Lo 3 (LG-3)
Lo 3 (LG-3)
Lo 3 (LG-3)
Learning Guide # 3
TVET Program Title: INFORMATION TECHNOLOGY
SUPPORT SERVICE Level I
Module Title: Connecting hardware peripherals
LG Code : ICT ITS1 L03-LG-3
TTLM Code : ICT ITS1 M01 0515
Learning Activities
1. Read the specific objectives of this Learning Guide.
2. Read the information written in the “Information Sheets 1” in pages 54-56.
3. Accomplish the “Self-check” in page 57.
4. If you earned a satisfactory evaluation proceed to “Information Sheet 2”. However, if your
rating is unsatisfactory, see your teacher for further instructions or go back to Learning
Activity # 1.
5. Submit your accomplished Self-check. This will form part of your training portfolio.
6. Read the information written in the “Information Sheet 2” in pages 58.
7. Accomplish the “Self-check” in page 59-61.
8. If you earned a satisfactory evaluation proceed to “Operation Sheet” in pages 58. However, if
your rating is unsatisfactory, see your teacher for further instructions or go back to Learning
Activity # 2.
9. Read the “Operation Sheet” and try to understand the procedures discussed.
10. Do the “LAP test” in page 14 (if you are ready) and show your output to your teacher. Your
teacher will evaluate your output either satisfactory or unsatisfactory. If unsatisfactory, your
teacher shall advice you on additional work. But if satisfactory you can proceed to Learning
Guide 2.
Once you have arranged a suitable time, make sure you adhere to it or give advanced notice if you
will be delayed. Remember that clients may have scheduled their daily workload around the
installation.
Also consider the timeframe expected by client when installing new hardware peripherals. If you
work for a busy organization, it may be necessary to work out a daily to-do list. Order tasks with
Electrical Safety
connected to 240V mains supply
Always turn off power at point and disconnect the power connection
Avoid over loading power board/point
Make sure power boards have safety switches
Make sure no fluid around where peripheral device is stored, installed used
Electrostatic Discharge: wear earth strap: static builds in body e.g. from walking
across carpet on dry day – high voltage discharge can occur if touch earthed device
Directions: Answer all the questions listed below. Use the Answer sheet provided in the next
page:
1. When is the best time to schedule hardware installation? Give four (4). (4points)
2. What must be done after the installation of hardware peripherals? (4 point)
3. Advantages of applying OHS at work place when installing peripheral devices? (4 point)
Answer Sheet
Score = ___________
Rating: ___________
Information Sheet 2
Removing and Replacing Old Peripherals
Answer Sheet
Score = ___________
Rating: ___________
You can ask your teacher for the copy of the correct answers.
Monitors will either have a VGA or a newer DVI plug (see picture, as they are a lot less apparent
than PS/2 / USB by comparison). Most monitors use VGA connectors, and so most graphics cards
have VGA output. If you have one type of plug and the graphics card has another, you can easily
buy an adapter. Some cards even come with one.
Connecting Mouse and Keyboard
There are two standard connectors for mice and keyboards; PS/2 connectors and the more
modern USB connectors. Plug the mouse and keyboard in the appropriate slot.
PS2 Cable
USB Cable
For audio devices such as speaker or headset, you can connect it o and Mic
Speaker/headset
Mic
To connect the Printer to the PC, you will use the cable below via printer port. A USB
able is now also being use to connect the new printer to the computer especially the
colored and laser printer.
Instructions: You are required to perform the following individually with the presence of your
teacher.
1. Installing and configuring peripheral devices of computer system and make the computer to
works and connect the peripherals listed below to its corresponding ports and make sure that it
will all work properly. (Apply safety procedure) (5 points)
Monitor
Mouse
Keyboard
Printer
Scanner
Speaker
Power Cord
2. Why is it necessary to make minimal disruption to the client when replacing hardware
peripherals? (5 points)
3. Explain the difference between installing and configuring peripheral devices? (5 points)
Ensure that all new installations are thoroughly tested after initial setup and prior to use by the
client. Depending on the device, different functions will need to be tested. Devices that have
components that are known to degrade with time, especially printers, should also be tested
periodically. Printers need to be routinely tested, as components such as the ink cartridges and
toner can cause deterioration of print quality and may require maintenance and/or cleaning.
Can the printer handle different paper types (for example A4, A5, foolscap, thick,
thin, overhead transparencies)?
Will the printer work successfully on different computers?
Will the printer work successfully with different software packages (for example,
word processing, spreadsheets and desktop publishing)?
Is black and white print quality acceptable to clients?
Is colour print quality acceptable to clients?
Scanner: - Scanner functions that may be tested are: -
Is the resolution of a scanned image an acceptable quality?
Does the scanner work correctly with different software packages (e.g. a word processor
or desktop publishing package)?
Instruction: Answer all the questions listed below, if you have some clarifications- feel free to
ask your teacher.
1. It is used to work out a structured process to ensure that a new device will work under all
expected circumstances. (1 point)
Answer Sheet
Score = ___________
Rating: ___________