Primary Sedimentation Tank: M.M. Ghangrekar, IIT Kharagpur
Primary Sedimentation Tank: M.M. Ghangrekar, IIT Kharagpur
Primary Sedimentation Tank: M.M. Ghangrekar, IIT Kharagpur
1
Industrial Water Pollution
Control
The solution containing suspended solids should be added in the column in such a way that
uniform distribution of solid particles occur from top to bottom. Settling should takes place
under quiescent conditions. It is important to maintain uniform temperature throughout the
experimental column to avoid convection currents. At various time intervals, samples are
withdrawn from the ports and analyzed for suspended solids. Percentage removal of solids is
calculated for each sample analyzed and is plotted as a number (%) against time and depth.
The curve of equal percentage removal is drawn between the plotted points.
The efficiency of the sedimentation tank, with respect to suspended solids and BOD removal,
is affected by the following:
• Eddy currents formed by the inertia of incoming fluid,
• Wind induced turbulence created at the water surface of the uncovered tanks,
• Thermal convection currents,
• Cold or warm water causing the formation of density currents that moves along
the bottom of the basin, and
• Thermal stratification in hot climates.
70
TSS= 200-300 mg/l
50
BOD= 200-300 mg/l
1 2 3 4 5
Detention time, h
Because of the above reasons the removal efficiency of the tank and detention time has
correlation R = t/(a+b.t), where ‘a’ and ‘b’ are empirical constants, ‘R’ is expected removal
efficiency, and ‘t’ is nominal detention time.
2
M.M. Ghangrekar, IIT Kharagpur
To account for the non optimum conditions encountered in the field, due to continuously
wastewater coming in and going out of the sedimentation tank, due to ripples formed on the
surface of the water because of wind action, etc., the settling velocity (overflow rate) obtained
from the column studies are often multiplied by a factor of 0.65 to 0.85, and the detention
time is multiplied by a factor of 1.25 to 1.50. This will give adequate treatment efficiency in
the field conditions as obtained under laboratory test.
Example: 1
The settling test was performed in the settling column of height 2.5 m. Four numbers of ports
were provided to the column at the height of 0.5 m from bottom. Samples were collected
from these ports at every 30 min and the results obtained are plotted in the Figure 16.1.
Determine the overall removal of solids after 1.0 h of settling.
∆ h1
∆ h2
H ∆h3
e
40%
i
g
h 50% 60%
t 80%
o ∆ h4
f 70% 0.5 m
c
o 30 60 90 120 150
l
u Time of sampling, min
m
n
Solution
Percentage removal = ∆ h 1x (R 1 + R 2 ) + ∆ h 2 x (R 2 + R 3 ) + ∆ h 3x (R 3 + R 4 ) + ∆ h 4 x (R 4 +
R5)
h5 2 h5 2 h5 2 h5 2
3
Industrial Water Pollution
Control
Therefore, total removal under quiescent settling condition is 63.68%. To achieve this
removal the detention time recommended in settling tank is 1 x 1.5 = 1.5 h.
Primary sedimentation tanks can be circular or rectangular tanks (Figure 16.2) designed using
average dry weather flow and checked for peak flow condition. The numbers of tanks are
determined by limitation of tank size. Two tanks in parallel are normally used to facilitate
maintenance of any tank. The diameter of circular tank may range from 3 to 60 m (up to 45 m
typical) and it is governed by structural requirements of the trusses which supports scrapper
in case of mechanically cleaned tank. Rectangular tank with length 90 m are in use, but
usually length more than 40 m is not preferred. Width of the tank is governed by the size of
the scrappers available for mechanically cleaned tank. The depth of mechanically cleaned
tank should be as shallow as possible, with minimum 2.15 m. The average depth of the tank
used in practice is about 3.5 m. In addition, 0.25 m for sludge zone and 0.3 to 0.5 m free
board is provided. The floor of the tank is provided with slope 6 to 16 % (8 to 12 % typical)
for circular tank and 2 to 8% for rectangular tanks. The scrappers are attached to rotating
arms in case of circular tanks and to endless chain in case of rectangular tanks. These
scrappers collect the solids in a central sump and the solids are withdrawn regularly in
circular tanks. In rectangular tanks, the solids are collected in the sludge hoppers at the
influent end, and are withdrawn at fixed time intervals. The scrapper velocity of 0.6 to 1.2
m/min (0.9 m/min typical) is used in rectangular tank and flight speed of 0.02 to 0.05 rpm
(0.03 typical) is used in circular tank.
4
M.M. Ghangrekar, IIT Kharagpur
Inlets for both rectangular and circular tanks are to be designed to distribute the flow equally
across the cross section. Scum removal arrangement is provided ahead of the effluent weir in
3 2 3 2
all the PST. The surface overflow rate of 40 m /m .d (in the range 35 to 50 m /m .d) is used
3 2
for design at average flow. At peak flow the surface overflow rate of 80 to 120 m /m .d could
be used when this PST is followed by secondary treatment. Lower surface settling rates are
used when waste activated sludge is also settled in the PST along with primary solids. In this
3 2 3 2
case the surface overflow rate of 24 to 32 m /m .d and 48 to 60 m /m .d are used for average
3
and peak flow conditions, respectively. The weir loading rate less than 185 m /m.d is used for
3
designing effluent weir length (in the range 125 to 500 m /m.d). Weir loading rate up to 300
3
m /m.d is acceptable under peak flow condition. Higher weir loading can be acceptable when
primary treatment is followed by secondary treatment. As such the weir loading rate has very
less impact on the overall performance of sewage treatment plant when secondary treatment
is provided after primary treatment. The detention time in PST could be as low as 1 h to
maximum of 2.5 h. Providing detention time of 1.5 to 2.5 h at average flow is a common
practice.
To avoid resuspension (scouring) of settled particles, horizontal velocities through the PST
should be kept sufficiently low. Following equation by Camp can be used to calculate the
critical velocity, Vc, which is the horizontal velocity that will just produce score (m/sec).
Vh = 8k g(S −1)D
F
Where, k = constant
= 0.04 for unigranular sand
= 0.06 for non-uniform sticky material
f = Darcy –Weisbach friction factor = 0.02 to 0.03
g = Gravity acceleration,
S = Specific gravity of the particle to be removed (1.2 to 1.6)
D = Diameter of the particle, m
wit
5
Industrial Water Pollution Control
Figure 11.3 (a) Rectangular and (b) Circular primary sedimentation tank
6
M.M. Ghangrekar, IIT Kharagpur
In generally weir loading rates have very little effect on the efficiency of primary
sedimentation tanks.
Example 2
Design of Primary Sedimentation basin
3
The average flow rate at a small sewage treatment plant is 20000 m /d. The observed peak
3
flow rate is 50000 m /d. Design rectangular primary clarifier with a channel width of 6 m.
Use minimum two clarifiers. Calculate the scour velocity to determine if settled material will
become resuspended. Estimate the BOD and TSS removal at average and peak flow. Adopt
3 2
an overflow rate of 40 m /m .day at average flow and side water depth of 4 m.
Solution:
3 2
1) Assume surface settling rate = 40 m /m .d
2
Therefore, the surface area of the tank = Q/SOR = 20000 / 40 = 500 m
2) length of tank (L) = A/W = 500/ (2*6) = 41.7 ( 42 m) (For two tanks)
3) Detention time and overflow rate at average flow
3
Tank Volume = 4* 2 (42*6) = 2016 m
3 2
Overflow rate = Q/A = 20000/2(6*42) = 39.7 m /m .d
Detention time = Vol/Q = (2016*24)/20000 = 2.42 h
4) Detention time and overflow rate at peak flow
Overflow rate = Q/A = 50000/2(6*42) = 99.2
3 2.
m /m d Detention time = Vol/Q = (2016*24)/50000
= 0.97 h The scour velocity is
VH = = = 0.063 m/sec
By considering d = 100 µm
Horizontal velocity should be checked for peak flow
Horizontal velocity for peak flow = Q/A = 50000/(2*6*4*24*3600) = 0.012 m/s
3
Check for Weir loading rate = Flow/length of weir = 20000/(2*6) = 1666 m /m.d
Estimate BOD and TSS removal rate:
7
Industrial Water Pollution Control
At peak flow
BOD removal rate R = t/(a+b.t) = 2.42/(0.018+0.02*0.97) = 26%
TSS removal rate R = t/(a+b.t) = 0.97/(0.0075+0.014*0.97) = 46%
3 3
Example 3: Solution for 10000 m /d avg flow & 25000 m /d peak flow S.W.D =3.5m,
width of the channel should be 6.0m
2
a) surface area of the tank = Q/SOR = 10000 / 40 = 250 m
2
b) length of tank (L) = A/W = 250/ 6 = 41.66 m
Provide two tank L = 20.83 m
3
Tank volume = 20.83*6* 3.5 = 437.5 m
Detention time = Vol/Q = 437.5/(10000/2) = 2.1 m ok (1.5 to 2.5)
The scour velocity is
VH = = = 0.063 m/sec
Horizontal velocity for peak flow = Q/A = 25000/(2*6*3.5) = 595.24 m/d = 0.0069 m/sec
< 0.063 m/sec, Hence O.K.
TSS removal rate R = t/(a+b.t) = 2.1/(0.0075+0.014*2.1) = 56.9%
At peak flow = 437.5/12500 = 0.84 h
TSS removal = 0.84/0.0075+0.014*0.84 = 43.61%
Example: 4
Design the primary sedimentation tank to treat wastewater with average flow rate of 10 MLD
and peak flow of 22.5 MLD.
Solution
3 2
Assume surface settling rate = 40 m /m .d
6 3 2
Therefore, the surface area of the tank = 10 x 10 / 40 x 10 = 250 m
3 3 2
Check for peak flow condition: The SOR at peak flow = 22.5 x 10 /250 = 90 m /m .d
This is less than the recommended value at peak flow.
Assume width = 6.0 m
Therefore theoretical length = 250/6 = 41.66 > 40
m Hence, provide two tanks in parallel
8
= 40 x 1.5 / 24 = 2.5 m =
3
(0.116 m /sec) / (2 x 2.5 x 6)
= 0.0039 m/sec < 1 cm/sec hence O.K.
M.M. Ghangrekar, IIT Kharagpur
Total length of each tank = 41.66/2 + 2 (inlet) + 2 (outlet) = 24.83 say 24.85 m
Now,
Flow rate x detention time = depth x surface area = volume of tank
Or Flow / Surface area = depth / detention time = Surface settling rate
3
At peak flow, the flow through velocity = 22.5 x 10 /(2 x 6 x 2.5) = 750 m/d = 0.0087
m/sec. (Horizontal velocity should be checked for non-scoring velocity i.e. less than 0.06
m/sec.) Provide total depth = 2.5 + 0.5 (free board) + 0.25 (space for sludge) = 3.25 m
3 3
Weir loading rate = 10 x 10 / 12 = 833.33 m /m.day > 185
3 3
m /m.day Length of weir required = 10 x 10 / 185 = 54.05 m
Hence, provide about 27.1 m of weir length for each tank. This can be provided by two
effluent collection channel across the width at outlet end offering total 24.0 m and side weir
of total 1.55 m on each side.
9
Industrial Water Pollution
Control
upgrading them. Plate settlers increase the effective surface area of the existing clarifiers and
sedimentation basins at water treatment facilities. New tanks can be greatly reduced in size
when designed to include plate settlers. This is because suspended solids removal in gravity
separators and clarifiers depends primarily on the surface area for settling and the
multiple parallel plates provide a large surface area in a small space. Plate settlers can reduce
retention time, thus increasing the efficiency. The plate settlers are:
(1) used to add surface area to decrease overflow velocity,
(2) used to avoid hydraulic short circuiting, and
(3) capable of self cleaning when inclined to the horizontal.
One drawback is the growth of bacteria and foul odour resulting from the accumulation of
solids. So the solids should be flushed periodically to avoid this nuisance.
Three types of plate settlers are designed based on the direction of liquid flow relative to
direction of particle settlement
(1) Upflow or countercurrent (Fig 1a)
(2) Downflow or concurrent (Fig 1b)
(3) Cross current (Fig 1c).
1
0
M.M. Ghangrekar, IIT Kharagpur
(2) Downflow or concurrent settling - Here settled sludge slides down the plates while water
flow is also down. The solids suspension is introduced above the inclined surface and the
flow is down through the plates. The time for a particle to settle a vertical distance between
the two surfaces is same as in case of concurrent settling.
Length of the surface needed, Lp =
(3) Crosscurrent –In this case settled sludge slides down the plate and the water flows across
the plates. The liquid is flowing in the horizontal direction and has no interaction with the
vertical settling velocity. So
Lp =
There are a number of proprietary lamella clarifier designs. Inclined plates may be based on
circular, hexagonal or rectangular tubes. Some possible design characteristics include:
The surface loading rate (also known as surface overflow rate or surface settling rate) for a
lamella clarifier falls between 10–25 m/h. For these settling rates, the retention time in the
clarifier is low, at around 20 minutes or less, with operating capacities tending to range from
3 2
1–3 m /hour/m (of projected area).
Design details
• Rise rate: Rise rates can be between 0.8 and 4.88 m/h from different sources.
• Plate loading: Loadings on plates should be limited to 2.9 m/h to ensure laminar flow
is maintained between plates.
• Plate angle: The general consensus is that plates should be inclined at a 50-70° angle
from the horizontal to allow for self-cleaning. This results in the projected plate area
1
2
M.M. Ghangrekar, IIT Kharagpur
Example 5:
Design a plate settler for a secondary treatment of wastewater having flow rate of 40 MLD.
Solution
3 2 2
Assuming a SOR of 20 m /m .day, area of plate settler = = 2000 m
Let the dimension of a plate be 1.3 m x 3.0 m and it is placed at an inclined angle of 55˚ to
the horizontal.
2
Area of each plate = 1.3 x 3 x cos 55˚ = 2.237 m
Number of plates required = = 894.05 (895 say)
So a total of 895 plates having dimension of 1.3 m x 3 m inclined at 55˚ to the horizontal are
required.
1
3
Industrial Water Pollution Control
3
Weir loading rate less than 185 m /m.d is used for design of SST.
3
Example 6: Design a SST for ASP to handle equalized wastewater flow of 1000 m /d. The
MLSS in aeration tank is 3500 mg/L.
Solution:
Example 7: Design SST to treat effluent from ASP with following data.
Avg. flow = 50 MLD
MLSS conc. in influent = 3000 mg/L
Peak flow factor = 2.25
Solution:
3 2
Adopt surface loading rate = 20 m /m .d at avg. flow
2
Surface area required = 50* /(20*1000) = 2500 m
Check for surface loading at peak flow
3 2
Surface loading = = 45 m /m .d (O.K. 40-50)
2
For solid loading of 80 kg/m .d at avg. flow
2 2
Area required = = 1875 m < 2500 m (hence O.K )
2 2
Area required for peak solid loading = = 1607 m < 2500 m , hence O.K
14
M.M. Ghangrekar, IIT Kharagpur
Questions