For Construction: B1 13 P 1 6 L0 R0 01 3V B1 19 P 03 2 7 L0 R0 01 3V B1 19 P 03 2 7

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

01 02 03
28500

A 6000 22500 A

L0R001 3VB101 P
3000 3000 3000 3000 3000 3000 3000 3000 2250 2250 TEE165*152*20
L0R001 3VB102 P L0R001 3VB112 P
L0R001 3VB110 P L0R001 3VB111 P L0R001 3VB110 P L0R001 3BE113 P
TEE165*152*20 TEE165*152*20
L0R001 1CL105 P 7500 TEE165*152*20 TEE165*152*20 TEE165*152*20 UB406*178*54
3500
B UC254*254*89 B
L0R001 1CL102 P
UC203*203*60 L0R001 3BE114 P L0R001 3VB109 P L0R001 3BE108 P CL OF BEAM SPLICE L0R001 3BE111 P CL OF BEAM SPLICE
UB356*171*45 TEE165*152*20 UB406*178*54 UB406*178*54
EL+113.500 L0R001 1CL107 P
(TOS) UC305*305*97
1000

L0
C P T E R 00 L0 L0 P C
13 E1 1 3 L0 UC R00
L0 P
19
P
EL+112.500 B1 6 TE R00 TE R00 19 15 CL OF COLUMN
3 V
*1
46 V
*1 B 1 1 UC R00 20 1 3 E1 1 3 E1 1 3 B1 B1 B1
01 127 27 20 1 3 3* V
20 B1 78 V 78 V 3V *27 3V *27 3V *46 SPLICE
0 *1 3 P 3* V *2 B11 *2 B11 1 3 1 3
1000

R 46* 0 20 0 20
0 6 20 B1 3* 14
46 03 03 R0 * R0 * 01 03
L E1 L0R001 2BE110 P 3* 14
46 P
P *2 9 P *2 9 P L0 178 L0 178 R0 3*2
TE 7 7 E E L0 20
UB356*171*45 TE TE C
EL+111.500 U
L0R001 3VB115 P
(TOS) UC203*203*46 D
D L0R001 2BE117 P L0R001 2BE115 P
UB305*165*40 UB305*165*40
PL0 L0 L0 P P P L0R001 2BE119 P
TE R00 U C R 00
2000

L0 L0 22
14 TE R 00 22 17
B1 E1 1 2 UC R00 20 1 2 U C R 00 E1 1 2 B1 B1 B1
UB305*165*40
2V *16 46 V
*1 B11 20 1 2 3*
20 VB1 20 1 2 78 V 2V *27 2V *27 2V * 46
01 27 27 3*
20 VB1 3* 18 3*
20 VB1 *2 B 1 2 01 203 01 203
R0 46*1 *1 4 P 46 03
*2 2 P R 0 8* R 0 * 01 03
L0 1 L0R001 1BE114 P 6 3* 1
46 9 P
P 3* 1
46 8 P 7 L0 E17 L0 E178 R0 3*2 L0R001 2VB117 P
TE
E
TE TE L0 20 UC203*203*46
E
UB254*146*31 UC E
EL+109.500
(TOS)
L0R001 1BE118 P L0R001 1BE116 P L0R001 2VB104 P L0R001 1BE120 P
L0R001 2VB101 P L0R001 2VB102 P L0R001 2VB103 P
UB305*165*40 UB305*165*40 TEE165*152*20 UB305*165*40
TEE165*152*20 TEE165*152*20 TEE165*152*20 L0R001 2VB106 P L0R001 2VB113 P
TEE165*152*20 TEE165*152*20
L0R001 2VB105 P
TEE165*152*20
F 4750 F
12200

*2 2 P
4500

*2 B 1 0

L0 E17
7

TE
R 0 8*2

6250
V
03
E1 1 1

01 03

THE PROPER AND CORRECT ERECTION SEQUENCE FOR


T E R 00

STRUCTURAL STEEL WORKS SHALL BE FOLLOWED


1V *27
78

TRUSSES OR BRIDGES SHALL PREFERABLY BE ASSEMBLED


B1

CL OF BEAM SPLICE CL OF BEAM SPLICE


L0

AT GROUND COMPLETELY AND THEN ERECTED TO FIT IN


01

G G
POSITION.
P

PRIOR TO ERECTION OF TRUSSES OR BRIDGES,SUPPORTING


COLUMNS AND VERTICAL BRACINGS SHALL BE ERECTED
COMPLETELY.
L0R001 0BE101 P
UB254*146*31
EL+105.000
H (TOS) H

L0R001 0CL109 P
L0R001 0CL106 P
L0R001 0CL102 P

UC305*305*97
UC254*254*89
UC203*203*60

7 P
3700

L0 E1
*2 0

J J
TE
03 11

R0 78
*2 B

01 * 20
78 0V

0V 3*2
E 1 01

B1 7
TE R0

11
L0

(TYP)
200

K K

EL+101.300
(U/S BASE PLATE) ELEVATION ON GRID C

FOR CONSTRUCTION
L D-000-5331-201 GA DRAWING PLAN AT EL 101.300 AND BASE PLATE DETAILS L
D-000-5331-202 GA DRAWING PLAN AT EL 109.500 AND EL 111.500
D-000-5331-203 GA DRAWING ELEVATION ON ROW A B & C
D-000-5331-204 GA DRAWING ELEVATION ON ROW 01 TO 03
D-000-5331-890 GA DRAWING PLAN AT EL 113.500
GA DRAWINGS NO. TITLE
REFERENCE DRAWINGS
M REVIEWING 17.10.2014 M
MANISH CHAVAN
ENGINEER NAME SIGNATURE DATE
√ 1 NO COMMENTS
2 REVIEWED WITH MINOR COMMENTS
3 REVIEWED WITH COMMENTS
4 REJECTED
N 5 SUPERSEDED N

6 VOID
7 FOR INFORMATION
ALL RIGHT RESERVED THIS DOCUMENT IS THE PROPERTY OF OMAN REFINERIES AND PETROCHEMICALS COMPANY LLC
AND CONTAINS INFORMATION WHICH IS PROPRIETARY, THIS INFORMATION IS TO BE HELD IN CONFIDENCE.
NO DISCLOSURE OR OTHER USE OF THIS DOCUMENT IS TO BE MADE
WITHOUT THE PRIOR WRITTEN CONSENT OF OMAN REFINERIES AND PETROCHEMICALS COMPANY LLC

P Oman Refineries and Petrochemicals Company LLC P

DAELIM Petrofac
SOHAR REFINERY IMPROVEMENT PROJECT
TITLE :
ERECTION DRAWING FOR ELEVATION ON GRID C
Q Q
PIPE RACK L0R001

NOTES:- 12. 7 MARK MEMBER ARE NOT DESIGNED FOR ANY PIPING OR OTHER
1. ALL ELEVATIONS ARE IN METERS,DIMENSIONS ARE IN MILLIMETERS AND WEIGHTS IN KG. VERTICAL OR HORIZONTAL LOADS. THESE ARE PUERLY TIE MEMBERS LEGEND:- ANEWA ENGINEERING PVT.LTD.
V-6130-204-L0R001-B01-001 A1

2. ALL FIELD BOLTS ARE M20 ASTM A325M BOLTS WITH 1 STD. NUT AND WASHER U.N.O. PAINTING -------- P
3 DENOTES ORIENTATION MARK THE ASSEMBLY. GALVANIZING -------- Z DATE: PREP'D: CK'D: APP'D:
4. ALL STRUCTURAL STEEL IS PAINTED U.N.O.
FIRE PROOFING ALL SIDE -------- F 17.10.2014 TPJ ASC/SMR PR/SM
5. LAST ALPHABETIC NOTATION IN THE ASSEMBLY MARK IDENTIFIES THE TYPE OF FINISH FOR THE ASSEMBLY REFER TO THE LEGEND FOR NOTATIONS.
R 6. 1 INDICATES M16 ASTM A325 BOLTS WITH 1 STD. NUT AND WASHER. BOX TYPE FIRE PROOFING ALL SIDE -------- G UNIT NAME & UNIT NUMBER: JOB NUMBER: SCALE: SH'T NO: R
7. 2 INDICATES M24 ASTM A325 BOLTS WITH 1 STD. NUT AND WASHER. FIRE PROOFING TOP FLANGE EXPOSED -------- H
8. 3 INDICATES M20 ASTM A325 BOLTS WITH 1 STD NUT,1 LOCK NUT AND WASHER. BOX TYPE FIRE PROOFING TOP FLANGE EXPOSED -------- K
COMMON-0000 120476/JI-2022 NTS 007 OF 010
Tekla structures

9. 4 INDICATES M20 ASTM A325 SHOULDER BOLT WITH 1 STD NUT,1 LOCK NUT AND WASHER. DRAWING NUMBER: SIZE REV:
10. 5 INDICATES M16 ASTM A325 SHOULDER BOLT WITH 1 STD NUT,1 LOCK NUT AND WASHER. 0 ISSUED FOR CONSTRUCTION PS BNR NAK DP 17.10.2014
11. 6 INDICATES M24 ASTM A325 BOLTS WITH 1 STD NUT,1 LOCK NUT AND WASHER. REV DESCRIPTION DRAWN CHK'D APP'D APP'D DATE V-6130-204-L0R001-B01-001 A1 0
SIZE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24