Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Pre - Feasibility Report: Tanganamal Sand Quarry

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

PRE – FEASIBILITY REPORT

TANGANAMAL SAND QUARRY

AREA OF -4.00 HECTARE

STRICTLY AS PER MOEF GUIDELINE DATE


30/12/2006 IN TERMS OF PROVISIONS OF EIA
NOTIFICATION 2006

VILLAGE TANGANAMAL
TEHSIL SHAHPUR
DISTRICT BETUL
STATE MADHYA PRADESH
MINERAL SAND
KHASRA NO. 209

PROJECT PRAPONENT
M/S. HOTEL UMA RESIDENCY
ADDRESS- CHANKYAPURI SATNA (M.P.) 1
Page
This pre – feasibility report, report has been prepared as per guidelines of
MOEF and sample application available on website of the department of
environment and forest. The contents of the report are geological, legal,
operating, economic, social environmental and other relevant factors
associate with the activities and are considered in sufficient details in
representative forms. We have tried to provide necessary information that it
could be reasonably serve as basic for the final decision by competent
authority to issue environmental clearance to the proposed project.

EXECUTIVE SUMMARY

The Proposed Sand quarry site is covering an area of 4.00 hectare at Village-
Tanganamal, Tehsil-Shahpur, District Betul, M.P. lease area is well connected
with village road SH19B-31 km and the lease area is 45 km from district HQ
Betul nearest railway station Shahpur is about 25 km by road from the site.
The proposed excavation area is less that 25 hectare hence belonging to B2
category. the mining, plan has been approved by the regional head , geology
and mining , betul , m.p. vide letter no. KHANIJ-2/N.K.10/2020/709 dated
02.06.2020 the details of other area of excavation/quarry lease falling within
a radius of 500m are mentioned in EMP.

(I) SALIENT FEATURES OF THE PROJECT :

PARTICULARS DETAILS
Name of project TANGANAMAL SAND QUARRY
Village TANGANAMAL
Tehsil SHAHPUR
District BETUL
QUARRY lease area 4.00 hectare
Khasra No. 209
Geographical coordinates
Latitude 22°10'58.54"N
Longitude 77°39'12.82"E
2
Page
River / Nalla No major river / nalla is located within the
500 m of lease area.
Forest (Np , Sanctuary, Bio Div .) Mining area does not fall within 10 km from
boundary of national park , sanctuary , Bio
diversity area.

Mineral Sand
Land use Govt. land
Lease Validity 3 Years
Production capacity 72000 cubic meter / year
Estimated project cost Rs. – 25 lakh.
Emp cost 20,60,000/-
Man power 50 Skilled / Unskilled
Machinery Jack Hammer drill , Dumper , truck etc.
Water requirement and supply Drinking water 2.0 kld plantation and
environment management 2.0 kld. Thus total
5 kld water will be required and will be
arrange from nearby village on personal
basis.
Nearest habitation / town Tehsil Shahpur– 25 km
Nearest dispensary PHC – Tanganamal– 1 km , District
Hospital –Betul 45 km
Nearest Airport Bhopal approx 130 km
Nearest Railway station Shahpur Railway station about2 5 km

3
Page
2. GENERAL
v

The proposed sand Quarry area is 4.00 hectare. Sand mining average capacity
shall be 72000 cubic meters annually, mode of excavation will be opencast
semi mechanized. Lease area / Status of land of lease area are Govt. Revenue
land .Mining project does not require any land acquisition nor raw material.

(I) Identification of project and project proponent

Name : Tanganamal Sand quarry


Location : Village Tanganamal, Tehsil Shahpur,
District Betul M.P.
Sanctioned Area : 4.00 Hectare
Proposed Production : 72000 M3/Year
Proposed depth of mining: 3 M

Address of proponent / Lessee:-

M/S. HOTEL UMA RESIDENCY


ADDRESS- CHANKYAPURI SATNA (M.P.)

(II) Brief Description of Nature of project


Area under consideration is fully exposed with horizontally sand
strata and overburden up 0m to 1m depth. It is Govt. Revenue land.
Mining activity has to be done following all the security mechanized
method.
Total available mineable reserve is 72000 M3 proposed excavation is
to be done up to a depth of 3 M with 72000 M3 sand production
annually.
As per MOEF notification no. om no. j – 1312 /12/2013 - IA –II (i)
dated 24th December 2013. The project comes under B2 category.
Hence pre – feasibility report has been prepared for a final decision
by competent authority to issue environmental clearance to the
4
Page

proposed project.
(III) Need for the project and its importance to the country and / or
region :
Mineral Sand is most commonly used as building and road
construction. The basic objective of the project is fulfillment of the
demand of mineral in the region and effective utilization. sand will be
supply to nearby area to fulfill the local requirement. After fulfillment
of local requirement it will sold in adjoining areas.
(IV) Demand – supply :
Mineral Sand is used as building and road material. Lot of
development work like road and building are going on in the region
.It has sufficient demand to sustain the supply of proposed mineral
production.
(V) Import VS. Indigenous production :
This is indigenous production. This will not be neither exported nor
imported.
(VI) Export possibility :
Not expected.
(VII) Employment Generation (Direct and Indirect ) due to the
project :
Total 50 Numbers of person, Including skilled and unskilled, are
likely to be engaged in this project most of these persons will
deployed from nearby villages.

3. PROJECT DESCRIPTION
5
Page
(I) Type of project including interlinked and interdependent projects:

The proposed project is sand quarry in which Sand have been involved. There
is no any interlinked and interdependent project.

Location:

Location and the geo co-ordinates of the lease area already mention in salient
features of the project.

(II) Details of alternate site considered and the basis of selecting


proposed site , particularly the environmental consideration gone
into highlighted:

This is a site specific project. Hence at present situation no alternate site is


considered.

(III) Size / magnitude of operation :

This is a small Quarry, it is proposed to Sand/material 72000 cubic meters.


annually. It is round the year operation work the total manpower require for
the proposed sand mining project will be 50.

(IV) Raw material required along with estimated quantity , likely


source , marketing area of final products , mode of transport of raw
material and finished product .

Raw material is not required for the sand excavation project, only mining
tools are required. the crushed material of varies in size (20mm, 40mm,
60mm ) will be carried out by the truck / tractor trolley .
6
Page
(V) Resource optimization / recycling and resource envisaged in the
project , if any , should be briefly outlined :

Resource optimization has been exercised but there is no scope of recycling


and re – use in the project only top soil (0-1M) shall be used in re –
generation of soil quality.

(VI) Availability of water and its source, energy/ power requirement


and its sources :

The total water requirement for the project is estimated 6.0 KLD for mining
spraying and domestic used and will be sourced from nearby village. No
electricity is required even so if required in future the same will be
arranged by taking connection from MPSEB.

(VII) Equipments and Machineries :

It is a small Quarry having total area of 4.00 hectare. Proposed annual


production is about 72000 cubic meters. Mining method will be open cast
Semi mechanized method

7
Page
4. SITE ANALYSIS
(I) Connectivity

Connectivity details are already given in the salient features of the project.

(II) Land form, land use and land ownership:

DISTRICT TEHSIL VILLAGE KHASRA AREA IN STATUS OF MINERAL


& STATE NO. HECTARE LAND
BETUL SHAHPU TANGANAMA 209 4.00 Govt. Sand
M.P. R L Land

8
Page
5. PLANING BRIEF

(I) Planning Concept

Sand mining along with mechanical crushing in the region is a rural business
which is categories as small scale unit. It is classified as semi skilled and under
any staff oriented mining industries. The area is not covered under any town
planning or development authority. Hence no need of any such planning by
the proponent also.

(II) Population projection:

Due to proposed mining activity there will not be influx of people from outside
as only local people will be engaged.

(III) Land Use Planning.

Mining will be done as per detail given in mining plan. Green belt shall be
developed along periphery of the lease area. Details of land use pattern have
already been given in previous chapter.

(IV) Assessment of Infrastructure Demand (Physical and Social)

It is not expected for the project under consideration, since the project will
not exert any unbearable load on any of this available infrastructure (School,
Hospital etc.)

(V) Amenities / Facilities: All available amenities and facilities shall be


provided to workers like – medicines, temporary shelter, safe drinking water
and security etc. as per their requirement.
9
Page
06. PROPOSED INFRASTRUCTURE

S. NO. PARTICULARS DETAILS


1. Lease Area 4.00 Hectare
2. Residential Area Not proposed
3. Road Connectivity The lease area is located about 1 km of
Tanganamal village. It is well connected
by road to the district HQ of Betul is at a
distance of 42 km from lease area.

4. Green Belt Green belt of 7.5 m width shall be


developed along the periphery on the
lease area with locally suitable ever
green plants. 50 numbers of trees
implant annually.
5. Social Infrastructure Physical and social infrastructure will
be provided and if necessary other
facilities will also be provided by mines
proponent.
6. Water Management The total water requirement for the
project is estimated 5.0 KLD for mining
spraying and domestic uses and will be
source from nearby village.

7. Sewerage System There will be no generation of


sewerage due to the project hence no
need of this system.
8. Industrial Waste N.A.
Management
9. Solid Waste N.A.
Management
10. Power Requirement N.A.
10
Page

You might also like