COMBINED FOOTING-2(CF2)

slab thk dia short sp beam width beam thk M+ dia Nos M- dia Nos Sh dia leg sp
350 16 180.0 750 650.0 20 6.0 20.0 13.0 12 4 120.0

combined footing
Col 1 x 0.85 Col 2 x 0.85
col 1 y 1.15 col 2 y 1
Beam width 0.75 m
SBC 20 T/m2
My1 3.34 Tm
My2 2.46 Tm
Mx1 3.34 Tm
Mx2 2.46 Tm
P1 167 T
P2 123 T
footArea reqd 14.5

ALONG X ALONG Y
a 1.4 1.5
b 2.0 0.0
c 1.7 1.5
L 5.1 3.0 15.29 M2
width 3.0 5.1

e (FOOTING) 1.15 m from end A 0.00 m from end B


E (LOAD) 1.15 m from end ABeam load T/m 0.00 m from end A
Pmax 18.98 T/m2 56.9 18.97 T/m2
Pmin 18.97 T/m2 56.9 18.97 T/m2

pp1 18.97 T/m2 56.9 18.97 T/m2


pp2 18.97 T/m2 56.9 18.97 T/m2

Shear AB 79.70 T 79.70 28.46


Shear BC 87.30 t 87.30 138.54
Shear CB 26.25 t 26.25 94.54
Shear CD 96.75 t 96.75 28.46
shear = 0 at 3.33 m from B
Me torsion 11.80 tm
Mba 18.60 Tm/m 55.8
Mcd 27.41 Tm/m 82.2
Mbc -14.95 Tm/m -44.8
MBB 21.35 Tm/m 64.0
MCC 21.34 Tm/m 64.0

cantilever proj of slab = 1.1 m


BM in slab 12.0 Tm
deff of slab 186.6 mm OK punching shear OK
Depth of slab 350 mm
deff provd. 284 mm SAFE
bar dia 16 mm
Ast reqd 1050.2 mm2
spacing 180.0 mm
Ast Provd 1117.0 mm2

Fck 25 N/mm2
fy steel 500
depth of footing 650 mm SAFE
cover 50 mm
bar dia 20 mm shear
deff 590 mm OK bar-dia 12
deff reqd 564 spacing 120.0 SAFE
Ast 2445 mm2 MBA legs 4
bar area 314.2 mm2
Nos 8.0 Nos

Ast 3890 mm2 MCD


bar dia 20
bar area 314.2 mm2
Nos 13.0 Nos

Ast 1628 mm2 MBC


bar dia 20
bar area 314.2 mm2
Nos 6.0 Nos 125
punching shear
Shear check for slab col 1 0.5684908 N/mm2 gen check
Total shear force in slab 106.37 KN col 2 0.3340307 N/mm2 gen check
allowed 1.25 N/mm2
Maximum permissible shear stress beam 0.844844
b = 3000 mm
drevised = 284 mm
p = 0.13 %
fck = 25 N/mm2
tc = 0.19 N/mm2
Shear stress tmax = 1.9 N/mm2
= V / bd = 0.125 < 0.19 N/mm2 SAFE
Shear strength of concrete = 0.125 < 1.9 N/mm2 SAFE
Vsteel = V-tc*b*d = -55.5 KN
Spacing = ssc X ASV X d
Vst
Assuming 6 legged 12 dia stirrups
ASV = 678.24 mm2
ssc = 200 N/mm2
Spacing of stirrups = -694.1 mm
Provide 6 legged 12 dia stirrups at -700.0 c/c

shear in beam
Total shear force in beam 580.48 KN

Maximum permissible shear stress


b = 750 mm
drevised = 590 mm
p = 0.55 %
fck = 25 N/mm2
tc = 0.31 N/mm2
Shear stress tmax = 1.9 N/mm2
= V / bd = 1.312 > 0.31 N/mm2 Shear reinft. reqd
Shear strength of concrete = 1.312 < 1.9 N/mm2 SAFE
Vsteel = V-tc*b*d = 443.3 KN
Spacing = ssc X ASV X d
Vst
Assuming 4 legged 12 dia stirrups
ASV = 452.16 mm2
ssc = 200 N/mm2
Spacing of stirrups = 120.4 mm
Provide 4 legged 12 dia stirrups at 120.0 c/c