Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
0% found this document useful (0 votes)
285 views

Process Design Guidelines

A guidline for the criteria of process design

Uploaded by

mms2007
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
285 views

Process Design Guidelines

A guidline for the criteria of process design

Uploaded by

mms2007
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 68

About these Process and Design

Guidelines

Process and Design


Guidelines
inge® product Series:
dizzer® XL Series Modules for Open Platform
T-Rack® 3.0 Series
About these Process and Design
Guidelines

Legal Notice

Manufacturer Details
Product
®
inge product Series:
® ®
dizzer XL Series Modules for Open Platform, T-Rack 3.0 Series and corresponding parts and components
for operation.

Manufacturer
inge GmbH
Flurstraße 27
86926 Greifenberg
Germany

Applies to
®
inge product Series:
® ®
dizzer XL Series Modules for Open Platform, T-Rack 3.0 Series and corresponding parts and components
for operation.
Duplication and archiving in any form whatsoever – including of excerpts – is only permitted with the written
consent of the manufacturer.
All brand and company names in these process and design guidelines are registered trademarks of the
corresponding companies.

Change Policy

The manufacturer reserves the right to change this process and design guidelines or any part thereof at any
time in the interest of continuous product improvement.
The system integrator is required to inquire about the current version of the process and design guidelines at
regular intervals:
 Download at: http://www.inge.basf.com
 By e-mail to info@inge.ag
 By telephone under +49 8192 997-700

Change History

Version Version date Author History

V0 07/2018 C+P Initial creation


V 1.0 09/2018 ON/CV/GS Layout adjustment
V 1.1 01/2019 MH/GS General adjustment

Process and design guidelines inge® product Series: Page 2 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
About these Process and Design
Guidelines

Table of Contents
1 About these Process and Design Guidelines ..........................................................................................5
1.1 Objective of these Process and Design Guidelines ...........................................................................5
1.2 Target Groups.....................................................................................................................................6
1.3 Symbols in this Process and Design Guidelines ................................................................................6
1.3.1 Symbols .................................................................................................................................6
1.3.2 Notes on Instructions and Rules ............................................................................................6
®
2 The inge Product Family ..........................................................................................................................7
®
2.1 Multibore Membrane Technology .....................................................................................................7
®
2.2 dizzer Module Technology ................................................................................................................8

3 Membrane Operating Modes .....................................................................................................................9


3.1 Filtration ..............................................................................................................................................9
3.2 Backwash .........................................................................................................................................11
3.3 Forward Flush ...................................................................................................................................13
3.4 Operating Cycles ..............................................................................................................................15
3.4.1 Alternating Operation ...........................................................................................................15
3.4.2 Single Sided Operation ........................................................................................................16

4 Feed Water Quality and Pretreatment .....................................................................................................18


4.1 Maximum Feed Concentration and Goals of Pretreatment ..............................................................18
4.2 Microflocculation ...............................................................................................................................19
4.3 Performing Microflocculation ............................................................................................................20
4.4 Continuous Chlorination in UF feed water ........................................................................................23

5 Chemically Enhanced Backwash (CEB) .................................................................................................24


5.1 General Overview .............................................................................................................................24
5.2 Types of CEB ....................................................................................................................................26
5.3 How a CEB is Performed ..................................................................................................................27

6 Chemical Clean In Place (CIP) .................................................................................................................29


6.1 General Overview .............................................................................................................................29
6.2 Establishing CIP Recirculation .........................................................................................................31
6.3 How a CIP is Performed ...................................................................................................................32
6.3.1 Preparing the Chemical Solution for a CIP ..........................................................................32
6.3.2 Preparing for a CIP Process ................................................................................................32
6.3.3 Recirculation and Soaking time ...........................................................................................33
6.4 Preparing to Rinse out the Rack/System..........................................................................................35
6.5 Rinsing out the Rack/System ...........................................................................................................36

7 Using Chemicals for CEB/CIP .................................................................................................................38


7.1 Differences between CIP und CEB ..................................................................................................38
Process and design guidelines inge® product Series: Page 3 of 68
dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
About these Process and Design
Guidelines

7.2 Permissible Chemicals and Operating Conditions ...........................................................................38

8 Design and Construction .........................................................................................................................42

9 System Commissioning ...........................................................................................................................49


9.1 General Overview .............................................................................................................................49
9.2 Functional Testing ............................................................................................................................50
9.3 Module Preservation .........................................................................................................................51
9.4 Venting and Rinsing..........................................................................................................................51
9.4.1 Venting the System ..............................................................................................................51
9.4.2 Rinsing the System ..............................................................................................................52

10 Disinfecting the System ...........................................................................................................................53

11 Integrity Testing ........................................................................................................................................55


11.1 General Overview .............................................................................................................................55
11.2 Compressed Air Specification ..........................................................................................................56
11.3 Testing Frequency ............................................................................................................................57
11.4 How to Perform a Pressure Hold Test ..............................................................................................57
®
12 Further Guidelines on Operating inge Modules/Racks .......................................................................61
12.1 Avoiding Membrane-Damaging Particles and Substances ..............................................................61
12.2 Preventing Chemically Irreversible Fouling ......................................................................................62
12.3 Permitted Conditions of Operation, Rinsing, Cleaning and Disinfection ..........................................63

13 System Shutdowns ...................................................................................................................................65

14 Documentation of Operating Conditions ...............................................................................................66

15 Technical Documentation ........................................................................................................................67


15.1 Other Applicable Documents ............................................................................................................67

How to Contact us ............................................................................................................................................67

Process and design guidelines inge® product Series: Page 4 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
About these Process and Design
Guidelines

1 About these Process and Design Guidelines

NOTE
READ THE PROCESS AND DESIGN GUIDELINES!
Read this document to plan your system.
The process and design guidelines described in this document are
only to be viewed as recommendations for your system.
The system integrator and the operator are responsible for
compliance with applicable legal and local regulations for
environment, health and safety (EHS).

1.1 Objective of these Process and Design Guidelines


®
This document contains a detailed description of all process and design guidelines of the inge product
Series:
® ®
→ dizzer XL Series Modules for Open Platform, T-Rack 3.0 Series.

This document contains instructions and rules for the correct, safe and fault-free design and operation of the
system.

Warranty Policy

NOTE
ADHERENCE TO ALL INSTRUCTIONS!
Full and proper compliance with the instructions in these process
and design guidelines is a prerequisite for making a claim under
the warranty.
The only version of these process and design guidelines of the
® ®
above mentioned inge product Series: dizzer XL Series Modules
®
for Open Platform, T-Rack 3.0 Series that has legal validity is the
English version.
In the event of making a warranty claim, the customer agrees to
automatically provide inge GmbH with a complete set of
documentation.
Please contact inge GmbH if you wish to deviate from any of the
guidelines or specifications provided in this document and request
written approval in advance. Otherwise, you risk invalidating any
warranty claims that you may make in the future.

Process and design guidelines inge® product Series: Page 5 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
About these Process and Design
Guidelines

1.2 Target Groups

Qualified Personnel
 Project and planning engineers/technicians
 Programmers
 Commissioning engineers/technicians
 Design engineers

1.3 Symbols in this Process and Design Guidelines

1.3.1 Symbols
The following symbols are used in this document:

SYMBOL DESCRIPTION (EXAMPLES)


IMPORTANT NOTE!
Failure to follow the instructions in this note may lead to problems
with operating the product.

INFORMATION!
Following the information provided in this note will simplify
®
commissioning and operation of the inge products.

CROSS REFERENCE!
Detailed information on this topic can be found in other
documentation.

1.3.2 Notes on Instructions and Rules


To ensure correct, safe and fault-free operation of the system, the document highlights instructions and rules
in the following manner:

NOTE
ATTENTION!
Observe the following guidelines!

Process and design guidelines inge® product Series: Page 6 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
The inge® Product Family

2 The inge® Product Family

2.1 Multibore® Membrane Technology


®
The Multibore membrane developed by inge GmbH (see Figure 2.1-1) combines seven capillaries of the
same diameter into a single fiber. This provides significantly higher mechanical stability than conventional
®
singlebore hollow fiber membranes. Multibore membranes are typically operated in dead-end mode and are
backwashed at regular intervals. Crossflow operation at low velocities is also feasible in principle, though it is
only used in certain circumstances.

®
Figure 2.1-1 - Multibore membrane developed by inge GmbH

®
inge GmbH supplies its Multibore membranes in a choice of capillary diameters from 0.8 to 1.5 mm (0.032 to
0.059 inch) to cater to different types of applications. The most popular diameter of 0.9 mm (0.035 inch) is
actually larger than most other capillary membranes typically used in similar applications. This larger diameter
enables the fibers to cope with a higher solid content. It also leads to a significant reduction in the hydraulic
pressure drop along the individual fibers in comparison to smaller capillaries. This results in a more uniform
distribution of the water along the capillaries. Another advantage of this design is that it improves the
backwash process: the accumulated foulants are removed more efficiently, which generally means you need
smaller quantities of backwash water and a smaller membrane area.
Fibers with a capillary diameter larger than > 0.9 mm (> 0.035 inch) are the choice for applications involving
continuously high levels of solids – for example backwash waters of conventional media filters, or 2nd-stage
UF systems (treating the non-chemical backwash water of a 1st-stage UF system. As a first indication these
larger capillaries should be considered for water with a concentration of suspended solids greater than 50
mg/l. The final decision for the used capillary diameter is depending on different factors like filtration time,
backwash time and the nature of the particles. The larger diameter significantly increases the solids content
that can be handled by the capillaries and in principle, enables higher flow velocities and lower pressure drops
in a semi crossflow operation, if employed.
®
The Multibore membrane is "spun" in a single production step from just one polymer solution in a patented
production process. Spinning the membranes using just one material creates what is known as an "integral"
membrane. Unlike composite membranes, which consist of multiple layers of various materials, integral
membranes do not pose the risk of individual layers peeling away. This is a huge advantage in terms of
membrane integrity.
The PES based membrane material is modified in a way that boosts the hydrophilicity of the membrane. This
increased hydrophilicity reduces the tendency of the membrane surface to adsorb organics, thereby improving
operating performance with less membrane fouling. The manufacturing process produces a defined thin
filtration surface (interface) on the inside of the seven capillaries with extremely low resistance to permeation
and with inner pores measuring approximately 20 nanometers (see Figure 2.1-2). This pore size is
Process and design guidelines inge® product Series: Page 7 of 68
dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
The inge® Product Family

substantially smaller compared to low pressure membranes of most other ultrafiltration membranes on the
market. This ensures a virus rejection of more than 4 log units without any pretreatment step like coagulation
and in addition a better removal of foulants if used as pretreatment for reverse osmosis plants. In spite of the
®
smaller pores, the Multibore membrane shows a substantially higher permeability because of the higher
surface porosity. This is translated into a very energy efficient operation.
The individual capillaries are firmly connected to each other by a homogeneous support structure that has a
permeability some 1,000 times higher than that of the actual filtration interface of the capillaries. The
capillaries are spaced at defined distances from each other to ensure a uniform distribution of water within the
®
Multibore membrane and superior overall stability.
Smaller pores, lower pressure, the unmatched resistance against high pH cleaning for removing organic
®
foulants and of course the stability are only a few unique characteristics of the Multibore PES membrane.

®
Figure 2.1-2 - Cross-section of a Multibore membrane

®
Multibore ultrafiltration membranes operate "inside-out", which means that the feed water flows from the
inside to the outside of the capillaries in filtration mode and flows in the reverse direction, i.e. from the outside
to the inside of the capillaries, in backwash mode.
® ®
inge Multibore ultrafiltration membranes reliably remove particles, bacteria and viruses from a variety of
water sources, even if fluctuations in the quality of the feed water exist. Maintaining the integrity of the
membrane fibers is a key prerequisite for ensuring that contaminants are properly removed from the system.
®
Although capillary defects are extremely unlikely due to the extraordinary stability of Multibore membranes,
the integrity of the membranes or capillaries can still be affected negatively by factors such as non-approved
substances in the feed water and, in particular, by excessive mechanical stress caused by improper operation.

2.2 dizzer® Module Technology

The UF membranes developed by inge GmbH are encased in a pressure housing. The resulting array is
® ®
known as the vertical inge dizzer module Series, which includes unique design features tailored to the
specific requirements of ultrafiltration in the water treatment industry. Particular attention has been paid to
optimizing the hydrodynamic characteristics of the internal module design in order to improve backwash
efficiency and membrane integrity.

Process and design guidelines inge® product Series: Page 8 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

3 Membrane Operating Modes

3.1 Filtration

In filtration mode, the source water is treated by being forced through the ultrafiltration membrane from the
feed side to the filtrate side. The contaminants in the water, which are blocked by the filtration surface,
accumulate on the inner surface of the membrane capillaries. The filtrate flows into the filtrate/backwash tank,
which serves as a storage container for the backwash water and the water that is to be used for further
processing or consumption. Alternatively, the filtrate can be piped directly to the ultimate consumers, in which
case the tank is used solely as a storage container for backwash water. The amount of water that can be
treated by each UF module depends on a number of factors, including the origin of the water being treated
(e.g. ground water, surface water, sea water, or pretreated waste water), the composition of the source water
(e.g. turbidity, concentration of solids, dissolved organics/inorganics, temperature), and the chosen cost
strategy (capital cost, operating costs).
The diagrams below show the two operating modes "Filtration Top" and "Filtration Bottom" in dead-end mode.
Figure 3.1-1 shows filtration being performed from top (FT) with the source-water being fed into the top of the
module, while Figure 3.1-2 shows filtration being performed from bottom (FB) with the source-water being fed
into the bottom of the module.

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE
Caustic

Hypo

Acid

CEB

Figure 3.1-1 - Filtration Top (FT) mode

Process and design guidelines inge® product Series: Page 9 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE

Caustic

Hypo

Acid
CEB

Figure 3.1-2 - Filtration Bottom (FB) mode

Process and design guidelines inge® product Series: Page 10 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

3.2 Backwash

During the filtration process, the contaminants accumulate on the UF membrane surface and form a filtercake.
As a result, the pressure drop required for filtration – also known as the transmembrane pressure (TMP) –
increases gradually. In order to remove the build-up of foulant from the membrane surface and reduce the
TMP, backwashes are performed at regular intervals. The water required for the backwash is drawn from the
backwash tank and forced through the module from the filtrate side using the backwash pump. It passes
through the membrane from the outside in (i.e. opposite to the direction of flow used in filtration mode) and
detaches the accumulated foulant from the membrane surface. The backwash water is then rinsed out of the
fiber capillaries and channeled through the module inlet connection to the drain.

NOTE
ATTENTION!
Observe the following guidelines!

 The backwash water must be free of abrasive or membrane-blocking particles, i.e. the level of
®
water cleanliness must be at least as high as that of inge UF filtrate. When drawing water from
the backwash tank, it is also important to ensure that no corrosion or erosion products that may
have formed in the tank or in the pipes are reversed flowed and thus preventing a contamination
of UF module(s) filtrate side.
 To be sufficiently effective, the backwash must be conducted at a flux rate of at least
230 l/m²h (135 GFD).
Effective backwash duration varies between 30 and 60 seconds depending on the quality of the feed water,
the type of operating cycle and the size of the installation.
 To ensure reliable cleaning even when the membranes are heavily fouled, it is important to
maintain a constant flow rate using a flow control system. One way this can be achieved is by
using a backwash pump driven by a frequency converter. The frequency converter should be
configured to ensure that the minimum flux rate of 230 l/m²h (135 GFD) is achieved within 5 – 7
seconds or less without pressure surges. The use of slow acting valves is advised to avoid
possible water hammers.

Process and design guidelines inge® product Series: Page 11 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

Backwash Operating Modes


The following diagrams show the two backwash operating modes "Backwash Drain Bottom" and "Backwash
Drain Top". Figure 3.2-1 shows a Backwash Drain Bottom (BWDB) in which the backwash water (filtrate)
exits the module at the bottom feed/drain port, while Figure 3.2-2 shows a Backwash Drain Top (BWDT) in
which the backwash water (filtrate) exits the module at the top feed/drain port.

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE Caustic

Hypo

CEB Acid

Figure 3.2-1 - Backwash to Drain Bottom (BWDB)

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE
Caustic

Hypo

Acid

CEB

Figure 3.2-2 - Backwash to Drain Top (BWDT)

Process and design guidelines inge® product Series: Page 12 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

3.3 Forward Flush

When treating source-water with high concentrations of solids, it may be advantageous to perform a forward
flush prior to the backwash. A forward flush can also be used to flush solids out of the system which have
been loosened from the membrane by a backwash, thereby potentially reducing the quantity of filtrate required
for the backwash. A forward flush also serves to ensure that no residues of the preceding backwash can
return to the membrane in a subsequent filtration stage. This method can boost cleaning performance while
simultaneously improving recovery rates.
Performing a forward flush is optional; if this option is activated, the forward flush will be performed before
and/or after a backwash. The forward flush is carried out using the filtration pump at a constant volume flow
rate equivalent to the filtration flux rate. For this reason, the volume flow rate for the forward flush is specified
here in l/m²h (GFD). No additional pump is required for the forward flush.
As shown in Figure 3.3-1 and Figure 3.3-2, the drain is kept open and the filtrate valve is closed during a
forward flush. This means that all the water flows lengthwise through the membrane capillaries. This method
is particularly effective at removing particulate matter, especially at the end of the membrane capillaries. A
forward flush generally occurs between 20 and 40 seconds. It can be performed either top-to-bottom (FFT) or
bottom-to-top (FFB).
In most applications a forward flush is not necessary.

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE
Caustic

Hypo

Acid

CEB

Figure 3.3-1 - Forward Flush Top (FFT)

Process and design guidelines inge® product Series: Page 13 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE

Caustic

Hypo

Acid
CEB

Figure 3.3-2 - Forward Flush Bottom (FFB)

Process and design guidelines inge® product Series: Page 14 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

3.4 Operating Cycles

In this context, an ultrafiltration operating cycle refers to a sequence of operations comprising a filtration
sequence followed by a backwash sequence. It is generally sufficient to run the backwash sequence without a
forward flush, in other words, only to do a backwash. The duration of the forward flush should generally be set
to 0 second. In certain applications, however, forward flushes may proof necessary either before or after the
backwash event. The duration of all operating modes should be user settable to allow for maximum process
flexibility.
Based on inge GmbH`s long-term experience two main operating philosophies (called alternating operation
and single sided operation) are well established.

3.4.1 Alternating Operation


The feed fluid is directed into the module(s)/racks from bottom and top inlet ports in an alternating manner as
shown in Figure 3.4-1.

Filtration Mode Backwash Mode Filtration Mode Backwash Mode

FB BWDT FT BWDB
Filtration Backw. Drain Filtration Backw. Drain
Bottom Top Top Bottom

Figure 3.4-1 - Alternating Operation

Filtration bottom (FB) / backwash drain top (BWDT) is followed by filtration top (FT) / backwash drain bottom
(BWDB) and so on in a continuous repetition.

Process and design guidelines inge® product Series: Page 15 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

3.4.2 Single Sided Operation


® ®
Single sided operation is applicable only when inge T-Rack Manifold or other manifold designs with bottom
inlet (feed bottom) are used. During single sided operation, the reverse combined backwash (RCBW) process
as shown in Figure 3.4-2 must be used.

Filtration Mode Backwash Mode

FB BWDB BWDT
Valve
Filtration Backw. Drain Backw. Drain
Swapping
Bottom Bottom Top

Figure 3.4-2 - Single Sided Operation

Filtration bottom (FB) is followed by a reverse combined backwash (RCBW) sequence (BWDB / VS / BWDT)
and so on in a continuous repetition.

Process and design guidelines inge® product Series: Page 16 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Membrane Operating Modes

NOTE
ATTENTION!
Observe the following guidelines!

 In order to keep the valve swapping time during backwash mode at a minimum (5-10 seconds
depending on valve operation time), the valve opening of BWDT side and the valve closing of
BWDB are recommended to be released in parallel
(= Valve Swapping).
 In the following Figure 3.4-3 please find the inge GmbH`s recommendations for the theoretical
RCBW time settings and some practical examples.

Figure 3.4-3 - Theoretical RCBW time settings and practical examples

 The functional descriptions, including advice for programming the control logic can be provided
on request.

Process and design guidelines inge® product Series: Page 17 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Feed Water Quality and Pretreatment

4 Feed Water Quality and Pretreatment

4.1 Maximum Feed Concentration and Goals of Pretreatment

NOTE
ATTENTION!
Observe the following guidelines!

 In some situations, the feed water may contain or may be expected to contain substances that
could potentially damage the membrane or membrane fibers or that may cause fouling or scaling
which would be too complex to remove even with chemical CIP (Clean In Place) cleanings. In
such cases it is essential to carry out effective pretreatment steps to remove these substances
from the water prior to ultrafiltration.
 The presence of predominantly large particles in the feed water may result in irreversible fouling
of the capillaries or in damage to the membrane or membrane fibers. Large and/or sharp
particles must therefore be removed by an upstream screen filter.

The quality of the water fed into a membrane system has a major impact on the membrane's performance,
recovery and availability. Substances in the water that permanently exceed a critical concentration or
temporarily rise above a maximum concentration can cause flux rates, achievable permeability and recovery
rates to fall below the stated design values. This also applies to the dosing of inorganic iron or aluminum-
based coagulants and powdered activated carbon. Concentrations that exceed permitted levels may also
significantly increase the frequency of chemically enhanced backwashes (CEB) required to maintain stable
operation as well as the frequency of chemical clean in place (CIP) to remove stubborn fouling/scaling
substances. This could lead to higher chemical consumption and negatively affect system availability.
No fixed values can be given for critical and maximum concentrations of feed water contaminants. Membrane
compatibility of many contaminants will differ depending on the type and even the sub-type of the source-
water used and the exact nature of the encountered contaminants, such as e.g. the type and quality of the
added powder activated carbon.

Process and design guidelines inge® product Series: Page 18 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Feed Water Quality and Pretreatment

4.2 Microflocculation
General Overview
Dissolved Organic Carbon (DOC) in the UF feed water can cause build-up of a hydraulically hard to remove
fouling layer as well as contaminate the UF filtrate water due to passage through the UF membranes.
Microflocculation is used to prevent or reduce the negative effects of dissolved organic matter by precipitation
and ultimately rejection of the organic molecules on the UF membranes. In many ultrafiltration installations,
microflocculation by means of inline coagulation is thus effectively used as a pretreatment process. In contrast
to sedimentation and depth filtration, which require the formation of larger macroflocs, ultrafiltration only
requires coagulation with subsequent formation of so-called “microflocs”. This has the advantage of reducing
the required quantity of coagulants and minimizing the quantity of sludge produced.
Depending on the concentration and characteristic structure of the dissolved organics in the feed water,
specific quantities of inorganic coagulant (usually metal salts such as FeCl3, polyaluminum chloride (PACI)
are added to the water prior to ultrafiltration and moderate amounts of energy, in the form of mixing, are then
applied to form microflocs. The principal effects are a reduction of free organic contaminants as a result of the
binding of the dissolved organics in the iron or aluminum flocs and the formation of a porous coating layer of
microflocs on the membrane surface which helps to promote a stable filtration process and high backwash
effectiveness and can therefore be used to increase or stabilize the membrane performance.
In addition, proper application of the microflocculation process can improve the filtrate water quality,
particularly in regard to the concentration of DOC (which in many cases can be reduced by up to 60%), the
SDI (Silt Density Index = clogging index; a key quality parameter for a reverse osmosis system downstream
from the UF system), and the phosphate concentration (especially important in waste water applications).
When performing microflocculation, it is important to note that the concentration of the residues of dosed
metal salts in the filtrate should not exceed 1% of the added metal concentration and should under no
circumstances exceed any relevant limits that may apply (e.g. for drinking water treatment).

Process and design guidelines inge® product Series: Page 19 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Feed Water Quality and Pretreatment

4.3 Performing Microflocculation

The goal of microflocculation (by using inline-coagulation) is to remove as much DOC as possible while
simultaneously maintaining process conditions to minimize the amount of coagulant that remains in the UF
filtrate. Achieving this goal requires precise adjustment of the inline-coagulation process. Based on the type of
coagulant and the quality of the source water, an acid or caustic must be used to adjust the pH value in order
to ensure an optimum pH for coagulation and microflocculation. The required contact time for the coagulant
depends on the type and concentration of the coagulant, the water chemistry and the water temperature.
®
In order to define the best possible coagulation parameters, inge recommends conducting jar tests in a
preliminary phase. The coagulant dosing system can then be designed based on the results of these tests. It
is important that the jar tests focus on analytical parameters such as residual concentrations of Al and Fe and
DOC removal rather than optical parameters such as floc formation. Table 4.3-1 gives an overview of various
coagulants and their key characteristics.

Table 4.3-1 - Inline-Coagulation and microflocculation parameters

Coagulant FeCl3 PACI


1
Dosage of Fe/Al [mg/l] 0.3 - 7.0 0.2 - 5.0
3+
Specific dosing (Me /DOC) [mg/mg] 0.5 - 2.0 0.25 - 0.5
pH range 5.0 - 10.0 6.5 - 7.5
pH Optimum 6.8 - 7.0 6.8 - 7.0
2
Contact time [s] 30 - 60 30 - 60
3
DOC elimination rate [%] 10 - 60 10 - 60
4
Rest quantity (as percentage of dosage) 1% 1%

1
The dosage can be decreased for swimming pool applications (e.g. 0.03 mg/l AL/Fe).
2
Contact time may show significant variation depending on water temperature, pH value, water chemistry
and treatment goals (t < 30 seconds and t > 60 seconds) → potential for optimization.
3
Removal of organics depending on water chemistry and coagulation parameters (pH value, etc.).
4 3+
Significant residues of Me (metal salts) indicate a problem with the coagulation parameters (mixing
conditions, pH value, alkalinity, contact time, dosage) and should be strictly avoided.

It is important to note here that using the prefilter to mix the coagulant may lead to fouling or scaling of the
prefilter (e.g. precipitation of Al hydroxides). Chemicals may then be required to remove this fouling if it can no
longer be removed by backwashing alone. inge GmbH therefore recommends installing the prefilter upstream
from the coagulant dosing station or downstream from the contact zone. In the event that the existing piping
does not guarantee sufficient contact time, a contact tank can be installed to increase the coagulant contact
time. The following process diagrams show a range of different configurations for inline-coagulation and
microflocculation.

Process and design guidelines inge® product Series: Page 20 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Feed Water Quality and Pretreatment

Figure 4.3-1 - Example 1: Prefilter – microflocculation – static mixer - UF

Figure 4.3-2 - Example 2: Microflocculation – static mixer – prefilter – UF

Figure 4.3-3 - Example 3: Microflocculation – feed pump – prefilter – UF

Process and design guidelines inge® product Series: Page 21 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Feed Water Quality and Pretreatment

NOTE
ATTENTION!
Observe the following guidelines!

 It is important to ensure proper mixing and adequate contact time. To achieve the best
microflocculation results, the contact time for the chemicals should be adjusted to reflect the
source-water quality (e.g. temperature) and the requirements regarding filtrate water quality (e.g.
DOC, residual concentration of Al or Fe in the filtrate). Under no circumstances should
microflocculation be allowed to take place in the membrane or on the filtrate side of the
membrane (this would be the case if coagulants were not able to fully react with the UF feed
water due to restrictions in timing and/or mixing and lead to unacceptable precipitation processes
in or on the membrane surface).
 All chemicals added to the membranes and modules must at least comply with technical quality
grade. Contaminated chemicals can cause irreversible fouling and are not permitted to use.
 When designing the microflocculation, please note that microflocculation processes are
significantly slower at low temperatures (< 5 -10 °C). To counter this, inge GmbH recommends
using polyaluminum chloride (PACI) which reacts significantly faster than other coagulants at low
temperatures.
 When calculating the size and shape of the contact tank, it is important to choose a design that
avoids short-circuiting in the tank.
 Special instructions must be followed for CEB and clean in place (CIP) and regular acid cleanings
have to be performed once coagulants are introduced to the UF feed water.
 No organic coagulants or coagulation aids (e.g. polyelectrolytes) may be used either alone or in
combination with inorganic coagulants since this may lead to severe, chemically irreversible
fouling on the membranes which even CIP cleanings may be unable to remove. In certain special
circumstances it may be possible to use substances of this type, but only if this has been tested
and approved in writing by inge GmbH in advance.
 To avoid excessive dosing of coagulants, it is important to monitor and document the
concentration of coagulants in the source water, feed and filtrate.

Process and design guidelines inge® product Series: Page 22 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Feed Water Quality and Pretreatment

4.4 Continuous Chlorination in UF feed water

In some cases, continuous pre-chlorination is used as a form of pretreatment to combat bacterial growth in
water treatment facilities. For a number of reasons, it is not recommended to apply pre-chlorination for UF.
Continuous chlorination of the UF feed water is in some cases considered to prevent micro- and macro-
biological growth in the UF feed water intake structures, however, it is not recommended to apply such
continuous chlorination upstream of the UF system. Instead, inge GmbH advises to implement other intake
cleaning strategies such as shock chlorination (see below).

NOTE
ATTENTION!
Observe the following guidelines!

 Chlorine is a powerful oxidant which can lead to the formation of volatile chlorinated
hydrocarbons in water chlorination processes. This by-product occurs as a result of free chlorine
reacting with organic material. The best-known by-products are trihalomethanes (THMs), a class
of chemicals that includes chloroform, which has been shown to cause cancer in laboratory
animals, and chloramines, which are believed to trigger allergies, and which cause the chlorine
smell associated with chlorinated swimming pools.
 THMs and other chlorinated hydrocarbons that are formed as by-products in the chlorination
process are grouped under the parameter AOX, which stands for adsorbable organic halogen
compounds. There are threshold values for waste water discharge in many countries.
 Experience has shown that the use of continuous chlorination in the feed water to ultrafiltration is
highly counterproductive. Chlorination of organic matter creates numerous tiny organic fragments
which can cause blockage of the membrane pores.
 In addition, the organic fragments produced by chlorination also tend to be bioavailable, a
situation that is compounded by the significant increase in the rate of bacterial growth in the
water if the free chlorine is neutralized. Together, these factors lead to an increase in the
formation of biofilms (biofouling) on any downstream equipment or processes (e.g. reverse
osmosis membranes).
For this reason, continuous chlorine dosing should not be used as a pretreatment stage.
 A better choice for pretreatment is a process known as shock chlorination, which involves adding
a high dose of chlorine to the source-water for a short period of time at less frequent intervals.

Process and design guidelines inge® product Series: Page 23 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemically Enhanced Backwash (CEB)

5 Chemically Enhanced Backwash (CEB)

5.1 General Overview

A chemically enhanced backwash (CEB) is used to boost the effectiveness of a backwash. It is performed
after a defined number of operating cycles

NOTE
ATTENTION!
Observe the following guidelines!

 The guidelines stipulated in the section on "Using Chemicals for CEB/CIP" must be observed.
For most applications, acidic and caustic (with or without the addition of oxidants) CEBs have
generally proved to be the best choice. Before using any other chemicals, it is necessary to
contact inge GmbH to obtain written approval and information on permissible concentrations.
 If a CEB is executed with a reduced flux (less than 230 l/m²h), a backwash should be performed
first. This enhances the effectiveness of the cleaning solution in the subsequent CEB.
®
 A CEB may only be performed using water of at least inge UF filtrate quality or reverse osmosis
permeate. The water used must be free of abrasive and membrane-blocking particles. When
drawing water from the tank for a CEB, the same rule applies as for normal backwashes, e.g.
ensure that no corrosion or erosion products that may have formed in the tank or in the pipes are
washed into the module.
 CEB frequency depends on feed water quality and other operating conditions such as flux rate
and recovery rate. The CEB is usually carried out several times a week.
 It is important to ensure that the CEB chemicals are injected into the system for a sufficiently long
period of time to ensure that they are distributed evenly and homogeneously throughout the
entire rack.
 The effectiveness of a CEB depends not only on the chemicals used, but also on the soaking
time and the operating cycles and time intervals between CEBs. The sequence of the various
CEBs should therefore be programmed as flexibly as possible.
 For the vast majority of applications, alkaline CEBs have proved to be the best choice for
removing organic build-up and acid CEBs have been proven as the best solution for removing
inorganic fouling.
 Since there is always the possibility of precipitation in an alkaline CEB, this must always be
followed by an acid CEB. It is advised to operate the membrane system for one filtration cycle
between a caustic CEB and an acid CEB in order to refill the backwash tank and neutralize the
water in the membrane fibers.
 An alkaline CEB should always be performed in combination with acid as a caustic/acid CEB.
Acid CEBs may be performed as a standalone procedure or in combination with caustic as a
caustic/acid CEB.
 If iron-based coagulants are used in the pretreatment stage, the residue can only be removed by
an acid CEB. If aluminum-based coagulants are used, then either acid or alkaline CEBs may be
performed.

Process and design guidelines inge® product Series: Page 24 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemically Enhanced Backwash (CEB)

 If using a coagulant in the pretreatment stage, it is essential to perform an acid CEB no later than
6 to 8 hours before any CEB that involves chlorine. This is in order to avoid the catalytic
formation of highly oxidative hydroxyl radicals due to the breakdown of chlorine and to prevent
coagulant from being deposited on the membrane. Before adding the chlorine, it is important to
ensure that the acid CEB solution has been completely rinsed out of the module. It is therefore
necessary to perform at least one operating cycle (= filtration and cleaning sequence) between
the acid CEB and a chlorine CEB.
 Chlorine containing CEB solution rinsed out of the system should under no circumstances be
mixed with acid CEB solutions (e.g. in a neutralization tank), since this could lead to the formation
of toxic chlorine gas.

The CEB’s mentioned in Table 5.2-1 or their combination - with defined frequencies - are used depending on
the application and feed water quality. The following points must be considered during the programming or
organization of the CEB sequences.

Process and design guidelines inge® product Series: Page 25 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemically Enhanced Backwash (CEB)

5.2 Types of CEB

NOTE
ATTENTION!
Observe the following guidelines!

 A caustic/acid CEB sequence is treated as a single CEB. In Table 5.2-1, this is designated as
CEB 1 and is divided into an alkaline CEB 1.1 and an acid CEB 1.2. If an oxidant is added to the
alkaline CEB 1.1, it is referred to as CEB 1.1 (B); if no oxidants are added, it is designated as
CEB 1.1 (A).
 The acid CEB is designated as CEB 2 (Table 5.2-1). The acid CEB 2 is considered stand-alone,
which means it is used independently from other CEB’s to enable the effective removal of foulant
build-up caused by inorganic water constituents or coagulants (e.g. FeCl3, PACl).
 The oxidant CEB is designated as CEB 3 (Table 5.2-1). CEB 3 is considered stand-alone, which
means it is used independently from other CEB’s. It is only required in applications involving the
treatment of water discharged from a wastewater treatment plant.

Table 5.2-1 - Organization of the CEB´s

CEB 1 CEB 2 CEB 3


Note Sequence of two chemical cleaning Single stage, Single stage,
stages (CEB 1.1 and CEB 1.2): caustic Performed Performed
followed by acid separately from separately from
other CEBs other CEBs
Purpose To clean off organic deposits and then to To remove Disinfection
clean off inorganic deposits and/or inorganic
remove precipitation deposits
(including
coagulant
residue)
Subprogram CEB 1.1(A) CEB 1.1(B) CEB 1.2 - -
Characteristics Purely Alkaline + Acid Acid Disinfection
alkaline oxidative
Chemicals NaOH NaOH und HCI or HCI or H2SO4 NaOCI
NaOCI H2SO4

Further advice for the programming of the control logic can be requested at inge GmbH.

Process and design guidelines inge® product Series: Page 26 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemically Enhanced Backwash (CEB)

5.3 How a CEB is Performed

The CEB is essentially performed in a similar way to a backwash, i.e. filtrate flows from the filtrate side to the
feed side.
In addition, a cleaning chemical is added to the filtrate to boost the effectiveness of the process. Figure 5.3-1
shows the basic sequence of steps generally used to perform a CEB based on typical values for the
respective parameter settings. The chemicals are introduced into the system using a defined flux rate
(referred to here as the injection flux rate) of approx. 120 l/m²h (71 GFD), which is lower than the backwash
flux rate. To improve the distribution of the CEB solution within the rack, the injection of the solution must be
divided into a "chemical injection to drain bottom" and a "chemical injection to drain top" The duration of the
injection to drain bottom and injection to drain top must be at least 20% of the total duration of the chemical
injection time in each case.
Once the rack has been completely filled with cleaning solution (controlled by the chemical injection time
setting) the injection process is stopped and the UF rack is isolated by closing all inlet and outlet valves.
This marks the beginning of the soak period. Once the soaking time has elapsed, the chemical solution and
the substances removed from the membrane must be washed out of the module(s)/rack with filtrate. This is
achieved by means of a Backwash Drain Bottom (with a duration of approximately 30 seconds) followed by a
Backwash Drain Top (also with a duration of approximately 30 seconds). The flux rate for rinsing out the
solution should be at least 230 l/m²h (135 GFD) just like a normal backwash.

Chemical injection Soak period Chemical rinse-out

Backwash Drain Backwash Drain Backwash Drain Backwash Drain


Bottom Top Bottom Top

Intake flux: min 120 l/m²h Rinsing flux: min 230 l/mh

e.g. 70 s e.g. 20 s 5 – 60 min e.g. 30 s e.g. 30 s

Figure 5.3-1 - Chemically enhanced backwash (CEB) process with


typical parameters for an injection flux rate of 120 l/m²h (71 GFD)

Process and design guidelines inge® product Series: Page 27 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemically Enhanced Backwash (CEB)

The time required to wash the chemicals into the module(s)/rack in a CEB depends on the position of the
chemical dosing points (referred to here as t ex (= “external time”, which is defined as the time required for the
CEB solution to make its way from the chemical dosing point to the rack), installed mixing devices, and on the
respective flow velocities in the backwash piping and in the piping systems built into the rack. At an injection
flux rate of 120 l/m²h (71 GFD), the chemical injection time (measured from the moment the CEB solution
® ®
enters the rack until the entire rack is completely filled) is approximately 60 - 90 seconds. This time period is
referred to here as tint (= “internal time” inside the rack).
The total chemical injection time total is the sum of tint and the time period tex (see Figure 5.3-2). The precise
figures for these two time periods should be calculated as part of the system commissioning process.

tint

tex
Chemicals
dosage

Figure 5.3-2 - Total chemical injection time during CEB

Process and design guidelines inge® product Series: Page 28 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

6 Chemical Clean In Place (CIP)

6.1 General Overview


®
The inge UF process is designed to maintain clean membrane state throughout the entire operation by both,
hydraulic cleaning steps (backwash) and chemical cleaning steps (CEBs). The feed water can, however,
contain contaminants (natural or introduced), which cannot be adequately removed by CEB.
A Clean In Place (CIP) procedure has been designed to restore membrane productivity for difficult to remove
fouling and scaling. There are several different CIP chemicals and procedures available, depending on the
nature of the foulant or scale. CIP is typically performed as a manual procedure; however, full automation of
the CIP procedure(s) is also possible.
A CIP is performed by introducing a chemical solution into the modules and shutting down the individual UF-
rack for a longer period of time than is required for conventional cleaning methods. One of the major
differences to a CEB is that a CIP is characterized with the recirculation of different chemicals using a forward
flush through the membranes back into a CIP tank followed by an extended soaking time (in some cases the
feed tank can also be used as a CIP tank).

NOTE
ATTENTION!
Observe the following guidelines!

 A CIP should be performed if the permeability of the system falls below 100 –150 l/m²h/bar (4 –
6 GFD/psi) and if this drop cannot be reversed by performing a CEB. A CIP is rated as
successful if the permeability of the system subsequent to the CIP is restored to a value of at
least 70 – 80% of the reference value* recorded after the commissioning of the ultrafiltration
system.
 Only those chemicals specified in the section "Using Chemicals for CEB/CIP" may be used for a
CIP, and only in conformance with the concentrations and soaking times specified. No other
chemical(s) may be used unless prior written approval has been obtained from inge GmbH
specifically agreeing to its use and stating the permissible concentration.
 The water used to prepare the CIP cleaning solution should be at least of drinking water quality.
If reverse osmosis permeate is available, this should be used for the alkaline CIP. Please note
that precipitation may occur in the CIP water, particularly if UF filtrate or water of drinking water
quality is used for the alkaline CIP. An alkaline CIP must therefore always be followed by an acid
CIP or alternatively by a standard acid CEB.
 The overall duration of the recirculation and soaking time of a CIP depends on the effectiveness
of its cleaning results, though it should not exceed 12 hours.
 A conventional backwash should be performed prior to a CIP to ensure that the membrane
surface is as clean as possible and to rinse out any foreign particles that may be contained in the
piping of the modules or racks.
 When performing a CIP, ensure that the modules and racks being cleaned are disconnected from
the rest of the main system.

* Experience has shown that permeability falls during the initial running-in phase of a membrane, which generally lasts around one
week, dropping from its initial level to a lower yet stable level of permeability which depends on a number of factors including the
quality of the source-water. It is this subsequent, stable level that is classified as the reference value. The initial permeability of inge®
modules lies somewhere in the range of approximately 700 l/m²h /bar (28.4 GFD/psi), while the reference permeability lies between
300 and 600 l/m²h /bar (12.2 – 24.4 GFD/psi) depending on the source-water quality.

Process and design guidelines inge® product Series: Page 29 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

 The CIP solution must be fed into the rack from the feed side of the modules/rack. This prevents
any damaging substances which could cause fouling or scaling from entering through the filtrate
side of the membranes during CIP recirculation.
 In some applications it may be possible to improve the effectiveness of the cleaning process and
reduce the soaking time by heating the CIP solution. If a system is available to heat the CIP
solution, this system must observe the maximum permitted temperature of 40 °C and the
maximum permitted rate of temperature change of 5 °C/min. A significant amount of energy is
required to heat the solution and the process of ensuring compliance with the maximum 5°C/min
temperature change rate can be relatively complicated. Heating of the CIP solution is not
®
necessary in the vast majority of application and is therefore not recommended when using inge
modules.
 Ensure adequate ventilation of the area before and while using cleaning chemicals.
 When preparing the chemical solution in a CIP tank (mixing together the cleaning chemical and
water), the chemicals must always be added to the tank of water, not the other way around.
Adding water to concentrated chemicals could cause a violent reaction.
 It is important to ensure that the CIP chemicals are recirculated in the system for a long enough
period of time to ensure that they are distributed evenly and homogeneously throughout the
entire rack in the concentration required in each case. If the concentration falls below the
required value, more of the chemical must be added.
 Note that the concentration of the CIP solution will be diluted by the water stored in the rack
including the manifold (known as the "hold-up volume") and that this hold-up volume may lead to
precipitation in the case of an alkaline CIP. When performing a CIP using reverse osmosis
permeate, it may therefore be a sensible idea to empty the rack including the manifold before
injecting the CIP solution.
®
 To increase the efficiency of a CIP cleaning, inge recommends performing multiple successive
cleaning steps using different chemicals.
 If using a coagulant in the pretreatment stage, or if there are concerns that metals may have
accumulated on the membrane surface, it is essential to perform an acid CIP before any CIP or
disinfection process that involves oxidants in order to optimize the cleaning efficiency and to
prevent coagulant from being deposited on the membrane. Ensure that the acid CIP solution has
been completely rinsed out of the system before performing the oxidant CIP or disinfection
process.
 Chlorine-containing CIP solutions should under no circumstances be mixed with acid CIP
solutions (e.g. in a neutralization tank), since this could lead to the formation of toxic chlorine gas.

Process and design guidelines inge® product Series: Page 30 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

6.2 Establishing CIP Recirculation

The CIP tank must be designed large enough to ensure that the minimum level of water delivers sufficient
initial pressure to the intake side of the CIP pump and that the previously empty pipes of the recirculation
system can be filled. The total volume of the CIP tank is therefore obtained by adding together the following
partial volumes:
 Empty volume of the piping from the top feed to the module/rack incl. manifold (V1)
 Empty volume of the filtrate piping (V2)
 Empty volume of the piping from the bottom feed to the module/rack incl. manifold (V3)
 Volume required to protect the CIP pump from running dry (V4)
 In seawater applications the UF rack has to be drained prior to CIP!

V2: CIP FILTRATE RETURN

V1: CIP FEED RETURN CIP Filt. Vent Filtrate


CIP Feed I-Test Air Vent Feed
Return
Return

Feed Top

Feed
Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
V1 FEED Feed
UF
Bottom
V2 Module(s)
V3 V3: CIP FEED Feed Bottom
Recirc. CIP
BACKWASH
V4: CIP Feed
Caustic
WASTE
Hypo

Acid
CIP OPERATIONAL Inlet
VOLUME

CIP Strainer 300μm CEB

Figure 6.2-1 - Partial volumes for determining the size of the CIP tank

To protect the membranes from damaging particles, it is important to install a screen filter with a minimum cut-
off of 300 µm in the recirculation system or at the point where the CIP solution is fed into the system. The
®
recommended volume flow rate for cleaning all inge UF modules is at least 25 l/m²h (12 GFD), the maximum
hydraulic pressure loss 1 bar /14.5 psi).
[Design recommendation for the CIP cleaning pump capacity:
Nb of modules x surface area / module x 25 l/m²h (12 GFD) = volume flow rate @ minimum 1 bar]

Process and design guidelines inge® product Series: Page 31 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

6.3 How a CIP is Performed

6.3.1 Preparing the Chemical Solution for a CIP


1. The CIP tank (or feed tank) is filled with UF filtrate, reverse osmosis (RO) permeate or drinking water. If
available, RO permeate should be used for the alkaline CIP.
2. The cleaning chemicals are added to the water-filled CIP tank, not the other way around.
3. The chemical solution is mixed using a mixer or a special recirculation system.
After mixing, check that the pH value and concentration of the solution correspond to the target values. It
is important to ensure that the concentrations do not exceed the maximum concentrations specified in
®
inge s specific product documentation.
4. (In seawater systems, there must be a rack draining step at this point).
5. If a heating system is to be used to heat the chemical solution, the heating process may not commence
until the chemical solution has begun recirculating through the modules. Significant differences in
temperature between the chemical solution and the water inside the modules could lead to stress cracks
in the module and should therefore be avoided. Do not exceed the maximum permitted rate of
temperature change or the maximum permitted operating temperature for the modules.

6.3.2 Preparing for a CIP Process


1. For a manual CIP, ensure that the valves are in the correct positions and that the connections are set
properly for the cleaning cycle:
 Cleaning solution inflow = feed bottom header connection
 Cleaning solution outflow = feed top header connection
 Filtrate outflow = filtrate
2. The cleaning solution may be pumped either in forward flush mode or in filtration mode.
However, the CIP method described should under NO circumstances be used in the backwash direction
since this could cause large-scale irreversible contamination or bacterial growth on the filtrate side.

Process and design guidelines inge® product Series: Page 32 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

6.3.3 Recirculation and Soaking time


1. In the first stage, recirculation should only take place via the feed side for at least 60 minutes in order to
perform initial cleaning of just the fiber lumen. The filtrate valve is closed during this procedure.
2. Injection of the chemical solution into the fiber lumen on the feed side is triggered by starting the CIP
cleaning pump (Figure 6.3-1). Set the minimum volume flow rate in accordance with the section
"Establishing CIP Recirculation". It is important to ensure a feed side venting.

CIP Filt. Vent Filtrate


CIP Feed I-Test Air Vent Feed
Return
Return

Feed Top

Feed
Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed
UF
Bottom
Module(s)

Feed Bottom
Recirc. CIP
BACKWASH
CIP Feed

Caustic
WASTE

Hypo

Acid
CIP TANK Inlet

CIP Strainer 300μm CEB

Figure 6.3-1 - Recirculation on the feed side


3. If the chemical solution is to be heated, it should be slowly heated to 30-35°C while it is recirculating
through the system. Do not exceed the maximum permitted rate of temperature change or the maximum
permitted operating temperature for the modules.
4. The readings of the temperature, pH value and concentration of the cleaning solution are to be
continuously monitored and documented to ensure that they remain within the required range and within
the scope of the permissible operating conditions. Long periods of recirculation could potentially heat the
solution to a level above the maximum permitted temperature due to waste heat from the pump entering
the equation. If the temperature exceeds the required level, this must be countered by adding fresh UF
filtrate, RO permeate or drinking water. The pH value and chemical concentration should be adjusted to
meet requirements.
5. Once at least 60 minutes have passed with the solution recirculating exclusively through the feed side, the
process moves on to a second stage in which the filtrate side is incorporated in the recirculation process.
The filtrate valve is now opened and CIP fluid is allowed to recycle through the feed top port and through
the filtrate port simultaneously. Normally, the flow rates should be of similar dimension which is
acceptable for the CIP process. Recycle flow rates should nevertheless be verified for similarity during the
first CIP. Flow rate ratios are allowed to differ as much as 20%-80% for compliance with this CIP
procedure.

Process and design guidelines inge® product Series: Page 33 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

CIP Filt. Vent Filtrate


CIP Feed I-Test Air Vent Feed
Return
Return

Feed Top

Feed
Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed
UF
Bottom
Module(s)

Feed Bottom
Recirc. CIP
BACKWASH
CIP Feed

Caustic
WASTE

Hypo

Acid
CIP TANK Inlet

CIP Strainer 300μm CEB

Figure 6.3-2 - Recirculation on feed and filtrate sides


6. During the entire recirculation process, which should last for at least a further 60 minutes, it is important to
ensure that the chemical solution recirculates through both - the feed and filtrate - sides.
7. Once the chemical solution has been recirculating through the system for approximately 2 hours, the
process moves on to a third stage which alternates between soaking periods and recirculation through the
feed and filtrate sides. In this third stage, the cleaning pump is stopped, the heating element is switched
off, and the feed side valves are closed (ensure venting all the time).
8. As a rule of thumb, 60 minutes is sufficient for the soaking time prior to the next recirculation, though
longer soaking times may be necessary in the case of stubborn fouling or scaling. To maintain a high
temperature during lengthy soaking times, a brief recirculation process lasting approximately 5 minutes
should be conducted midway through the soaking time.
9. The next steps involve alternating between recirculation through the feed and filtrate sides and soaking
times. Note that the duration of a recirculation period should not exceed 60 minutes and the overall
duration of recirculation and soaking time should not exceed 12 hours.

Process and design guidelines inge® product Series: Page 34 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

6.4 Preparing to Rinse out the Rack/System

1. Once the recirculation process has been completed, the chemical solution is drained from the CIP tank.
Where required, the solution should be neutralized before being discharged. Ensure that the discharged
solution complies with all the local regulations regarding discharges into the sewage system. Before
emptying the CIP tank, ensure that the feed side valves of the modules/racks are closed.
2. Once the CIP tank is empty, it can then be refilled with UF filtrate, RO permeate or drinking water ready
for the next rinsing process. It is not necessary to use RO permeate to rinse out the system even if this is
available.

Process and design guidelines inge® product Series: Page 35 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

6.5 Rinsing out the Rack/System

After completion of the soaking period, the standard CEB rinsing procedure is used to rinse out the remaining
chemicals.
The following diagrams show the two rinsing operating modes "Rinsing Drain Bottom" and "Rinsing Drain
Top". Figure 6.5-1 shows a Rinsing Drain Bottom (RDB) step in which the backwash water (filtrate) exits the
module at the bottom feed/drain port, while Figure 6.5-2 shows a Rinsing Drain Top (RDT) step in which the
backwash water exits the module at the top feed/drain port.

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE
Caustic

Hypo

Acid

CEB

Figure 6.5-1: Rinsing of CIP chemicals in Drain Bottom mode

Process and design guidelines inge® product Series: Page 36 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Chemical Clean In Place (CIP)

I-Test Air Vent Feed Vent Filtrate

Feed Top

Feed BW Drain
Top Top Filtrate FILTRATE
Filtrate

BW
Supply
Control Valve
FEED Feed BW Drain UF
Bottom Bottom Module(s)

Feed Bottom
BACKWASH
WASTE

Caustic

Hypo

Acid
CEB

Figure 6.5-2: Rinsing of CIP chemicals in Drain Top mode


If the chemical solution has previously been heated, the first step before beginning the rinsing process is to
equalize the respective temperatures of the rinsing water and the chemical solution contained within the
module/rack by stopping the CIP pump and waiting for the temperature inside the UF rack to return to ambient
conditions. Alternatively, colder water can be added at slow rate to the CIP tank towards the end of the CIP
recirculation. Significant differences in temperature between the rinsing water and the chemical solution inside
the modules/rack could lead to stress cracks in the module and should therefore be avoided. Do not exceed
the maximum permitted rate of temperature change or the maximum permitted operating temperature for the
modules
Required duration of the CIP rinsing procedure must be determined by sampling of discharge water for
residual chemicals (e.g. pH or free chlorine) and evaluated based on project specific permissible contaminant
concentration.
During the rinsing process, the flow rate (flux rate), the temperature and the TMP (transmembrane pressure)
should be monitored and documented in order to calculate the permeability and check the cleaning efficiency
of the preceding cleaning process.
Once the rinsing process has been completed, the permeability should be monitored and documented in
filtration mode in order to check the efficiency of the CIP. This should be conducted after every CIP, even if
two CIPs are performed in succession.

Process and design guidelines inge® product Series: Page 37 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Using Chemicals for CEB/CIP

7 Using Chemicals for CEB/CIP

7.1 Differences between CIP und CEB

CEB and CIP are both chemical cleaning processes to restore membrane permeability by removing a
hydraulically irreversible fouling layer. The CEB is used typically once daily which is projected as sufficient to
maintain satisfactory membrane permeability throughout the lifetime of the plant. The feed water can,
however, contain contaminants (natural or introduced), which can not be adequately removed by CEB.
CIP is used when membrane permeability can no longer be recovered by CEB. While a standard CIP can
contain the same chemicals as a CEB, chemicals are recirculated and soaked at stronger concentrations, for
extended durations and are in some rare cases heated, thus thoroughly cleaning the membrane surface and
pores until clean conditions are reached. Special CIP cleaning agents can also be used in instances where
standard CIP chemicals are not sufficiently able to clean the membranes. CIP is mostly applied as a manual
procedure as it is not expected to occur frequently, however, the CIP can also be fully automated in the plant’s
SCADA system.

NOTE
ATTENTION!
Observe the following guidelines!

 In addition to the instructions stipulated in this section, the performance of CEBs and CIPs is also
subject to the permissible operating conditions stipulated in the individual sections.

7.2 Permissible Chemicals and Operating Conditions

The parameters of a CEB and, in particular, a CIP – for example, the type of cleaning chemical – should be
tailored to the type of membrane fouling/scaling and thus to the quality of the water being treated. Three
different types of water have been defined for this purpose:
 Water type A: Ground water and surface water
 Water type B: Discharge water from a municipal waste water treatment plant
(secondary effluent)
 Water type C: Sea water

NOTE
ATTENTION!
Observe the following guidelines!

 The permissible chemicals and operating conditions for the different types of water are listed in
Table 7.2-1 for the CEB and Table 7.2-2 for the CIP. The only chemicals that are permitted for
use in CEB and CIP are the chemicals listed here, and only in the concentrations and soaking
times specified in the tables. Written approval must be obtained from inge GmbH before using
any other chemicals (e.g. specially designed membrane cleaners).

Process and design guidelines inge® product Series: Page 38 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Using Chemicals for CEB/CIP

 All chemicals added to the membranes and modules must comply with at least “technical quality
grade”. Contaminated chemicals can cause irreversible fouling and are not permitted.
 With the concentrations and soaking times defined in Table 7.2-1 and Table 7.2-2 the chemicals
®
listed here are generally a very effective choice for the CEB/CIP of inge membranes, though in
some cases they must be further adapted/optimized to cater to special source water situations.
Should this be necessary, the modification of the parameters must be carried out in consultation
with inge GmbH.
 Conducting an alkaline CEB/CIP may potentially lead to precipitation, though generally only to a
minor extent. This precipitation can be removed by the subsequent acid CEB/CIP.
 The use of chlorine by itself without the addition of caustic is only required for system disinfection
or system shutdowns. Since the potential for bacterial growth is far higher in waste water
applications than in applications involving other types of water, systems used to treat waste water
should be disinfected once a week in accordance with Table 7.2-1.
The organic acids (citric acid/oxalic acid) can be used to enhance the removal of inorganic foulant in the CIP
(not in CEBs) and the surfactant sodium lauryl sulfate can be used to help remove organic foulant in an
alkaline CIP.
The UF system does not retain salts. Consequently, the salt concentration in the UF filtrate remains
unchanged in sea water applications and applications with high salinity. If UF filtrate is used for CEB/CIP in
sea water applications, the high magnesium concentration (1,200 – 1,600 mg/l) means that magnesium
hydroxide (MgOH2) precipitation begins to occur as soon as the dosage of OH- ions in the form of caustic
soda (NaOH) reaches approximately 2-5 mmol/l (exact dosages can be determined by titration). This quantity
of dosed NaOH corresponds to an increase in the pH value to approximately 9.5 – 9.7. As the dosing of
caustic continues, the quantity of MgOH2 precipitation increases up until the point at which there is virtually no
magnesium left in the water. The pH value does not increase any further during this process. As a result of the
very high magnesium concentration, the level of precipitation increases substantially if dosing is continued.
 When using ultrafiltered sea water for a CEB, we specifically advise against using NaOH
dosages in excess of 2 mmol/l or setting the pH value > 9.5 – 9.7.
 If the UF system is being used as a pretreatment stage for reverse osmosis (for example in a sea
water desalination or waste water reuse facility), RO permeate must be used for every alkaline
CIP (with or without oxidants) in order to avoid precipitation and maximize the effectiveness of
the CIP. For the same reasons, RO permeate is recommended to be used for an alkaline CEB
(whether this is performed with or without oxidants). To reduce the use of RO permeate, UF
filtrate can be used to rinse out the system after the CEB.
The key factors in using chemicals to remove irreversible fouling or scaling are, firstly, the required contact
between the chemical cleaning solution and the membrane foulant and, secondly, the interaction between
variables such as concentration, recirculation, soaking time and temperature. The vast majority of cases also
feature a combination of different types of foulant or scalant, which means that multiple cleaning steps are
required to remove it. The use of chemicals at low temperatures reduces the effectiveness of the cleaning
process and requires longer soaking times and/or higher concentrations

Process and design guidelines inge® product Series: Page 39 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Water type A: Water type B: Water type C:
Ground water Discharge water Seawater
Chemicals and surface from a municipal Notes

© inge GmbH
water wastewater
treatment plant
pH-value 1 < pH < 2.5 1 < pH < 2.5 1 < pH < 2.5
typical pH 2.3 pH 2.3 pH 2.3
Hydrochloric
acid (HCl) Soaking time min. 10 - 60 10 - 60 10 - 60
Inorganic
typical min. 15 15 15
Fouling pH-value 1 < pH < 2.5 1 < pH < 2.5 1 < pH < 2.5
Scaling
Sulphuric acid typical pH 2.3 pH 2.3 pH 2.3

Process and design guidelines inge® product Series:


(H2SO4) Soaking time min 10 - 60 10 - 60 10 - 60
typical min 15 15 15

pH-value 12 < pH < 13 12 < pH < 13 9.5 < pH < 9.7


typical pH 12 pH 12 pH 9.5 Seawater:
Caustic soda
using RO permeate for
(NaOH) Soaking time min 10 - 60 10 - 60 10 - 60 CEB pH 12.3 (12)
typical min 10 10 10

dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
Organic pH-value 12 < pH < 13 9.5 < pH < 9.7

Fouling Sodium typical pH 12 pH 9.5


hypochlorite
Concentration mg/L max. 50 max. 200 Seawater:
(NaOCl)
using RO permeate for
+ typical mg/L 20 20 CEB pH 12.3 (12)
Caustic soda
Table 7.2-1 - Chemicals, Concentrations and Soaking times for CEBs

(NaOH) Soaking time min 5 - 60 5 - 60

typical min 7 7
The specified
Concentration mg/L > 1 mg/l < 10 concentrations must be
Sodium
reached in the
Disinfection hypochlorite Soaking time min 30
discharged rinse water at
(NaOCl)
Frequency: 1x per week the end of the soaking
Using Chemicals for CEB/CIP

time

Page 40 of 68
Water type A: Water type B: Water type C:
Ground water Discharge water Seawater
Chemicals and surface from a municipal Notes

© inge GmbH
water wastewater
treatment plant

Hydrochloric pH-value: 1 < pH < 2.5 1 < pH < 2.5 1 < pH < 2.5
acid (HCl) typical: pH 2 pH 2 pH 2

Sulphuric acid pH-value: 1 < pH < 2.5 1 < pH < 2.5 1 < pH < 2.5
Inorganic (H2SO4) typical: pH 2 pH 2 pH 2
Fouling
Scaling Citric acid pH-value: 1 < pH < 2.5 1 < pH < 2.5 1 < pH < 2.5
+
hydrochloric typical: pH 2 pH 2 pH 2

Process and design guidelines inge® product Series:


acid Concentration: g/L max. 10 max. 10 max. 10
or
sulphuric acid typical: g/L 4 4 4
Citric acid g/L 4 4 4
12h)

Oxalic acid g/L 4 4 4

Caustic soda pH-value: 12 < pH < 13 12 < pH < 13 12 < pH < 13 Use RO permeate if
(NaOH) typical: pH 12.5 pH 12.5 pH 12.5 available

dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
Sodium pH-value: 12 < pH < 13 12 < pH < 13
hypochlorite
(NaOCl) typical: pH 12 pH 12 Use RO permeate if
+ NaOCl: mg/L max. 500 max. 500 available
Organic Caustic soda
Fouling NaOH) typical: mg/L 100 100
pH-value: 12 < pH < 13T 12 < pH < 13
Sodium lauryl
sulfate typical: pH 12 pH 12 Use RO permeate if
+
Concentration: g/L max. 10 max. 10 available
Caustic soda
(NaOH)
typical: g/L 4 4
Disinfection Sodium hypochlorite (NaOCl)
Table 7.2-2 - Chemicals and Concentrations for CIPs (overall duration of soaking time and circulation max.
Using Chemicals for CEB/CIP

Page 41 of 68
Design and Construction

8 Design and Construction


Following inge GmbH provide estimates and rough approximations for the design and construction of UF
®
systems. The given information is based on inge s longterm experience in treating different types of source
water.
The following parameters are the minimum basis needed to perform a feed water analysis:
 Particulate water constituents:
 Turbidity / Total Suspended Solids (TSS)
 Organic water constituents:
 DOC/TOC and SAK254,
 For waste water: Chemical Oxygen Demand (COD) and Biological Oxygen Demand (BOD)
 Inorganic water constituents:
 Ca, Mg, alkalinity / HCO3-, Fe, Mn, Al
 pH value
 Temperature
 Seasonal Changes

If the UF feed water quality and temperature of the source water is subject to seasonal changes, details on the
range of fluctuation are also required for the analysis (ideally in the form of a distribution, otherwise at least
stating the minimum, maximum and median values). Other important information for surface waters (and for
source waters affected by surface waters) includes the duration and impact of heavy rain and flooding events.
The collection of detailed information to the project specific pretreatment steps and/or intake situation (e.g. for
seawater systems) is recommended.
®
inge GmbH has developed the software program "iSD = inge System Design" which can help to elaborate a
rough approximation of the required UF system for a specific application, including the metering pumps. This
®
tool can be downloaded for free from the inge website. Further support is available from your inge GmbH
representative. Pilot testing has shown to be an excellent strategy in many cases. Performing pilot testing
before designing the plant enables the design institute, the system integrator and/or the operator to define and
optimize the design and operating parameters in advance.
Avoiding errors in the design and construction of an UF system is fundamental to achieving smooth, trouble-
free operation when the plant is completed. It also reduces the risk of damaging the membranes and modules
or suffering irreversible loss of performance. Proper compliance with the following guidelines is a key
prerequisite for making successful claims under the warranty should this become necessary.

Process and design guidelines inge® product Series: Page 42 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Design and Construction

NOTE
ATTENTION!
Observe the following guidelines!

 The design and construction of any UF system should be based on state-of-the-art technology
and in accordance with good engineering practices.
 The system should be specifically designed to avoid any pneumatic and/or hydraulic pressure
surges or siphoning effects. All UF systems should include the following components and
observe the following requirements:
 The system should include a means of controlling the feed and backwash volume flow rates (e.g.
using frequency-controlled pumps or control valves with PID controllers). For the backwash pump
controller, it is important to ensure that the set point value for the volume flow is reached within 5
- 7 seconds (time depends on pump capacity and valve dimension).
 The actuators of all (butterfly) valves should be equipped with air throttling valves to control the
opening and closing procedure. Air/water hammer can occur if the valves open or close too
abruptly.
 Air vent valves must be provided to vent the dead ends of the rack feed and filtrate headers to
prevent pressure surges caused by air trapped in the dead end. Further air vent valves should be
provided on all higher sections of the rack piping and connecting pipework.
 The rinse water piping must be equipped with vacuum breakers (air intake valves).
 The switching circuits of the pumps and valves must be designed to ensure that no pressure
surges are produced in the system, .e.g. the pumps and valves should be actuated in a
controlled sequence at intervals of approximately one second so that pumps are never running
against closed valves.
 Any change of operating mode that involves a switch between the feed and backwash pump,
including the switching of the required valves (e.g. backwash to filtration) must include an idle
interval of approx. 5 - 7 seconds between the completion of one operating mode and the
activation of the subsequent operating mode.
 Every module in a membrane rack must be operated under the same operating conditions.
 When designing and constructing an ultrafiltration system, it is important to ensure that there are
no dead spaces, particularly on the filtrate side, which could encourage microbial growth. For the
same reason, it is essential that there is no direct connection between the feed and filtrate sides
which could create a bypass between the two sides of the filtration process.
 When designing/constructing an ultrafiltration system, it is also important to ensure that no
corrosion or erosion products from the feed tank, backwash tank or piping can be rinsed back
into the modules. For this reason, the tanks used for source water, filtrate/backwash and Clean In
Place (CIP) must be made of non-corroding materials which will not release any contaminants or
damaging (e.g. abrasive) substances into the water. The same applies to the piping and all other
components installed within the ultrafiltration system.
 The dosing pumps must be designed and scaled to meet the concentrations and pH values
required for CEBs.
 Only air release valves may be used. The use of combination vacuum valves/air release valves
or valves designed purely for vacuum breaking is not recommended (with the exception of
vacuum breakers in the rinse water piping) in order to prevent air from accidentally entering the
system.

Process and design guidelines inge® product Series: Page 43 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Design and Construction

 The use of gap-type/edge filters is not recommended for the required prefilter protection stage,
which should have a maximum mesh size of 300 µm. The prefilter should be automatically
backwashable.
 It is important to protect the water in the filtrate/BW tank and connecting pipework from direct
sunlight and exposure to light in order to prevent excessive heating and avoid exposure to
sunlight which could pose a risk of promoting bacterial and/or algae growth.
 Sealed filtrate/backwash tanks with air filters must be used to prevent microbiological
contamination.

UF membranes cannot reject dissolved substances. This physical fact should be taken into account for all
† ‡
parameters (SDI15 , turbidity , etc.) when designing a UF system (including the effect on any downstream
treatment processes) and when measuring UF filtrate quality.

 We recommend providing three chemical dosing points for CEBs for each membrane train (=
independent backwashable unit of several modules). These dosing points should be as close to
the train as possible. Experience has shown that it is sensible to place the acid dosing unit
furthest upstream in the system. Any precipitation that builds up on the other dosing units further
downstream can then be removed by means of acid dosing. It is important to ensure that the
chemicals are properly mixed into the flow of water (mixing devices should be used if required).
This system offers numerous advantages over the alternative of a central dosing unit:
 Reduces the volume of water that must be replaced when dosing and rinsing, thereby reducing
dosing time.
 Avoids the mixing of different chemicals in the backwash piping which could otherwise occur if
two CEBs were performed one immediately after the other for two different trains.
 Reduces chemical consumption and provides higher recovery rates because less water is used.
 Introduces fewer variables for the control system.
 When using coagulants in the pretreatment on an iron basis, residuals can only be removed with
an acid CEB.
® ®
 UF systems with dizzer modules and UF systems with T-Rack s should adhere to the basic flow
diagrams shown in the following diagrams (see Figure 7.2-1 to Figure 7.2-4).

† SDI15; (fouling index) measurement according to ASTM D4189-94


‡ Turbidity to be measured using analytical sensors and procedures in compliance with ISO 7027 and/or, Standard Methods 2130 B.
Process and design guidelines inge® product Series: Page 44 of 68
dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Design and Construction

®
Figure 7.2-1 - Flow Diagram for a UF System dizzer XL Series Modules for Open Platform
(version conventional)

Process and design guidelines inge® product Series: Page 45 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Design and Construction

®
Figure 7.2-2 - Flow Diagram for UF System T- Rack 3.0 Series
(version single sided)

Process and design guidelines inge® product Series: Page 46 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Design and Construction

®
Figure 7.2-3 - Flow Diagram for UF System T-Rack 3.0 Series
(version double sided)

Process and design guidelines inge® product Series: Page 47 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Design and Construction

®
Figure 7.2-4 - Flow Diagram for UF System T-Rack 3.0 Series
(version split rack)

Process and design guidelines inge® product Series: Page 48 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
System Commissioning

9 System Commissioning

9.1 General Overview

NOTE
ATTENTION!
Observe the following guidelines!

 System commissioning comprises functional testing and test operation.


®
 All inge UF modules/racks must be put into operation in accordance with the guidelines
stipulated below.
 The steps involved in commissioning the system must be logged and archived.
 inge GmbH recommends verifying the composition of the feed water quality before commencing
the commissioning process.
 The operating personnel should be incorporated in the commissioning process.
®
 Before commencing water supply operations, the modules, T-Rack s, filtrate tank(s) and filtrate
piping (including all the installed valves, fittings and devices) must be adequately rinsed and then
disinfected.
 During system commissioning it is also necessary to determine the chemical injection times for
the CEB by measuring the rise in concentration in the rinse water discharged from the rack
during chemical dosing.
 Before commencing water supply operations, check that the water produced by the
rack(s)/system meets the stipulated requirements.
 inge GmbH recommends performing integrity tests immediately after the commissioning is
completed, as described in the section on "Integrity Testing". This is also an important means of
determining the reference value(s) required for future testing. This reference value(s) must be
determined and documented during the commissioning process for the fully assembled rack(s).

Process and design guidelines inge® product Series: Page 49 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
System Commissioning

9.2 Functional Testing

NOTE
ATTENTION!
Observe the following guidelines!

Before beginning test operation, review the SCADA design. Verify that the automatic program control system
(programmable logic controller, PLC) is running error-free. Consider checking all items on the below list for
completion:
 Verify that all required system instruments are properly assembled and installed.
 Confirm data display, historic data archiving & processing.
 Confirm calculations TMP & permeability (hydrostatic offsets).
 Confirm permeability to be temperature corrected.
 Confirm dry operation all butterfly valves (functionality and adequate opening/closing speed).
 Confirm functionality all vent valves.
 Confirm filtration sequences (Top and Bottom) functional.
 Confirm Backwash Drain Top and Bottom sequence functional.
 Confirm Forward Flush Sequence functional.
 Confirm CEB set points adjustable.
 Confirm correct CEB sequence (caustic – acid – others, if applicable).

Process and design guidelines inge® product Series: Page 50 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
System Commissioning

9.3 Module Preservation


®
The Multibore membranes contain preservative in order to prevent the membranes from drying out, to protect
the membranes from freezing temperatures during transport and storage and to inhibit microbiological growth
in the membranes. Drying of the pores in the membranes would result in permanent permeability loss due to
pore collapse, while freezing of the fluids in the pores could potentially damage the membranes.
Microbiological growth wouldn’t damage the membranes, but it would necessitate extensive oxidative
cleaning.

®
inge ’s standard preservative solution consists of a mixture of glycerin (1,2,3 propantriol) and propylenglycol
(1,2 propanediol). As both glycerin as well as propylenglycol are non-hazardous substances (approved as
food additives), and are completely miscible with water, it is relatively easy to rinse these substances out of
the modules.

9.4 Venting and Rinsing

NOTE
ATTENTION!
Observe the following guidelines!

 After functional testing, but before test operation, the entire system including the piping,
connecting pipework must be vented and cleaned to remove any contaminants, abrasive
materials and oily substances from the system.
 Before filling the UF system/filtrate tank, it is important to thoroughly clean the filtrate tank to
remove any contaminants.
 Ensure that the rinsing process removes the preservation solution from the system. The
preservation solution is biologically available when sufficiently diluted with water. Consequently, it
is possible that any residue of the preservation solution could cause microbial growth on the
filtrate side or in the filtrate tank in certain circumstances.

9.4.1 Venting the System


To vent the module(s) prior to system commissioning, proceed as follows (the various operating modes are
described in the section on "Membrane Operating Modes"). Below procedure applicable for each installed UF
rack:
1. Filling the feed side with source water
 Confirm that no valves are closed on the filtrate side.
 Fill the feed side of the system with source water slowly to avoid water hammer. For this purpose,
run the system in filtration bottom (FB) mode at a flux rate of approximately 40 l/m²h (23.5 GFD)
for at least 20 minutes.
 Where possible, the filtrate should be discharged before it reaches the filtrate tank to prevent the
preservation solution from accumulating in the filtrate tank.
2. Venting the modules
 Run system in forward flush bottom (FFB) mode at a volume flow rate corresponding to a flux
rate of approximately 80 l/m²h (47 GFD) for at least 10 minutes.
Process and design guidelines inge® product Series: Page 51 of 68
dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
System Commissioning

3. Filling the filtrate side


 Confirm that no valves are closed on the filtrate side.
 Run system in filtration bottom (FB) mode at a flux rate of approximately 40 l/m²h
(23.5 GFD) for at least 15 minutes.
 Run system in filtration top (FT) mode at a flux rate of approximately 40 l/m²h
(23.5 GFD) for at least 15 minutes.
 Where possible, the filtrate should be discharged before it reaches the filtrate tank to prevent the
preservation solution from accumulating in the filtrate tank.
4. In the event that it was not possible to discharge the filtrate before it reached the filtrate tank, empty the
filtrate tank completely (including removal of any residue), discharging its contents into the drain, and then
clean the filtrate tank if necessary.

9.4.2 Rinsing the System


To rinse the system, proceed as follows:
1. Filling the filtrate tank
 Confirm that no valves are closed on the filtrate side.
 Run system in filtration bottom (FB) mode at a flux rate of approximately 40 l/m²h
(23.5 GFD) for at least 15 minutes to completely refill the filtrate tank.
2. Performing backwashes
 Run system in backwash drain top (BWDT) mode for at least 60 seconds (or use up the full
volume contained in the filtrate tank).
 Fill the filtrate tank (see point 1), but this time running the system in filtration top (FT) mode.
 Run system in backwash drain bottom (BWDB) mode for at least 60 seconds (or use up the full
volume contained in the filtrate tank).
 Fill the filtrate tank (see point 1).

NOTE
Due to the preservation solution, consisting of glycerin and
propylenglycol, some COD will still be measurable after this rinsing
procedure. If there are specific limits to the amount of COD in the
waste water and/or filtered water, then further rinsing might be
®
required. Please contact inge for further information.

Process and design guidelines inge® product Series: Page 52 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Disinfecting the System

10 Disinfecting the System

NOTE
ATTENTION!
Observe the following guidelines!

 The chemical sodium hypochlorite (NaOCl) is used to disinfect the system. This chemical is
normally supplied as a chlorine bleaching agent in a stock solution containing a concentration of
free chlorine of approx. 12-15 wt%.
 If necessary, the disinfection procedure should be performed multiple times.

Proceed as follows (for each installed UF rack):


1. Add the calculated volume Vdosage of a NaOCl stock solution to the filtrate tank, which should already
be completely filled with filtrate, in order to obtain a concentration of 20mg/l of sodium hypochlorite in
the filtrate tank (calculations must be tailored to tank volume). Run a backwash drain top (BWDT) for
®
the furthest installed UF T-Rack for at least 30 seconds in order to disinfect the complete filtrate
piping. Alternatively, it is also possible to run a chemical enhanced backwash (CEB) bottom to top
(with a concentration of 20 mg/l sodium hypochlorite).
2. Run a backwash drain bottom (BWDB) for at least 30 seconds. Alternatively, it is also possible to run a
chemical enhanced backwash (CEB) from top to bottom with a concentration of 20 mg/l of sodium
hypochlorite.
3. Open and close all the filtrate sampling valves and all other valves in the filtrate piping/filtrate tank area
multiple times.
4. Close all the feed valves.
5. Allow the NaOCl to soak for at least 30 minutes (max. 60 minutes).
6. Periodically check the concentration of sodium hypochlorite (at 5-10 minutes intervals). If the level of
sodium hypochlorite falls below a value of 5 mg/l, repeat chlorination or add extra doses of fresh stock
solution.
7. Run a backwash drain top (BWDT) for at least 60 seconds.
8. Run UF rack in filtration bottom (FB) mode at a flux rate of 80 l/m²h (47 GFD) for at least
10 minutes.
9. Run a backwash drain top (BWDT) for at least 60 seconds.
10. Run UF rack in filtration top (FT) mode (alt. filtration bottom for single sided operation) at a flux rate of
approximately 80 l/m²h (47 GFD) for at least 10 minutes or until the filtrate tank is completely full.
11. After completion of the disinfection for all installed UF racks, empty the filtrate tank completely (remove
any residues right down to the deepest section of the tank).
12. Run all available UF racks in filtration bottom (FB) mode at a flux rate of approximately 80 l/m²h (47 GFD)
for at least 10 minutes.
13. Empty the filtrate tank completely (remove any residues right down to the deepest section of the tank).
14. Run all available UF racks in filtration top (FT) mode (alt. filtration bottom for single sided operation) with
the flux rate and filtration time that is envisioned for the subsequent process (i.e. normal operation).

Process and design guidelines inge® product Series: Page 53 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Disinfecting the System

15. Conclude the previous filtration sequence with a regular backwash. The UF system is now ready for
operation. Prepare to verify and potentially adjust the BW process, CEB dosing setpoints and timing as
well as the UF feed water coagulation procedure.
16. Perform sampling and analysis to check the bacteriological filtrate quality. If the test results are not
satisfactory, repeat the disinfection process. Contact inge GmbH if the number of required disinfection
processes exceeds a total of six a year.

Process and design guidelines inge® product Series: Page 54 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Integrity Testing

11 Integrity Testing

11.1 General Overview

Integrity testing can be an effective means of checking the intactness of the membrane fibers and the
®
modules. Two types of tests are available for inge modules as standard: fully automatic pressure hold test
and semi-automatic bubble test with visual inspection.
Both tests are based on the phenomenon seen in wetted ultrafiltration membranes whereby water can pass
through the pores, but air is prevented from passing through until a certain pressure has been exceeded (the
minimum pressure at which air begins to flow is referred to as the “bubble point”). The bubble point pressure
depends on the membrane's pore size and on the surface tension at the air-liquid interface. The bubble point
®
pressure of the pores of inge membranes is much higher than the applied test pressure (approx. 1 bar) that
is required to detect non-intact fibers.
As a general rule, integrity testing can be performed on both the feed and filtrate sides. If air is used to
displace all the water on one of the two sides of the membrane (feed or filtrate side), the pressure on this side
will then continue to increase since the air cannot pass through the wetted pores (this side is referred to in this
context as the "high-pressure side"). Once the test pressure has been reached, all the valves are closed on
the pressure side. This means that the air can now only escape through defective fibers or epoxy sealing or
faulty valves/devices/pipes. A slight pressure drop may be observed due to the natural air diffusion process
through the water-filled pores of the membranes. If the pressure differential from the high-pressure side to the
low-pressure side is higher than the tolerance limit stipulated by inge GmbH this may indicate a defective fiber
or epoxy sealing (or a leakage in the pressurized equipment parts).
In the bubble test, air escaping on the low-pressure side due to defects in the fibers or epoxy sealing is
visually confirmed by bubbles appearing in the transparent pipes on the feed or filtrate side (depends on the
specific product Series; see Figure 11.4-3). In principle, the bubble test can therefore be performed in
conjunction with every pressure hold test.

NOTE
ATTENTION!
Observe the following guidelines!

®
 In conventional rack systems with dizzer XL Series for Open Platform the test is carried out on
the filtrate side, i.e. the high-pressure side in this case is the filtrate side and the transparent pipe
®
is located on the feed side of the module. In T-Rack systems
(Series TR3.0 and Series TR3.0S) the test is carried out on the feed side, i.e. the high-pressure
side in this case is the feed side and the transparent pipe is located on the filtrate side of the
module.
 Higher test pressures than those recommended by inge GmbH are to be discussed and
approved in writing by inge GmbH.
 The air used for air integrity testing must comply with at least the air quality specified in
11.2.Compressed Air Specification.
Using air with lower quality can cause irreversible fouling and is not permitted.
®
The vertical installation of the modules and the ergonomic configuration of the inge GmbH T-Rack system
enable pressure hold testing to be carried out automatically, making it easy to detect any affected modules
using the bubble test. Integrity testing is carried out on installed modules (i.e. it is not necessary to remove
any of the modules from the rack/system).

Process and design guidelines inge® product Series: Page 55 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Integrity Testing

11.2 Compressed Air Specification


® ® ® ®
inge UF- dizzer XL Series for Open Platform and T-Rack 3.0 Series / T-Rack 3.0 S Series

Integrity-Testing & Valve-Cluster

Class* Pressure
Application
[solid.water.oil] [barg] / [psi]

Cabinet / Valve Cluster 1.4.2 6.0 / 90


Integrity test 1.4.1 1.0 / 15

Class ISO 8573-1 (2010)*


solid
3
(particle size and max. concentration [mg/m ]) water oil

max. pressure 3
0.1<d≤0.5µm 0.5<d≤1.0µm 1.0<d≤5.0µm ppm mg/m / ppm
dew point (DTP)
1 ≤ 20 000 ≤ 400 ≤ 10 0.08 - 70°C / -94°F 0.01 / 0.008
2 ≤ 400 000 ≤ 6 000 ≤ 100 0.8 - 40°C / -40°F 0.1 / 0.8
3 ≤ 90 000 ≤ 1 000 4.2 - 20°C / -4°F 1 / 0.83
4 ≤ 10 000 6.7 +3°C / +37°F 5 / 4.2
5 ≤ 100 000 8.3 +7°C / +45°F 25 / 21

* according to ISO 8573-1: 2010


Classification of purity for the particles, water and oil

Total air flow rate** Hold-up volume Hold-up volume connecting Time
= Module Rack*** + pipework**** /
@ 1bar (recommended)
®
T-Rack 3.0 / 3.0 S = feed side + Feed header / manifold / 10 minutes
®
dizzer XL Series for filtrate side
= + Filtrate header / manifold / 10 minutes
Open Platform

** For compressor sizing


®
*** Find hold-up volume in the inge product data sheet
**** To be calculated

Process and design guidelines inge® product Series: Page 56 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Integrity Testing

11.3 Testing Frequency

Both integrity tests (pressure hold and bubble test) should be performed at the end of the commissioning
phase, after maintenance work, and in the event of any suspicion that the membrane system may be
malfunctioning (e.g. increased bacteria counts on the filtrate side). Integrity testing can also be regularly
carried out on an automated basis (for example once a day, once a week or once a month) and seamlessly
integrated in standard filtration operations. There are no restrictions on the frequency of integrity testing for
inge GmbH modules. The frequency can therefore be flexibly tailored to match the regional or operator's
specific requirements and preferences.

11.4 How to Perform a Pressure Hold Test

A pressure hold test is carried out for each rack in turn, i.e. the modules of a single rack are tested in parallel.
The following figure shows an example using the feed side as the high-pressure side.
® ®
1. Dewater the respective high-pressure side (feed side for T-Rack 3.0 and T-Rack 3.0 S Series; filtrate
®
side for dizzer XL Series for Open Platform) and build up the pressure:
Fill the entire high-pressure side with dry, oil-free compressed air at a pressure of 1 bar (14.5 psi). The
low pressure side of the modules must be left open to drain towards atmospheric pressure. The applied
air pressure forces the water through the membrane from the high-pressure side to the low-pressure side
(dewatering phase). In principal air cannot pass integral membranes due to the surface tension of the
water in the membrane pores (diffusion processes not considered). The duration of emptying a rack
depends on total rack size and volume of connected pipework and compressor capacity. Based on
experience the dewatering phase takes up to 20 minutes to complete.

2. Once the high-pressure side has been completely emptied of water and a stable pressure of 1 bar (14.5
psi) has been reached (and maintained for at least 1 minute), close the air supply to the high-pressure
side.

Figure 11.4-1 - Dewatering phase for integrity test from feed side

Process and design guidelines inge® product Series: Page 57 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Integrity Testing

Figure 11.4-2 - Pressure hold phase and pressure measurement for integrity test from feed side

3. Measure the pressure drop:


Measure the pressure drop on the high-pressure side for at least 3 minutes. Due to the air diffusion
process through the water-filled pores of the membranes, a slight pressure drop may be observed. This
should be taken as a base value and should not be regarded as a membrane leakage due to defective
fibers. This diffusion effect may also result in a minor degree of bubble formation becoming visible in the
transparent pipe. The base value is dictated by various factors, including the hold-up volume, the
tightness of all valves and fittings and the diffusion component of the modules. In the event that the base
value is exceeded, we recommend conducting a detailed examination to establish the cause.

NOTE
ATTENTION!
Observe the following guidelines!

 Determination of the base value must be performed using new modules (during system
commissioning) in the fully assembled rack. This base value then serves as a reference value. At
a test pressure of 1 bar (14.5 psi), this value is expected to be lower than 10 mbar/min for all rack
sizes.
 It is important to ensure that the low-pressure side is open, unpressurized and completely filled
with water when measuring this value.
4. Bubble test:
Any leakage in an individual module can be detected on the low-pressure side using a built-in transparent
pipe (see Figure 11-3). In the event of a leak, a continuous stream of air bubbles of a steady intensity will
be visible during the integrity test.
If a significant, uniform stream of air bubbles is visible in the transparent pipe, and if the pressure drop is
greater than the base value, it can be assumed that the rack/system has a capillary or epoxy defect,
assuming that all other sources of error have been ruled out during the integrity test.

Process and design guidelines inge® product Series: Page 58 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Integrity Testing

Figure 11.4-3 - Monitoring and ensuring error-free operation of the assembled rack with the help of an
®
integrated transparent pipe on the feed side (in the dizzer XL Series for Open Platform - left) and on the
® ®
filtrate side (in the T-Rack 3.0. and T-Rack 3.0 S Series - right)
5. Pressure relief:
After performing the pressure hold test, the pressure is released on the high-pressure side. For feed-side
tests, this is achieved by opening a valve on the feed/rinse water side, while for filtrate-side tests the
pressure is released by opening a valve on the filtrate side.

Figure 11.4-4 - Process Flow I-Test Pressure Relief

NOTE
ATTENTION!
Observe the following guidelines!

 Make sure to carefully control the pressure release, among other reasons to prevent any
water/air hammers and any risk to people who may be in the surrounding area.

Process and design guidelines inge® product Series: Page 59 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Integrity Testing

6. Venting the system:


After completing the integrity test, the rack/system must be vented. Confirm that no valves are closed on
the filtrate side.
Run system in forward flush bottom (FFB) mode at a volume flow rate corresponding to a flux rate of
approximately 80 l/m²h (47 GFD) for 5 - 10 minutes.
Regular filtration operation can then resume, starting with a filtration bottom (FB). During the first approx.
5 – 10 minutes, filtration must be performed at a reduced flux rate of approximately 40 l/m²h (23.5 GFD)
to ensure the system is completely vented.

Figure 11.4-5 shows a clear overview of all the steps involved in a pressure hold test on the feed side.

1 2 3 4 5 6
Close
Ventilation
pressure
Dewater feed Measure Vent with filtration at
regulating

Pressure relief 0 bar (feed side)


side pressure drop forward flush reduced flow
valve on feed
rate
side Bubble test (optional)

Figure 11.4-5 - Procedure for a feed-side pressure hold test

Process and design guidelines inge® product Series: Page 60 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Further Guidelines on Operating inge®
Modules/Racks

12 Further Guidelines on Operating inge® Modules/Racks

12.1 Avoiding Membrane-Damaging Particles and Substances


® ®
inge Multibore membrane fibers are extraordinarily resistant to chemical, mechanical and thermal damage.
®
Nevertheless, incorrect or improper operation of inge membranes could still potentially cause damage to the
membrane material, membrane resin or membrane fibers.

NOTE
ATTENTION!
Observe the following guidelines!

 Any treatment of waters with concentrations of dissolved substances in excess of 7 wt% is a


special application which is not covered by the standard terms of the inge GmbH warranty policy.
We therefore recommend performing pilot testing before building a membrane facility to treat
waters of this kind.
 inge GmbH's warranty policy does not cover modules and membranes that are irreversibly
destroyed by particles, substances or foreign objects that are produced within the module/rack or
washed into the module/rack by feed water, backwash water, CEB/CIP water or compressed air
®
(for example during integrity testing) due to a failure to comply with inge s specific product
documentation (including installation manuals and process and design guidelines).
 In particular, the modules' conditions of use prohibit any of the following substances from being
introduced into the module(s)/rack(s) on either the filtrate or feed side:
 Particles and foreign objects > 300 µm.
 Abrasive, sharp-edged particles that can cause irreversible damage to the membrane surface.
 Corrosion or erosion products produced in the water treatment plant and washed into the
module (e.g. sand or concrete residue from the backwash tank.
 Foreign objects introduced during installation and maintenance such as metal or plastic
shavings.
 Precipitated material washed into the module during operation (e.g. during a CEB or CIP) or
precipitation that forms within the module which has not been properly removed from the
module in accordance with the guidelines.
 Polar, organic or chlorinated solvents.
 Concentrated acids with a pH < 1 or caustics with a pH > 13.
 Ozone or any other hydroxyl-radical-producing oxidizing agents from advanced oxidation
processes (AOPs) such as UV + H2O2, UV + TiO2 or Fenton-like reactions such as H2O2 +
Fe(II), Cu(II), Ti(III), Cr(II) or Co(II).

Process and design guidelines inge® product Series: Page 61 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Further Guidelines on Operating inge®
Modules/Racks

12.2 Preventing Chemically Irreversible Fouling


®
Thanks to their high level of chemical resistance, Multibore membranes and modules can be cleaned using a
®
range of chemicals in high concentrations The standard inge CIP is capable of removing practically all
natural water constituents which cannot be removed by regular CEBs and which accumulate in or on the
membrane over the course of time.
®
Nevertheless, failure to operate inge membranes in accordance with the guidelines or the presence of non-
membrane-compatible substances in the feed water, backwash water, CEB/CIP water or compressed air
could potentially lead to cases of irreversible fouling/scaling which can no longer be removed at a reasonable
cost even with the most intensive CIP. Substances of this kind can be found, for example, in blow-down
waters from cooling tower water treatment processes, in industrial process waste waters and in surface waters
containing a significant proportion of waste water. We therefore urgently recommend performing pilot testing
before building a membrane facility to treat waters of this kind.

NOTE
ATTENTION!
Observe the following guidelines!

 inge GmbH's warranty policy does not cover modules and membranes that are irreversibly
contaminated – to an extent that cannot be successfully rectified even by intensive chemical
cleaning – by particles, substances or foreign objects that are produced within the module or
washed into the module by feed water, backwash water, CEB/CIP water or compressed air due
®
to a failure to properly comply with inge s specific product documentation (including installation
manual and process and design guidelines).
 In particular, the modules' conditions of use prohibit any of the following substances from being
introduced into the modules/racks on either the filtrate or feed side:
 Organic polymers that are not naturally present in the water being treated. These polymers may
not be added to the system either directly upstream from the membrane/module(s)/rack(s) or at
any other point in the overall process. These include, for example:
 Organic coagulants and coagulation aids
 Organic corrosion inhibitors
 Organic dispersants
 Organic wetting agents
 In exceptional cases, the substances listed above may be used or may be present in low
concentrations in the water being treated if it has been proven that they do not cause any
chemically irreversible fouling. However, this requires prior written approval by inge GmbH.

Process and design guidelines inge® product Series: Page 62 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Further Guidelines on Operating inge®
Modules/Racks

12.3 Permitted Conditions of Operation, Rinsing, Cleaning and Disinfection

NOTE
ATTENTION!
Observe the following guidelines!

®
 All inge modules/casings/racks must be operated and used in accordance with the following
operating conditions. Proper compliance with the permitted operating conditions is a prerequisite
for making a claim under the warranty.

Maximum system
pressure
®
dizzer XL Maximum system pressure 5 bar @ 1 °C to 40 °C
®
T-Rack 3.0 / 3.0S Maximum system pressure 5 bar @ 1 °C to 40 °C

Trans-membrane Pressure (TMP)


Filtration: max. 1.5 bar
Backwash: max. 3.0 bar
Integrity test: max. 1.0 bar air pressure

The permissible transmembrane pressures are not calculated on the basis of membrane strength. Instead,
®
they are designed to ensure stable long-term operation. The burst pressure of the Multibore membrane is in
excess of 10 bar.

Process and design guidelines inge® product Series: Page 63 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Further Guidelines on Operating inge®
Modules/Racks

Permitted Chemicals
®
Chemicals may only be used in accordance with inge s specific product documentation (including installation
manuals and process and design guidelines).

Permissible pH range during operation: pH 3 – 10


Permissible pH range for cleaning: pH 1 – 13
Maximum concentration of hydrogen peroxide (H2O2): 500 mg/L

The use of sodium hypochlorite is only permitted for the following applications in the maximum concentrations
indicated below:

Maximum For CIP 500 mg/L at pH ≥ 9.5


concentration
For CEB 200 mg/L at pH ≥ 9.5
At the membrane
0.2 mg/L
during continuous dosing
During shock chlorination
10 mg/L for 30 minutes, max. once a day
at pretreatment stage
10 mg/l for 30 minutes, max. once a week
Membrane disinfection CEB
or daily in the event of system shutdown
in waste water applications
> 24 h < 7 d
20 mg/L for 60 minutes,
During system disinfection
max. 6 times a year
Maximum continuous
concentration In swimming pool applications 0.7 mg/l

Permissible Temperature Ranges

Maximum temperature range 1 °C - 40 °C


Maximum rate of temperature change < 5 °C/ min

NOTE
ATTENTION!
Observe the following guidelines!

 Please note that operating the membranes/module(s) with a simultaneous combination of the
maximum limits for temperature, pH, effective chemical concentration and/or pressure during all
operating modes will have an impact on the membranes' service life.

Process and design guidelines inge® product Series: Page 64 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
System Shutdowns

13 System Shutdowns
Please observe the following guidelines for different downtime conditions and durations.

NOTE
ATTENTION!
Observe the following guidelines!

 Membranes/module(s) that have been used must be kept wet at all times.
 To avoid microbial growth during plant shutdowns or storage of decommissioned modules, wet
membranes must be rinsed with a suitable disinfectant solution and properly preserved.
 Rinsing prior to a downtime of up to 24 hours.
Before a downtime lasting less than 24 hours, a backwash of at least 60 seconds must be
performed. No further action is required.
 Rinsing and disinfection for downtimes > 24 hours.
For shutdowns >24h, a chlorinated backwash is required prior to shutdown. To do so,
hypochlorite must be dosed together with caustic soda during backwash to achieve a
concentration of 2-3 ppm free chlorine, while operating the caustic soda pump to achieve a pH of
9.0 - 9.5.
UF racks must be checked daily (feed bottom and filtrate sampling ports) to ensure a residual of
a minimum of 0.1 ppm free chlorine. Otherwise the process must be repeated.
 Preserving modules for downtimes > 7 days.
Membranes/module(s) must be properly preserved in the event of a system shutdown lasting
longer than 7 days. Before taking steps to preserve the membranes/module(s), it is absolutely
essential to perform chemical cleaning to remove any organic or inorganic contaminants (fouling,
®
scaling) from the membranes. Please contact inge for instructions on the preservation method
®
for the dizzer modules.

NOTE
ATTENTION!
Observe the following guidelines!

 Whichever of the above situations applies, the membranes/module(s) should be kept


hydraulically filled with liquid. The membranes must be kept free of any oxidizing agents during
system shutdowns.
 If you wish to use any other disinfectants, please contact inge GmbH beforehand. It is essential
to obtain prior written agreement and approval from inge GmbH regarding the chemicals and
concentrations that are permitted for use.
 To put the system/module(s)/rack(s) back into operation, it is essential to follow the guidelines for
system commissioning.

Process and design guidelines inge® product Series: Page 65 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Documentation of Operating Conditions

14 Documentation of Operating Conditions

NOTE
ATTENTION!
Observe the following guidelines!

 From the moment the module(s)/rack(s) are first put into operation, the operator is obliged to
maintain complete and continuous documentation of the operating parameters and the amount of
time the plant has been operated in each of the various operating modes.
 No warranties or warranty claims shall be valid without this documentation.
 The feed water quality must be measured after every chemical dosing procedure and after the
prefiltration stage in front of the UF. The results of the analyses must be documented.

The following UF system parameters must be recorded and documented:


§
1. pH value, temperature and turbidity in the feed immediately prior to ultrafiltration (UF)
2. Permeability (@ 20°C), volume flow rate, transmembrane pressure (TMP) and absolute pressure
(feed/filtrate) per rack / per filtration line during filtration/backwash, CEB/CIP and integrity testing; realized
as a delta p measurement transmitter or with individual transmitters, positioned close to the module(s).
Data shall be automatically collected and logged at least every 2 seconds during backwash and CEB and
at least every 3 minutes during filtration to ensure that all effects of changes in pump operation and/or
valve positions (changing modes and procedures) are recorded.
To guarantee adequate documentation and to optimise the membrane plant, the data should be recorded
and logged in the shortest possible intervals.
3. Chemicals
 Use of chemicals for pretreatment, measured directly in the feed prior to ultrafiltration (UF):
 Type and concentration of coagulants
 Type and concentration of oxidants
 Use of chemicals for CEB/CIP, measured within the rack(s) (chemicals in contact with the
membranes/module(s)):
 Type, contact time and concentration of oxidants or other membrane cleaning agents
 Type, contact time and pH value of acids/bases
The minimum interval for one complete set of measurements (lab or on-line measurements) is one
per day or one measurement per CEB/CIP.
In the event of a module defect, it is necessary to provide documentation on the position of the
defective module within the rack(s) (line, train/unit, side, position) together with details of the
module(s) serial number.

§ White light turbidity meters are impacted by dissolved organic molecules while infrared devices are impacted by particles only;
therefore, infrared or laser devices are recommended to monitor the UF filtrate turbidity. In addition, glass cuvettes should be
replaced on a frequent basis to prevent interferences by scratches.

Process and design guidelines inge® product Series: Page 66 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Technical Documentation

15 Technical Documentation

15.1 Other Applicable Documents


®
 T-Rack 3.0 Series – Assembly Instructions
®
 dizzer XL Series Modules for Open Platform – Assembly Instructions

How to Contact us
Please contact inge GmbH if you require any further information:

inge GmbH
Flurstraße 27
86926 Greifenberg
Germany
Tel: +49 8192 997-700
Fax: +49 8192 997 999
E-Mail: info@inge.ag
Web: www.inge.basf.com

Process and design guidelines inge® product Series: Page 67 of 68


dizzer® XL Series Modules for Open Platform, T-Rack® 3.0 Series 1.1(2019-01) E inge
© inge GmbH
Note

The descriptions, designs, data and product information


contained herein are presented in good faith and are
based on inge GmbH’s current knowledge and
experience. inge GmbH cannot accept any liability for
the accuracy of this product information, which is
provided at no charge and for guidance only.

inge® products are designed to be operated in


accordance with the corresponding inge ® product
documentation. The product information and products
inge GmbH are protected by copyright and/or other intellectual
property laws worldwide. However, inge GmbH cannot
Flurstrasse 27 guarantee that the product information and products
86926 Greifenberg can be used without infringing third party intellectual
Germany property rights. The products and product information
Phone: +49 8192 997-700 may only be used, distributed and marketed with the
Fax: +49 8192 997-999 express prior permission of inge GmbH.
Email: info@inge.ag No warranties of any kind regarding the products, either
Website: www.inge.basf.com expressed or implied, including, but not limited to,
warranties of merchantability, fitness for a particular
purpose or no third party rights are made, other than as
expressly set out in the contractual agreement with the
customer. Mechanical stability and full functionality of
inge® products can only be provided by genuine inge ®
parts.

inge GmbH reserves the right to modify products and


product information at any time without prior
information. Current product information can be
obtained from the website www.inge.basf.com.

You might also like