06/2016: Wintarijaya Office 25.5.2016: 10.30 AM
06/2016: Wintarijaya Office 25.5.2016: 10.30 AM
06/2016: Wintarijaya Office 25.5.2016: 10.30 AM
CADANGAN PEMBANGUNAN JENIS KONSEP PRIMA DENGAN BERUSAHA SAMA DIATAS LOT 6273
DAN 6275, MUKIM PULAU SEBANG, DAERAH ALOR GAJAH, MELAKA UNTUK TETUAN
WINTARIJAYA SDN.BHD.
DATE: 25.5.2016
TIME : 10.30 AM
PRESENT:-
CC:-
Mr Tang - MY TAG Solution Sdn Bhd. (MYT)
4.2 CME arises the issue that some technical amend should be consider INFO
because of new PRIMACOMP guidelines.
4.3 CME will give WSB the estimation cost for TNB contribution CME
5.6 4 WSB requested HYJ to assist on appointed of Clerk of Work for C&S WSB/HYJ
and Resident Engineer during the construction period. This person will
be hired by WSB but will appoint to be C.O.W and Resident Engineer of
C&S under the supervision of HYJ
6.0
Developer-WSB ALL
6.1 WSB reminded all party to keep the issue of adjusting building
location as an internal issue until further notice.
ALL
6.2 WSB reminded all party to give fully support in archiving our target to
get Site Possession by early JULY 2016.
ALL
6.3 WSB need all party to amend their drawing after the new layout of
Development Order received.