Final Handover Certificate Earthworks
Final Handover Certificate Earthworks
Final Handover Certificate Earthworks
14
MEL’S CONSTRUCTION Lda
Rev: 06/2017
FINAL HANDOVER CERTIFICATE
Page: 1 of 1
WORK DESCRIPTION
CLEARING AND GRUBBING OF ENTIRE SITE
RIP TO ROADBED, 150MM SUBGRADE LAYER AND 150MM SOIL CEMENT STABILISATION LAYER
EXCEPTIONS / DECLARATION
The above work / equipment has been inspected by the appointed representative or inspector and is considered to be acceptable under the
terms of the above contract with the following exceptions (if none state NONE):-
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
All punch list items have confirmed as complete.
COMMENTS
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
.......................................................................................................................................................................................................
SIGN-OFF
MELS
................................................. ................................................. ..............................
REPRESENTATIVE NAME SIGNATURE DATE
NCI
................................................. ................................................. ..............................
REPRESENTATIVE NAME SIGNATURE DATE