CE 316
Concrete Structures Design
Sessional I
Types of Bridges
Arch bridges
suspension bridge
Cable-stayed bridge
Box girder bridge
Slab Bridge
1
18-Oct-15
Arch bridge
Suspension Bridge
2
18-Oct-15
Cable-stayed bridge
3
18-Oct-15
Slab Bridge
Slab Bridge:
• Small Span (20-25 ft) Deck Girder Bridge: 50’<L<100’
• No navigation (ships/boats) Box Girder Bridge: L>100’
• Only water flows
4
18-Oct-15
Loads
5
18-Oct-15
Loads (contd)
6
18-Oct-15
Design Data
• Clear Span= 20+n (n=1,2,3,... … , 15)
• Width= 24 ft (Odd rolls)
30 ft (even rolls)
• Tensile strength of steel,fy= 40 ksi (Odd rolls)
60 ksi (even rolls)
• f’c= 4000 psi(Odd rolls)
3000 psi (even rolls)
• Design truck : HS15(Odd rolls)
HS20 (even rolls)
• Wearing surface loading= 30 psf
• Abutment wall thickness = 1’6”
7
18-Oct-15
Analysis
• Span,L or, S =c/c distance between supports
or, clear span + slab thickness
(whichever is smaller)
• Determine minimum thickness of the slab.
tmin =1.2 ( ) [deflection control criteria]
(Here, S in ft and tmin will be in ft.)
• Compute self-weight and wDL .
wDL = wself-weight + wwearing surface
Analysis
• Calculate Dead load moment.
MDL = wDLL2/8 lb-ft/ft
• Wheel load distribution width, E= (4+.06S) ft< 7 ft
• Calculate Live load moment.
MLL = ( ) where, P’= P/E (for truck loading)
or, P/2E (for lane loading)
P= P15 = 12,000 lb for HS15/H15
= P20 = 16,000 lbfor HS20/H20
=13,500 lb for HS15/H15 lane loading
=18,000 lb for HS20/H20 lane loading
*Note: For lane loading, Moment due to UDL has to be added.
both UDL & concentrated load is distributed within 2E.
8
18-Oct-15
Analysis
• Calculate Impact Factor.
I=( ) < 0.3
• Moment due to Impact, MI= I*MLL
• Total Moment,Mtotal = MDL+MLL +MI
Design
• Allowable concrete compressive stress,
fc= 0.45 f’c
• Allowable stress in steel, fs= 0.40 fy
• n= =9 ; r=
• k= ; j= 1-
• Check ‘d’ with the following formula for WSD.
M = fc kj bd2
Adjust slab thickness if needed.
9
18-Oct-15
Design
• Determine required steel , As =
Design
• Provide Temperature reinforcement.
According to AASHTO 8.20.1, As= 1/8 in2 /ft
need to be provided under all exposed surfaces.
• Check for shear and bond. Not necessary for
slabs designed for bending in this method.
• Check for minimum reinforcemnet.
fr= 7.5 ; Icr = bh3 /12
frIcr
Mcr =
/
Check if Mdesign is more than 1.2 Mcr . If so, ok.
10
18-Oct-15
Edge Beam
• Three alternative suggestions for edge beam-
a)a slab section additionally reinforced
b)a beam integral & deeper than the slab
c)an integrally reinforced section of
slab & curb
11
18-Oct-15
Assignment
• Slab design
• Curb/Edge beam design (with bar cutoff)
Drawings
1. Longitudinal Section of Slab,
2. Tranverse section of Slab (with edge beam detailing)
3. Long section & Cross section of edge beam (with
bar cutoff)
4. Plan of Slab Bridge showing reinforcement
distribution.
[Drawing should be submitted in tracing paper with
proper scale]
12