To NASSER MOHD N H AL-KAABI ‫إلى‬ Facsimile 44325970 ‫فاكس‬

F.A.O. NASSER MOHD N H AL-KAABI Facsimile

From MANAGER, ELECTRICITY NETWORK PLANNING ‫من‬ Facsimile 4493 4557 ‫فاكس‬

Number of pages ‫عدد الصفحات‬


Date 08/21/2019 ‫التاريخ‬ Reference No: #0007720 - 01/05/2019 1
including cover ‫متضمنة الغالف‬

Subject: Your Request for Material Approval of 1600 KVA dry type transformer 11/0.4 KV
(Manufacturer: ABB – Spain)
Project: GP-13298-2 PRIVATE VILLA
KM BP #CE/2017/0000484 KM Scheme #19/47/2014

Greetings from Qatar General Electricity & Water Corporation (KAHRAMAA), with
reference to your application #0007720 dated 01/05/2019 regarding the
abovementioned subject.
The technical details and documents submitted with respect of 1 - Nos. of 1600 KVA dry
type transformer 11/0.4 KV manufactured by ABB - Spain have been examined and found
meeting with KM requirements. Therefore, it is approved for use in the above referred
project. However, the material will be subjected to inspection at site before installation for
final approval.
Note:-
1. Please note that KM approval of technical submittal is based on prevailing specification and product
performance. This approval does not form a basis to approve any future submittals.
2. This approval is valid for one year from the date of this letter. The delivery and KM inspection shall be within
the period. Afterward, new submittal needs to be submitted for KM review and approval.
3. The approval shall become void if any deviations are found as referred below:-
a) Material data incorrect in respect of BP, Scheme number, Material Details etc.
b) Deviation in the physical equipment/materials at the time of installations. Therefore, the rejection letter
shall be issued by Electricity Distribution Department.
4. Approved with following remarks
01.The Transformer shall be with earthing arrangement as agreed
02.Updated name plate with country of origin-Spain shall be arranged/ available during KM -EDC

Best Regards,inspection

Hamad Mohd Al Maddad Al-Marri


CC: Director, ENA
: Head of Mat. Stds. & Spec. MANAGER, Electricity Network Planning Dept.
EPM-P6/F3 Issue: 1 12-02-2018 Internal

You might also like