Assignmnet Ii
Assignmnet Ii
ASSIGNMENT II
Name :- GUNASINGHA DS
Index No :- EGT/16/439
System Studied During Energy Audit has been followed these steps same as the lecture,
In the case study there is no detail mention about the enough pre survey information;(ex)
Drawings
Number of floors
Building gross area
Air - conditioned area
Non - air - conditioned area
Climate Zone
Buildings
Constructed and installations years of buildings and equipment
And data collections stage during the walk through survey. However, the project team: Godrej’s
Green Building Consultancy Service and Ingersoll Rand, has gathered all the relevant details and
the audit was done.
The drawings have not been considered for green concept implementations suitability
study and main AC Systems, windows without protective glazed, upgrade of the green rooftop
were not properly in detail studied. In additions to that How the monitoring was conduct and
verification of the data not shown in the report. This will lead to understanding problem of data
for someone else who doesn’t have much knowledge about energy management
3. Calculations
o Cost for replacing LCD monitor instead of CRT was not considered when
calculating pay-back period.
Proper assumptions must be included ( It has been assumed monitors are working 8hr
per day) 8hr may increase when research and exams are done so it is better to take a
average from studding past few years Utility bills data
Page 23 Table 4
• Wattage of ceiling fans in ladies’ hostel are made a calculation error. It must be
corrected as;
• Exhaust fan total wattage is missed when recording the total wattage, so it has been
made a observations error on the row.
Page 24 Table 05:
• Exhaust fan total wattage are not including when representing the Graphical Presentation on
Load Mix
Page 24 Table 07
• In the water Pump Load measurement 3HP pump is 0.29kw in the table it must be corrected as
5.29KW
Recommendations:
1) Chairman cabin and administrative office is recommended to provide key tag switch to
avoid unwanted operation and wastage of electricity.
2) T12 tube light and magnetic choke is recommended to replace with energy efficient T5
and electronic choke to conserve energy.
3) Submersible pump set is recommended to overhaul after three months to avoid
wastage of energy due to poor performance.
4) Motor pump set is recommended to provide power capacitor.
5) It is strongly recommended to insulate and seal inside space of IR spectrophotometer
and UV visible spectrophotometer cabin from outside to arrest loss of reconditioned air.
6) Air conditioner shall be operated between temperature range of 23-25C to maintain
lower cooling load on compressor to save energy.
7) Submersible motor found overload which need urgent repairing.
8) Voltage and current harmonic measured are beyond permissible limit which needs
harmonic mitigation treatment.
9) CRT monitor of PCS are recommended to replace with energy efficient LCD monitors
to conserve energy.
10) Solar energy application is recommended for battery charging of UPS.
5. Critical question – if you are to conduct an energy audit for a similar situation, how
would you conduct your Energy Audit in order to recommend additional energy saving
measures and upgrades?
Bellow steps and method will be applied in addition to all the step they followed.
• Observe all the utility bills over past few years to understand usage of energy & average
of use for more reliable and correct analyzing as well as correct predications.
• Make many different types of scenarios and calculate the power usage theoretically for
best and energy saving and cost effective method from all
• Study all the drawings to modify architecture and implement green building concepts to
minimized energy consumptions and generate energy like increase Solar Energy
generation and usage, Increase Rain water storage & usage, Increase of Natural
illumination, reduce heat gain and heat losses at relevant places, Increase natural
ventilation, etc…
• Analyzed building strategies to adapt BMS for the institute with smart tech.
• Finder.
• Will be used more understandable statically methods to Analyzing and representation the
collected data
Suggestions
• All the individual areas lux demands will analyze, according to that LED, T5&T8
will replace depending on the management requaments other than replacing all
the T12 into T8,
• Proper insulation in laboratory facilities will reduce wastage of AC system power
usage.
• LED monitors will be Replaced inserted of LCD monitor