SAFE WORK PROCEDURE (SWP) FOR: No.

S
Unloading of Power Transformer Company:
Prepared by :
Reviewed by :
Approved by:
SAFE WORK PROCEDURE (SWP) Reference (i.e. Method
Statement, Manufacturers Manual etc.
Issue Last Next Review Date:
Date: Reviewed:
DESCRIPTION OF WORK: POTENTIAL HAZARD:
Unloading of Power Transformer Equipment Falling Down
People getting struck between equipments and stable
object
Lifting Tackles Failure

PERSONAL PROTECTIVE EQUIPMENT (PPE) REQUIRED: TRAINING/REFERENCE/INFORMATION


Hard Hat, Safety Shoes, Hi-Vis Jacket Lifting Tackles Training
Hand Gloves, Coverall Usage of PPE’s

PERSONS INVOLVED TOOLS AND EQUIPMENT USED/INVOLVED:


(Job category and number of personnel): (List of Tools and Equipment):
15 Labors Lifting Tackles
Hand Tools

Pre Job Safety Checks


Plan for Safe Work, Barricades & Warning Signs, Emergency Team, Segregated Access for peoples
Inspection of Hand Tools and Lifting Tackles

Safe Work Procedure to Perform Task


1. Ensure that the safe plan is available before issuing work permit
2. Ensure that the approved drawings available to install the power transformer
3. TBT or Training for all those who are going to involve in that work
4. Wear PPE’s before start the work
5. Ensure the truck placing area is well compacted with proper compaction equipments
6. Ensure that the truck has been placed in a proper stable ground
7. Make sure that the power transformer unloading is on going with the supervision of competent person
8. Ensure that all the lifting tackles and hand tools are in good condition
9. Ensure the barricades and do not allow anyone who is not involved into that area
10. Ensure that the proper access available for peoples
11. Make sure that the lifting tackles load certificate available before using the same
12. Inspect all the hand tools before using it
13. Ensure that nobody is keep their body parts under the suspended load
14. Make sure that the transformer is secured after unloading completed
15. Clean the area before closing the work permit
16. Close the permit after completion of the work

Emergency Response Arrangements and Response


1. Emergency responsible plan should be posted in the site
2. Emergency contact numbers posted on site
3. Emergency Response Team
4. First Aid Team
Ending Operations & Clean Up
1. Clean that area and ensure that there is no excess materials in that area