SCHEDULE – A
(See Clause 10.1)
1. The Site
1.1 Site of the Four Lane project Highway shall include the existing land, buildings,
structures and road works as described in Annex-I of this Schedule-A.
1.2 An inventory of the Site including the land, buildings, structures, road works, trees
and any other immovable property on, or attached to, the Site shall be prepared
jointly by the Independent Engineer and the Concessionaire, and such inventory
shall form part of the memorandum referred to in Clause 10.3.1 of this Agreement.
1.3 Additional land required for Toll Plazas, Truck Lay bye, Traffic Aid Posts, Medical Aid
Posts and vehicle rescue posts or for construction of works specified in the Change
of Scope Order issued under Clause 16.2.3 of this Agreement shall be acquired in
accordance with the provisions of Clause 10.3.6 of this Agreement. Upon
acquisition, such land shall form part of the Site and vest in the Authority.
6 The chainages given in this document are in km unless otherwise specified, all other
dimensions are in meters.
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A– 1
National Highways Authority of India Schedule – A
Annex – I
(Schedule – A)
Site for Four Laning
1. Site
The site of the Four Laning of Project Highways comprises the section of National
Highway 8E commencing from Km 180.478 (Design km 181.450) to Km 221.610 (Design
km 222.400) i.e Una-Kodinar Section in the State of Gujarat. The land, carriageway and
structures comprising the Site are described below:
2. Land
3. Carriageway
The present carriageway of Project Highways is 2-lane (flexible pavement) with paved
shoulder for most of the project stretch.
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A– 2
National Highways Authority of India Schedule – A
Total
Name / Span Length Type of Carriage
SI Type of Type of Footpath Total Deck
Bridge/ location arrangement F.F of Superstruc way
No Substructure Foundation provided width
str no Existing Exp Jt to Exp Dirt ture Width
or not (m)
Ch. Jt (m) wall (m)
(m)
(2x7.8)+14.2+
R.c.c T- Rubble
1 * 183.179 (4X18.3) 141.5 Well 7.3 NO 8.3
beam masonary
+13.3+(3X8.4)
Girder type Wall type pier foundation
2 199/2 198.904 7x10.7 87.3 R.c.c slab R.c.c wall open 11.5 NO 12.5
Type Type pier foundation
R.c.c T- Rubble
3 212/1 211.631 6X15.7 94.2 open 7.2 NO 8.2
beam masonary
Girder type Wall type pier foundation
4. Major Bridges
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design Chainage Km 222.400) In the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity) mode
A– 3
National Highways Authority of India Schedule – A
Type of Structure
Chainage No. of Width (in
Sl. No. Sub Super
(in Km) Foundation Spans m)
structure Structure
NIL
Type of Structure
Chainage No. of Width (in
Sl. No. Sub Super
(in Km) Foundation Spans m)
structure Structure
NIL
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A– 4
National Highways Authority of India Schedule – A
7. Minor Bridges
Span Total
SI Name / Bridge/ Type of Type of Type of Footpath Total
arrangement Length Carriageway
No location Strct Superstructure Substructure Foundation provided Deck
Exp Jt to Exp Jt F.F of Dirt Width (m)
(Km) no or not Width (m)
(m) wall (m)
1 180.838 * 3X7.4 22.2 R.c.c slab Rubble masonary Open 10 No 11
Type Wall type pier
2 187.745 * 3X7.2 21.6 R.c.c slab R.c.c wall Open 11.1 No 12.1
Type Type pier
3 201.012 * 2X5.2 16.2 R.c.c slab R.c.c wall Open 9.7 No 10.5
Type Type pier
4 201.617 * 6X8 48 R.c.c slab Rubble masonary Open 7 No 9.4
Type Wall type pier
5 205.191 * 3X6 18 R.c.c slab Rubble masonary Open 9.4 No 10.2
Type Wall type pier
6 208.946 209/1 3X3.6 10.8 R.c.c slab Rubble masonary Open 6.7 No 7.7
Type Wall type pier
7 210.703 * 3X5.4 16.2 R.c.c slab R.c.c wall Open 9.8 No 10.8
Type Type pier
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design Chainage Km 222.400) In the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity) mode
A– 5
National Highways Authority of India Schedule – A
Span Total
SI Name / Bridge/ Type of Type of Type of Footpath Total
arrangement Length Carriageway
No location Strct Superstructure Substructure Foundation provided Deck
Exp Jt to Exp Jt F.F of Dirt Width (m)
(Km) no or not Width (m)
(m) wall (m)
8 216.727 217/1 3X3.5 10.5 R.c.c slab R.c.c wall Open 8.7 No 9.7
Type Type pier
9 217.242 218/1 2X3 6 R.c.c slab R.c.c wall Open 10.3 No 11.3
Type Type pier
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design Chainage Km 222.400) In the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity) mode
A– 6
National Highways Authority of India Schedule – A
8. Culverts
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design Chainage Km 222.400) In the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity) mode
A– 7
National Highways Authority of India Schedule – A
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design Chainage Km 222.400) In the State of Gujarat through public private
partnership (PPP) on Hybrid (Annuity) mode
A– 8
National Highways Authority of India Schedule – A
The total number of bus shelters and truck lay byes on the Project highway is noted
below:
The Site includes the following permanent bridge/ bypass/ tunnel which were constructed
at the cost noted below:
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A– 9
National Highways Authority of India Schedule – A
NIL
Crossing
Sr. Existing Design Carriageway Category of
Side
No. Chainage (Km) Chainage Width (m) Road
(LHS/RHS)
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A – 11
National Highways Authority of India Schedule – A
17. Bypasses
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A – 12
National Highways Authority of India Schedule – A
The Feasibility report of Authority provided in soft copy is for the purpose of reference
only. The Authority makes no representation whatsoever, express, implicit or otherwise,
regarding the accuracy, adequacy, correctness, reliability and/or completeness of any
assessment, assumptions, statement or information provided by it and the
Concessionaire confirms that it shall have no claim whatsoever against the Authority in
this regard.
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A – 13
National Highways Authority of India Schedule – A
Appendix A1
Four Laning of Una-Kodinar Section of NH – 8E from Km 180.478 (Design Chainage Km 181.450) to Km 221.610 (Design
Chainage Km 222.400) In the State of Gujarat through public private partnership (PPP) on Hybrid (Annuity) mode
A – 14