The new PCs plant is a fully automated, the first in its kind in the whole Middle East Region, and is currently
used to supply DCP Qatar and other DCP branches in the region with the required PCs to produce the high
quality PC admixtures.
The manufacturing process goes in three main steps; the first one is the Monomor Reaction, where the main raw
material (MPEG) is added with some acids and water and mixed together at a high temperature for about 24 hours. The
product of this step is then air pumped to a mixer, where caustic soda and water are added to naturalize the mixer.
This second process continues for about 12 hours. The last step then starts after moving the product to another
reactor, where more acids and catalysts, are added and mixed together at high temperature for about 18 hours. Then,
the finished product is moved to storage tanks until it is used to produce the Hyperplast admixtures.
Core Purpose Statement
Core Values
Location Map
ISO Certificate
Quality Policy & Program
DCP Quality Program
We will comply with all applicable laws and relevant industry standards of practice.
We will continuously evaluate the Health and Safety and Environment (HSE) aspects of our equipment
and services.
We believe that effective HSE management is good business and we are committed to the continuous
improvement of HSE management practices.
From top management through to entry level, everyone is responsible and accountable for HSE.
We are committed to the integration of HSE objectives into our management systems at all levels. This will
enhance our business success by reducing risk and adding value to our services.
Our Vision:
DCP expects its personnel to achieve year-over-year improvement in safety performance while driving to Zero
injuries.
DCP is aiming for a destination called “zero” - zero safety incidents, zero injuries and zero days off work due to
injury; in other words, a perfect HSE record.
Driving to Zero means accepting that every incident is preventable. Our Driving to Zero vision is a “decision to
change” - change behavior and the way things are done to ensure safety is always at the forefront for every
employee. As a global construction chemicals manufacturer company, we expect our workers to make safety
on-the-job an everyday priority.
Our process management system contains all business processes and is valid worldwide. It has also
created a framework for environmental topics that allows us to comprehensively meet the demands of
our corporate responsibilities. We want to continue to improve the quality of our products, services and
processes throughout the company, and this includes the topic of the environment. It goes without
saying that this also embraces meeting the ISO 9001 and ISO 14001 international quality and
environmental standards.
We respect the environment. We reduce, recycle, and reuse our waste wherever and whenever is
possible. We avoid using any harmful materials to people or to the environment.
Construction professionals know that only a safe construction site is a productive one. For this reason we
offer our customers appropriate solutions for added safety and productivity in all phases of their
construction projects. Our products and user training also actively contribute to health protection and
accident prevention.
We continue to invest in new technologies aimed at protecting the health and safety of the user. DCP has
stepped up its efforts to protect the environment, control its consumption of energy, water and
materials, and facilitate recycling. The Group works alongside its customers to provide solutions that
enhance the safety of people and environment.
i. Commercial Registration
ii. Computer Card
iii. Municipality Certificate
Compliance Statement
(QCS 2014)
Technical Data Sheet
Test Reports/Certificate
Material LEED Certificate
Distance: 5,795 Km. from Jordan Port to Doha Port, Qatar
Certificate of Origin
Material Safety Data Sheet
Application/Method Statement
Previous Material Approvals
Project Reference List
(On-going & Completed)
No. PROJECT DETAILS PRODUCT SUPPLIED
1. Project Name: Banana Island (Anantara Resort) Flo-Grout 2, Keyfix E, Cempatch AB, Strongcoat 400, Strongcoat
Client: Private Engineering Office (PEO) PE1, Repcoat P, Strongcoat HB, Cemflow TS300, Quickmast 341
Consultant: Engineering Consultants Group (ECG) Cempatch FL, Bituproof 100, Cemfair PF, Quickmast 105,
Contractor: Al Khayyat Contracting & Trading (KCT) / Flexseal PU440
Redco International W.L.L.
2. Project Name: Mall of Qatar Cemfix BB, Proplast CM100, Proplast RC100, Formcoat S,
Consultant: KEO International Consultants Formcoat WB, Setseal 22, PP Fiber, Cempatch SBR, Cempatch
Contractor: Al Khayyat Contracting & Trading (KCT) / SBR100, Cempatch AB, Repelicone L, Cemfix2 CS, QuickmastEP
Redco International W.L.L. 200, Setseal B, Bituproof 100, Aquathane R100, Flexseal PS660,
Industry/Type: Buildings/Shopping Centre Flexseal PU425, Cellrod, Fiberboard, Flo-Grout 2, Flo-Grout
Started/Finished: Nov 2012/Nov 2016 EP260, Cempatch S, Cemfair PF,Repcoat ZR, (Nullifire FS701)
Project Value (USD Million): 824.00 (Actual)
3. Project Name: CP10 NDIA-Airfield & Road Tunnel Package Cempatch FL, Cemfair 2CT, Quickmast 110, Quickmast 120,
Client: NDIA Steering Committee Quickmast 341, Cellrod, Hotrod, Fiberboard, Donseal 555,
Consultant: Bechtel Qatar Donseal 777, Flexseal PU440, Setseal 44, Formcoat GSR, EVA-
Contractor: Sinohydro - Gamuda & WCT (JV) CON, DCP Solvent, Cemflow Base, Cemflow Acrylic Primer,
Industry/Type: Infrastructure/Roads & Bridges Strongcoat Primer, Strongcoat EPU100, Strongcoat 400,
Started/Finished: Feb 2006/Feb 2012 Quickmast 108, Cempatch SBR100, ACT Packers 68/100/150
Project Value (USD Million): 503.00 (Actual)
5. Project Name: NDIA - CP51 Passenger Terminal Complex North Node Cemfix BB, Proplast CM100, Proplast RC100, Cellrod, Donseal
Client: NDIA Steering Committee 777, Hotrod, Fiberboard, Flo-Grout 2, Flo-Grout 3, Flo-Grout HF1,
Consultant: Parsons International Flo-Grout BP80, Flo-Grout CR, Cempatch S, Quickmast 341,
Contractor: Six Construct - Midmac (JV) Quickmast 105, Repcoat ZR, Cempatch AB, Quickmast SB, DCP
Industry/Type: Buildings/Terminal Buildings, Airport Fine Aggregates, DCP Washed Aggregates, Safe-Stride Acrylic,
Started/Finished: Aug 2010/Aug 2015 ArboXL1075, Arbokol682, Arbothane1245, Pyrocoustic Sealant,
Project Value (USD Million): 745.00 (Actual) Neoprene Sponge, DSB Brown 900 SL, Colorseal Horizontal,
Colorseal Seismic, Universal 90’s
6. Project Name: Msheireb Downtown Doha (Phase 1, 2, 3 & 4) Cellrod, Keyfix E, Flo-Grout 2, Cemfix BB, Probuild BM200,
Client: Msheireb Properties Proplast RC100, Cemfix GP, Proplast Smooth, Proplast CM100,
Consultant: Burns & McDonell, Qatar Keyfix E, Quickmast SB
Contractor: Hyundai Eng’g. Const. (HEC) / Obayashi-HBK JV / CCC-TCC
JV / Carillion-QBC JV / Brookfield Multiplex (Medgulf) / HBK Nullifire
Contracting Co., W.L.L. (FS701, FP300, FB747-50)
Industry/Type: Buildings/Mixed Use, Commercial, Hotel, Recreational
Facilities, Educational Facilities, Apartments, Car Park American Hydrotech
Started/Finished: May 2010/Aug 2020 (Flex Flash F, Surface Conditioner, MM6125 EV, Hydroflex30,
Project Value (USD Million): 5500.00 (Actual) Flex Flash UN)
7. Project Name: New Doha Port Buildings & Infrastructure - NPP/0057 CemfixBB, Probuild BM200, Proplast CM100, Proplast RC100,
Client: New Port Project Steering Committee Flo-Grout 2, Keyfix E, Cemfix GP, Cemafill GP, Quickmast EP200,
Consultant: AECOM Middle East Ltd. Bituproof 300, Bituproof 100, Flexseal PS660, Flexprime PS100,
Contractor: Sinohydro - UCE (JV) Flexseal MH200, Cellrod, Fiberboard, Strongcoat EPU100,
Industry/Type: Buildings/Mixed Use, Manufacturing Cempatch S, Cemfair PF, Cemfair PF100, Cemfair 2C, Quickmast
Started/Finished: Feb 2015/Dec 2019 110, Quickmast 120, Formcoat WB, Cemflow GPU, Cemflow
Project Value (USD Million): 380.00 (Actual) Acrylic Primer, Cemflow Base S, Cemflow Primer, Cemflow
TS200
8. Project Name: Food Processing & Storage Facilities - NPP/0085 Flo-Grout 2, Keyfix E,
Client: New Port Project Steering Committee Cempatch S, Cempatch FL90, Cemfair PF100,
Consultant: Dorsch Qatar Formcoat WB, Setseal 22,
Contractor: Al Jaber Engineering W.L.L. (JEC) Cempatch SBR100,
Industry/Type: Industrial/Warehouse & Workshop Hyperseal DP-2010H, Hydrostop HW,
Started/Finished: Nov 2017/Apr 2020 Monoshake
Project Value (USD Million): 438.00 (Actual)
No. PROJECT DETAILS PRODUCT SUPPLIED
9. Project Name: Mega Reservoir PRPS-1 at Umm Birka (Package A) Formcoat WB,
Client: Qatar General Electricity & Water Corporation (Kahramaa) Flo-Grout 2, Flo-Grout EP330, Flo-Grout EP260,
Consultant: Hyder Consulting Middle East Limited Quickmast EP200,
Contractor: CCC-TCC (JV) / BMC Qatar W.L.L. Bituproof 100, Hyperseal DP-2010H, Hyperseal DPS-200,
Industry/Type: Power & Water/Water Pipeline Hydrostop HW, Hydroseal FS Plus,
Started/Finished: May 2015/Sep 2019 Quickmast341
Project Value (USD Million): 550.00 (Estimated) Cempatch SBR100
10. Project Name: Mega Reservoir PRPS-2 at Umm Salal (Package B) Cemfix W, Cemfix GP, Quickmast EP200, Cemafill GP, Cemfix
Client: Qatar General Electricity & Water Corporation (Kahramaa) Enhance,
Consultant: Hyder Consulting Middle East Limited Setseal AW, Formcoat WB,
Contractor: HBK Contracting Co. W.L.L. Bituproof 100, Setseal B,
Industry/Type: Power & Water/Water Pipeline Setplug, Cemfair PF100, Cempatch FL90,
Started/Finished: May 2015/Dec 2018 Flo-Grout 2,
Project Value (USD Million): 632.60 (Actual) Keybond 2000
11. Project Name: Mega Reservoir PRPS-3 at Rawdat Rashed (Package D) Setseal AW, Formcoat GSR100,
Client: Qatar General Electricity & Water Corporation (Kahramaa) Setseal B, Hydrostop HW,
Consultant: Hyder Consulting Middle East Limited Proplast RC100,
Contractor: Leighton Contracting (Qatar) W.L.L. Flo-Grout 2,
Industry/Type: Power & Water/Water Pipeline Cempatch FL90, Cemfair PF, Cempatch S
Started/Finished: May 2015/Apr 2020
Project Value (USD Million): 608.00 (Actual)
12. Project Name: Mega Reservoir PRPS-4 at Abu Nakhla (Package E) Setseal AW, Formcoat WB,
Client: Qatar General Electricity & Water Corporation (Kahramaa) Cemfair PF100, Cempatch S, Cempatch SBR100,
Consultant: Hyder Consulting Middle East Limited Setseal B, Bituproof 100,
Contractor: CGGC - Burhan (JV) Flexseal PS660, Flexprime PS100, Flexseal PU425,
Industry/Type: Power & Water/Water Pipeline Proplast RC100, Proplast CM100,
Started/Finished: May 2015/Jun 2019 Repcoat, Strongcoat PE1
Project Value (USD Million): 550.00 (Estimated)
13. Project Name: Mega Reservoir PRPS-5 at Al Thumama (Package C) Formcoat WB,
Client: Qatar General Electricity & Water Corporation (Kahramaa) Flo-Grout 2, Flo-Grout EP330, Flo-Grout EP260,
Consultant: Hyder Consulting Middle East Limited Quickmast EP200,
Contractor: CCC-TCC (JV) / BMC Qatar W.L.L. Bituproof 100, Hyperseal DP-2010H, Hyperseal DPS-200,
Industry/Type: Power & Water/Water Pipeline Hydrostop HW, Hydroseal FS Plus,
Started/Finished: May 2015/Sep 2019 Quickmast 341,
Project Value (USD Million): 550.00 (Estimated) Cempatch SBR100
14. Project Name: Metro Phase 1 Systems, Rolling Stock, Track Work & Cemfix BB, Probuild BM200, Proplast CM100, Proplast RC100,
Depot) Formcoat WB, Setseal 22, Setseal AW,
Client: Qatar Railways Development Company Quickmast 341, Quickmast 105, Cemfair PF100, Cempatch S,
Contractor: HBK Contracting Co. W.L.L. Quickmast 110, Quickmast 120, Quickmast 108,
Industry/Type: Infrastructure/Rail Flo-Grout 2, Keyfix E,
Started/Finished: May 2015/Dec 2019 Cemfix GP, Cemafill GP,
Project Value (USD Million): 3350.00 (Actual) Bituproof 3 00
16. Project Name: Facility D-IWPP (Umm Al Houl Power Plant) Hydrostop HW, Hyperseal DP-2010H, Hyperseal DPS-200,
Client: Umm Al Houl Power Flexseal PU425, Fiberboard,
Consultant: Mott MacDonald Quickmast EP200, Cemfix GP,
Contractor: Simplex Infrastructure Limited / Samsung C & T Quickmast 341, Quickmast 105, Cemfair PF100,
Corporation / Al Jaber Engineering W.L.L. Proplast CM100,
Industry/Type: Power & Water/Power and Desalination Plant Strongcoat PE1,
Started/Finished: Aug 2015/Jul 2018 Flo-Grout 2,
Project Value (USD Million): 3150.00 (Actual) Formcoat GSR100,
Cempatch FL, Cempatch S
No. PROJECT DETAILS PRODUCT SUPPLIED
17. Project Name: Salwa Resort - Buildings & Infrastructure Works Cemfix BB, Proplast CM100, Proplast RC100, Flo-Grout 2, Flo-
Client: Private Engineering Office (PEO) Grout EP260, Hydrostop HW, Hyperseal DP-2010H, Hyperseal
Consultant:Dar Al-HandasahShair & Partners DPS-200, Hydrostop AB, Setseal B, Formcoat S, Setseal AW,
Contractor: Al Ali Engineering Co., W.L.L. Trading & Contracting / Setseal A, Setseal 22, Flexseal PU425, Flexseal PS660, Flexseal
Contraco W.L.L. AS111, Cellrod, Flexseal GA777, Strongcoat Primer, Griptop TF,
Industry/Type: Buildings/Hotel Griptop TF Primer, Cemflow TS200, Strongcoat SL1, Strongcoat
Started/Finished: May 2015/May 2020 HB, Antislip Aggregate, Quickmast 341, Setplug, Cempatch FL,
Project Value (USD Million): 1050.00 (Estimated) Cempatch S, Repcoat ZR, Cemfair PF100, Cemfair PF, Cempatch
SBR100, Cemfix Flex,Cemfix GP, Cemafill GP, Repcoat FF,
Repcoat, Repcoat Primer, Strongcoat EPU100, Quickmast EP200
FIRESTOPIT (Pyroscoustic Sealant)
18. Project Name: Al Bayt Stadium and Precinct in Al Khor Hydrostop HW, Hypereal DP-2010H,
Client: Supreme Committee for Delivery and Legacy Aspire Zone Cempatch SBR100,
Consultant: KEO International Consultants Formcoat GSR100, Formcoat WB,
Contractor: Galfar Al Misnad Engineering - Salini Impregilo - Cimolai Flo-Grout BP800, Flo-Grout 2,
(GSIC-JV) Cempatch S,
Industry/Type: Buildings/Sports Facilities Bituproof 300
Started/Finished: Nov 2015/Dec 2019
Project Value (USD Million): 850.00 (Actual)
19. Project Name: Al Wakrah Stadium & Precinct Main Works Flexseal PS660
Client: Supreme Committee for Delivery & Legacy Aspire Zone Flexprime PS100
Consultant: AECOM Middle East Limited
Contractor: Midmac-PORR-Six Construct (JV)
Industry/Type: Buildings/Sports Facilities
Started/Finished: Feb 2016/Apr 2019
Project Value (USD Million): 750.00 (Estimated)
20. Project Name: Lusail Stadium & Precinct Probuild BM200, Cemfix BB, Proplast CM100, Proplast RC100,
Client: Supreme Committee for Delivery & Legacy Aspire Zone SetsealAW,
Consultant: Louis Berger Flo-Grout 2,
Contractor: HBK-CRCC (JV) Hydrostop HW, Hyperseal DP-2010H,
Industry/Type: Buildings/Sports Facilities Quickmast 108,
Started/Finished: Feb 2017/Sep 2020 Formcoat WB,
Project Value (USD Million): 767.00 (Actual) Flexseal PU425
23. Project Name: New Orbital Highway - Phase 3 Cemfair PF100,Cemfair PF, Cempatch FL90,Cempatch FL
Client: Public Works Authority (Ashghal) Cempatch S, Quickmast 105, Quickmast 341, DCP Solvent,
Consultant: AECOM Middle East Ltd. Formcoat WB, Strongcoat PE1, Setseal B, Hyperseal DP-2010H,
Contractor: Leighton-JEC (JV) Hyperseal DPS-200, Flo-Grout EP260, Flo-Grout 2, Keyfix E
Industry/Type: Infrastructure/Roads & Bridges Quickmast SB, Cempatch AB,
Started/Finished: May 2014/Feb 2019 Flexseal PS660, Flexprime PS100, Flexseal PU425
Project Value (USD Million): 1687.00 (Actual) PP Fiber, Repcoat
24. Project Name: New Orbital Highway -Phase 4 Formcoat WB, Formcoat S, Formcoat GSR, Formcoat GSR100
Client: Public Works Authority (Ashghal) Setseal AW
Consultant: AECOM Middle East Ltd. Fiberboard, Flexseal PS660, Flexprime PS100, Flexseal PU425
Contractor: Daewoo Engineering & Construction Co. Cempatch AB, Cempatch SBR100, Quickmast 108,
Industry/Type: Infrastructure/Roads & Bridges Flo-Grout 2
Started/Finished: Aug 2015/Feb 2019
Project Value (USD Million): 910.00 (Actual)
No. PROJECT DETAILS PRODUCT SUPPLIED
25. Project Name: Lusail Expressway Project Fiberboard
Client: Public Works Authority (Ashghal) Flo-Grout EP260
Consultant: CDM Smith Setseal B
Contractor: Hyundai Engineering & Construction Co., Ltd.
Industry/Type: Infrastructure/Roads & Bridges
Started/Finished: Nov 2012/Dec 2019
Project Value (USD Million): 1369.00 (Actual)
26. Project Name: Doha North Sewerage Treatment & Associated Works Flo-Grout 2, Keyfix E, Strongcoat Primer, Cellrod
PS70 & Pumping Mains 682/2 Cempatch S, Cempatch FL, Cemfair PF, Quickmast 201EJ,
Client: Public Works Authority (Ashghal) Quickmast 341, Repcoat ZR
Consultant: Stanley Consultant Inc. Cemflow Base (S), Cemflow Acrylic Primer,
Main Contractor: Qatari DiarVinci Construction (QDVC) Cempatch AB, Quickmast 108,
Sub-Contractor: Redco International W.L.L.
Industry/Type: Infrastructure/Sewerage & Waste Network Adshead Ratcliffe:
Started/Finished: Feb 2009/May 2012 Arbokol AG2,
Project Value (USD Million): 490.00 (Actual) Arbokol AG2 Primer
29. Project Name: EPIC for Hamad International Airport Jet A-1 Supply Formcoat WB, Cemfix GP, Quickmast EP200
Project (JSPP) Cempatch FL90, Cemfair PF100, Quickmast 341
Client: Qatar Petroleum (QP) Cempatch SBR100, Hydrostop HW, Setseal B, Strongcoat PE1
Contractor: CCC-TCC (JV) Strongcoat Primer, Strongcoat HB, Monoshake
Industry/Type: Oil & Gas/Storage Tanks Flo-Grout 2, Flo-Grout EP260
Started/Finished: Feb 2017/May 2019 Cemfix BB, Probuild BM200, Proplast RC100, Proplast CM100
Project Value (USD Million): 450.00 (Estimated) Flexseal PS660, Flexseal PU425
30. Project Name: Qatar Petroleum District - Fit Out Works Setseal B,
Client: Qatar Petroleum (QP) Cemfix GP,
Consultant: Arab Engineering Bureau (AEB) Flo-Grout 2,
Contractor: UCC / Alghanim / Al Balagh / Shapoorji Pallonji / Medgulf Cemfair PF, Cemfair PF100, Cempatch FL, Cempatch FL90,
Industry/Type: Buildings/Mixed Use, Commercial, Hotel, Religious Keybond 2000
Facilities, Retail Outlets Strongcoat HB
Started/Finished: Jan 2019/Mar 2021 Cempatch S, Quickmast341
Project Value (USD Million): 500.00 (Estimated) Strongcoat SL4, Strongcoat Primer
31. Project Name: Lusail Palace (T.J) & Main Majlis Bituproof 300
Client: Private Engineering Office (PEO) Proplast CM100
Consultant: AECOM Middle East Ltd.
Contractor: UrbaCon Trading & Contracting (UCC)
Industry/Type: Buildings/Residential
Started/Finished: Feb 2018/Dec 2020
Project Value (USD Million): 1400.00 (Estimated)
32. Project Name: Qatar Emiri Signal Corps New Camp Project - Design & Formcoat WB, Setseal 44, Setseal NF105,
Build (Q-102-01) Bituproof 100, Cempatch MH, Keyfix E, Flo-Grout 2,
Client: Qatar Armed Forces (QAF) Cemfair PF100, Cempatch FL, Cempatch S, Cempatch Primer M,
Consultant: Qatar Emiri Corps of Engineers (QECE) Flexseal PS660, Flexseal PU425,Cempatch SBR100, Cemfix GP,
Contractor: Bahadir Construction Engineering Contracting & Trading Cemflow Primer, Cemflow GPU,
Inc. Co. Dowsil 890SL, Styccobond F44, Nullifire FS701
No. PROJECT DETAILS PRODUCT SUPPLIED
33. Project Name: KataraTowers in Lusail (Lusail Katara Hotel) Cemfair 2C
Client: Katara Hospitality Cempatch S
Consultant: Dar Al-Handasah Consultants Cempatch FL90
Contractor: HBK Contracting Co., W.L.L. Formcoat GSR100
Industry/Type: Buildings/Hotel
Started/Finished: Sep 2018/Mar 2021
Project Value (USD Million): 528.00 (Estimated)