Beban TC:: Halaman 7
Beban TC:: Halaman 7
Beban TC:: Halaman 7
BEBAN TC :
In service
Moment Max (Mmax) = 100.00 t.m
Gaya Tekan Max (Vmax) = 50.00 ton
Gaya Horisontal Max (Hmax) = 3.00 ton
Halaman 7
Out of service
Moment Max (Mmax) = 20.00 t.m
Gaya Tekan Max (Vmax) = 50.00 ton
Gaya Horisontal Max (Hmax) = 3.00 ton
2. Beban TC
Jumlah Section = 17 buah
Tinggi per section = 2.5 meter
Berat per section = 0.82 ton
Tinggi TC (free standing) = 40 meter
Lebar section = 2.1 meter
DATA PONDASI
Jarak Tiang
Jenis Pondasi = Bore Pile
Jumlah Tiang = 4 buah
Jarak Tiang (s) = 2.5 m 2.7
Diameter tiang = 0.4 m
Pile Cap
Tebal selimut beton = 0.04 m
Panjang minimum = 2.58 m
Panjang = 3.5 m OK!
Lebar = 3.5 m
Tinggi = 1.5 m (tebal minimal)
Berat Poer = p x l x t x gbeton = 44.10 ton
= 44.10 ton
fc' = 25 MPa = 2500 T/m2
fy = 390 MPa = 39000 T/m2
Es = 200000 MPa = 20000000 T/m2
Data TC
Panjang Jib (LJ) = 30 m
Beban Jib (qJ) = 0.226666667 ton/m
Panjang Counter Jib (LCJ) = 14 m
Beban Counter Jib (qJB) = 0.16 ton/m
Counter weight (wCW ) = 4 ton
Beban Max (wMAX) = 1 ton
Jarak beban max (LMAX) = 11.85 m
Momen pada kondisi normal = 0,5 x qJ x LJ2 - 0.5 x qCJ x LCJ2 - 1,3 x wCW x LCJ
= 13.52 t.m
= 14 t.m
Momen pada kondisi beban 8 ton = 0,5 x qJ x LJ2 + 1,3 wMAX x LMAX - 0.5 x qCJ x LCJ2 - 1,3 x wCW x LCJ
= 28.925 t.m