The Engineering Change Notice documents a proposed change to the inner or outer ring of an affected component. It lists the quality system documents that may need updating due to the change and gets sign off from various department directors and general managers. The notice will go into effect on a specified date and may be either permanent or temporary.
The Engineering Change Notice documents a proposed change to the inner or outer ring of an affected component. It lists the quality system documents that may need updating due to the change and gets sign off from various department directors and general managers. The notice will go into effect on a specified date and may be either permanent or temporary.
The Engineering Change Notice documents a proposed change to the inner or outer ring of an affected component. It lists the quality system documents that may need updating due to the change and gets sign off from various department directors and general managers. The notice will go into effect on a specified date and may be either permanent or temporary.
The Engineering Change Notice documents a proposed change to the inner or outer ring of an affected component. It lists the quality system documents that may need updating due to the change and gets sign off from various department directors and general managers. The notice will go into effect on a specified date and may be either permanent or temporary.
Affected Affected Component: Inner Ring / outer Ring Department: Symbol: Change Description: Existing details: Proposed Changes:
Reason for Change:
Changes in Quality System Documents:
Document Name Change Required Responsibility Target date Completion date Control Plan Yes / No Process FMEA Yes / No Component Drawing Yes / No Set up sheets Yes / No Operation sheets Yes / No Incoming inspection format Yes / No Final inspection format Yes / No Work instructions Yes / No In process Inspection Yes / No formats Visual Aids Yes / No Masters Hard/ soft Yes / No Product control plans Yes / No PPAP Reuq. Yes / No Other Inf. Yes / No
Nature of change: Permanent / Temporary ECN Effective from date:
In case of Temporary change: Change applicable for period : Change applicable for Qty: Change completed on date: Details of new drawing / specs: Existing Issue status & date: Existing Revision status & date: Changed issue status & date: Changed Revision status & date: Copies issued to: Manufacturing Purchase Quality Vendor Approvals: Director Mktg. & Customer Relations: Director Technical: Director Purchase, fin. & Admin: GM works: GM Operations: