DYPNF Presendation For Biomass PDF
DYPNF Presendation For Biomass PDF
DYPNF Presendation For Biomass PDF
ABOUT DYPNF
PROJECT EXECUTION
EXPERIENCE
FOUNDED RELIABLE
CREDIT RATING
SINCE
SPECIALIST (BBB+)
1996 OF * Dun & Bradstreet
30 COUNTRIES KOSDAQ
EXPERIENCED TURNOVER
HEAD OFFICE
ENGINEERS 140 MILLION USD
IN
FOR IN
SEOUL, KOREA
MCS BUSINESS 2019
BRANCHES FACTORIES
IN IN
OUR VALUES
We focus on clients
expectation of services
and solutions
We do our work to
convey client’s success
through the project
ABOUT DYPNF
PROJECT EXECUTION
EXPERIENCE
BUT,
We think the conveyor system is not only the mean of
transportation of bulk material to the destination but it’s the
main stream of networking of resources within client’s plant
for the promised performance.
Pulley
& Roller Structural
Design Design
Chute General Hazardous
Dust Control
Design Arrange Enclosure
System
Location & Design
Bulk System
Properties Seismic
Capacity
Belt Cleaner Belt Condition
Process Civil
& Material
Requirement Design
Scrapper &Tension
Parts
Motor & Equipment
Material
Gearbox Selection
Selection
For Better performance and Centering the bulk on the belt Dust comes from Air
operation rate, Fugitive is Critical because it impacts
material shall be controlled the performance of the 3 Sources of Air movement;
conveyor. 1. Displaced Air (Material Vol.)
1. Adhering on Belt (Carry Back) 2. Induced Air (Mat’l Stream)
Material build-up will cause the 3. Generated Air (By Equip.)
belt to mistrack and lead extra
maintenance and clean-up cost
Air
+ Dust
Therefore, we developed a
solution of 3D DEM analysis to
minimize the problem from
loading area.
2. Transfer Point Spillage
Minimize Belt Sag Tight is Right ;
Skirt Edge Seals / Protectors Seal the entry and exit area
Modulation and
Programs
Standardization
ABOUT DYPNF
PROJECT EXECUTION
EXPERIENCE
Reference : The Wolfson Centre For Bulk handling technology, Greenwich University, U.K
System Description
Problems
Countermeasures
ABOUT DYPNF
PROJECT EXECUTION
EXPERIENCE
Supervision
Project Manager
Field Safety
Field QA/QC
Field Engineering
QA/QC Manager
Site Team Commissioning
Safety Manager
MANAGEMENT STRATEGE
<Note>
Marked functions as (*)to be executed and supported by Company
Common Organization
Health and
Process Safety HSE Related
Environment
Activities Activities
Activities
ABOUT DYPNF
PROJECT EXECUTION
EXPERIENCE
Project:
Location:
•Pyeongtaek, Korea
Plant Description :
Contract form :
Handling Capacity
•45 Ton/Hr
Scope of Supply :
Start-up :
•Dec, 2017
Location:
•Dangjin, Korea
Plant Description :
Contract form :
Handling Capacity
•125 Ton/Hr
Scope of Supply :
Status :
•Under Construction
Project:
Location:
•Daesan, Korea
Plant Description :
Contract form :
Handling Capacity
•200 Ton/Hr
Scope of Supply :
Status :
•Under Construction