Keywords: Geothermal power operation, geothermal output of 8.5 MW. The two high pressure wells LA-3 and
power plant maintenance, well output decline, Turbine LA-6 are feeding the geo fluid to the conventional steam
derating, solid depositions, turbine of the GCCU. The exhaust steam coming out of the
steam turbine is delivered to a heat exchanger which, in
ABSTRACT turn, boils a binary fluid to drive the organic binary turbine.
Ethiopia is well endowed with geothermal resources, and After its commissioning, the power plant operated for a
current exploration is believed to have studied only a relatively short period of time before a number of problems
fraction of the ultimate potential. The potential prospective arose that severely affected the availability and power
areas are distributed along the Ethiopian Rift valley system output level, ultimately leading to the shutdown of the
which runs in a northeast direction along the entire length power plant. These problems occurred underground, within
of Ethiopia. To begin to realize this potential, in 1998, the the surface (fluid handling) equipment, and in the power
Ethiopian Electric Power Corporation (EEPCO) constructed plant itself. After a number of years, EEPCO issued an
the Aluto Langano geothermal pilot power plant (8.5 MW international tender to rehabilitate the power plant and put it
gross) consisting of two Ormat generating units, one an back into operation.
OEC (Ormat Energy Converter) and the other a GCCU
(Geothermal Combined Cycle Unit consisting of a back
pressure steam turbine exhausting to an OEC bottoming
cycle unit) - each designed to have similar power outputs.
currently supplying the geothermal fluid to the 5. Worn-out steam turbine shaft on the drive-end
GCCU unit. side
¾ Installing data loggers to enable records of 6. Tube leaks in the OEC heat exchangers
wellhead pressure and temperature under static
and dynamic condition. This has helped EEPCO 7. Frequent failure of the cooling fan shafts
personnel to understand the way the wells
respond under dynamic flow condition. 2.1 Solid Depositions in the Wellbore and Surface
Equipment
¾ Analysis and investigation of corroded OEC heat
Liquid dominated geothermal reservoirs are hydrothermal
exchanger tubes to determine the root cause of the
reservoirs that contain circulating liquids which transport
tube failures. The result of the tests indicated
the thermal energy of the hot rock with dissolved minerals
brine carry-over, with traces of chloride, was the
near to the surface by natural fluid circulation. The fluid
root causes of the tube failure. Based on the
comes from such reservoirs may form scale that deposits in
results obtained it was decided to replace all the
the well bore and fluid carrying surface equipment,
heat exchanger tubes (over 2,000 tubes) with
particularly after boiling and brine separation. Therefore the
higher quality duplex stainless steel. Modification
brine scaling potential, corrosiveness, non-condensable gas
work is currently underway to install a duplex
(NCG) and hydrogen sulfide (H2S) content are the four
filtering system to remove any debris and solid
major chemical characteristics that have to be studied and
carryover to the heat exchangers in order to
addressed in the geothermal power plant design.
maintain fluid quality.
The schematic diagram showing common locations of solid
2. IDENTIFIED PROBLEMS RELATED TO THE depositions (Teso Merga report, 2001, UNU- GTP) shows
STEAM FIELD AND THE POWER PLANT in Figure 2.
Some of the problems that were identified that relate to the
steam field and the power plant are: The geothermal reservoir that feeds the well bore contains a
variety of dissolved minerals and gases. Tests and
1. Solid deposition in the well bore and surface downhole logs conducted on the Aluto Langano geothermal
equipment field wells indicated that well LA-4 exhibited calcite scale
depositions. This well was drilled in 1983 to a depth of
2. Well output decline 2062 m in the outflow zone of Wonji fault. The logging
result of May 2006 indicated that a go-devil of 3 in
3. Difficulty of operating the two high enthalpy, diameter stopped at a depth of 1085 m and a 4 ½ in go-devil
wells LA-3 and LA-6 in parallel stopped at a depth of 1050 m while logging fragments of
white soft pieces, resembling calcium carbonate, were
4. Journal bearing failure of the steam turbine recovered from both go-devils.
2
Teso
The blockage observed in well LA-4 has also significantly available locally who could do the de-staging. De-staging
reduced the flow from this well. Subsequently, a well work of the GCCU unit was performed successfully and the unit
over was recommended to remove the obstruction and bring was put back into normal operation in June 2007.
the well back into normal flow. It is expected that, within a
six month time period, the well work over will be
completed and the well will come back into normal
operation.
of the chemistry of the geothermal fluid with that of the logic controller (PLC), Supervisory Control
tube materials. Acquire Data Acquisition (SCADA) system and
Human Machine Interfacing (HMI) of the power
plant.
Table 2: Results of tube inspection
6. CONCLUSION
Tube Number of Pit Depths Pit Diameter
pits per foot (mm) (mm) As described above, Ethiopia is endowed with considerable
on ID geothermal resource potential. But, up to now, only a tiny
fraction of this enormous resource has been used. The
1 12 0.2 to 0.9 0.2 to 1 success with the re-commissioning of the Aluto plant will
now pave the way for future expansion of power generation
2 23 0.2 to 0.9 0.2 to 1 at Aluto and at other geothermal prospects.
1 8 0.2 to 0.9 0.2 to 1 Bringing the Aluto Langano geothermal power plant back
into operation has been a high priority for EEPCO in order
to maximize the return on the capital invested in the project,
provide power to the national grid system, and
The result of Jonas’ investigation indicated that localized demonstrates that geothermal power from Aluto site as well
pitting inside the tubes was due to high concentrations of as from other fields can reliably meet the future electricity
corrosive impurities carried into the heat exchanger by demand in Ethiopia.
brine carry-over during the initial operation of the plant.
Jonas concluded that the heat exchanger material was not Expansion of the Aluto Langano geothermal site to larger-
compatible with the chemistry of the Aluto wells. It further scale power generation is in the pipe line and the experience
indicated that if the heat exchangers were operated under gained in operation and maintenance of the existing pilot
the same conditions, further damage would occur to the plant will ultimately be used for larger scale development.
heat exchanger tubes. The recommendation was to replace
the existing heat exchanger tubes with a more resistant Close monitoring of the resource (reservoir performance,
grade 2205 Duplex Stainless Steel. fluid chemistry and steam quality) and performance of the
power plant will ensure the reliable operation of the pilot
5. EXPERIENCE GAINED plant as well as provide useful operational data that can be
used for future power plants in the country.
1. Experience gained in refurbishment of wellhead
master valves and bleed lines is very important.
This included experience with the assembly and ACKNOWLEDGEMENTS
disassembly of master valves, hydrostatic testing, My deep thanks to my company for granting me permission
acquisition of spare parts, use of specialized tools to present this paper on World Geothermal Congress
and equipment, and local manufacture of some (WGC) 2010 conference. I also thank the Aluto Power
valve parts. Plant Manager for providing me energy data to include into
this paper.
2. The knowledge acquired in steam field resource
management and wellhead equipment operation REFERENCES
would ultimately be used for Aluto expansion and
Consultant Report (Geothermal Development Associates,
other geothermal prospects.
GDA) submitted to EEPCO, as per the Contract
3. Experience was gained with the operation of a Agreement (RHGP 1/97, June 2006) - Consultancy
new, digital, Kuster K-10 tool for down hole services and Repair of the Alutoto Langano GPP.
pressure and temperature logging. Jonas Inc. Report: Analysis of Heat Exchanger Tube pitting
Aluto OEC -Unit, unpublished.
4. Knowledge was acquired in the use of wellhead
data loggers and interpretation of the logged data. PB POWER, Unpublished Report submitted to EEPCO:
Aluto Langano Geothermal Pilot plant Project, June
5. Experiences was gained with the refurbishment of 200.
cooling tower fans, specifically, in vertical shaft
alignment, and correct tensioning of the torque Geothermal Development Associates: Final Project TOR
transmission belt, which will be used to resolve Reports, November 16, 2007 and April 1, 2008.
problems that may arise with the cooling system. Teso Merga, 2001: Effect of Solid Depositions and
Methods of control. UNU - GTP, Iceland, Report 9.
6. Knowledge was acquired in updating the power
plant automation system. This familiarized plant
personnel with the operation of the programmable