Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                

Engineering Change Notice: Supersonic Turners Pvt. LTD

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 1

SUPERSONIC TURNERS PVT. LTD.

ENGINEERING CHANGE NOTICE


ISSUE NO: 01 ISSUE DATE: 15.11.01 REV NO: 00 REV DATE: NIL

ECN No. ECN issue Date: Initiator:


Affected Affected Component: Inner Ring / outer Ring Department:
Symbol:
Change Description:
Existing details: Proposed Changes:

Reason for Change:

Changes in Quality System Documents:


Document Name Change Required Responsibility Target date Completion date
Control Plan Yes / No
Process FMEA Yes / No
Component Drawing Yes / No
Set up sheets Yes / No
Operation sheets Yes / No
Incoming inspection format Yes / No
Final inspection format Yes / No
Work instructions Yes / No
In process Inspection Yes / No
formats
Visual Aids Yes / No
Masters Hard/ soft Yes / No
Product control plans Yes / No
PPAP Reuq. Yes / No
Other Inf. Yes / No

Nature of change: Permanent / Temporary ECN Effective from date:


In case of Temporary change:
Change applicable for period :
Change applicable for Qty:
Change completed on date:
Details of new drawing / specs:
Existing Issue status & date: Existing Revision status & date:
Changed issue status & date: Changed Revision status & date:
Copies issued to:
Manufacturing Purchase
Quality Vendor
Approvals:
Director Mktg. & Customer Relations: Director Technical:
Director Purchase, fin. & Admin: GM works: GM Operations:

You might also like