Daily Report in Revised Formats 310120

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 3
At a glance
Powered by AI
The document contains daily progress reports for the Purvanchal Expressway project in India, tracking earthwork, subgrade work, and pavement layer construction.

The daily progress report is tracking the scope of work, daily and cumulative progress for clearing and grubbing, earthwork, and subgrade, GSB, WMM, DBM and concrete layer construction.

The daily progress report is tracking the progress of subgrade, granular sub-base (GSB), wet mix macadam (WMM), dense bituminous macadam (DBM) and concrete pavement layers.

Purvanchal Expressway Project Format D-1.

3
Daily Progress Report of CNG & Earthwork
Date- 11/18/2018
Clearing and Grubbing Earthwork in MCW

Approved
Package Work Done Cumulative Borrow Area
No. Daily Work Done Daily Work Done % Remark
Scope (Km) (Km) % Progress Scope (Cum) Work done Qty (Cum)
Target(Km) Today1(Km) Target(Cum) Today (Cum) Progress
Cumulative (Cum)

1 2 3 4 5 6 7 8 9 10 11 12 13
(A) Main Carriageway
I 40.47 40.47 0.00% 9,661,991 39,385 0.00%
II 39.70 39.70 0.200 5.290 13.32% 11,111,631 39,324 1,550 311,350 2.80% 111,000
III 41.70 41.70 0.00% 11,600,000 35,373 0.00%
IV 42.70 42.70 0.00% 9,661,994 34,161 0.00%
V 54.00 54.00 0.00% 12,647,498 41,323 0.00%
VI 28.20 28.20 0.00% 6,884,521 24,298 0.00%
VII 46.08 46.08 0.00% 10,434,296 32,839 0.00%
VIII 47.97 47.97 0.00% 11,184,620 41,271 0.00%
TOTAL 340.824 340.824 0.200 5.290 1.55% 83,186,551 287,973 1,550 311,350 0.37% 111,000
(B) Service Road
I 0.00%
II 55.01 5,000 #N/A #N/A 0.00%
III 0.00%
IV 0.00%
V 0.00%
VI 0.00%
VII 0.00%
VIII 0.00%
TOTAL 5,000 #N/A #N/A 0.00% -
Purvanchal Expressway Project Format D-1.7
Daily Progress Report of Subgrade, GSB, WMM, DBM, BC
Date- 11/18/2018
Subgrade GSB WMM DBM BC

Package Scope* Cumulative Work % Cumulative % Cumulative Work done % Cumulative Work % Cumulative Work done %
No. (Km)
Layer Target till done on Cumulative Excess/
Work done Progress Shortfall
Work done Cumulative
Target till on Previous Work done
Excess/
Progress Shortfall Target till on Cumulative Progress Excess/
Work done Shortfall Target till done on Cumulative Excess/
Work done Progress Shortfall Target till on Cumulative Progress Excess/
Work done Shortfall
Remark
month end Previous (Km) (Against (+/-) month end day (Km) (Km) (Against (+/-) month end Previous (Km) (Against (+/-) month end Previous (Km) (Against (+/-) month end Previous (Km) (Against (+/-)
(Km) day (Km) Scope) (Km) Scope) (Km) day (Km) Scope) (Km) day (Km) Scope) (Km) day (Km) Scope)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
(A) Main Carriageway
Layer-1
I 80.94 8.000 0.000 0.000 0.000 0.000 -
Layer-2

Layer-1 - - 0.00% - - 0.00% 0.00%


II 79.40 30.000 - 30.000 20.000 - - 0.00% - 20.000 6.000 - 6.000 0.000 - - - 0.000 - - 0.00% -
Layer-2 - - 0.00% - - 0.00% 0.00%

Layer-1
III 83.40 44.800 22.796 12.212 11.398 0.000 -
Layer-2

Layer-1
IV 85.40 34.400 21.800 14.600 11.600 0.000 -
Layer-2

Layer-1
V 108.00 54.000 32.000 9.000 0.000 0.000 -
Layer-2

Layer-1
VI 56.40 18.000 6.000 3.000 0.000 0.000 -
Layer-2

Layer-1
VII 92.17 8.860 8.860 1.610 1.610 0.000 -
Layer-2

Layer-1
VIII 95.94 38.000 27.000 4.500 3.000 0.000 -
Layer-2

681.648 Layer-1 0.000 0.000 0.00% 0.000 0.000 0.00% 0.000 0.000 0.00%
TOTAL 236.060 -30.000 138.456 0.000 0.000 0.00% -20.000 50.922 -6.000 27.608 0.000 0.000 0.000
681.648 Layer-2 0.000 0.000 0.00% 0.000 0.000 0.00% 0.000 0.000 0.00%

(B) Service Road


I

II

III

IV

VI

VII

VIII

TOTAL

1- In Main Carriageway the scope of the work is taken as two times length of the package considering LHS & RHS are being constructed separately.
2- The targets will be modified after receiving revised work program from Contractor.
Format D-1.8
STATUS OF ROAD WORKS ON MCW OF PURVANCHAL EXPRESSWAY
PACKAGE NO- 2 Date- 11/18/2018
Package Length:79.400 (3 lane Km)
Daily Progress of GSB, WMM, DBM and Concrete
GSB WMM DBM Concrete

Cumulative
Progress as on 0.000 Km 0.000 Km 0.000 Km
03.08.19
Average Daily Target=
Target 4499 MT 267 m 0 MT 0m ____ MT _____ m 349 Cum

GSB WMM DBM Concrete


Date (Cum)
MT Length (M) MT Length (M) MT Length (M)
1/1/2020 - - 2,205 310 180 50 380
1/2/2020 - - 727 - 180 50 326
1/3/2020 - - - - - - 530
1/4/2020 - - 3,338 700 - - 320
1/5/2020 - - 2,003 420 899 250 640
1/6/2020 - - 1,871 240 216 60 621
1/7/2020 - - 1,251 110 507 140 150
1/8/2020 - - - - - - 230
1/9/2020 - - 1,335 280 - - 275
1/10/2020 - - 858 180 1,809 500 270
1/11/2020 - - 2,215 180 2,641 730 334
1/12/2020 - - 3,624 120 3,329 920 297
1/13/2020 - - 2,909 610 3,075 850 180
1/14/2020 - - 2,116 210 3,546 980 280
1/15/2020 - - 1,924 180 1,700 470 880
1/16/2020 - - - - - - -
1/17/2020 - - - - - - -
1/18/2020 - - - - - - -
1/19/2020 - - 896 - - - 540
1/20/2020 - - 1,066 - 289 80 292
1/21/2020 - - 727 - 362 100 247
1/22/2020 - - 872 - 362 100 240
1/23/2020 - - 242 - 1,302 360 380
1/24/2020 - - 286 60 1,085 300 250
1/25/2020 - - 1,776 220 2,207 610 410
1/26/2020 1,049 120 1,308 - 2,098 580 310
1/27/2020 961 110 2,398 320 2,641 730 576
1/28/2020 1,311 150 2,019 210 1,266 350 731
1/29/2020 1,136 130 1,308 - 626 173 659
1/30/2020 1,311 150 1,066 - 1,990 550 567
1/31/2020 1,049 120 1,754 185 3,148 870 563

Average of
Month
Cumulative for
6,818 780 42,093 4,535 35,457 9,803 11,478
Month

Note:- Km and Length is for 3-lane Km