You are on page 1of 1

No: SHEQ 75.0.

14
MEL’S CONSTRUCTION Lda
Rev: 06/2017
FINAL HANDOVER CERTIFICATE
Page: 1 of 1

Project: MSC BEIRA : WAREHOUSE STORAGE FACILITY


Equipment Type: EARTHWORKS

Certificate of:  Take-over  Intermediate  Final

WORK DESCRIPTION
 CLEARING AND GRUBBING OF ENTIRE SITE
 RIP TO ROADBED, 150MM SUBGRADE LAYER AND 150MM SOIL CEMENT STABILISATION LAYER

EXCEPTIONS / DECLARATION
The above work / equipment has been inspected by the appointed representative or inspector and is considered to be acceptable under the
terms of the above contract with the following exceptions (if none state NONE):-

.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
All punch list items have confirmed as complete.

COMMENTS

.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................

SIGN-OFF

MELS
................................................. ................................................. ..............................
REPRESENTATIVE NAME SIGNATURE DATE

NCI
................................................. ................................................. ..............................
REPRESENTATIVE NAME SIGNATURE DATE