Location via proxy:   [ UP ]  
[Report a bug]   [Manage cookies]                
Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020

DP 1X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN

NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP KPR


No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X KPR I - DP 5%

1 FERNHIL 36 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

2 FILARE 18 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

3 FILARE 22 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

4 FILARE 56 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

5 FILARE 58 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

6 GAYTON 06 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

7 GAYTON 08 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

8 GAYTON 10 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

9 GAYTON 12 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

10 GAYTON 16 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

11 GAYTON 18 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

12 GAYTON 20 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

13 GAYTON 21 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

14 GAYTON 22 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

15 GAYTON 23 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

16 GAYTON 25 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

17 GAYTON 26 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

18 GAYTON 31 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

19 GAYTON 62 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

20 GORGE 32 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

21 GORGE 36 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

22 GORGE 50 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

23 GORGE 52 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

24 GORGE 56 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

25 GORGE 58 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

26 GORGE 66 STD 6X8 48 56 901,200 954,700 974,900 1,015,300 964,200


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 1X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN

NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP KPR


No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X KPR I - DP 5%

27 HARVESTER 37 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

28 HORIZON 10 STD 7X8 56 68 1,045,000 1,107,000 1,130,400 1,177,400 1,118,100

29 HORIZON 16 STD 7X8 56 68 1,045,000 1,107,000 1,130,400 1,177,400 1,118,100

30 HORIZON 18 STD 7X8 56 68 1,045,000 1,107,000 1,130,400 1,177,400 1,118,100

31 HORIZON 20 STD 7X8 56 68 1,045,000 1,107,000 1,130,400 1,177,400 1,118,100

32 HORIZON 23 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

33 HORIZON 29 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

34 HORIZON 31 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

35 HORIZON 33 STD 6X8 48 56 910,800 964,900 985,300 1,026,200 974,600

36 INGLESIDE 10 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

37 INGLESIDE 12 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

38 INGLESIDE 16 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

39 INGLESIDE 18 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

40 INGLESIDE 19 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

41 INGLESIDE 20 STD 7X8 56 68 1,029,000 1,090,100 1,113,200 1,159,400 1,101,000

42 INGLESIDE 21 STD 7X8 56 68 1,029,000 1,090,100 1,113,200 1,159,400 1,101,000

43 INGLESIDE 22 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

44 INGLESIDE 23 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

45 INGLESIDE 26 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

46 INGLESIDE 28 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

47 LECHUZA 51 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

48 LECHUZA 53 STD 6X8 48 56 892,200 945,200 965,200 1,005,200 954,600

49 LECHUZA 55 STD 3X8 24 - 234,100 248,000 253,200 263,700 250,500

50 LECHUZA 56 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

51 MESA 06 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

52 MESA 07 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 1X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN

NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP KPR


No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X KPR I - DP 5%

53 MESA 12 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

54 MESA 25 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

55 MESA 35 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

56 MESA 36 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

57 MESA 37 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

58 MESA 50 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

59 MESA 51 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

60 MESA 56 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

61 MESA 58 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

62 MESA 60 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

63 MESA 62 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

64 MESA 66 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

65 PENA 03 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

66 PENA 05 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

67 PENA 06 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

68 PENA 07 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

69 PENA 09 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

70 PENA 15 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

71 PENA 16 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

72 PENA 17 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

73 PENA 18 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

74 PENA 19 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

75 PENA 20 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

76 PENA 21 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

77 PENA 22 STD 7X8 56 68 1,029,000 1,090,100 1,113,200 1,159,400 1,101,000

78 PENA 23 STD 6X8 48 56 897,000 950,200 970,300 1,010,600 959,700


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 1X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN

NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP KPR


No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X KPR I - DP 5%

79 PENA 26 STD 7X8 56 68 1,034,600 1,096,000 1,119,200 1,165,600 1,107,000

80 PENA 35 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

81 PENA 37 STD 5X8 40 53 793,900 841,000 858,800 894,500 849,400

82 SERA 03 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

83 SERA 06 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

84 SERA 11 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

85 SERA 15 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

86 SERA 19 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

87 SERA 21 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

88 SERA 23 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

89 SERA 25 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

90 SERA 27 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900

91 SERA 29 STD 6X8 48 56 901,700 955,300 975,500 1,016,000 964,900


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 1X

CARA PEMBAYARAN:
TUNAI KERAS
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP I (60% - UTJ)/2 : Hari ke 15 setelah UTJ
- Pembayaran DP II (60% - UTJ)/2 : Hari ke 30 setelah pembayaran sebelumnya
- Pelunasan (40%) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 18 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP (30% - UTJ) : Hari ke 15 setelah UTJ
- Angsuran 1 (@ 70%/18) : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 2 s/d 18 (@ 70%/18) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 24 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP (30% - UTJ) : Hari ke 15 setelah UTJ
- Angsuran 1 (@ 70%/24) : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 2 s/d 24 (@ 70%/24) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 36 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP (30% - UTJ) : Hari ke 15 setelah UTJ
- Angsuran 1 (@ 70%/36) : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 2 s/d 36 (@ 70%/36) : Hari ke 30 setelah pembayaran sebelumnya

KPR (*)
KPR I - DP 5%
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP (5% - UTJ) : Hari ke 15 setelah UTJ
- Akad Kredit (95%) : Hari ke 30 setelah pembayaran sebelumnya

HARGA SUDAH TERMASUK: HARGA BELUM TERMASUK:


1. IMB (Izin Mendirikan Bangunan) 1. BPHTB (Biaya Perolehan Hak Atas Tanah & Bangunan)
2. PPN Tanah & Bangunan 2. Biaya AJB (Akta Jual Beli) & Balik Nama Sertifikat HGB
3. Biaya Penyambungan Daya Listrik 3. Biaya Penyambungan Telepon
4. Biaya Penyambungan Air Bersih 4. Biaya Proses Kredit Bank

KETERANGAN:
- Unit yang sudah dibeli tidak dapat ditukar dengan unit lainnya
- Uang Tanda Jadi harus disetor ke Kasir Developer (tidak menerima reserve & titipan booking )
- Uang Tanda Jadi tidak dapat dikembalikan jika terjadi pembatalan pembelian
- Perubahan bangunan hanya diperkenankan setelah pembayaran lunas mencapai 100%
- Untuk mengetahui stok unit yang masih tersedia dapat diakses pada website https://app.paramount-land.com/siteplan
- Harga dan ketentuan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
- Khusus cara bayar KPR DP 1X (*) :
> Besaran DP untuk cara pembayaran KPR minimal 5% dan dapat bertambah sesuai kebijakan yang berlaku di Bank penyedia KPR
> Suku bunga bank tergantung dari Bank penyedia KPR dan yang berlaku pada saat SPK diterbitkan atau akad KPR dilakukan
> Segala kebijakan pemerintah yang mengakibatkan perubahan ketentuan KPR di luar tanggung jawab Pengembang
> Jika terjadi penolakan kredit, DP dapat dikembalikan dengan pemotongan pajak sesuai ketentuan yang berlaku
- Proses penandatanganan PPJB dilakukan setelah pembayaran DP 15%
- Serah terima bulan ke 18 terhitung sejak penandatangan PPJB
- Minimal pembayaran pada saat serah terima sudah mencapai 45% dari harga jual
PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 6X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN
NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP
No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X

1 FERNHIL 36 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

2 FILARE 18 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

3 FILARE 22 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

4 FILARE 56 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

5 FILARE 58 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

6 GAYTON 06 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

7 GAYTON 08 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

8 GAYTON 10 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

9 GAYTON 12 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

10 GAYTON 16 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

11 GAYTON 18 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

12 GAYTON 20 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

13 GAYTON 21 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

14 GAYTON 22 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

15 GAYTON 23 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

16 GAYTON 25 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

17 GAYTON 26 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

18 GAYTON 31 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

19 GAYTON 62 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

20 GORGE 32 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

21 GORGE 36 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

22 GORGE 50 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

23 GORGE 52 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

24 GORGE 56 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

25 GORGE 58 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

26 GORGE 66 STD 6X8 48 56 901,200 981,200 1,002,200 1,044,200

27 HARVESTER 37 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

28 HORIZON 10 STD 7X8 56 68 1,045,000 1,137,800 1,162,100 1,210,800

29 HORIZON 16 STD 7X8 56 68 1,045,000 1,137,800 1,162,100 1,210,800


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 6X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN
NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP
No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X

30 HORIZON 18 STD 7X8 56 68 1,045,000 1,137,800 1,162,100 1,210,800

31 HORIZON 20 STD 7X8 56 68 1,045,000 1,137,800 1,162,100 1,210,800

32 HORIZON 23 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

33 HORIZON 29 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

34 HORIZON 31 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

35 HORIZON 33 STD 6X8 48 56 910,800 991,700 1,012,900 1,055,300

36 INGLESIDE 10 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

37 INGLESIDE 12 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

38 INGLESIDE 16 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

39 INGLESIDE 18 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

40 INGLESIDE 19 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

41 INGLESIDE 20 STD 7X8 56 68 1,029,000 1,120,400 1,144,300 1,192,300

42 INGLESIDE 21 STD 7X8 56 68 1,029,000 1,120,400 1,144,300 1,192,300

43 INGLESIDE 22 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

44 INGLESIDE 23 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

45 INGLESIDE 26 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

46 INGLESIDE 28 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

47 LECHUZA 51 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

48 LECHUZA 53 STD 6X8 48 56 892,200 971,400 992,200 1,033,800

49 LECHUZA 55 STD 3X8 24 - 234,100 254,900 260,300 271,200

50 LECHUZA 56 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

51 MESA 06 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

52 MESA 07 STD 5X8 40 53 793,900 864,400 882,900 919,900

53 MESA 12 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

54 MESA 25 STD 5X8 40 53 793,900 864,400 882,900 919,900

55 MESA 35 STD 5X8 40 53 793,900 864,400 882,900 919,900

56 MESA 36 STD 5X8 40 53 793,900 864,400 882,900 919,900

57 MESA 37 STD 5X8 40 53 793,900 864,400 882,900 919,900

58 MESA 50 STD 5X8 40 53 793,900 864,400 882,900 919,900


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 6X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN
NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP
No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X

59 MESA 51 STD 5X8 40 53 793,900 864,400 882,900 919,900

60 MESA 56 STD 5X8 40 53 793,900 864,400 882,900 919,900

61 MESA 58 STD 5X8 40 53 793,900 864,400 882,900 919,900

62 MESA 60 STD 5X8 40 53 793,900 864,400 882,900 919,900

63 MESA 62 STD 5X8 40 53 793,900 864,400 882,900 919,900

64 MESA 66 STD 5X8 40 53 793,900 864,400 882,900 919,900

65 PENA 03 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

66 PENA 05 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

67 PENA 06 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

68 PENA 07 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

69 PENA 09 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

70 PENA 15 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

71 PENA 16 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

72 PENA 17 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

73 PENA 18 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

74 PENA 19 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

75 PENA 20 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

76 PENA 21 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

77 PENA 22 STD 7X8 56 68 1,029,000 1,120,400 1,144,300 1,192,300

78 PENA 23 STD 6X8 48 56 897,000 976,600 997,500 1,039,300

79 PENA 26 STD 7X8 56 68 1,034,600 1,126,400 1,150,500 1,198,700

80 PENA 35 STD 5X8 40 53 793,900 864,400 882,900 919,900

81 PENA 37 STD 5X8 40 53 793,900 864,400 882,900 919,900

82 SERA 03 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

83 SERA 06 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

84 SERA 11 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

85 SERA 15 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

86 SERA 19 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

87 SERA 21 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 6X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN
NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP
No. JALAN TIPE
UNIT (M2) TNH BGN KERAS 18 X 24 X 36 X

88 SERA 23 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

89 SERA 25 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

90 SERA 27 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800

91 SERA 29 STD 6X8 48 56 901,700 981,800 1,002,800 1,044,800


PRICELIST CORRAL @MALIBU AS OF FEB, 3RD 2020
DP 6X

CARA PEMBAYARAN:
TUNAI KERAS
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP I (60% - UTJ)/2 : Hari ke 15 setelah UTJ
- Pembayaran DP II (60% - UTJ)/2 : Hari ke 30 setelah pembayaran sebelumnya
- Pelunasan (40%) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 18 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP I (30% - UTJ)/6 : Hari ke 15 setelah UTJ
- Pembayaran DP II (30% - UTJ)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Pembayaran DP III s/d VI (30% - UTJ)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 1 s/d 13 (@ 70%/13) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 24 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP I (30% - UTJ)/6 : Hari ke 15 setelah UTJ
- Pembayaran DP II (30% - UTJ)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Pembayaran DP III s/d VI (30% - UTJ)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 1 s/d 19 (@ 70%/19) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 36 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 10.000.000,- (pada saat transaksi)
- Pembayaran DP I (30% - UTJ)/6 : Hari ke 15 setelah UTJ
- Pembayaran DP II (30% - UTJ)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Pembayaran DP III s/d VI (30% - UTJ)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 1 s/d 31 (@ 70%/31) : Hari ke 30 setelah pembayaran sebelumnya

HARGA SUDAH TERMASUK: HARGA BELUM TERMASUK:


1. IMB (Izin Mendirikan Bangunan) 1. BPHTB (Biaya Perolehan Hak Atas Tanah & Bangunan)
2. PPN Tanah & Bangunan 2. Biaya AJB (Akta Jual Beli) & Balik Nama Sertifikat HGB
3. Biaya Penyambungan Daya Listrik 3. Biaya Penyambungan Telepon
4. Biaya Penyambungan Air Bersih

KETERANGAN:
- Unit yang sudah dibeli tidak dapat ditukar dengan unit lainnya
- Uang Tanda Jadi harus disetor ke Kasir Developer (tidak menerima reserve & titipan booking )
- Uang Tanda Jadi tidak dapat dikembalikan jika terjadi pembatalan pembelian
- Perubahan bangunan hanya diperkenankan setelah pembayaran lunas mencapai 100%
- Untuk mengetahui stok unit yang masih tersedia dapat diakses pada website https://app.paramount-land.com/siteplan
- Harga dan ketentuan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
- Proses penandatanganan PPJB dilakukan setelah pembayaran DP 15%
- Serah terima bulan ke 18 terhitung sejak penandatangan PPJB
- Minimal pembayaran pada saat serah terima sudah mencapai 45% dari harga jual
PRICELIST MALIBU VILLAGE AS OF APR, 14TH 2020 (NEW STOCK)
DP 1X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN
NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP KPR
No. JALAN TIPE SPEK FINISHING TAMPAK
UNIT (M2) TNH BGN KERAS 18 X 24 X KPR I - DP 5%
1 BONSAL 11 STD 7X8 56 68 SPEK 1 CAT 1,154,900 1,221,000 1,246,000 1,205,000

2 FILARE 09 STD 6X8 48 55 SPEK 3 CAT 1,006,000 1,063,700 1,085,500 1,049,700

3 FILARE 51 STD 6X8 48 55 SPEK 1 CAT 995,900 1,053,100 1,074,600 1,039,200

4 INLAND 15 STD 7X8 56 68 SPEK 1 CAT 1,144,000 1,209,500 1,234,200 1,193,600

5 RAMBLA 05 STD 7X8 56 68 SPEK 5 ARTIFICIAL STONE 1,186,500 1,254,100 1,279,500 1,237,700

CARA PEMBAYARAN:
TUNAI KERAS
- Uang Tanda Jadi (UTJ) : Rp. 20.000.000,- (pada saat transaksi)
- Pembayaran DP I (60%)/2 : Hari ke 15 setelah UTJ
- Pembayaran DP II (60%)/2 : Hari ke 30 setelah pembayaran sebelumnya
- Pelunasan (100%-UTJ-DP) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 18 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 20.000.000,- (pada saat transaksi)
- Pembayaran DP (30%) : Hari ke 15 setelah UTJ
- Angsuran 1 (@100%-UTJ-DP)/18 : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 2 s/d 18 (@100%-UTJ-DP)/18 : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 24 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 20.000.000,- (pada saat transaksi)
- Pembayaran DP (30%) : Hari ke 15 setelah UTJ
- Angsuran 1 (@100%-UTJ-DP)/24 : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 2 s/d 24 (@100%-UTJ-DP)/24 : Hari ke 30 setelah pembayaran sebelumnya
KPR (*)
KPR I - DP 5%
- Uang Tanda Jadi (UTJ) : Rp. 20.000.000,- (pada saat transaksi)
- Pembayaran DP (5%) : Hari ke 15 setelah UTJ
- Akad Kredit (100%-UTJ-DP) : Hari ke 30 setelah pembayaran sebelumnya

HARGA SUDAH TERMASUK: HARGA BELUM TERMASUK:


1. IMB (Izin Mendirikan Bangunan) 1. BPHTB (Biaya Perolehan Hak Atas Tanah & Bangunan)
2. PPN Tanah & Bangunan 2. Biaya AJB (Akta Jual Beli) & Balik Nama Sertifikat HGB
3. Biaya Penyambungan Daya Listrik 3. Biaya Penyambungan Telepon
4. Biaya Penyambungan Air Bersih 4. Biaya Proses Kredit Bank
5. Funiture dan Interior (Khusus Rumah Contoh)*)

KETERANGAN:
- Unit yang sudah dibeli tidak dapat ditukar dengan unit lainnya
- Uang Tanda Jadi harus disetor ke Kasir Developer (tidak menerima reserve & titipan booking )
- Uang Tanda Jadi tidak dapat dikembalikan jika terjadi pembatalan pembelian
- Perubahan bangunan hanya diperkenankan setelah pembayaran lunas mencapai 100%
- Untuk mengetahui stok unit yang masih tersedia dapat diakses pada website https://app.paramount-land.com/siteplan
- Harga dan ketentuan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
- Khusus cara bayar KPR DP 1X (*) :
> Besaran DP untuk cara pembayaran KPR minimal 5% dan dapat bertambah sesuai kebijakan yang berlaku di Bank penyedia KPR
> Suku bunga bank tergantung dari Bank penyedia KPR dan yang berlaku pada saat SPK diterbitkan atau akad KPR dilakukan
> Segala kebijakan pemerintah yang mengakibatkan perubahan ketentuan KPR di luar tanggung jawab Pengembang
> Jika terjadi penolakan kredit, DP dapat dikembalikan dengan pemotongan pajak sesuai ketentuan yang berlaku
- Proses penandatanganan PPJB dilakukan setelah pembayaran DP 15%
- Serah terima bulan ke 6 terhitung sejak penandatangan PPJB
- Minimal pembayaran pada saat serah terima sudah mencapai 45% dari harga jual
PRICELIST MALIBU VILLAGE AS OF APR, 14TH 2020 (NEW STOCK)
DP 6X

Dalam Ribuan Rupiah (,000)


*HARGA SUDAH TERMASUK PPN
NO UK KAV LUAS LUAS TUNAI TUNAI BERTAHAP
No. JALAN TIPE SPEK FINISHING TAMPAK
UNIT (M2) TNH BGN KERAS 18 X 24 X
1 BONSAL 11 STD 7X8 56 68 SPEK 1 CAT 1,154,900 1,253,800 1,279,700

2 FILARE 09 STD 6X8 48 55 SPEK 3 CAT 1,006,000 1,092,300 1,115,000

3 FILARE 51 STD 6X8 48 55 SPEK 1 CAT 995,900 1,081,400 1,103,800

4 INLAND 15 STD 7X8 56 68 SPEK 1 CAT 1,144,000 1,241,900 1,267,600

5 RAMBLA 05 STD 7X8 56 68 SPEK 5 ARTIFICIAL STONE 1,186,500 1,287,500 1,314,000

CARA PEMBAYARAN:
TUNAI KERAS
- Uang Tanda Jadi (UTJ) : Rp. 20.000.000,- (pada saat transaksi)
- Pembayaran DP I (60%)/2 : Hari ke 15 setelah UTJ
- Pembayaran DP II (60%)/2 : Hari ke 30 setelah pembayaran sebelumnya
- Pelunasan (100%-UTJ-DP) : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 18 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 20.000.000,- (pada saat transaksi)
- Pembayaran DP I (30%)/6 : Hari ke 15 setelah UTJ
- Pembayaran DP II (30%)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Pembayaran DP III s/d VI (30%)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 1 s/d 13 (@100%-UTJ-DP)/13 : Hari ke 30 setelah pembayaran sebelumnya
TUNAI BERTAHAP 24 BULAN
- Uang Tanda Jadi (UTJ) : Rp. 20.000.000,- (pada saat transaksi)
- Pembayaran DP I (30%)/6 : Hari ke 15 setelah UTJ
- Pembayaran DP II (30%)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Pembayaran DP III s/d VI (30%)/6 : Hari ke 30 setelah pembayaran sebelumnya
- Angsuran 1 s/d 19 (@100%-UTJ-DP)/19 : Hari ke 30 setelah pembayaran sebelumnya

HARGA SUDAH TERMASUK: HARGA BELUM TERMASUK:


1. IMB (Izin Mendirikan Bangunan) 1. BPHTB (Biaya Perolehan Hak Atas Tanah & Bangunan)
2. PPN Tanah & Bangunan 2. Biaya AJB (Akta Jual Beli) & Balik Nama Sertifikat HGB
3. Biaya Penyambungan Daya Listrik 3. Biaya Penyambungan Telepon
4. Biaya Penyambungan Air Bersih
5. Funiture dan Interior (Khusus Rumah Contoh)*)

KETERANGAN:
- Unit yang sudah dibeli tidak dapat ditukar dengan unit lainnya
- Uang Tanda Jadi harus disetor ke Kasir Developer (tidak menerima reserve & titipan booking )
- Uang Tanda Jadi tidak dapat dikembalikan jika terjadi pembatalan pembelian
- Perubahan bangunan hanya diperkenankan setelah pembayaran lunas mencapai 100%
- Untuk mengetahui stok unit yang masih tersedia dapat diakses pada website https://app.paramount-land.com/siteplan
- Harga dan ketentuan dapat berubah sewaktu-waktu tanpa pemberitahuan terlebih dahulu
- Proses penandatanganan PPJB dilakukan setelah pembayaran DP 15%
- Serah terima bulan ke 6 terhitung sejak penandatangan PPJB
- Minimal pembayaran pada saat serah terima sudah mencapai 45% dari harga jual

You might also like