1 2 3 4 5 6 7 8 9 10

REV. No.

C02
GENERAL NOTES
FAC1-TG-823002
SHT. No.

1. FOR GENERAL INSTRUCTIONS, SYMBOLS, NOMENCLATURE, STANDARD DETAILS


001

EXPORT GAS COMPRESSOR AREA AOC SUMP REFER TO P&ID LEGEND SHEETS DRAWING NO's KZ01-PR-PID-53-00004 TO 00026.
ECA ICR
SIZE: 7700.0 mm(L)X7700.0 mm(W)X3170.0 mm(H) 13 AOC WATER
2"-FAC1-WO-8230741-B01B1-NI 2. ALL INSTRUMENTS ON THIS P&ID SHALL BE PREFIXED BY PLANT LOCATION ID. FAC1
CAPACITY: 90.00 m^3 5802 KZ01-PR-PID-53-80470-001
DP/DT: /ATM/5 °C(MIN)/82 °C(MAX) TO PRODUCED WATER AND UNLESS OTHERWISE SPECIFIED.
A A
MATERIAL: CONCRETE INTERNALLY LINE OPEN DRAIN TREATMENT
INSULATION/THK: NI/ PACKAGE 3. ALL SAMPLE POINTS, HAND VALVES, CHECK VALVES, REMOVABLE SPOOLS, SPECTACLE
TRIM NUMBER: FAC1-TX-8230003-B01B1-NI BLINDS AND SPADES ON THIS P&ID SHALL BE PREFIXED BY PLANT LOCATION ID FAC1
FAC1-TX-8230012-B01B2-NI 15
UNLESS OTHERWISE SPECIFIED. ALL SAMPLE POINTS, HAND VALVES, CHECK VALVES,
REMOVABLE SPOOLS, SPECTACLE BLINDS AND SPADES SHALL TAKE THEIR SYSTEM NO.
FROM LINE NO. PSST ON WHICH THEY ARE LOCATED.
KZ01-PR-PID-53-80578

NOTES
DWG. No.

1 CONNECTION TO BE USED FOR NITROGEN AND GENERAL UTILITIES.

2 VENT TO ATMOSPHERE AT SAFE LOCATION.


B B

3 SELF CLOSING SAMPLE HATCH.

4 DELETED.

5 DELETED.

HV-190

2"
6 CONNECTION FOR GULLY SUCKER / VACUUM TRUCK CONNECTION.

7 PUMP FAC1-P-823002 AUTO STARTS AT HIGH LEVEL AND STOPS AT LOW LEVEL.
1"x3/4" HV-191
C C
D 8 MINIMUM RATING OF 300# IS REQUIRED FOR INSTRUMENTS.
3/4"
9 DELETED.

10 DELETED.

HV-193

2"
11 1 WAREHOUSE SPARE TO BE PROVIDED COMMON FOR ALL AOC SUMP PUMPS.
FO
8230
+
12 DELETED.
033

13 HEIGHT SPECIFIED IS EXCLUDING BOOT DEPTH.

14 FOR PUMP MOUNTING DETAILS AND NOZZLE SIZE REFER GA DRAWING


D D
(KZ01-CV-GAS-53-0733/34).

15 PIPING AT NOZZLE N04 SHALL HAVE TRIM TX-8230012-B01B2-NI.


PI HV-189
8230
037 3/4" 16 FOR DETAILS OF SUMP, BOOT AND NOZZLE ORIENTATION REFER GENERAL ARRANGEMENT
DRAWINGS KZ01-CV-GAS-53-0733 AND KZ01-CV-GAS-53-0734.

ON/OFF
HOLDS
1 TO 6 DELETED.

2"-FAC1-WO-8230741-B01B1-NI
MP
E 8230 E
LC H 7 902

2"-FAC1-WO-8230742-B01B1-NI
8230
BN-58 022 L

LZI XZS
8230 8230 51
6"-FAC1-VO-8230002-B01B1-NI

023 LL 902

2"x1-1/2"
GWR GWR
LT LZT
20"-FAC1-DO-8230722-B01B2-NI

8230 8230
022 023 HV-188

RS-06
1

14
F 6" 6 F
3
RS-05
8
HV-187

PEC
2"

1-1/2" VENDOR
ECA C02 12/01/2016 APPROVED FOR CONSTRUCTION RC/AVS RB/YH/KK TAM/IDD
GEN M01 N01 N03 K01 K02 N09 N06 M02 N02 N07
OVERFLOW 800X800 2" 6" 6" 6" 2" 6" 800X800 6" C01 05/07/2015 APPROVED FOR CONSTRUCTION PD/SNG RB/SG/KK TAM/IDD
WEIR
B01H 23/03/2015 APPROVED FOR DESIGN PD/SNG RB/SG/KK TAM/IDD
TO SURFACE
OPEN DRAINS COLLECTION HV-186 A02H 09/12/2014 ISSUED FOR HAZOP PD/SNG SKG/VG/KK IDD
WATER SEWER
HEADER FROM EXPORT 15
HV-211

COMPRESSOR AREA SU-07 N04 A01H 13/10/2014 ISSUED FOR REVIEW PD/YP VG/KK IDD
FB
1"

LO 20" HLL=1570.0 mm
D 16 REV DATE DESCRIPTION ORIG CHK'D APP'D
P01C6 B01B2 LLL=450.0 mm
20"-FAC1-DO-8230708-P01C6-NI
LLLL=300.0 mm
20"-FAC1-DO-8230926-P01C6-NI
G G

1:300
CLIENT: BP EXPLORATION (EPSILON) LIMITED
FAC1-TG-823002 CENTRAL PROCESSING FACILITY (CPF) - KHAZZAN PROJECT
CONTRACT NO. : CO-BPXO-12-0376 ORIGINAL DWG SIZE : A1
7
PETROFAC JOB NO. : JI-2024 SECURITY CLASS. : PROJECT INTERNAL
TITLE:
FAC1-P-823002 PIPING AND INSTRUMENT DIAGRAM - FAC1 - SYSTEM 8230
OPEN DRAINS
FAC1-P-823002
KZ01-PR-PID-53-80578.pid

11
H
EXPORT GAS COMPRESSOR AREA AOC SUMP PUMP EXPORT GAS COMPRESSOR AREA AOC SUMP AND PUMP H
CAPACITY: 6.0 m^3/hr
ABSORBED POWER: 2.8 kW
MATERIAL: LTCS SCALE DRAWING No. SHEET No. REVISION
INSULATION/THK: NI/ C02
TRIM NUMBER: FAC1-TX-8230004-B01B1-NI
NONE KZ01-PR-PID-53-80578 001
CAD Filename: KZ01-PR-PID-53-80578-001-C02.pid
1 2 3 4 5 6 7 8 9 10