Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Three-Storey Residential Building: Technical Description

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TABLE OF CONTENTS

TECHNICAL DESCRIPTION SHEET NO. PARTICULARS


- EXTERIOR PERSPECTIVE - SITE DEVELOPMENT PLAN
LOT 8, BLK-2 A-1 - VICINITY MAP - TECHNICAL DESCRIPTIONS
REPUBLIC OF THE PHILIPPINES
- GROUND FLOOR PLAN
A-2
LINES BEARINGS DISTANCES - SECOND FLOOR PLAN
- THIRD FLOOR PLAN - REAR ELEVATION
A-3 - FRONT ELEVATION - RIGHT ELEVATION
OFFICE OF THE BUILDING OFFICIAL
1-2 DUE SOUTH 12.00 M - LEFT ELEVATION
A-4 - SECTION THRU "A"
2-3 10.82 M - SECTION THRU "B"
- GROUND FLOOR FINISH LAYOUT
3-4 7.60 M - SECOND FLOOR FINISH LAYOUT

4-5 DUE NORTH 13.56 M - THIRD FLOOR FINISH LAYOUT


A-5 - GROUND FLOOR REFLECTED CEILING PLAN
5-6 DUE EAST 5.00 M - SECOND FLOOR REFLECTED CEILING PLAN MUNICIPALITY
6-7 DUE NORTH 5.50 M A-6 - THIRD FLOOR REFLECTED CEILING PLAN
- WINDOW SCHEDULE
7-8 DUE EAST 12.90 M - DOOR SCHEDULE
A-7 - GUEST BEDROOM DETAIL
8-1 6.64 M - BEDROOM 2 DETAIL
- MASTER BEDROOM DETAIL
TIE LINES FROM MON #18, BINAN A-8 - MAIN KITCHEN DETAIL
ESTATE TO COR. "1" - DIRTY KITCHEN DETAIL
- GUEST BATHROOM DETAIL
1515.41 M A-9 - MAID'S TOILET AND BATH DETAIL
- MASTER TOILET AND BATH DETAIL
- THIRD FLOOR TOILET AND BATH DETAIL
- POWDER ROOM DETAIL
- WALK-IN CLOSET DETAIL
3 A-10 - BALCONY DETAILS
- SURFACE MOUNTED SLIDING DOOR
A 1 - STAIR DETAIL
- GENERAL NOTES
S-1 - LEGENDS & SYMBOLS
- REBAR DEVELOPMENT LENGTH,
LAND USE & ZONING
STANDARD HOOKS AND DETAILS
- SLAB SCHEDULE
LOT 10, S-2
BLK-2
B - SLAB DETAIL
- BEAM SCHEDULE
- FOOTING SCHEDULE - FOOT RIDGE DETAIL
- COLUMN SCHEDULE - WALL RAFTER
S-3 - FOOTING DETAIL CONNECTION DETAIL
5 4' 4 3' 3 2 1 - RAFTER DETAIL - TRUSS DIAGRAM
1 S-4
- MASONRY REINFORCEMENT DETAIL
- SHEAR WALL DETAIL
12613 - CANTILEVERED STAIR CONNECTION DETAIL
A 1
3950 553 950 1700 2235 1825 1400
- STAIRWAY SHEAR WALL DETAIL
- FOUNDATION PLAN
LINE & GRADE
S-5 - SECOND FLOOR FRAMING PLAN
- THIRD FLOOR FRAMING PLAN
17900
- ROOF BEAM FRAMING PLAN
2700 800 1500 2204 800 1000 5710 1000 1986 S-6

Y
- ROOF FRAMING PLAN

W
2004 10038

PK
LD
2500 7 - GENERAL NOTES

1033
1033
FIE
- LEGENDS & SYMBOLS

N
- PPR PIPE SIZE EQUIVALENT

EE

1000
1000
LANGKIWA
- WATER CLOSET MOUNTING

GR
- FLOOR DRAIN MOUNTING
Building Line A LOT 9,
P-1 - UNDERSLAB CLEANOUT

1000
BLK-2
SITE A'
- FLOOR CLEANOUT
- CATCH BASIN DETAIL
ARCHITECTURAL

Building Line

3050
3050
- SHOWER MOUNTING DETAIL

Building Line
- LAVATORY MOUNTING DETAIL
- AIR CHAMBER DETAIL

3550
- AREA DRAIN DETAIL

1000 500
5 6 1000 - GREASE TRAP DETAIL

1500
- GROUND FLOOR WATER LINE LAYOUT
P-2 - SECOND FLOOR WATER LINE LAYOUT
1 B - THIRD FLOOR WATER LINE LAYOUT
R

- GROUND FLOOR SEWER LINE LAYOUT

1750
PI
D
W

O
D
P-3 - SECOND FLOOR SEWER LINE LAYOUT
VE
TA

CA
TA

2763
LA
M

O
NG

AV - THIRD FLOOR SEWER LINE LAYOUT


AR

STRUCTURAL
M

UI
IN

LE
D

- GROUND FLOOR STORM DRAINAGE LAYOUT

1000
ST

A
PI

P-4
KWY

18585
D - ROOF STORM DRAINAGE LAYOUT

14395
19060
IR
DR PI L LOMA Building Line
C - EMBEDDED DOWNSPOUT DETAIL
ST

FIELD P
ST

VA
E O
S

E IT
AV
TI

NU
IPIL

IM - ISOMETRIC WATER LINE LAYOUT


A

L
O VERDANA KA
M
MAMPLASAN P-5 - ISOMETRIC SEWER LINE LAYOUT
GREEN

CENTRAL PARK - ISOMETRIC STORM DRAINAGE LAYOUT


BI

3510
NT

DR

Building Line

10045
AN

AN - GENERAL NOTES
HY
5220
ATIS ST
IPIL ST

BA
DA

E- 1 - LEGENDS & SYMBOLS


YA
MOLAVE E DR

LOT 7,
P

PI
ST

AT
- SERVICE DROP DIAGRAM
H BLK-2
DU D - POWER SINGLE LINE DIAGRAM
- DESIGN ANALYSIS

1397
DR
VE
W - PANEL BOARD DETAILS ELECTRICAL
PO

LA
NARR
A ST PI E- 2 - SINGLE LINE DIAGRAM
N

O
E
D
ER

M Y
AN RD
O

- LOAD COMPUTATION
SA

LI
G Building Line
1000

O
NA

AN

AH VA - LOAD COMPUTATION
AH
RR

2175
M
NU
AW

Building Line
DR
A

E- 3
ST

W - GROUND FLOOR CEILING LIGHT LAYOUT


AVE
ST

MOL PI
I L
AL P O
1575

T
YAK AN
DR - SECOND FLOOR CEILING LIGHT LAYOUT
IA PI VE
E
S
Building Line F
ACAC O PI E- 4 - THIRD FLOOR CEILING LIGHT LAYOUT

983
AGOH LA
O
M - GROUND FLOOR WALL LIGHTING LAYOUT
- SECOND FLOOR WALL LIGHTING LAYOUT
KWY

1932

1002
1389

VE E
DR E- 5 - THIRD FLOOR WALL LIGHTING LAYOUT
LD P

MOLA 2 - GROUND FLOOR POWER LAYOUT


919 1081
NFIE

3
4
2500 4063 5350 2000 E- 6 - SECOND FLOOR POWER LAYOUT
PLUMBING
RD

- THIRD FLOOR POWER LAYOUT


GREE
LI

18414
VA

- GENERAL NOTES
NU

CELINA
HOMES AU - 1 - LEGENDS & SYMBOLS
- SINGLE LINE DIAGRAMS
LOT 3, LOT 5, - GROUND FLOOR AUXILIARY LAYOUT
BLK-2 BLK-2 AU - 2 - SECOND FLOOR AUXILIARY LAYOUT
- THIRD FLOOR AUXILIARY LAYOUT
- GENERAL NOTES -KITCHEN HOOD DETAIL
M-1 - EQUIPMENT SCHEDULE -EXHAUST GRILLE
2 4 - LEGENDS & SYMBOLS
- GROUND FLOOR ACU LAYOUT
- SPLIT TYPE ACU DETAIL

A 1 A 1 M-2 - SECOND FLOOR ACU LAYOUT


- THIRD FLOOR ACU LAYOUT
FIRE DEPARTMENT
REPUBLIC ACT 9266 NO REVISION DATE SHEET CONTENTS
THIS DRAWING ACTING AS AN PERSPECTIVE
1 -
INSTRUMENT OF SERVICE IS A

VLADIMIR M. LONGID
PROJECT
THREE-STOREY RESIDENTIAL BUILDING PROPERTY OF GAUDAN DESIGN
& CONSTRUCTION SERVICES,
AND AS SUCH WOULD BE
2
3
-
-
VICINITY MAP
TECHNICAL DESCRIPTION
SITE DEVELOPMENT PLAN
UNLAWFUL TO DUPLICATE OR
ARCHITECT ENGINEER MAKE COPIES OF SAID 4 -
PRC NO. 0015959 PTR NO. 0623786 PRC NO. PTR NO.
OWNER MR. DINDO BORLASA & MRS. MARIA ELEANOR BORLASA DOCUMENTS FOR USE IN THE
REPETITION OF AND FOR OTHER 5 -
IAPOA PROJECTS, WETHER EXECUTED 6 - DRAWN BY DATE SHEET NO
15791059845101210 ISSUED 03/03/2016 TIN ISSUED JNSP
LOCATION PARTLY OR IN WHOLE WITHOUT
TIN 182-447-315 PLACE BAGUIO CITY PTR PLACE THEIR CONSENT. 7 - CHECKED BY VML APRIL 2016 A 1