15. TESTING
15.1. A sample meter of a particular type from a Vendor shall be declared acceptable
by COMPANY, only if the meter satisfies this specification and the following
tests in all respects. This acceptance will be notified by issuing a written approval
letter to the Vendor. In case of any conflict (either not clear parts in IEC
standards, this specification, or different opinions), the decision of COMPANY
shall be final.
Meter. In this case, the Vendor shall submit the certified test report for the
complemented item(s) by the specified date to the COMPANY.
15.3. The Vendor shall conduct interoperability test with AMR/AMM server, Gateway
(DCU) M
designated place. If there is any problem found, the Vendor shall solve its Meter
problem by the specified date to the COMPANY.
15.4. If the interoperability problem is found among the Meter, Gateway (DCU), and
Page 68 / 86
Saudi Electricity Company
Page 69 / 86
Saudi Electricity Company
15.7.3. Some test items of the Routine Test may be performed on sample basis
Type Routine
Test Item Related clauses
Test Test
Tests of insulation properties
Impulse voltage tests O 7.3 of IEC 62052-11
7.4 of IEC 62053-22 and
AC voltage tests O
7.4 of IEC 62053-23
Tests of accuracy requirements
Test of meter constant O O 8.4 of IEC 62053-22
Page 70 / 86
Saudi Electricity Company
Type Routine
Test Item Related clauses
Test Test
Test of starting condition O O 8.3.3 of IEC 62053-22
Test of no-load condition O O 8.3.2 of IEC 62053-22
Test of error due to influence
O 8.2 of IEC 62053-22
quantities
Test of error due to variation of the
O O 8.1 of IEC 62053-22
current
Accuracy tests at reference O
8.1 of EN50470-3
conditions
Repeatability O 8.2 of EN50470-3
Maximum permissible error O 8.4 of EN50470-3
Tests of electrical requirements
Test of power consumption O 7.1 of IEC 62053-22
Test of influence of supply voltage O 7.1 of IEC 62052-11
Test of influence of short-time
O 7.2 of IEC 62053-22
over-currents
Test of influence of self-heating O 7.3 of IEC 62053-22
Test of influence of heating O 7.2 of IEC 62052-11
Test of immunity to earth fault O 7.4 of IEC 62052-11
Anti-tampering/Anti-fraud O 9.10
O 9.11
Tests for electromagnetic compatibility (EMC)
Radio interference suppression O 7.5.8 of IEC 62052-11
Fast transient burst test O 7.5.4 of IEC 62052-11
Damped oscillatory waves
O 7.5.7 of IEC 62052-11
immunity test
Test of immunity to
O 7.5.3 of IEC 62052-11
electromagnetic RF fields
Test of immunity to conducted
disturbances, induced by radio- O 7.5.5 of IEC 62052-11
frequency fields
Page 71 / 86
Saudi Electricity Company
Type Routine
Test Item Related clauses
Test Test
Test of immunity to electrostatic
O 7.5.2 of IEC 62052-11
discharges
Surge immunity test O 7.5.6 of IEC 62052-11
Prevention of PLC Signal
O 7.11.10
Attenuation and Distortion
Tests of the effect of the climatic environments
Dry heat test O 6.3.1 of IEC 62052-11
Cold test O 6.3.2 of IEC 62052-11
Damp heat, cyclic test O 6.3.3 of IEC 62052-11
Solar radiation test O 6.3.4 of IEC 62052-11
Mechanical tests
Vibration test O 5.2.2.3 of IEC 62052-11
Shock test O 5.2.2.2 of IEC 62052-11
Spring hammer test O 5.2.2.1 of IEC 62052-11
Terminals (blocks) O O 5.4 of IEC 62052-11
Tests of protection against
O 5.9 of IEC 62052-11
penetration of dust and water
Test of resistance to heat and fire O 5.8 of IEC 62052-11
Terminal coating test O ISO 2093
Salt spary test O IEC 60068-2-52
Input Output Requirement
Display O O 8.1
Power Supply for External
O O 8.3
Communication Devices
Optical Interface O O 8.4.1
RS-485 Communication Interfaces O O 8.4.2
In-home Display (IHD) Support O O 8.4.3
Protocol O O 8.5
Output relay O O 8.6
kWH Pulse Output and EOI Pulse
O O 8.7
Output
Page 72 / 86
Saudi Electricity Company
Type Routine
Test Item Related clauses
Test Test
Functional tests
Total Energy registers O 9.1.2
TOU registers O 9.1.3
Current/last Average Demand O 9.1.4
Maximum Demand O 9.1.5
Cumulative Maximum Demand O 9.1.6
Load Profile O 9.1.7
Billing periods O 9.1.8
Special day settings O OBIS 6.7
Reset Function and Historical Data
O 9.2
Recording
9.3 (for clock accuracy test,
Real Time Clock and Calendar O
IEC 62052-21 / 62054-21)
Energy storage device O 9.4
Data Retention O 9.5
Instantaneous Measurements O 9.6
Display Function O 9.7
Security Access O 9.8
Data transport security O 9.9
Anti-tampering/Anti-fraud O 9.10
O 9.11
Page 73 / 86
Saudi Electricity Company
Type Routine
Test Item Related clauses
Test Test
Name-plate O O 12.
Terminal Cover / Meter Cover O O 6.3, 6.4, 12
Packing O O 12
Interoperability O O 14.9
Test Method O O 16
Page 74 / 86
Saudi Electricity Company
IEC 62053-23.
16.3.3. Limits of error due to variation of the current: as per clause 8.1 of IEC
62053-22 / IEC 62053-23.
16.3.4. Limits of error due to influence quantities: as per clause 8.2 of IEC
62053-22 / IEC 62053-23.
Outside temperature range: -10°C to 75°C
I is 0.5, applied mean temperature coefficient is 0.1% / K.
16.3.5. Limits of error due to influence of sub-harmonics: as per clause 8.2.2
of IEC 62053-22.
16.4. Electrical Requirements Test
16.4.1. Influence of supply voltage: as per clause 7.1 of IEC 62052-11.
16.4.2. Temperature rise: as per clause 4.1, 7.5 of this technical specification
and clause 7.2 of IEC 62052-11.
16.4.3. Power consumption: as per clause 7.1 of IEC 62053-22 and clause 7.1
of IEC 62053-23.
16.4.4. Influence of short-time overcurrents: as per clause 7.2 of IEC 62053-
22 and clause 7.2 of IEC 62053-23.
16.4.5. Influence of self-heating: as per clause 7.3 of IEC 62053-22 and clause
7.3 of IEC 62053-23.
16.5. Electromagnetic Compatibility (EMC) Test
16.5.1. Test of immunity to earth fault: as per clause 7.4 of IEC 62052-11
16.5.2. Test of immunity to electrostatic discharges: as per clause 7.5.2 of IEC
62052-11.
16.5.3. Test of immunity to electromagnetic RF fields: frequency range
80~2000 MHz, unmodulated test field strength 10V/m with operation
current, unmodulated test field strength 30V/m without operation
current, and as per clause 7.5.3 of IEC 62052-11.
16.5.4. Fast transient burst test: as per clause 7.5.4 of IEC 62052-11
16.5.4.1. Cable length between coupling device and tested meter:
0.5m±0.05m
16.5.4.2. Repetition rate: 0.75ms at 100kHz
16.5.5. Test of immunity to conducted disturbances, induced by radio-
Page 75 / 86
Saudi Electricity Company
Page 76 / 86
Saudi Electricity Company
16.7.8. Clearance and creepage distances: as per clause 5.6 of IEC 62052-11.
16.7.9. Insulating encased meter of protective class II: as per clause 5.7 of IEC
62052-11.
16.7.10. Resistance to heat and fire: as per clause 5.8 of IEC 62052-11.
16.7.11. Protection against penetration of dust and water: as per clause 5.9 of
IEC 62052-11.
16.7.12. Terminal coating test according to ISO 2093
16.8. Metering / Measurement Conformance Tests
16.8.1. The metering / measurement values shall be tested and verified as per
clause 7.9, 8.1.8, 8.2, 8.7 and 9.1 of this technical specification.
16.8.2. The metering test shall be tested and verified with applied THD (Total
Harmonics Distortion) test conditions.
16.8.3. TOU functions shall be tested per season, week, day, time and DST.
16.9. Latch Relay Tests
Page 77 / 86
Saudi Electricity Company
16.9.1. Latch Relay Tests: as per clause 6.9.8.4, 6.9.8.5 and 6.10.6 of IEC
62052-31
16.9.2. Utilization category : UC3
16.9.3. Number of operating cycles is 5500 (other conditions as per IEC
62052-31)
16.9.4. Temperature test should be as per IEC 62052-31 clause10.
16.9.5. Relay should operate normally during "OIML R46-1/-2 Edition 2012
(E), available at https://www.oiml.org/en/files/pdf_r/r046-p-e12.pdf,
section 6.3.13 "continuous (DC) magnetic induction of external
origin" Test with external magnetic interference of (500mT ±50mT).
16.10. Meter Function Tests
16.10.1. Reset function and Historical Data recording: as per clause 9.2 of this
technical specification.
16.10.2. Clock and calendar: 20 years calendar with leap years, six (6) days
time error rate conversed to one (1) month as per clause 9.3 of this
technical specification and clause 7.5 of IEC 62054-21.
16.10.3. Energy storage device: consumed energy storage device current,
technical specification of energy storage device, capacity operation as
per clause 9.4 of this technical specification.
16.10.4. Data retention: tested with accumulated metering data after the meter
power is off and one (1) hour of energy storage device removal. When
the meter power is recovered (on), the metering data shall be kept
normally as per clause 9.5 of this technical specification.
16.10.5. Instantaneous measurements: as per clause 9.6 of this technical
specification.
16.10.6. Self-diagnostics and Alarms: as per clause 8.1.20 of this technical
specification.
16.10.7. Display function: as per clause 8.1, 9.7 of this technical specification
and clause 5.10 of IEC 62052-11.
16.10.8. Output devices: as per clause 8.2, 8.6 of this technical specification
and clause 5.11 of IEC 62052-11.
16.10.9. Communication interfaces/devices: as per clause 8.3, 8.4, 8.5 of this
technical specification.
16.10.10. Security access: as per clause 9.8 of this technical
Page 78 / 86
Saudi Electricity Company
specification.
16.10.11. Data transport security Access: as per clause 9.9 of this
technical specification.
16.10.12. Anti-tampering/Anti-fraud: as per clause 9.10 of this technical
specification.
16.10.13. Magnetic Interference Tampering Protection: as per clause
9.11 of this technical specification.
16.10.14. Events/Alarms/Logs: as per clause 9.12 of this technical
specification.
16.10.15. Auto Registration: as per clause 9.13 of this technical
specification.
16.10.16. Global meter reset: as per clause 9.14 of this technical
specification.
16.10.17. Meter password reset management: as per clause 9.15 of this
technical specification.
16.10.18. Harmonics: as per clause 9.17 of this technical specification.
16.10.19. Other measurement and recording requirements: as per clause
9.17 of this technical specification.
16.10.20. Marking and packing of meter: as per clause 12, 13 of this
technical specification and clause 5.12 of IEC 62052-11.
16.10.21. Accelerated Reliability Testing: according to IEC 62059-32-1:2011:
it shall be conducted taking into account the following conditions:
T.Max = 80ºC and Moisture= 95% R.H and life time output condition
a. n (index characteristic) = 3
b. Ea (Activation Energy) = 0.9eV
c. Temperature/Moisture condition as below
Tuse: 30 °C
RHuse: 35%
d. Life time evaluation condition: 15-years life time with
Reliability/Confidence level 50%.
e. Five combinations of stresses to be applied:
Temperature: 80 °C, relative humidity: 95 %
Page 79 / 86
Saudi Electricity Company
Page 80 / 86
Saudi Electricity Company
17.1.2. Technical support for the quantity and inspection check, performance
test, integration test with Gateway (DCU) and AMR/AMM server and
trial operation.
Page 81 / 86