.53
Main Bar STR 10 3.15 1 45 1 45 3.15 141.75
Dist. Bar STR 8 14.06 1 15 1 15 14.06 210.90
Laps 8 0.40 1 15 4 60 0.40 24.00
Extra Top II SS @ 15' 3.430 0.350 2.410 10 2.09 1 47 1 47 2.09 98.09
Binder 10 14.06 1 7 1 7 14.06 98.42
Laps 10 0.50 1 7 4 28 0.50 14.00
Extra Top II SS @ Btwn 14'-
15' 2.410 0.230 3.550 10 2.00 1 47 1 47 2.00 94.14
Page 9 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
47.70
23.40
9.90
Page 10 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
54.91
3.20
10.54
6.40
Page 11 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
Page 12 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
Page 13 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
Page 14 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
Page 15 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
Page 16 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
Page 17 of 21
Date:-
21.05.2017,10.06.2017
g Length (In Meter)
Page 18 of 21
3173.92
2859.56
1965.30 2:25 AM
85.00
1909.71
85.00
480.22
505.51
18.00
863.87
954.86
34.00
480.22
505.51
18.00
72.24
149.38
142.56
160.05
584.92
160.05
140.98
160.05
143.61
160.05
119.48
138.71
51.79
53.35
435.20
327.50
244.85
216.07
206.40
210.80
36.67
39.30
65.88
78.60
36.67
39.30
-27.70
-17.67
171.43
153.05
120.77
101.15
101.27
110.34
35.09
37.59
16.46
10.21
6.64
7.01
17.66
18.28
34.80
87.78
212.29
72.27
34.96
45.71
48.13
55.44
106.55
129.36
73.33
83.16
1412.40
1112.74
194.10
197.64
8.00
312.73
395.28
16.00
194.15
197.64
8.00
352.32
190.61
141.92
141.47
14.00
136.20
161.68
16.00
291.53
141.75
98.09
98.42
14.00
94.14
112.48
16.00
128.17
80.36
98.67
100.60
34.97
30.87
29.26
38.28
196.92
184.01
148.10
161.68
4.00
267.83
303.15
7.50
143.15
161.68