Gti'S Acid Gas Treating Pilot Plant (Agtpp) Relocation and Integration With Flexfuel Facility
Gti'S Acid Gas Treating Pilot Plant (Agtpp) Relocation and Integration With Flexfuel Facility
Gti'S Acid Gas Treating Pilot Plant (Agtpp) Relocation and Integration With Flexfuel Facility
2
GTI’s Pilot Plant Unit
> Built in 1994 by Gastech Engineering,
Tulsa, OK
> Used extensively for the development of
the Morphysorb process - last used in
1999
> Needs reconditioning and modifications to
meet syngas application requirements
> Solvent Chillers need to be
replaced/rented
> 2005 – State of Ilinois IDCEO has funded
relocation/refurbishment project
3
GTI Flex-Fuel Gasification Test Facility
Capacity: ~10 – 20 tpd coal
4 4
Flex Fuel PFD
Gas Cooler
Cyclone 2
CWR
Cyclone 1 Flue
Gas
N2 Sulfur
Guard
Flare
Bed N2
GASIFIER CWS
Dust
Spent
Sorbent
5
Flex Fuel
> Various capabilities will be added in
planned programs:
– Entrained gasification (third party)
– Acid gas removal (AGTPP)
– Gas quench/gas cooling
– Sulfur Capture (SulfaTreat)
– Shift/COS Hydrolysis
– Oxygen feed
– Higher-pressure operation
> Using syngas from ongoing tests will be
best option if cost is major factor
6
AGTPP Pilot Plant Unit
Pilot Plant Specifications:
– Pressure, 1200 psig
– Circulation Rate,
5-15 gpm
– Feed Gas Flow Rates Up to 1
MMSCF/d
– Reboiler Capacity,
600,000 Btu/h
– Overall Dimensions,
12 x 12 x 60 ft.
– Contract to move this to GTI
Fall 2006 – integrate with
FlexFuel gasifier - underway
7 7
GTI Pilot Plant Unit
Condenser
Chiller Air cooler
Absorber Desorber
Reboiler
Flash
8
Moving the Plant from Kinder
Morgan’s Zapata Plant
9
Site Preparation at GTI
10
New Rich/Lean Exchanger
Added balcony
11
Case 1: High CO2
> Gas pressure: 400 psig
> Gas Temperature: 90 F
> Total gas flow:1925 lb/hr
> Solvent Circulation: 30 gpm
> Gas Composition
12
Case 2—Low CO2 in Feed Gas
> Gas pressure: 400 psig
> Gas Temperature: 90 F
> Total gas flow:1925 lb/hr
> Solvent Circulation: 30 gpm
> Gas Composition
13
AGTPP Modifications
> Replace high-pressure pump
14
AGTPP Absorber Column Details
> 16” diameter column
> ~35 ft packing
> Structured Packing
> Solvent Redistributor
after 20 ft
> Total Column height
50 ft
15
Regenerator Column (12” Dia)
> Structured packing
16
Koch’s Structured packing
> The new style FLEXIPAC® HC® (High Capacity)
structured packing, incorporates a patented
modification to the bottom and top edge of each
individual corrugated sheet.
> Lower Pressure Drop and up to 40% Higher
Capacity than Conventional Structured Packing
17
Relocation of AGTPP to Flexfuel
Test Facility –Major Tasks
18
Task 1: Relocation & Erection of
AGTPP
> Task 1.1 -- Prepare Site at Flex-Fuel
> Task 1.2 – Prepare and Submit Permits
> Task 1.3 -- Prepare Pilot Plant for Transfer
> Task 1.4 -- Transport Pilot Plant to Des Plaines
> Task 1.5 – Install AGTPP at Flex Fuel Facility
19
Task 2--Installation of Acid Gas Treating
Unit at Flex Fuel Testing Facility
20
Task 3 – Acid Gas Treating Pilot
Plant Unit Shakedown and Testing
21
AGTPP Status (as of June 2006)
> Main module is expected to ready by end
of June
> Absorber Column fabrication and packing
is complete
> AGTPP Foundation pad is ready at GTI,
Des Plaines, IL
> FFTF and AGTPP piping tie-ins will be
completed by August ’06
> AGTPP expected to be at GTI by July’06
22
Conclusion
> Funding will be needed to carryout any
testing or development in the AGTPP
> Please contact the author if you have a
potential need for carrying out any testing
or development
dennis.leppin@gastechnology.org
tel.: 847 768-0521
mobile: 847 682-2566
23