Catchment Area Calculation
Catchment Area Calculation
Catchment Area Calculation
1 Synopsis (summary)
This report is based on the calculation of calculation of catchment area of a hydrological
structure (Gandao dam). The data was collected from the concerned department FDA ( Fata
Development Authority). A topographic sheet was collected along with some coordinates.
The area is calculated by two methods using Q GIS and Auto cad. The map was created in
Auto cad and Q Gis then the area was calculated from that map
2 Objective
To calculate the catchment area of a hydraulic structure by different methods
3 Introduction
3.1.1 Basin
A river basin drains out towards a larger body of water such as the ocean or the sea.
Usually basin refers to a large catchment area of a large hydraulic structure such as basin of
river Indus. A river basin is also known as a catchment area, drainage basin, or catchment
basin. It can have smaller sub-basins that combine to form a larger water basin. When rain
falls or when ice and snow melts, the water that comes from them flows towards a river basin
before exiting towards the river, lakes, oceans, or sea
These landforms are called watersheds which are the divides or elevations that
separate the river basin or catchment area. They are also known as drainage divides because
they divide the river system or river basins from other river systems. A watershed is also a
term that is being used in the North American region to refer to a water basin which is
smaller in size and flows into a smaller outlet such as a stream or wetland. Watersheds are
considered part of a water basin. In other regions of the world, watersheds are the drainage
divides that cut through a river system.
4.2.1Dam Information
Country Pakistan
Location Mohmand Agency, FATA
Coordinates 34°18′18″N 71°24′04″E
Status Under construction
Construction began 2013
Opening date 2015 est.
Construction cost PKR 449 million
Owner(s) Government of Pakistan
Dam and spillways
5
Simpson's rule
trapezoidal rule
or other survey methods
6
5.2 By software
By the invention of software the catchment area is calculated easily just by some clicks
Q GIs
Arch GIs
AutoCAD
STEP 1
First of all we loaded the scan image of base map in QGIS
STEP 2
We geo referenced the base map as a raster image in QGIS by assigning the real
world coordinates to it.
STEP 3
7
Then we captured the coordinates of the boundary of the catchment area through
coordinate capture plugin and prepared a text file from them. We added this delimited
text file to QGIS and it resulted in a polygon representing the catchment area.
STEP 4
Finally we measured the catchment area through field calculator.
2) After adding a raster image then we aligned the scale with line of length equal to one
unit using align command.
3) After alignment, we used polyline command to draw the boundary of Ghandao khwar
looking to the contours of map with great care.
9
4) After drawing the boundary we calculated the area of boundary Using area command.
5.3 Calculations:
Scale factor 1 inch to .789 mile
The area calculated was 53.23 inch sq. as it was the catchment area on the page to
find the real area we
Area * scale factor
53.23*.789= 41.9984
6 Results
The Gandao Dam was having a catchment area of 41.9984 sq miles