Unit 5 - Week 3: Assignment 3
Unit 5 - Week 3: Assignment 3
Unit 5 - Week 3: Assignment 3
reviewer4@nptel.iitm.ac.in ▼
Unit 5 - Week 3
Register for
Certification exam Assignment 3
The due date for submitting this assignment has passed.
Course As per our records you have not submitted this Due on 2019-02-27, 23:59 IST.
outline
assignment.
How to access 1) Recovered materials from e-waste are purified by which of the following process? 1 point
the portal
a. Landfilling
Week 0
b. Hydrometallurgical
Week 1 c. Composting
Lecture 15: a. Glass to glass recycling is more cost effective than glass to lead recycling
Recovery of
Metals from b. Glass to lead recycling is more cost effective than glass to glass recycling
Electronic
c. In both glass to glass and glass to lead recycling, related cost is same
Waste
Powered magnet
a. Permanent by
Week 4
b. Electromagnet
DOWNLOAD
VIDEOS c. Eddy current separator
a. Pyrometallurgical
Interaction
Session b. Hydrometallurgical
c. Biometallurgical
6) Out of the followings metal recovery processes, which process is predictable and more 1 point
easily controlled?
a. Pyrometallurgical
b. Hydrometallurgical
c. Biometallurgical
7) Out of the following responsibilities, what is the responsibility of collection centers? 1 point
a. Ensure that the e-waste collected is stored in a secured manner till it is sent to registered
dismantler (s) or recycler (s)
b. Obtain authorization and registration and ensure that the facility and recycling processes
are in accordance with the guidelines
c. Collection of e-waste generated during manufacturing, from the end of life of their products
with the principle of Extended Producer Responsibility.
8) What is the correct order of the steps followed by recycling companies? 1 point
a. Segregate-dismantle-recycle-transport-collect
b. Collect-transport-segregate-dismantle-recycle
c. Recycle-dismantle-transport-collect-segregate
d. Collect-transport-recycle-dismantle-segregate
Score: 0
Accepted Answers:
b. Collect-transport-segregate-dismantle-recycle
9) Out of the followings, which company is India’s first Government authorized e-waste 1 point
recycler?
a. Cyanide Leaching
b. Halide leaching
c. Thiourea leaching
d. Noranda process
11)Which of the following mechanisms of extraction of precious metal from leaching solution is 1 point
used in hydrometallurgical process?
c. Ion exchange
d. Electrocoagulation
12)Out of the followings, what are the objectives of Hazardous and Other Wastes 1 point
(Management and Transboundary Movement) Rules, 2016?
a. True
b. False
14)According to Hazardous and Other Wastes (Management and Transboundary Movement) 1 point
Rules, 2016, it is the duty of bulk consumer to ensure that no damage is caused to the environment
during storage and transportation of e-waste.
a. True
b. False
15)Attero’s recycling, is the only unit which does the complete e-waste management process 1 point
with its end to end e-cycling plant, zero dumping technology.
a. True
b. False