Debby Willar Thesis PDF
Debby Willar Thesis PDF
Debby Willar Thesis PDF
IMPLEMENTATION IN INDONESIAN
CONSTRUCTION COMPANIES
By
Debby Willar
S.T. (Civil), MEngSc (Project Management)
Doctor of Philosophy
2012
STATEMENT OF ORIGINAL AUTHORSHIP
“The work contained in this thesis has not been previously submitted to meet
requirements for an award at this or any other higher education institution. To the
best of my knowledge and belief, the thesis contains no material previously published
or written by another person except where due reference is made."
QUT Verified
Signature
Signature: Date: 09/07/2012
ii
ACKNOWLEDGEMENT
Praise the LORD, Who, in His infinite mercy, guided me to the completion of this
PhD thesis. „I will praise You, O LORD, with my whole heart; I will tell of all Your
marvelous works.‟ (Psalm 9:1).
Thanks are also extended to my fellow colleagues and friends at the Manado State
Polytechnic, Ir. Chris Hombokau, M.T. and Jerry Lintong, S.E.Ak., at the Ujung
Pandang State Polytechnic, Ir. Muhammad Taufan, all of whom helped and provided
strong support during the activities of data collection. I would also like to thank Dr
John Schiller of the University of Queensland, for the final proof reading of this
thesis.
Last but not least, my heartiest thanks and love to my mother, husband - Frankie, and
daughters - Esther and Jessie, who have given me continuous support throughout this
journey.
Debby Willar
Brisbane, July 2012
iii
ABSTRACT
iv
practitioners, policy makers and academic experts, which further considered and
validated the usefulness and applicability of the framework. Based on the outcome
from this discussion and on the results of the earlier data analysis, a final version of
the framework was developed to assist Indonesian construction companies in
improving their capability of construction project delivery, and thereby contribute to
providing or improving the competitive advantage of Indonesian construction
companies in the local, national and global construction market.
v
TABLE OF CONTENTS
CHAPTER 1
INTRODUCTION
1.1 Problem Statement 1
1.2 Research Aim and Objectives 7
1.3 Research Significance 9
1.4 Methodology Approach 11
1.5 Thesis Organisation 13
CHAPTER 2
QUALITY MANAGEMENT SYSTEM AND ORGANISATIONAL
CULTURE IN CONSTRUCTION
2.1 Introduction 15
2.2 Quality Management Systems in Construction 16
2.2.1 Quality Defined in Construction 16
2.2.2 ISO 9001 Standard 20
2.2.3 The Effectiveness of Implementing a Quality Management 27
System
2.2.4 Barriers to Implementing Quality Management Systems 31
2.3 The Existing Use of the ISO 9001 Standard in Indonesian Construction 35
Companies
2.4 Organisational Culture in the Construction Industry 46
2.4.1 Concepts of Organisational Culture 46
2.4.2 The Competing Values Framework 48
2.5 The Culture-based Quality Management System 56
2.5.1 Culture Change 56
2.5.2 Relationship between Organisational Culture and Quality 59
Management System Practices in Construction Companies
2.5.3 Construction Organisation Performance Measurement 64
2.6 Research Gaps 68
2.7 Summary 69
vi
CHAPTER 3
RESEARCH DESIGN
3.1 Introduction 71
3.2 Research Plan 72
3.3 Selection of Research Methods 78
3.3.1 Questionnaire Design 81
3.3.2 Sample Design 89
3.3.3 Preliminary Studies 92
3.3.4 Questionnaire Survey 99
3.3.5 Focus Group Discussion 103
3.4 Summary 107
CHAPTER 4
INDONESIAN CONTRACTORS’ QUALITY MANAGEMENT SYSTEM
AND ORGANISATIONAL CULTURE
4.1 Introduction 108
4.2 Profiles of Respondents 109
4.3 Current Quality Management System Implementation 112
4.3.1 Development of Quality Management Systems 113
4.3.2 Levels of Quality Management System Implementation 118
4.3.3 Problems Affecting Effective Quality Management System 121
Implementation
4.3.4 Key Performance Indicators of ISO 9001 Certified Contractors 123
4.4 Contractors Organisational Culture Profiles 124
4.4.1 Overall Dominant Organisational Culture Types 125
4.4.2 Dominant Types of Six Cultural Dimensions 127
4.5 Examination of the Theoretical Framework 130
4.5.1 Sets of Meaningful Quality Management System Variables 130
4.5.2 Relationships among Quality Management System and 136
Organisational Culture Variables
4.6 Discussion of Results 144
4.7 Summary 157
CHAPTER 5
CULTURE-BASED QUALITY MANAGEMENT SYSTEM
IMPROVEMENT IMPLEMENTATION FRAMEWORK
5.1 Introduction 160
5.2 Development of a Framework 160
5.2.1 Types of Organisational Culture 161
5.2.2 Construction of Framework Components 165
5.3 Evaluation and Validation of Framework 167
5.3.1 Composition of the Panel Group 167
5.3.2 Analysis and Results 171
5.4 Discussion of Results 185
vii
5.5 The Framework 190
5.6 Summary 209
CHAPTER 6
CONCLUSIONS
6.1 Conclusions 210
6.2 Research Contributions 213
6.3 Limitations and Recommendations for Future Research 215
REFERENCES 218
viii
LIST OF TABLES
ix
Table 4.14 ANOVA Results: Significant Group Response for 119
Implementation Level of ISO 9001 Principles
Table 4.15 Company Implementation Level of ISO 9001 Elements 120
(N=403)
Table 4.16 ANOVA Results: Significant Group Responses for 121
Implementation Level of ISO 9001 Elements
Table 4.17 Barriers to the Effective Quality Management System 122
Practices (N=403)
Table 4.18 Contractors‟ Key Performance Indicators (N=403) 123
Table 4.19 Dominant Culture Types of Indonesian Construction 126
Organisational Culture
Table 4.20 Dominant Culture Types of Six Cultural Dimensions 129
Table 4.21 Principal Component Analysis Results for the QMS Variables 133
(N=403)
Table 4.22 Reliability of Internal Consistency (N=403) 134
Table 4.23 Descriptive Analysis of QMS Factors (N=77) 136
Table 4.24 Pearson‟s rho Correlation Matrix (N=77) 139
Table 4.25 ANOVA Results: QMS Practices on the Six Cultural 141
Dimensions
Table 4.26 Pairwise Comparisons in the Six Cultural Dimensions of QMS 141
Practices between the Four Culture Types
Table 5.1 Applicability of Hierarchy-Market Culture in Four 163
Organisational Areas
Table 5.2 Invited and Agreed Focus Group Panellists 168
x
LIST OF FIGURES
xi
Figure 5.9 Framework 6: Verification of Product Realization 201
Improvement
Figure 5.10 Framework 7: Quality Management and Quality System 203
Improvement
Figure 5.11 Framework 8: Process Approach Improvement 205
Figure 5.12 Framework 9: Improvement of Continual Improvement 207
Figure 5.13 Framework 10: Improvement of Factual Approach to Decision 208
Making
xii
LIST OF ABBREVIATIONS
xiii
LPJK : Lembaga Pengembangan Jasa Konstruksi
NCAI : National Contractors Association of Indonesia
NCSDB : National Construction Services Development Board
OCAI : Organizational Culture Assessment Instrument
PCA : Principal Component Analysis
QA : Quality Assurance
QHSE : Quality, Health, Safety and Environment
QMR : Quality Management Representative
QMS : Quality Management System
R&D : Research and Development
SD : Standard Deviation
SEM : Structural Equation Modelling
SNI : Standar Nasional Indonesia
SPSS : Satistical Package for Social Science
TQM : Total Quality Management
xiv
CHAPTER 1
INTRODUCTION
Since the early 1970s, the construction sector has been one of the main economic
indicators to show continuous and gradual growth of the Indonesian economy. This
sector accounted for 10.19% of GDP in 2011 (Central Bureau of Statistics 2012).
Planning activities in the construction sector in Indonesia are estimated to have
provided direct employment for around 5 million people, with this figure increasing
to around 10 million during project execution stages (LPJK 2007). It has been
reported that in the first-quarter of 2011, the construction industry workforce in
Indonesia was about 5.58 million, making it one of the largest employment sectors in
the Indonesian economy (Central Bureau of Statistics 2011).
The Ministry of Finance reported that the Ministry of Public Works of Indonesia was
allocated around 36.09 IDR trillion in 2010, 56.52 IDR trillion in 2011, and 62.56
IDR trillion in 2012 (The Presidential Unit of Monitoring and Control 2012) within
the national budget (APBN) specifically for infrastructure development, most of
which was for bridge construction and road maintenance. The Ministry of Public
1
Works received the third largest national budget allocation in each of the three years
from 2010 to 2012.
Given the emerging prospects of the Indonesian construction industry to become the
„engine‟ of national economic development, as well as adding value to social and
cultural development and conservation of the environment, Indonesian construction
companies are still unfortunately plagued by low competitiveness (Pamulu 2010).
The lack of competitiveness of domestic contractors when competing for contracts
with foreign companies, both at national and international levels, is mainly attributed
to their poor performance and inability to adapt to change, high execution costs,
project delays, low levels of efficiency, low productivity, and conflict among
involved parties (Budiwibowo et al. 2009; Larasati and Tsunemi 2009). These
challenges and constraints have resulted in many Indonesian contractors not being
able to capitalise on development and contractual opportunities due to their not being
capable of attaining higher levels of performance (ibid 2010). At the same time, there
has in recent years been a significant increase in the number of foreign companies
competing for contractual opportunities in Indonesia, while a very small number of
2
large-scale Indonesian contractors are operating in an international market
(Widjajanto, Pribadi and Suraji 2011).
Sudarto et al. (2008) report that, within Indonesia, market related issues including
customer satisfaction rate, competition between companies, and constraints in
capturing market interest, are major factors contributing to the poor performance of
Indonesian construction companies when competing for contracts with constructors
from other South-East Asian countries. This situation is exacerbated with China
being particularly competitive and securing contracts for international projects in
countries in the Middle East, as well as in the free-trade market country groupings of
ASEAN Free Trade Area (AFTA) and Asia-Pacific Economic Cooperation (APEC).
3
becoming increasingly important to customers, who have developed a growing
aspiration to engage qualified and professional construction companies, capable of
meeting their specification requirements, and capable of giving better customer
satisfaction. Quality management in the construction industry is different from that in
manufacturing or other service industries, as in the construction industry it
encompasses not only the quality of products, but also the total management
approach to meet a defined purpose provided by clients (Rumane 2011).
The quality management systems (QMSs) currently being implemented by the G-7
(the highest grade of Indonesian contractor qualification) contractors and builders,
are based on the ISO 9001 standard. Though the ISO 9001 standard is sometimes
criticized in terms of its ability to assist construction companies in operating quality
procedures and producing quality products, ISO 9001-based QMSs have been widely
adopted in the global construction arena (Chini and Valdez 2003; Turk 2006;
Lordsleem, Duarte and Barkokébas 2010; Watson and Howarth 2011). Holding a
valid ISO 9001 certification is a requirement for construction companies that wish to
be registered in the G-7 category, as well as for companies wishing to tender for
government projects with a value above USD 100,000.
4
follow the trends of other companies, rather than having any real company objective
to improve processes, or to satisfy customers with improved project outcomes.
To cope with such problems, the Ministry of Public Works in cooperation with the
National Construction Services Development Board (NCSDB) has been conducting
seminars and human-resource training focused on quality awareness themes, to help
motivate local and national contractors to properly implement ISO 9001 certified
QMS (Sudaryono 2006; Andi and Chandra 2007). In 2005, the NCSDB released
„Guidelines for Quality Management Implementation (ISO 9001:2000) for
Construction and Consultant Services‟, in order to assist construction companies in
the planning and implementation of QMSs, and with the establishment of related
quality documentation. However, despite these efforts, there has been little positive
evidence of improved quality output (ibid 2007) and, rather it has been
acknowledged that there needs to be further support for an improvement in strategies
for improving the quality performance of Indonesian construction companies
(Sudarto et al. 2008). Questions which have also been raised in relation to this issue
include the following:
Why does the work undertaken by ISO 9001 certified Indonesian contractors
fail to satisfy most customers?
What are the barriers faced by Indonesian construction companies when
implementing QMSs, and how can these barriers be removed and project
outcomes be significantly and continuously improved?
Why do ISO 9001 certified construction companies fail to capture potentially
lucrative construction market opportunities?
The holding of an ISO 9001 certificate does not mean that a company is
implementing an effective QMS, to do that requires a cultural shift. The change from
a culture of building to the lowest quality level and then repairing inevitable
defective work, to a culture of producing „right–first-time‟ output, is required for the
demonstration of achievement of successful quality system application. Corbett and
Rastrick (2000), Irani, Beskese and Love (2004) and Koh and Low (2008) state that
there is a definite relationship between corporate culture and quality in construction
projects, and in order to support the necessary elements of such a QMS, an
appropriate corporate culture is a prerequisite. This relationship is „mutually
5
reinforcing‟ and this means that if the corporate culture is good, the quality system
will be applied appropriately, with the resulting products and services also being
good (ibid 2008).
The cultural factors, which are integrated into organisational management and
policies, also play a major role in determining how effectively construction
companies implement their QMSs. This perspective is equally applicable in the
Indonesian scenario. From the few studies that exist on the subject, it is apparent that
the cultural values which support quality system implementation need to be
internally driven by the management and staff of construction companies. Hence,
with a strong culture that gives an organisation a distinct identity and drives it to
operate effectively (Sai, Wong and Wu 2011), an effective implementation of the
company QMS that also exhibits continuous improvement, is expected. Such a
system should be capable of meeting project owner requirements, and of providing a
high level of customer satisfaction in the area of project delivery.
6
1.2 Research Aim and Objectives
The research undertaken within the context of this thesis was aimed at the
development of a comprehensive Culture-based Quality Management System
Improvement Implementation Framework for Indonesian contractors and builders,
suitable for integration into their own company and project quality management
practices, to help them achieve better project quality delivery. By providing a
framework for the effective implementation and continuous improvement of QMSs
by Indonesian construction companies, it is expected that there would be
improvements in customer satisfaction, reflecting the better management and control
being applied to construction projects. Organisations could then be expected to begin
to move towards operating total quality management practices, which should help to
improve their delivery capability of construction projects, and thereby also contribute
to giving these organisations a greater competitive advantage in local, national and
global markets.
In order to achieve the research aim above and address the issues raised in the
previous section, three main questions needed to be addressed:
1. What is the current status of the quality management systems (QMSs) being
implemented by Indonesian construction companies?
7
If there are obstacles to the implementation of QMSs, what are they?
Do the barriers to the implementation of an effective quality
management system significantly relate to the quality management
system practices?
With reference to the above research questions, the following research objectives
were established, which then became the focus of the research within the context of
this thesis.
9
The research reported in this thesis seeks to identify and address the critical factors
that impact on the gap between quality management and organisational culture, and
the actual realization of such factors within the context of the management of
construction processes and project implementation and achieved outcomes. The
research also aims to facilitate the development of integrated culture-based QMS
framework aimed at improving QMS implementation and performance outcomes in
Indonesian construction companies undertaking infrastructure and building
construction projects both domestically and internationally. The framework is
designed as a guideline and strategic tool for use by G-6 and G-7 Indonesian
contractors and builders to measure and understand their own corporate cultures, and
to successfully prepare, develop and apply more effective QMSs, in order to adopt
more efficient quality processes and practices. It is also expected that the framework
will have a direct impact on the ability of many Indonesian construction companies
and practitioners to enter the international construction contracting market, reflecting
their increased capability due to applying culture-based QMS framework. Finally, it
is anticipated that the framework will facilitate consultation and communication
among construction services providers and decision makers involved in the process
of national infrastructure project delivery, thereby achieving improved quality
outcomes throughout the development project life-cycle and across the management
system. This would also be expected to result in improved construction company‟s
levels of competitiveness and performance.
This research has also sought to provide a deeper understanding of the existing body
of knowledge with respect to QMS implementation and organisational culture
identification, within the context of construction project management. In addition,
the study aims to enrich the extant literature with a contemporary perspective on the
characteristics of organisational culture and the extent of QMS practices in
Indonesian construction companies, and the relationships between these two.
Finally, the proposed framework was aimed at providing support for introducing ISO
9001 certification of QMSs to a wider base of Indonesian construction companies,
including the small-medium (G-2 to G-5) construction companies, by providing a
better understanding of the Indonesian construction regulations pertaining to QMSs
establishment and implementation (i.e. SNI 19-9001-2001/ISO 9001-2000). The
10
framework will also positively contribute to the establishment of robust benchmarks,
which can be expected to facilitate the Ministry of Public Works in a more
widespread governance of specific policy designed to encounter better QMS
implementation in the Indonesian construction industry.
11
The research questions and objectives also established the boundaries of the research,
as it was not intended that this would develop a comprehensive culture-based QMS
framework model. Rather, it was intended to identify the improved factors and
attitudes present in ISO 9001 certified Indonesian construction companies that have
an impact on the quality of performance of their project management procedures and
the application of process controls. The research was also aimed at assessing the
organisational culture profiles of companies by using the Organizational Culture
Assessment Instrument (OCAI) (Cameron and Quinn 2006), which is based on the
Competing Values Framework (CVF) model (Quinn and Rohrbaugh 1983), to
ascertain which culture profiles are dominant and how well they can support QMS
implementation.
While this research is scoped based on the above premise, the data collection is
drawn only from Indonesia, thus the outcomes contextually reflect the scenarios
prevalent in Indonesian construction organisations. However, global construction
industry experience is also referred to in the literature review in order to provide a
fuller understanding of the research topic.
12
Figure 1.2 Three Locations of Respondents
(source: University of Texas Libraries 2012)
This thesis consists of six chapters, a brief outline of the content of each chapter
being given below.
Chapter 6: This chapter summarises the main conclusions of the research study, it
then outlines how the study output has contributed to the general body of knowledge,
the construction industry, and future policy. Finally, the chapter acknowledges some
of the limitations of the current study and gives recommendations for further
research in the future.
14
CHAPTER 2
QUALITY MANAGEMENT SYSTEM AND
ORGANISATIONAL CULTURE IN CONSTRUCTION
2.1 Introduction
The previous chapter gave an introduction to the research of this study. This chapter
aims to build a theoretical foundation upon which the research is based, by reviewing
the relevant literature to identify research issues in the area of quality management
systems (QMSs) and organisational culture in construction.
The concept of quality management systems and, in particular the use of QMS-ISO
9001 standard, are introduced before discussing effective practices of QMSs and
challenges to their implementation in the global construction industry. An overview
of current Indonesian construction companies‟ practices related to their QMSs is
provided. The chapter examines how government regulations affect the
implementation of QMSs, the motives underlying the establishment of QMSs in
Indonesian construction companies, and current barriers impacting on effective QMS
implementation. A review of the importance of the organisational culture in
companies involved in construction, covering the usefulness of the organisational
culture model of Cameron and Quinn (2006) in establishing inherent culture
typologies of organisations, is also provided. Furthermore, the review covers cultural
changes and research findings, where there have been significant relationships
between the organisational culture and effective QMSs, it also covers the issue of
construction performance as an outcome of correct organisational culture and
successful quality practices. Premised on these discussions, the QMS research gaps
in the Indonesian construction industry are identified.
15
2.2 Quality Management Systems in Construction
The sub-sections below introduce the general concept of quality and quality
management system (QMS), in the context of the construction sector perspective;
also introduced are the essential concepts of one of the well-known QMSs, the ISO
9001 standard. The two concepts are reviewed to contextualize the extent and
significance of these research topics. Accordingly, the effectiveness of implementing
QMSs and barriers to implementing the quality system are also justified.
With regard to any examination of quality issues in the construction industry, there
are commonly three main terms that require objective definition and discussion.
They are - what is actually meant by „quality‟, „quality management system (QMS)‟,
and what constitutes a „total quality management (TQM)‟ philosophy.
Lam, Low and Teng (1994, 15), in the context of construction, define „quality
management‟ as “that aspect of the overall management function that determines and
implements the quality policy”, and „quality system‟ as “the organisational structure,
responsibilities, procedures, processes and resources for implementing quality
16
management”. Hoyle (1997) indicates that the production of desirable quality
products does not happen by chance, but rather it must rely on the use of a quality
system as the management suite to meet all of the established quality goals. Hence,
the essence of understanding „quality in construction‟ relates to achieving quality in
the construction business performance through the implementation of a quality
management system (QMS). This concept is supported by Thorpe and Sumner (2004,
3) who describe a QMS in companies as “a formal statement of an organization‟s
business policy, management responsibilities, processes and their controls, that
reflects the most effective and efficient ways to meet (or exceed) the expectations of
those it serves, whilst achieving its own prime business objectives”. It is generally
true to say that, in the global construction industry, one of the aims of every
construction firm is to win the trust and acknowledgment of customers as a means of
gaining business competitiveness and making greater profits; it therefore follows that
this should also be one of the main reasons for QMS to become a prime focus in
every construction company, for the fulfillment of customers‟ needs and satisfaction.
Quality has a number of components, and a focus on only one aspect may result in a
loss of customers (Center for the Advancement of Process Technology 2011). The
application of a QMS in order to consider the important aspects of the quality, is one
of the key quality concepts reviewed by the writers on quality, these quality concepts
including the following:
(1) a management commitment to reflect that „quality issues‟ must start from the
top;
(2) management systems to ensure consistency of operations;
(3) the use of statistics as the tool to run and evaluate processes as efficiently as
possible;
(4) team work; and
(5) training to provide teams with the required knowledge of management
systems, statistics, and improvement methodologies (ibid 2011).
17
Thorpe and Sumner (2004) have proposed a number of fundamental concepts for an
effective QMS, that include the following:
A system that enables a company to identify with, and completely meet,
customers‟ needs;
A system that clearly defines the responsibilities for carrying out defined
functions and activities;
A system that is representative of the most effective and efficient organisation
for carrying out business processes and various discrete activities;
A system that recognises the sound advice offered by standards such as ISO
9001;
A system that is successful because of people‟s understanding commitment, due
a sense of ownership; and,
A system that is formally and continuously reviewed in a quest for ongoing
improvements.
18
In several scholarly articles written by Wong and Fung (1999), Low and Teo (2004),
Ahmed et al. (2005), Farooqui and Ahmed (2009), Shibani, Soetanto and Ganjian
(2010), it is generally concluded that the concepts of QMS and TQM are at about the
same level. Some construction companies have adopted a TQM approach as an
initiative to help raise quality and productivity, while others, who were reported to be
adopting TQM, were in fact actually applying the eight basic elements of an ISO
9001 based QMS. Thorpe and Sumner (2004) have recommended that construction
companies that are eager to benefit from the TQM approach, start by establishing a
QMS concept as their first step on what Grossman and Helpman (1989), among
others, have called the „quality ladder‟. Figure 2.1 provides a simple illustration of
the interface of the QMS and TQM concepts.
TQM
QMS
The main reason for undertaking a review of these two quality concepts is that
among Indonesian construction companies, the concepts of QMS and TQM are not
always well understood. Based on preliminary interviews, while some local
contractors understand what a QMS is, they do not have a clear understanding of the
philosophy of TQM. However, for national level contractors who successfully
implement QMS, they ultimately target TQM in their quest for total quality
achievement in their companies.
19
2.2.2 ISO 9001 Standard
Quality control systems were originally developed from United Kingdom (UK)
nuclear and military standards, and then rolled out as BS5750:1979 in the
manufacturing industry. It was much later (in the 1980s and early 1990s) that the
systems were adopted by UK construction companies to meet local and national
government requirements for the construction industry, when companies were
required to have certified quality systems in order to take up offered bidding
opportunities (Thorpe and Sumner 2004).
The ISO 9000 series has now become the QMS model recommended by the
followers of the quality movement as a benchmark for implementation of good
management and process control in a variety of industries and sectors (McCornac
2006; Tricker 2008; Fotopoulos, Psomas and Vouzas 2010; Wahid, Corner and Tan
2011). The model has been particularly widely adopted by the construction industry
(Chini and Valdez 2003; Turk 2006; Lordsleem, Duarte and Barkokébas 2010;
Watson and Howarth 2011). The first series of ISO 9000 developed by the
International Organization for Standardization-Technical Committees (ISO-TC 176)
in 1987, was updated in 1994 and 2000, with the latest version of this standard being
ISO 9001:2008. The 2008 version did not introduce any major changes relative to the
2000 version, and therefore does not require the re-writing of quality documents to
suit the most recent version (Vianna 2007; International Organization for
Standardization 2011). The ISO 9001 standard is actually a generic one, which can
be used successfully in construction companies and on their projects, even though
every project is unique and involves different sub-contractors and suppliers.
The QMS-ISO 9001 standard is made up of five main clauses and 23 sub-clauses,
each of which contains requirements that should be fully implemented to gain the
potential benefits from the adoption of the system. There are 20 elements of ISO
9001 which are used as the basis of ISO 9001:1994. These elements have been
replaced by five clauses for undertaking quality processing. However, the twenty
elements are clearly identifiable within the process-based approach for implementing
ISO 9001:2008 (Watson and Howarth 2011). The twenty elements have been
adapted for construction procedures to cover a wide scope of quality related activities
20
of construction-related firms (Chini and Valdez 2003), as QMS elements to meet
construction organisation and project conformity needs. In developing and
maintaining ISO 9001, the collective experience and knowledge of international
experts relating to ISO-TC 176 has been used for the development of the eight major
quality management principles embedded in the ISO 9001 standard, that can be used
by management as a basis for improving an organisation‟s performance (Tricker
2008). These eight quality management principles are:
1. Customer focus
The company focuses on customer requirements and expectations.
2. Leadership
The leaders establish unity of purpose and direction of the company.
3. People involvement
Employees are fully involved and their abilities are empowered for the
company‟s benefit.
4. Process approach
Project activities and related resources are managed as a process.
5. Systems approach to management
The company identifies, understands, and manages interrelated processes as a
system.
6. Continual improvement
The company has a strategic objective for permanent and continuous
improvement of overall performance.
7. Factual approach to decision making
Decision-making is based on an analysis of relevant data and information.
8. Mutually beneficial supplier relationships
The company and its suppliers have interdependent and a mutually beneficial
relationship.
The twenty elements of the ISO 9001 standard relating to building construction are
summarised in Table 2.1.
21
Table 2.1 Summary of the Twenty Elements of ISO 9001 Standard
ISO 9001 Elements Quality Functions Required
E1 Management Define, document and publicize quality policy
responsibility Define, document responsibility, authority and interrelations of
staff
Identify and provide adequate resources
Appoint quality manager
Review quality systems on a regular basis
E2 Quality system Establish, document and maintain quality system
Prepare and effectively implement documented procedures.
Define and document how quality planning is conducted for a
project or contract, including preparation of a quality plan
E3 Contract review Review tender before submission
Review contract before signing
Review variation order before acceptance and transfer amended
requirements to functions concerned
E4 Design control Plan design activities
Identify and review design input
Review, verify, and validate design input
E5 Document and Review and approve documents prior to issue
data control Review and approve document changes prior to issue
Control distribution and updating of documents
E6 Purchasing Evaluate and select subcontractors on basis of capabilities for
quality
Exercise appropriate control over subcontractors
Review and approve purchasing documents prior to release
Specify arrangements for verification and product release of
subcontractors product or work at subcontractor‟s premises if
required
Allow the client or his representative to verify subcontracted
product or work at the contractor‟s/subcontractor‟s premises
where specified in contract
E7 Control of Control verification, storage, and maintenance of customer-
customers‟ supplied product
supplied
product
E8 Product Identify material and semi-finished product from receipt and
identification during all stages of production, delivery, and installation, where
and traceability appropriate
Provide unique identification of individual product or batches
where specifically required
E9 Process control Identify, plan, and control production, installation and servicing
processes, including provision of documented procedures and
suitable equipment
Assign qualified operators to carry out special processes
E10 Inspection and Conduct receiving inspection and testing of incoming materials
testing and components
Conduct in-process inspection and testing of semi-finished work
in accordance with quality plan
Maintain signed-off records of inspections and tests
22
Table 2.1 Summary of the Twenty Elements of ISO 9001 Standard (continued)
ISO 9001 Elements Quality Functions Required
E11 Control of Use inspection, measuring, and testing equipment capable of
inspection, necessary accuracy and precision
measuring and Calibrate the equipment at prescribed intervals, or prior to use,
test equipment and indicate its calibration status
Review previous results when the equipment is found to be out
of calibration
E12 Inspection and Indicate by suitable means the conformance or nonconformance
test status of product or work with regard to inspect and performed
E13 Control of non- Identify and segregate, when practical, any nonconforming
conforming product or work
products Review and dispose of the nonconforming product or work by
an authorized person
Inspect and/or test the product or work again after repair
E14 Corrective and Investigate cause of nonconformities, including client
preventive complaints
action Take corrective/preventive action to eliminate cause/potential
cause of nonconformities
Implement and record changes to document procedures
resulting from corrective/preventive action
Ensure that corrective/preventive action is taken and that it is
effective
E15 Handling, Establish methods of handling product that prevent damage or
storage, deterioration
packaging, Use designated storage areas to prevent damage or deterioration
preservation and Asses condition of product in stock at appropriate intervals
delivery Protect product during delivery
E16 Control of Retain quality records for prescribed period
quality records Maintain quality records in such a way that they are identifiable,
retrievable and secured against damage, deterioration, or loss
E17 Internal quality Plan and schedule internal quality audits
audits Assign independent personnel to carry out internal quality
audits
Conduct follow-up audits if necessary
E18 Training Identify training needs of staff
Provide training required
E19 Servicing Verify that servicing meets specified requirements
E20 Statistical Identify the need for statistical techniques in quality control
techniques Implement and control the application of statistical techniques
Sources: Chung (1999, 38), Rumane (2011, 104)
The relationship between the structure of five clauses of the ISO 9001 standard and
the eight quality management principles, and the incorporation of the twenty
elements with the five clauses, are shown in Table 2.2 and Table 2.3, respectively.
23
In summary, as an international standard for QMS (in comparison with other quality
standards and awards - Six Sigma, Malcolm Baldrige National Quality Award
Criteria, The European Foundation for Quality Management Excellence Model-
EFQM EM), ISO 9001 is now widely accepted in many manufacturing, production
and services industries, because it specifies what an organisation should do to
achieve better quality management and improvement. It is acknowledged by
McCornac (2006) that the standard focuses on the way an organisation goes about its
work, and not directly on the results of this work. This QMS standard is currently
being adopted by Indonesian construction companies and is officially recommended
by the Ministry of Public Works as an approach to solving quality problems in the
construction industry and for meeting customers‟ needs.
24
Table 2.2 Matrix of the Five Clauses and Eight Management Principles of
ISO 9001 Standard
Factual approach to
People involvement
Mutually beneficial
Systems approach
Process approach
ISO 9001 Principles
decision making
Customer focus
improvement
relationships
Leadership
Continual
ISO 9001 Clauses
supplier
4.0 Quality Management System
4.1 General requirements
4.2 Documentation requirements
5.0 Management Responsibility
5.1 Management commitment
5.2 Customer focus
5.3 Quality policy
5.4 Planning
5.5 Responsibility, authority and
communication
5.6 Management review
6.0 Resource Management
6.1 Provision of resources
6.2 Human resources
6.3 Infrastructure
6.4 Work Environment
7.0 Product Realization
7.1 Planning of product realization
7.2 Customer-related processes
7.3 Design and development
7.4 Purchasing
7.5 Production and service provision
7.6 Control of monitoring and measuring
devices
8.0 Measurement, Analysis and Improvement
8.1 General
8.2 Monitoring and measurement
8.3 Control of nonconforming product
8.4 Analysis of data
8.5 Improvement
Adopted from: Luk (2006, 51)
25
Table 2.3 Matrix of the Incorporation of the Twenty Elements with Five Clauses of ISO 9001 Standard
ISO 9001 Standard E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20
4.0 Quality Management System
4.1 General requirements
4.2 Documentation requirements
5.0 Management Responsibility
5.1 Management commitment
5.2 Customer focus
5.3 Quality policy
5.4 Planning
5.5 Responsibility, authority and
communication
5.6 Management review
6.0 Resource Management
6.1 Provision of resources
6.2 Human resources
6.3 Infrastructure
6.4 Work Environment
7.0 Product Realization
7.1 Planning of product
realization
7.2 Customer-related processes
7.3 Design and development
7.4 Purchasing
7.5 Production and service
provision
7.6 Control of monitoring and
measuring devices
8.0 Measurement, Analysis and Improvement
8.1 General
8.2 Monitoring and measurement
8.3 Control of nonconforming
product
8.4 Analysis of data
8.5 Improvement
Sources: Chung (1999, 38), Rumane (2011, 104)
26
2.2.3 The Effectiveness of Implementing a Quality Management System
27
A company‟s QMS
Quality
Quality
procedures
Effective QMS
implementation
28
Quality Management System Continual
Resource Measurement
Management Analysis
Improvement
Figure 2.3 ISO 9001 Process Model (Watson and Howarth 2011)
29
Table 2.4 Benefits of Applying ISO 9001 in Construction Organisations
Area of Representative
Benefits of ISO 9001
Improvement Authors
Preventing work repetition and project delays Low and Wee
Construction Buildability factor of most projects can be (2001), Low and
project increased while the project cost is decreased Abeyegoonasekera
As an effective and appropriate working (2001), Ofori, Gang
platform at both design and construction stage and Briffett (2002),
of a project Farooqui and
Efficient in using material resources Ahmed (2009)
Consistent and effective control of key Farooqui and
Project
processes and project management Ahmed (2009),
management
More efficient and effective utilisation of Watson and
scarce resources. Howarth (2011)
Failure to meet specifications can be Low and Wee
Quality minimized (2001), Farooqui
Promoting control of suppliers and and Ahmed (2009),
subcontractors and the development of Watson and
effective supply chain management Howarth (2011)
Provide a corporate quality advantage
World-wide recognition and be chosen to bid Ofori, Gang and
Organisation in both local and global market contracts Briffett (2002),
performance Provides a means of achieving a top-quality Turk (2006),
performance in all areas/activities Farooqui and
Reduced inspection costs hence improved Ahmed (2009),
corporate profitability Lordsleem, Duarte
As a tool to help contractors establishing and and Barkokébas
measuring their performance indicators (2010), Watson and
Howarth (2011)
Improvement of organisation communication Low and
Management system and working environment Abeyegoonasekera
system Better efficiency (2001), Ofori, Gang
Continual improvement and Briffett (2002),
Greater emphasis on leadership, team spirit Farooqui and
and motivation Ahmed (2009),
Change management and adequacy of training Lordsleem, Duarte
Planning and review process to ensure that and Barkokébas
the system in place remains suitable (2010), Leonard
Effective and capable of identifying new (2010),Watson and
opportunities Howarth (2011)
Provide clear and valid operating procedures
All the above advantages cited for construction organisations are based on the
lessons learned from the use of an appropriate and effective quality system
framework for controlling the processes required when constructing a project. An
example cited in the research of Zin, Chen and Ali (2009) is that the majority of
Malaysian constructors have been able to improve their company competitiveness by
30
80%, after having certified to ISO 9001. This clearly indicates that QMSs need to be
developed and implemented effectively, for any construction company wishing to
become a sector leader.
A number of researchers in the area of QMS implementation are of the opinion that
ISO 9001 is not an appropriate standard for use in construction firms. For example,
Landin (2000), in studying the Swedish construction sector argues that ISO 9001 is
difficult to apply by construction companies because its clauses are too general.
Construction projects, practices, contracts and specifications are regarded as unique
and specific in every project, and they usually provide different specific products and
services outcomes that are difficult to be fully incorporated within a generic system
such as ISO 9001.
Turk (2006) notes that the development of an ISO 9001 certified QMS requires a
huge amount of written documentation and needs a long time to integrate into a
company‟s management system, leading to potential substantial increases in
operating costs. The author further notes other significant problems confronting the
ISO 9001 certification process within the Turkish construction firms that prolongs
the registration process as well as making it expensive. Some company‟s
management is not open to research and criticism, while in others the personnel
systems needs restructuring for the establishment of QMS (ibid 2006).
In addition to the above barriers, Bubshait and Al-Atiq (1999), in describing a Saudi
Arabian case, indicate that overload of work for the quality assurance team and the
tendency for disputes to arise concerning quality issues in internal organisations, are
also among the major causes of difficulties in implementing the ISO 9001 quality
standard in construction companies. Further to these views, Quazi, Hong and Meng
31
(2002) make the point in their study of the Singapore construction sector, that there is
evidence to suggest that it cannot always be proven that ISO 9001 certified
companies do actually provide qualified products and services. From these contrary
views, the key question that arises is why some construction companies cannot
effectively empower their organisations to establish successful QMS arrangements,
while others are successful in implementing a QMS.
According to Oztas, Güzelsoy and Tekinkus (2007), the differences and uniqueness
of the construction industry from other industries (e.g., a long time for project
completion; human relationships generally formed once; difficulty in defining quality
standards and feedback relating to the construction processes) make it difficult for
construction companies to implement QMSs, which can be fragmented and slow in
their attempts at quality improvement (Leonard 2010). In addition, the fact that the
construction industry has historically been reluctant to deal with changes (Haupt and
Whiteman 2004; Low and Hong 2005) is reflected in slower implementation of ISO
9001 especially in developing countries.
32
culture of the company (ISO9000Council.org 2009). The consultant tries to mold the
entire company and align it to „a one-size-fits-all‟ ISO 9001 set of quality procedures
(ibid 2009). In addition, management will often attempt to choose the perceived
„easiest‟ certification body recommended by the consultant in the market, reflecting a
misconception of the reasons for obtaining ISO 9001 certification (McCornac 2006).
33
performance when the extent of changes in the company‟s management system after
ISO 9001 registration were only relatively minor.
From the above it can be concluded that problems relating to the attitudes and
perceptions of management, and related lack of commitment, are the main deterrents
to the effective implementation of the ISO 9001 in many organisations. Another
consideration that appears to be associated with these problems relates to the
differing cultures that exist in every organisation, and the impact that these cultural
traits may potentially have on the effective implementation of QMSs and related
attitudes towards complying with the attributes of ISO 9001. Within the construction
industry, inappropriate quality corporate cultures are a recognised barrier to
successful implementation of ISO 9001 (Watson and Howarth 2011). Much effort is
necessary to achieve the potential benefits from successful implementation of QMS
practices.
Current ongoing research into the construction management area has produced
evidence that organisational issues, such as quality culture and corporate culture, are
determinant factors contributing to the successful or unsuccessful implementation
and maintenance of an ISO 9001 quality system (van Marrewijk 2007; Koh and Low
2008; Yip Robin and Poon 2009; Coffey 2010). A detailed review and discussion of
these issues is provided in a later section (Section 2.5) of this literature review.
34
As part of this study an examination is made of how effective are the existing quality
management systems being implemented by Indonesian construction companies, and
what are the main obstacles to the implementation of QMSs. The following section
of the review is aimed at providing an understanding of these issues, while also
helping to explain the need to develop and use specific research instruments in the
data collection stage of the study.
2.3 The Existing Use of the ISO 9001 Standard in Indonesian Construction
Companies
The growth of the national economy, as well as the improvements in the roll-out of
national development, appears to be a positive driver for the Indonesian construction
industry, especially when the Government has speeded up it‟s infrastructure
development plan and investment in delivery of roads, water resources and human
settlement infrastructure, in support of the acceleration of economic growth
(Widjajanto, Pribadi and Suraji 2011). These prevailing conditions trigger higher
levels of competition among national and foreign contractors in tendering for
government construction projects and investing focus on enhanced maintenance
demands.
According to Pamulu (2011), the macro and micro environments of most Indonesian
construction company, which in turn influence the way they operate, are also factors
pertinent to market competition. In the macro environment, a variety of trends in
political, economic, social and legal developments are assuming greater strategic
importance for contractors in market competition (idem 2011). On the other hand, in
a micro context, low levels of competitiveness, low barriers for entry into the
construction industry (Budiwibowo et al 2009), inefficiency and high-cost
transactions, collusion, and incompetent human resources (Suraji et al. 2007), are
among the problems that national contractors have to deal with in dealing with
market competition. This is reflected especially in the low quality of delivery of
infrastructure project, and dissatisfaction by project owners and end-users.
35
In response to this scenario and these drivers, for the past decade the Indonesian
construction sector has had the intention (or has been made) to promote the
development and implementation of quality management systems (QMSs) among its
various players. Quality issues must now be seriously considered by both the
Government and the construction industry, particularly as it is recognised that the
construction services at the national level have not been optimal, and the role of
foreign construction companies undertaking construction of both government and
private projects is gradually increasing (Sudarto 2007; Construction Management
and Engineering of Bandung Institute of Technology 2009). At the same time, the
number of Indonesian construction companies working overseas has remained below
the number of foreign companies extending their operations into Indonesia
(Widjajanto, Pribadi and Suraji 2011).
36
projects. The decree is a follow-up to the Decree of Ministry of Settlement and
Regional Infrastructure No. 339/KPTS/M/2003 on Guidelines for Construction
Services Procurement by Government Agencies. In these guidelines, it is stated that
government working units or procurement committees should recognise the fact that
certain contractors are ISO certified, and for special or complex work, or works
involving high levels of technology, the Director General may include the
requirement for tendering contractors to be ISO 9001 certified.
Another decree on QMS implementation within the construction services was issued
by the Head of Construction and Investment Development Agency, on behalf of the
Ministry of Settlement and Regional Infrastructure. This decree is known as the
Construction Quality Management System for Small Scale Construction
Corporations, No. 16/KPTS/KE/2004. The Agency recommends SNI-19-9001-
2001/ISO 9001-2000 as one of the instruments to be used to meet the quality
requirements for construction work. Small to medium-sized construction companies
are referring to these two regulations as „the rules‟ applicable for developing their
quality management systems, and as the main driver for using ISO 9001
requirements to govern the QMSs eventually being developed.
37
Further promotion of the implementation of construction services QMSs has been
continuing through various other programmes of government and contractors‟
associations. The Secretary of the Agency for Construction Development of The
Ministry of Public Works has introduced a QMS guideline based on ISO 9001
standard to help small and middle-scale construction company‟s categories trying to
develop their QMSs (Sudaryono 2006). The Ministry of Public Works acting as a
mandatory quality controller, has also been conducting seminars and „toolbox
training‟ programmes to help motivate local contractors in the implementation of
ISO 9001 certified QMSs. An article from a website of Indonesian Contractors
(Indonesian Contractor 2007) reports that a programme (Technical Assistance
Programme) has been introduced into some regions to provide opportunities for
small-scale construction companies to gain a better conceptual understanding of the
benefits of, and the methodology for, implementing ISO 9001 certified QMSs.
Within the large-scale construction categories, the Indonesian Contractors
Association has endorsed a proposal that its members develop and advance their
performance in the area of training on ISO 9001 (Indonesian Contractors Association
2010).
38
Information obtained from the preliminary studies which involved interviews with
the officers from the NCSDB and the Public Works Ministry, and with practitioners
from the Indonesian Contractors Association (ICA) and National Contractors
Association of Indonesia (NCAI), regarding the lead role of the Government and also
the extant regulations for QMS implementation, validates the focus on these issues as
the basis of the research problem in this study.
39
its business performance. It would therefore be useful to discover whether the
motives of companies in developing their quality management system can generate,
or be generated from, those aims.
A considerable amount of research has been carried out relating to the study of the
motives of construction companies in wishing to become ISO 9001 certified.
Dissanayaka et al. (2001), Ofori, Gang and Briffett (2002), Chini and Valdez (2003),
Low and Teo (2004), Turk (2006), Oztas, Guzelsoy and Tekinkus (2007), and Zin,
Chen and Ali (2009) have all evaluated some of the motives that have proven to be
successful in driving construction companies in achieving their goals and
expectations. Included among the motives are the aim of improving the quality of
work done and thereby gain a competitive advantage, and to reduce the company‟s
operating costs. However, many construction firms are motivated to obtain ISO
9001 certification on account of client demands for it and/or due to specific tender
requirements for such certification (ibid 2001; ibid 2003; ibid 2004; ibid 2006).
In the Indonesian scenario, there still appear to be some doubts among other
Indonesian construction companies in relation to the whole concept of quality
management practices. In discussions with construction practitioners during
preliminary interviews conducted in January 2010, it was revealed that some
construction companies and builders have been trying to obtain ISO 9001
certification solely for the purpose of following the trend of other companies, rather
than any internal company desire to improve processes or satisfy customers with
improved project outcomes. This view indicates that certain companies are merely
paying „lip service‟ to the objective of quality management being primarily for
customer satisfaction, without considering the many broader advantages from the
adoption of quality management practices. Novessro (2009) reports that obtaining
ISO 9001 certification solely for prestige is one of the main root-causes of ineffective
ISO 9001 implementation by Indonesian contractors and builders.
This study aimed at identifying the factors which have prompted some Indonesian
contractors to become ISO 9001 certified. Chini and Valdez (2003) in their research
on QMS in the US construction industry, indicate that “knowledge about each
company‟s motivation for certification was a key component of their study‟. By
40
conducting studies into the motives which underlie a decision to apply for, or resist
consideration of, ISO 9001 certification, a QMS framework might then potentially be
designed that will assist some Indonesian construction companies in achieving their
aspirations for growth based on a more competitive business model, while others
would be able to more clearly view the benefits of, and processes required to
maintain, ISO 9001 certification.
Given the pressing need for implementing SNI 19-9001:2001 (ISO 9001–2000) for
the establishment, implementation and operation of a bona-fide QMS, every G-7
construction company should develop its own QMS, including establishing full and
auditable quality documentation (i.e., quality manuals, quality procedures, work
instructions, and internal and external audit requirements, as well as regular
management reviews). Currently all G-7 Indonesian contractors and builders, have
already obtained ISO 9001 certification in order to become registered for government
work, while many others are trying to get their required certification.
From the preliminary interviews, it was revealed that during the establishment phase,
when setting up their ISO 9001 systems, Indonesian construction companies
commonly hire a quality consultant to assist and guide them in the preparation of a
timeline and programme, to achieve the goals of obtaining certification, developing
quality documentation as required by ISO 9001, and training their workforce and
Quality Assurance (QA) team. The needed to appoint an ISO 9001 consultant is
based on the construction companies need for assistance for the interpretation of the
ISO 9001 requirements and integrate them into their own construction company
business processes and procedures; this being a necessary part of the quality-based
41
approach. Nugroho, Saroso and Nurcahyo (2009) state that interpretation of all
clauses of the ISO 9001 is one of the most important milestones in the early stages of
establishment of a quality system. They argue that the failure in executing proper
ISO 9001 interpretation may lead to an ineffective and inefficient implementation
stage, making the expected benefits of QMS implementation difficult to achieve.
Despite the role of ISO 9001 consultants in the early stages of development of a
quality-based system, for the later stages companies need to have the confidence and
ability for maintaining and improving the system, based on the use of their own
resources.
42
be able to produce sustainable construction projects and have competitive power
within developing countries in the Asian region as well as globally.
Many clients have serious questions relating to unsatisfactory work, poor quality and
project outcomes, from Indonesian constructors, some of which are reported in
Indonesian newspapers, based on complaints coming from various local government
officials. Five government projects totaling 9.15 billion rupiahs in Asahan Tanjung
Balai District in the province of North Sumatera were reported to have not met
project specifications (Ombudsman-Asahan 2008), while several projects with a total
cost exceeding 1 billion rupiahs in the districts of Melawi and Pontianak in West
Kalimantan Province, and in Merak-Banten Province, were reported to have been
improperly carried out (Pontianak Post Online 2006; Radar Banten 2007). The South
Sulawesi Provincial Government has also issued complaints to a construction
company undertaking a fly-over project in Makassar on account of delays in the
project causing serious traffic jams (Media Online Finroll 2009). Similarly, in the
province of North Sulawesi, representatives of the province and related recipient
communities, have directed complaints to a contractor in relation to significant
project delays and poor performance on the Soekarno Bridge in Manado (Komentar
Newspaper 2009). Another complaint was forwarded from project users to another
developer over concerns that the materials used for Lobo Bridge in Talaud District
43
North Sulawesi Province were seriously outside specifications (ibid 2009). The
complaints clearly reflect concerns relating to the current state of ISO 9001 and QMS
implementation in the construction industry in Indonesia. They also raise basic
questions relating to how QMSs can be effectively applied in the day-to-day
activities of Indonesian constructors and builders, and the maintenance of quality
standards throughout the life of projects.
Discussion of the issues related to why QMSs cannot be effectively applied by some
Indonesian constructors and builders is very limited in the extant literature. As
reviewed in the sub-section on barriers to QMS implementation in the global
construction industry, the Indonesian experience is very similar. Susilawati, Salim
and Soesilo (2005), Sudarto (2007) and Novessro (2009) indicate that the main root-
causes for ineffective ISO 9001 certified QMS implementation by Indonesian
contractors and builders include: a lack of top management commitment; minimum
availability of supporting resources; failure in applying continuous improvement
concepts; unrealistic timelines set up for rolling-out QMS programs; failure in
disseminating QMS programs to all organisational levels (since it is assumed that the
system is only appropriate for manufacturing processes); unsuccessful human
resources training with regards to becoming an agent of change; unsuccessful
definition and design of QMS documentation; the fact that implementation of QMS
is only allowed as an add-on to standard operating procedures; and, that QMSs are
applied without conducting a comprehensive review of existing management
systems.
In addition (but of particular significance), some of the best practices that result from
the proper use of ISO 9001 and implementation of a good QMS, have been
undermined by the fact that companies implementing their QMS often possess weak
corporate cultures. Gapeksindo (2007) opines that deterioration in the
implementation of QMS occurs from the time of tender-bidding throughout the
period of project execution. The authors provide an example of a winning project
which priced at only 50-60% of total project budget estimate. The question then rose
related to whether it was realistic to promote quality assurance in a project, the
contract for which was based on a „cut-throat‟ tender price. Supporting this view,
Rayendra L. Toruan in an editorial foreword to Quality Management
44
Implementation Guidelines (LPJK 2005), criticized the practice of „lowest-bid
tender award processes‟ because of the possibility that such awards might be
influenced by corruption-collusion and nepotism-(CCN), with dubious mark-up
practices which inevitably affect the quality of subsequent construction work.
In summary, there are few research articles which have reporting on the results of an
examination of the use of ISO 9001 by construction companies in Indonesia,
especially in terms of identifying the barriers that prevent proper implementation of
quality initiatives. The research that forms the basis to this thesis aims to provide a
much-needed and comprehensive study on how well QMSs and ISO 9001 are being
used by construction companies in Indonesia, together with how their
implementation might be better guided by the establishment of a new framework for
use by client bodies and constructors, to produce better output, improve business
outcomes, and strengthen the organisational culture. These research issues have been
supported by the use of a quantitative questionnaire survey as a primary tool,
supported by qualitative focus group discussions as a complimentary tool, to validate
results from the survey questionnaire.
45
In the previous section it has been stated that „other research reveals that the
organisational culture does correlates with QMS implementation‟. This study
therefore aims to investigate the current organisational culture profiles of Indonesian
contractors‟, and the influence of different culture types on quality system
implementation. The following sections aim to explain how quality management
systems and practices may be better implemented, and better business outcomes and
customer satisfaction achieved, using the strengths and directions of organisational
culture.
Chapter 1 described how the research approach used in this study aim to assess and
analyse the culture profiles of Indonesian construction companies and investigate the
relationship between QMS attainment levels and those culture profiles. It is therefore
necessary to understand the concepts surrounding, and theoretical models of,
organisational culture. In this section, the organisational culture assessment model of
Cameron and Quinn (2006), derived from Quinn and Rohrbaugh‟s (1983) earlier
Competing Values Framework (CVF) is reviewed, as this instrument is chosen for
use as the primary instrument for the collection and interpretation of data for
identifying and analysing the organisational culture profiles of Indonesian
contractors. Since culture is often regarded as an abstract concept (Cheng 2005), the
underlying values of „culture‟ are also reviewed in order to gain a better
understanding of the more specific concept of „organisational culture‟, to help
enhance the analysis of the situation pertaining to Indonesian constructors and
builders undertaken in the later stages of this study.
46
2010). The following are a sample of some of the definitions of „organisational‟ or
„corporate‟ culture described by different authors and researchers.
There has been a growing body of literature since the 1990s that has examined
organisational culture and its links to different aspects of organisational management
and practices. Handy (1993) notes that the customs and traditions of a place are
powerful in influencing people‟s behaviour. Moreover, contemporary studies link
organisational culture to the following: innovation (Tijhuis 2010; Abiola Falemu,
Ogunsemi and Oyediran 2010); effectiveness and performance of the organisation
(Lemon and Sahota 2004; Corbett and Rastrick 2000; Maull, Brown and Cliffe 2001;
Liu, Zhang and Leung 2006; Zheng, Yang and McLean 2009; Coffey 2010);
sustainability in construction (Yip Robin and Poon 2009) which, in turn, is the most
47
important element of competitiveness (Cameron and Quinn 2006); and to
implementation of quality management systems (Irani, Beskese and Love 2004;
Mahmood et al. 2006; Nummelin 2006; Koh and Low 2008).
The CVF has been selected as the conceptual paradigm for analysis in this study, as
being the most suitable organisational culture model for use due to its suitability for
identifying the profiles or types of organisational culture of construction companies,
48
especially for Indonesian construction companies, which generally do not attach
much importance to organisational culture. The CVF helps provide an understanding
of how sometimes complex phenomenon operate in these companies. In addition,
output based on the CVF model is regarded as being compatible with studies
pertaining to culture in the construction industry in other countries.
The CVF consists of four major culture types (clan, adhocracy, hierarchy, market)
that are theorized to compose cultural profiles within various kinds of organisational
contexts (Choi et al. 2010). These authors further explain that an organisation can
possess either a predominant internal or external focus, and may either be wishing to
achieve flexibility and discretion, or stability and control. This combination of
factors creates four potential cultural categories, each representing a distinct set of
cultural values. The four major culture types that emerge from the framework (Figure
2.4) are briefly described by Cameron and Quinn (2006) as follows:
Clan Adhocracy
Hierachy Market
From the above explanation on the four types of culture, it is acknowledged that
different organisations have diverse working environments, work attitudes and roles,
leadership styles, strategies, etc. These are all important when considering the
incorporation and implementation of a new management approach such as QMS,
because all these factors will determine the degree of success of any QMS related
innovations. Companies should, therefore, fully understand their organisational
culture profiles and initiate changes if necessary, in order to improve organisational
performance in order to gain external recognition and appreciation.
50
improve their performance, as most will successfully develop cultural values and
become more effective.
The first aspect of the CVF that is applicable to organisational behavior is leadership
(covering leader type, value drivers and the theory of effectiveness). The second
aspect relates to organisational effectiveness, which is reflected in high values in
each type of culture. Further, the authors, Cameron and Quinn (2006) have indicated
that the CVF can help organisations improve their TQM practices by applying
various quality strategies in each culture type, specifically, with reference to the
dominant cultures that exist within the company. When conducting research into
human resource (HR) management, Ulrich and Brockbank (2005) used the CVF
approach to identify the changing roles of the human resource manager. These
researchers concluded that the role, means, and competencies required by the HR
manager associated with each of the four cultures could foster organisational change
and improvement (Cameron and Quinn 2006). These latter authors also state that the
framework derived by Ulrich and Brockbank‟s (2005) research is a more
comprehensive view of HR management than that discussed in much of the
literature, because their model is a strategic one for more inclusive and rational HR
roles. Table 2.5 presents the CVF applicability to each type of culture.
51
Table 2.5 The Appicability of the Competing Values Framework Model to
Organisational Typologies
CVF
CLAN TYPE ADHOCRACY MARKET HIERARCHY
Applicability
Organisational Leadership
Facilitator, Innovator, Hard driver, Coordinator,
Leader Type
Mentor, Team Entrepreneur, Competitor, Monitor,
Builder Visionary Producer Organizer
Commitment, Innovative Market share, Efficiency,
Value Drivers
Communication, outputs, Goal achievement, Timeliness,
Development Transformation, Profitability Consistency
Agility and uniformity
Human Innovativeness, Aggressively Control and
Theory of
development and vision, and new competing and efficiency with
Effectiveness
participation resources produce customer focus capable
produce effectiveness produce processes
effectiveness effectiveness produce
effectiveness
Organisational Effectiveness
Cohesion, high New products, Achieving goals, Efficiency,
Organisational levels of creative solutions outpacing the timeless,
Effectiveness employees morale to problem, competition, smooth
and satisfaction, cutting-edge ideas, increasing market functioning,
human resources growth in new share, acquiring predictability
development, markets premium levels of
teamwork financial returns
Involvement and Innovation and Competition Control foster
participation of new ideas create creates an impetus efficiency
employee foster new market, new for higher levels of
empowerment customers, and productivity
and commitment new opportunities
Total Quality Management
Empowerment, Surprise and Measuring Error detection,
Quality Strategies Team building, delight, Creating customer Measurement,
Employee new standards, preferences, Process control,
involvement, Anticipating Improving Systematic
Human resource needs, Continuous productivity, problem
development, improvement, Creating external solving,
Open Finding creative partnerships, Quality tools
communication solutions Enhancing
competitiveness,
Involving
customers and
suppliers
Human Resource Management Roles
Employee Change agent Strategic business Administrative
Human Resource
champion means means facilitating partner means specialist
Role
responding to transformation aligning HR with means re-
employee needs business strategy engineering
processes
Morale Systems analysis; General business Process
Competencies
assessment; Organisational skills; Strategic improvement;
Management change skills; analysis; Strategic Customer
development; Consultation and leadership relations;
System facilitation Service needs
improvement assessment
Source: Cameron and Quinn (2006)
52
In summary, organisational performance can be highly improved by combining the
dominant culture profile with the applicability aspects of the CVF: leadership styles,
management and employees roles, quality management, and effectiveness criteria
(Cameron and Quinn 2006). In relation to this study, the CVF and its applicability
are regarded as being beneficial to the research by helping with the development of a
framework for QMS implementation, which is specifically referred to in the ISO
9001 standard, in order to develop a culture-based QMS implementation guidance
for Indonesian construction companies.
Once the culture profile of an organisation has been determined, Cameron and Quinn
(2006) use the OCAI to provide comparison standards to enable researchers to
analyse different culture profiles in depth. The first comparison standard is to
identify the dominant type of culture; this is useful for matching this most influential
culture with the demands of competitive environment. Secondly, the culture profile is
analysed to establish the degree of strength needed in order to be successful in its
environment. The third comparison standard is to identify whether the culture profile
is congruent or incongruent. Cultural congruence means that the same culture type is
emphasized in various parts of the organisation (ibid 2006). The fourth comparison
standard is to compare the culture profile with the average culture profiles of other
companies/industries that have been surveyed by Cameron and Quinn, to help
stimulate additional change in a way that enhances organisational effectiveness.
Finally, it is important to use the culture profile to determine operational trends of an
organisation, to help provide a more comprehensive culture profile.
53
In construction research on organisational culture profiles, Thomas et al. (2002),
Numellin (2006), Liu, Zhang and Leung (2006), Oney-Yazıcı et al. (2007) and Koh
and Low (2008) used the OCAI to identify the culture profiles of construction
companies in each country of their research domain. They found that the tool is
helpful in providing a comprehensive picture of a company‟s organisational culture
and the values that characterize each culture, as well as providing a comparison
standard for culture profile interpretation. The six cultural dimensions of OCAI
represent the culture climate in an organisation which forms a cumulative
representation of an organisational culture (Rameezdeen and Gunarathna 2003). The
cultural dimensions with associated cultural types of the OCAI are presented in
Table 2.6.
54
Table 2.6 OCAI Traits and Typologies
Cultural Culture Types
Dimensions Clan Culture Adhocracy Culture Market Culture Hierarchy
Culture
Dominant It is a very It is a very dynamic It is very results- It is a very
Characteristics personal place. It and entrepreneurial oriented. A major controlled and
is like an place. People are concern is with structured place.
extended family. willing to stick their getting the job Formal
People seem to necks out and take done. People are procedures
share a lot of risks. very competitive generally govern
themselves. and achievement- what people do.
oriented.
Organisational The leader is The leader is The leader is The leader is
Leadership generally generally generally generally
considered to considered to considered to considered to
exemplify exemplify exemplify a no- exemplify
mentoring, entrepreneurship, nonsense, coordinating,
facilitating, and innovation, or risk aggressive, results- organising, or
nurturing. taking. oriented focus. smooth-running
efficiency.
Management The management The management The management The management
of Employees style is style is style is style is
characterised by characterised by characterised by characterised by
teamwork, individual risk hard-driving security
consensus, and taking, innovation, competitiveness, employment,
participation. freedom, and high demands, and conformity,
uniqueness. achievement. predictability,
and stability in
relationships.
Organisation The glue that The glue that holds The glue that holds The glue that
Glue holds the the organisation the organisation holds the
organisation together is together is the organisation
together is commitment to emphasis on together is formal
loyalty and innovation and achievement and rules and
mutual trust. development. There goal policies.
Commitment to is an emphasis on accomplishment. Maintaining a
this organisation being on the cutting smooth-running
runs high. edge. organisation is
important.
Strategic It emphasizes It emphasizes It emphasizes It emphasizes
Emphases human acquiring new competitive actions permanence and
development. resources and and achievement. stability.
High trust, creating new Hitting stretch Efficiency,
openness, and challenges. Trying targets and winning control, and
participation new things and in the marketplace smooth
persist. prospecting for are dominant. operations are
opportunities are important.
valued.
Criteria of Success is on the Success is on the Success is on the Success is on the
Success basis of the basis of having the basis of winning in basis of
development of most unique or the marketplace and efficiency.
human resources, newest products. It outpacing the Dependable
teamwork, is a product leader competition. delivery, smooth
employee and innovator. Competitive market scheduling, and
commitment, and leadership is key. low-cost
concern for production are
people. critical.
Source: Cameron and Quinn (2006)
55
2.5 The Culture-based Quality Management System
Drawing from the understanding that culture addresses people matters, and thus
becomes the crucial factor in effective QMS implementation, as well as being the
primary determinant for organisations to improve (McCabe 1998), culture-based
quality management system is interpreted as meaning a mixture of strong
organisational culture and effective QMS implementation. In more concrete terms,
this means ensuring that, with recognizable adaptable strong organisational culture
profiles, a construction companies‟ QMS-ISO 9001 can be efficiently and effectively
implemented and continually improved, to provide a strategic management system
that improves a company‟s performance. The sub-sections below draw on the two
aspects of developing culture-based quality management system: (i) the steps of
culture change and (ii) details of the relationships between organisational culture and
QMS implementation in construction settings.
When conducting the preliminary interviews at the time of the preliminary study,
most of the local construction companies in Manado in North Sulawesi Province
admitted that they do not have a good understanding of organisational culture,
whereas national Jakarta based companies generally realised that their organisational
cultures were not well developed or „strong‟. The output of the interviews also
indicated that there was still a lack of „quality awareness‟ among both management
and workers. A change of attitude is therefore required at all levels for an
organisation to achieve an understanding of the importance of quality, and so enable
individuals to become role models for others. This research has aimed to develop a
culture-based QMS improvement implementation framework to guide construction
companies in developing and changing their organisational culture, to impact
favourably on their quality practices and procedures incorporated in their QMS, and
espoused in their quality values.
Just as for organisational culture, there are many different meanings of the term
„culture change‟. Cameron and Quinn (2006) suggested „culture change‟ is
56
concerned with making real changes in the behaviour of people throughout the
organisation. Trice and Beyer (1993, 395) described „culture change‟ as referring to
“planned, more encompassing, and more substantial kinds of changes than those
which arise spontaneously within cultures or as a part of conscious efforts to keep an
existing culture vital. It involves a break with the past and disrupts the cultural
continuity; it is an inherently unbalanced process” (ibid 1993).
57
initiate changes in order to develop a „strong‟ corporate culture, is not an easy task.
Sandholm (1999) claims that it might be difficult for a company to alter its usual
habits and behaviour to embrace a new „quality‟ culture. Supporting this view, Lakhe
and Mohanty (1994) conclude that in order to guarantee the successful adoption of
TQM principles, there should be a total transformation of the corporate culture,
restructuring of management responsibilities and a complete and long-term
involvement of all stakeholders for quality process improvement. This means that
strategies for strong cultural development and change may be required, to change
people‟s mindset and behaviour within an organisation.
Although there are apparent hurdles that must be faced by organisations in changing
the status quo and developing cultures that will support QMS, these may well be
overcome by applying accurate and appropriate strategies aimed at specific actions
leading to cultural change. Therefore, the strategy of change is an important one.
Once an organisation has established an intention to change its current culture to
reflect its wish to adapt and deal with internal and external challenges, according to
Cameron and Quinn (2006, 87), there are six potential steps in strategies for
organisational culture change. These steps are:
The strategy for culture change must be well planned, in order to minimize the
chance of failure. According to Susanto (2008), one of the causes of organisational
change failure is because of a lack of strong consensus with the organisational
leaders as to what is to be changed and how. If members of organisations feel that the
58
proposed changes will cause any pressure, then resistance can sometimes be manifest
in the form of sabotage, reduced productivity and reduced motivation (Low and Teo
2004). Based on the researcher‟s own experience as the Quality Manager of an ISO
9001 certified educational institution, management and staff, while acknowledging
that ISO 9001 certification must be retained, do not always positively respond to
„sincere‟ strategies for its implementation or any related action plan to retain it. Yip,
Robin and Poon (2009) emphasize that the culture in construction companies needs
to be a sustainable one, and this can only be achieved by making changes over time
in response social demands for sustainability, and global tendencies in sustainable
construction development. Therefore, any proposed steps for culture change need to
be included in the culture-based QMS framework design, to identify what current
organisational culture profiles are currently in place that can lead management
towards designing its own strategy for culture development and change, in order to
reach a desired quality culture.
A number of studies have been undertaken analysing how a quality system can be
successfully implemented and in identifying the potential benefits to be gained by a
construction organisation that achieves effective implementation of such systems.
Corbet and Rastrick (2000), Irani, Beskese and Love (2004), Coffey (2005), Coffey
(2010) agree that there is a definite relationship between corporate culture and
quality in construction projects. It has also been noted that the nature of the culture is
a major determinant factor for such success, and that this, in turn, is related to the
successful implementation of a QMS. Koh and Low (2008) have referred to this
relationship as “mutually reinforcing” and by this they mean that if the corporate
culture is good, the quality system will be applied appropriately, with the resulting
products and services also being good.
59
of organisational culture within an organisation influences quality management
practices and vice versa (Noronha 2002), and all the organisational practices must be
in a state of congruence for good quality practices to operate (Koh and Low 2008).
This implies, for example, that if the management applies a new approach that
focuses on internalizing quality values [which are part of organisation‟s culture] in
all organisational members (Bright and Cooper 1993), then the organisational culture
creates an organisational climate which supports quality improvement and/or also
grows the quality climate; this, in turn, directs the quality management processes
[and implementation] that achieve quality results (ibid 2002).
Koh and Low (2008) appear to have established the links between corporate culture
models and strategies for TQM practices. They have proposed that organisations
should continuously adjust their corporate cultural values using transparent and
open-minded vision, thereby placing themselves in a group of similar strong culture
organisations. The authors observe that companies then need to bring these strong
cultural traits into their TQM strategies, as the two need to be incorporated
simultaneously.
60
implementation of the eight elements of TQM. From their survey findings, four
organisational culture types were identified - strong comprehensive, clan-driven,
hierarchy-driven and weak comprehensive culture. Figure 2.5 illustrates these four
culture profiles and the corresponding TQM implementation strategies necessary to
be applied for each culture type; they conclude that there are two major strategies:
“(1) modification of organisational culture in response to the diagnosis on weak
cultural aspects that require fortification; and (2) adaptation of TQM practices to
better suit the prevailing organisational culture so that quick results can be attained.”
(ibid 2008, 245).
Figure 2.5 Culture-based TQM Implementation Strategies (Koh and Low 2008)
Looking more deeply into the specific factors of the relationship, earlier research
findings have revealed that the link between corporate culture and effective QMS or
TQM implementation in construction organisations is related to several common but
important management traits. These include: (1) process management; (2) leadership
and management commitment; and (3) staff empowerment and effective
communication.
61
Process management: The processes that exist in any organisation reflect their day-
to-day set of activities, and therefore, quality work outcomes are a result of
consistent and regular quality management processes and their control. Zhang,
Waszink and Wijngaard (2000) have emphasized that process management is the key
element in guaranteeing project results that conform to specified requirements. In
support of this view, Mahmood et al. (2006) point out that if all organisations‟
activities are directed to TQM initiatives in order to achieve overall quality
performance, then process management appears to be an essential requirement for
quality of conformance. However, QMS supports the operation of the processes
which is an organisation itself, has the mandate to design and is free to determine the
type and extent of quality documentation it references for its process approach
(Watson and Howarth 2011). Therefore, the corporate culture needs to be embedded
in a project‟s process management through the establishment of top-driven and high-
quality project objectives, combined with a desire to satisfy customers by meeting
and even exceeding their requirements.
Many styles of leadership in construction have also been researched. It has been
noted that top leadership and project manager leadership styles are closely associated
62
with effective outcomes for better construction firm work settings. Muller and Turner
(2007) indicate that the project manager‟s leadership style influences project success,
and different leadership styles are appropriate for different types of projects. Toor
and Ofori (2008) and Mahmood and Mohammed (2008) argue that authentic
leadership must be embedded in the organisational culture to maximise positive
outcomes and achieve a factual organisational performance. Ozorovskaja, Voordijk
and Wilderom (2007) have examined the practice of transformational and
transactional leadership in Dutch and Lithuanian construction companies, in an effort
to get more trustful, productive, and committed employees. The important role of
leadership in the construction industry, with the influence of organisation‟s culture,
according to Tijhuis (2010), can make construction more innovative, as long as the
central management is seriously involved with decision making and communication
in a professional manner.
63
staff to produce valuable outcomes, as they know exactly what they must do. This is
reflected in staff maintaining a positive perspective, even when there is a
transformation in the organisation, thereby leading to employee recognition and
rewards (Mahmood and Mohammed 2008). Sai, Wong and Wu (2011) also note that
goal settings and accomplishment, team orientation, coordination and integration,
performance emphasis, innovation orientation, member participation and reward
orientation, are significant organisational culture factors in the construction industry
that help provide an organisation with an identity. From these perspectives, it can be
seen that corporate human resources are an important factor to be considered in the
broader picture of successful QMS implementation, as the cultural values of an
organisation are inspired in the minds and attitudes of organisational players and
actualize them in a quality manner with a full understanding of their responsibilities.
The fact that the effective implementation of QMS-ISO 9001 in the construction
companies‟ benefits either the internal management and operational systems of the
companies, through the improvement of quality awareness and understanding, and
therefore, the quality of services and product delivery, or the satisfaction of external
parties involved in the services and product provided by the companies, including the
end-users of the construction, indeed the overall benefit is an important for the
companies‟ business performance improvement.
Although there are many potential criteria, which might be measured to assess
construction companies performance and achievements, the notion that construction
companies‟ performance is measured in terms of business or financial performance is
still critical, particularly for the Indonesian construction industry which is focused on
ISO 9001 certified contractors (Asa, Abidin and Latief 2009). Research on the links
between quality by ISO 9001 certified companies and financial performance in
various industries, has found contradictory results. ISO 9001 certified companies, in
addition to improving their operational efficiency, also have improvements in their
financial performance (Cow-Chua, Goh and Tan 2003; Sharma 2005; Haupt and
Whiteman 2004). Marín and Ruiz-Olalla (2011) also researched this issue and found
64
that there was a positive relationship between ISO 9001 quality certification and
business results. However, not all companies that become ISO 9001 certified show
financial performance benefits (Naveh and Marcus 2005; Morris 2006; Benner and
Veloso 2008). In the construction research area itself, studies on the effects of ISO
9001 implementation on the certified companies business performance are still
limited.
Bassioni, Price and Hassan (2004) addressed the shift of performance measurement
in construction companies, from financial considerations to a mixture of both
financial and non-financial considerations. Using Korean construction companies as
an example, Yu et al. (2007) developed an implementation model to measure and
compare the performance of construction companies with other construction
companies. They proposed a model based on: (1) financial aspects (profitability,
growth, stability); (2) customer aspects (external customer satisfaction, internal
customer satisfaction, market share); (3) internal business processes (R&D,
technological capability, business efficiency); and (4) learning and growth aspects
(HR development, organisation competency). Some popular frameworks, such as
Balanced Scorecard (BSC) model, the European Foundation for Quality
Management (EFQM) excellent model, and the Construction Best Practice Program -
Key Performance Indicators (CBPP-KPI) model, have been adopted and widely used
within the construction industry (Yang et al. 2010).
65
As outlined in the review of the relationships between organisational culture and
construction companies‟ effective performance (Section 2.4.1), a strong
organisational culture helps ensuring that an organisation operate effectively and
give identity to the organisation (Sai, Wong and Wu 2011), as well as supporting
QMS-ISO 9001 implementation, ensures that future projects are more marketable
and repeat business ensured. This is also reflected in the relationship between a
strong organisational culture and an effective QMS or TQM implementation, in
reference to their impact on the organisational effectiveness and a high level of
successful performance, although there is still relatively limited research on these
links.
The importance of national culture to, and relationships with, quality management
practices and effectiveness is not well documented in the literature. However, a
number of significant studies do exist. Specifically, Noronha (2002) and Noronha
(2003) use case studies of ISO 9001 and TQM companies operating in mainland
China, Hong Kong and Taiwan, and found that Chinese cultural values have an
important influence on an organisations‟ quality climate, processes, methods and
results. More recently, Kull and Wacker (2010), in a survey-based study of
manufacturing industries have found that differences in quality management
66
effectiveness exist among the East Asian cultures of China, South Korea, and
Taiwan.
Comprehensive studies on the links between national culture and quality systems,
and/or organisational performance in an Indonesian context, are also very limited,
although that linkage was not investigated within the scope of this study. The
research focus of this study related to the perceived „immature‟ state of QMS roll-out
in the Indonesian construction industry, reflecting the fact that culturally, Indonesian
contractors tend to be employed based more on relationships than on capability or
performance records.
In the case of Indonesian construction companies, there has been also limited
research on organisational culture and its impact on QMS practices leading to
improved performances. Some studies on industry performance conducted by
Wirahadikusumah and Pribadi (2011) have highlighted the need for the Indonesian
construction industry to immediately implement strategic initiatives aimed at
improving conditions within the construction sector, especially for companies
interested in the global construction market. The small number of Indonesian
companies regarded as capable of competing for national and international projects,
has been cited by Budiwibowo et al. (2009), as reflecting poor development
strategies and polices. Despite this and other studies on the Indonesian construction
industry performance, there remains a great need for the further study of issues
relating to the improvement in performance within the Indonesian construction
industry. This thesis study on the effects of the organisational culture and QMS
implementation on construction performance in Indonesia, is a counterpart to earlier
studies, as the issues relating to the organisational culture and QMS have the
potential for having a strong impact on facilitating organisational strategy and policy
development.
67
certified construction companies, in order to measure their performance in response
to the implementation of QMS.
The study of the organisational culture in the construction industry is still in the stage
of debate (Oney-Yazıcı et al. 2007). Despite the complexities involved in measuring
culture of the construction industry (Tijhuis and Fellows 2012), this culture is
regarded as being worthy of research, especially in relation to the organisational
culture needed to support QMS (Koh and Low 2008; Watson and Howarth 2011) and
to improve organisational effectiveness, and therefore, organisational performance
(Sai, Wong and Wu 2011; Coffey 2010).
While research into the construction organisational culture, the practice of QMSs and
the performance of contractors implementing such QMSs has involved many
researchers, there is no critical mass of research specifically in relation to the
Indonesian situation. Studies based on contemporary perspectives of the
characteristics of the construction organisational culture using Cameron and Quinn‟s
Organizational Culture Assessment Instrument and its relationship with the QMS-
ISO 9001 standard practices of construction companies in Indonesia, have not been
previously undertaken. The lack of research intention in this area is particularly
surprising, as Indonesian contractors are already applying QMSs with ISO 9001
certification. Increased attention is needed on the matter of Indonesian QMSs
improvement. This has been the objective of this thesis research, particularly as the
Indonesian construction industry has been facing challenges in relation to its internal
organisation and work environment, in order to attain an effective QMSs
implementation. It is also important to investigate the organisational culture profile
in an Indonesian construction organisation, together with the current implementation
of contractors‟ QMS-ISO 9001 and their performance during implementing QMSs,
as information in these areas has a bearing on the poor performance and low levels of
effectiveness of Indonesian construction companies, when reviewed in terms of
quality and profitability, performance and effectiveness; the industry faces
68
challenges and uncertainties in an environment of increasing construction demands
and changing economic environment.
While acknowledging that there has been little research based on the use of Cameron
and Quinn‟s CVF-OCAI tool for identifying types of contractors‟ organisational
culture profiles and their relationship with QMS-ISO 9001 principles and elements,
there has also only been limited research into the relationships between the barriers
to implementing ISO 9001 standard and construction companies‟ performance while
implementing the standard. Research output and information is also very limited
relating to the strength of contractors‟ organisational culture driving an effective
QMS-ISO 9001 implementation, impacting on companies‟ effective performance. To
rectify these research gaps, the research which has formed the basis of this thesis has
been aimed at a study of organisational culture types (based on CVF) and their
relationship to the implementation of QMS-ISO 9001 standards. The thesis output
has been the development of a comprehensive Culture-based Quality Management
System Improvement Implementation Framework for construction organisations, to
provide the basis for improvements in company performance and quality outcomes.
2.7 Summary
This chapter reviews the literature related to QMSs, both in a global and Indonesian
context. It also reviews the basis of the relationships that have increasingly been
69
shown to exist between contractors‟ organisational culture and the practice of QMSs
in construction companies.
Based on the literature review and identified research gaps, the conceptual
framework for Indonesian contractors‟ culture-based QMS implementation was
developed in Chapter 3, to provide guidance for the selection of appropriate research
methods for later stages of the study.
70
CHAPTER 3
RESEARCH DESIGN
3.1 Introduction
Saunders, Lewis and Thornhill (2009) state that a research design must clearly
describe the general plan of how the research questions will be answered together
with providing justification of the methods selected and employed for a particular
research design. Although this study combined quantitative and qualitative methods
to achieve the research objectives as outlined in Chapter 1, a quantitative approach
was employed as the major methodology; as this best suited the research objectives
and associated research gaps highlighted in Chapter 2. The methodology employed a
survey questionnaire of construction industry practitioners, to collect opinions as
well as empirical data regarding the first and second research objectives. Other
secondary methodologies were also used: a preliminary study to help in clarifying
the research gaps and designing the final survey questionnaire, and a focus group
discussion to finalize and validate the research findings (the third research objective).
Using the collected data, analyses were carried out to establish a generic, integrated
culture-based quality management system improvement implementation framework
to assist construction companies in enhancing the development and implementation
of a specific company-based QMS. The design and development of the framework is
covered in Chapter 5.
Having established the research objectives in Chapter 1, this chapter presents the
process by which the objectives were achieved. The research plan (Section 3.2)
covers the general research process used in the study, together with the theoretical
framework on which the entire research study is based. The research methods
selected in order to answer the research questions are discussed in Section 3.3.
Section 3.4 provides a summary of the content of this chapter.
71
3.2 Research Plan
Before embarking on the actual research, a research plan was needed to address the
strategic stages and specific components which need to be implemented to meet the
research objectives. The first stage of the research plan was to undertake some an
initial studies, which provided the means for identifying the research problem and
defining the research questions, established the objectives of the research, enabled
the planning of the proposed research process to be carried out in order to confirm
and refine the specific research topic to study. An initial study is an essential stage in
the identification of a topic has not already been researched, or if previously studied
and reported, needs further investigation (Fellows and Liu 2008).
The second stage involved an extensive literature review, focusing on the area
proposed as the research topic, designed produce a questionnaire instrument for first
testing in the preliminary study. The results from the preliminary study were used to
refine the questionnaire and to make some adjustment of the research plan in order to
develop a comprehensive survey. The benefit of conducting a preliminary study is
that it contributes to the narrowing of the problem area and in defining a specific
problem statement (Sekaran and Bougie 2009).
Data collection and analysis relating to questionnaire are covered in stage 3. In this
stage, a tentative Culture-based Quality Management System Improvement
Implementation Framework was developed, and there was a focus group discussion
(FGD) to evaluate and validate the framework. The feedback from the FGD was
analysed and the results used to refine the expected research findings. Fellows and
Liu (2008) note that a mixture of quantitative and qualitative methods may be
employed to gain specific advantages and reduce potential disadvantages of each
method. Following the qualitative analysis of results, a final Culture-based Quality
Management System Improvement Implementation Framework was established.
Stage 4 (the last stage) of the research plan development comprised the writing of the
research report. Figure 3.1 provides an illustrated framework of the activities
undertaken during the study.
72
Re-appraisal by Researcher
Dissemination
Qualitative
Focus group
STAGE 1 STAGE 2 STAGE 3 data
discussion analysis
Culture-based QMS
Key framework
STAGE 4 refinement
Information obtained
from existing knowledge
Information added to
existing knowledge Thesis writing
Figure 3.1 Overall Research Plan (adapted from Fellows and Liu 2008)
73
Theoretical Framework
The way the research questions are presented and the proposed research objectives to
achieve, highlights the classification of the research study (Saunders, Lewis and
Thornhill 2009). This study can be classified as an „explanatory study‟, which
emphasizes the study of a situation or problem in order to explain the relationships
between variables (ibid 2009). The approach needs a theoretical framework to
establish how certain variables are related to each other (a model) and why these
variables are believed to be associated with each other (a theory) (Sekaran and
Bougie 2009).
This study uses a theoretical framework based on means, to examine the extent of:
(1) the relationships between barriers and the effectiveness of QMS implementation;
(2) the relationships between the barriers and performance of construction companies
certified under the QMS-ISO 9001; (3) the relationships between the effectiveness of
QMS implementation and the performance of construction companies; and (4) the
influence of construction companies‟ organisational culture profiles on the
effectiveness of implementation of quality management systems (QMSs). All these
factors underpin the theoretical framework, and are the main variables in this
research (Figure 3.2).
Identification of the main variables and the possible linkages between them, as
established in the theoretical framework, were developed within the literature review
documented in Chapter 2. The main findings of this review can be summarised as
follows:
The variable of typical profiles of Indonesian contractors‟ organisational
culture has been based on Cameron and Quinn‟s (2006) organisational culture
traits and typologies. They are the four culture types (clan, adhocracy, market
and hierarchy) within the six cultural dimensions (dominant characteristics,
organisational leadership, management of employees, organisation glue,
strategic emphases, and criteria of success). It has been theorized that the
organisational culture influences successful QMS implementation. This was
therefore assessed within the context of Indonesian construction organisation
practices of organisational culture and QMS.
74
The variable of an effective QMS implementation refers to the meeting of a
company‟s own specified quality requirements and prescribed quality
objectives which are based on the quality management principles and the
elements of ISO 9001 standard. This was tested within the context of
establishing where there were linear relationships between the effective QMS
implementation and the key performance indicators within construction
companies.
75
Organisational (4)
culture profiles Effective Performance
quality of
management (3) construction
system companies
(QMS)
Barriers to (1) practices
implementing
effective QMS
(2)
The theoretical framework for the research and the issues 1, 2 and 3 reflected in
Figure 3.2, were developed in reference to Research Question 1 and its sub-
questions, which are outlined below:
Research Question 1:
What is the current status of the quality management systems (QMSs) being
implemented by Indonesian construction companies?
76
(2) The relationships between the barriers and performance of construction
companies certified under the QMS-ISO 9001, are associated with:
sub-question 1.2:
Do the barriers to the implementation of an effective quality management
system significantly relate to the key performance of construction companies?
(3) The relationships between the effectiveness of QMS implementation and the
performance of construction companies, are associated with:
sub-question 1.3:
Does the identified presence of quality management system practices
significantly relate to the key performance of construction companies?
The theoretical framework and item number 4 depicted in Figure 3.2, were
developed in relation to Research Question 2 and its sub-question, which are
summarized below:
Research Question 2:
What are the organisational culture profiles of Indonesian construction companies?
77
Research Question 3:
How can effective QMSs be properly established, and be effectively implemented
and continuously improved, by Indonesian construction companies?
Examining the relationships between the main variables and answering the specific
research questions is conducted through appropriate statistical analyses.
A „mixed-method‟ approach was adopted for this research. Collecting data using a
multitude of methods and from multiple sources lends rigor to research and can
potentially reduce potential bias associated with some data collection methods
(Sekaran and Bougie 2009). This approach comprised two complimentary methods: a
questionnaire survey and focus group discussion. The questionnaire generated
quantitative data, while the second provided richer qualitative details, while at the
same time validating the quantitative findings. Hurmerinta-Peltomaki and Nummela
(2006) have found there is value-adding to results based on the adoption of mixed
methods, when compared with using a single method. The combined approach also
78
provides considerable potential for increasing the validity of information and
creating knowledge through the study of alternative designs (ibid 2006).
The choice of the mixed-method approach for the conduct of the research was based
on the requirements of the different research strategies. A survey was regarded as
appropriate to answer the „what?‟ type research questions, while interviews based on
group discussions are appropriate to answer the „how?‟ type research question
(Fellows and Liu 2008). While parts of the questionnaire were quantitative in nature
for measuring the numerical itemized rating scale, the Organizational Culture
Assessment Instrument was basically qualitative, as it measured the attitudes to
current organisational culture. The information generated in these surveys was
utilised to answer Research Questions 1 and 2, and partially to respond to Research
Question 3. The analysis and results from the questionnaires were validated by a
focus group of expert stakeholders in order to fully answer Research Question 3.
Although the quantitative method was the mainstay of the methodology used to
generate the research findings in this study, the focus group discussion was able to
not only validate, but also give a deeper and more practical description of, the
findings in order to improve their usefulness and contributions. The quantitative
findings in this research required validation based largely on deductive qualitative
findings. Therefore, the combination of quantitative and qualitative methods both for
data collected and analysis in this study was considered as the best strategy in order
to get robust valid answers to the research questions.
79
Table 3.1 Integration of Research Methods and Research Objectives with Expected Outcomes
Research Methods
Phase Research Objectives Expected Outcomes
Data Collection Data Analysis
To identify quality management systems (QMSs) issues in
Literature review - Theoretical framework
1 construction projects and organisations in both international
and Indonesian contexts, identify gaps and problems of issues
particularly in the Indonesian case
2 To develop a draft research instrument (questionnaire) Literature review - Draft questionnaire and variables
To confirm the selected variables for the study, and shape the
3 Preliminary Studies Qualitative Final questionnaire instrument
final questionnaire with necessary modification based on
information developed in Phase 2
To examine the effectiveness of the QMSs being operated in Level of QMSs implementation,
4 Questionnaire Quantitative
Indonesian construction companies, including the QMS improvement elements
identification of current problems within the systems, and variables and statistical
examine the companies‟ performance while implementing relationships between these
QMSs variables
Dominant types of Indonesian
5 To assess the organisational culture (OC) profiles of Questionnaire Quantitative
contractors‟ OC and statistical
Indonesian construction companies and analyse the influence
analysis of OC and QMS
of different organisational culture profiles on QMS
improvement elements variables
implementation
To design and develop a draft of culture-based QMS
6 - - A framework to improve QMS
improvement implementation framework, to enable
implementation
Indonesian construction companies to effectively implement
QMS
7 To disseminate the framework to practitioners and policy Focus group Qualitative Refinement of the framework and
makers and evaluate its usefulness in practice discussion its validation
Valuable implications for
8 To refine and finalize the culture-based QMS improvement - -
construction industry and
implementation framework
practitioners in Indonesia
80
3.3.1 Questionnaire Design
To ensure that meaningful data was collected, the research instrument (i.e.
questionnaire) in this study was carefully developed and tested in the pilot study,
followed by minor revisions in order to have a well-validated survey instrument. All
statements were primarily based on information derived from the literature review
and preliminary studies.
The scale of the questionnaire does not include a mid-point, due to a consideration of
potential cultural bias in response to the survey instrument. According to Coffey
(2010), noting findings of previous research (Hofstede and Bond 1988; Hofstede
1991; Si and Cullen 1998) when conducting studies in Asian countries, there has
been notable experience that managers tend to select the mid-point of an odd-number
based rating scale in a questionnaire. They can even apply it in their general life; this
reflects a Confucian doctrine that regardless of correctness, always follows a middle
way. According to Beck (2010), Confucius taught the middle way between extremes
in regard to most virtues and considered moderation transcendent and rare in his
time. Many researchers have different views of the use of the „middle-way‟ response.
However, it depends ultimately on the researcher‟s own decision and level of
confidence in using mid-point scales, or making a conscious decision not to use
them, in questionnaire response categories (Coffey 2010).
In order to secure the most enthusiastic response possible to this survey, the language
used for the questionnaire was Bahasa, which was back-translated twice from the
original English version by different translators who were both fluent in English and
81
Bahasa. Figure 3.3 shows the flow of this back-translation technique when used for
the questionnaire adjustment.
Comparison of
E1 and B2 and
Original Editing
English English
Bahasa BAHASA
version version Bahasa
Version
(E1) (E2) version (FINAL
(B1)
(B2) VERSION)
Back-translation processes
Saris and Gallhofer (2007) recommend that is best to start with general questions and
keep key questions in the last part of the questionnaire. However, revision of the
original questionnaire design resulted in the main questions being in the middle part
of the questionnaire which commenced by providing general information to
respondents on the objectives of the survey, with the middle sections requiring them
to think deeply; the questions in the last section allowed respondents to be more
relaxed in expressing their thoughts and opinions.
82
Questionnaire Format
One section of the questionnaire focused on the company‟s quality management
system (QMS) details, while the five main sections were focused on the development
and implementation of QMS-ISO 9001. One main section was also focused on the
assessment of a construction company‟s organisational culture profile.
The QMS related sections of the questionnaires was constructed in manner designed
to gauge the respondents‟ opinions of how their companies‟ QMSs were developed;
the perception of the construction companies to the way that QMSs were being
operated to comply with the ISO 9001 principles and elements; what do the
construction companies perceive as the major difficulties impeding the process of
attaining their QMSs; and successful outcomes of ISO 9001 certified contractors in
the three cities (i.e. Manado, Makassar, and Jakarta) in Indonesia.
83
Table 3.2 summarises the construction, measurement items and development of the
questionnaire, and sources of information for the main sections, corresponding with
the research objectives. A sample of the questionnaire is presented in Appendix A.
To examine the The practice 3.1 – The level of implementation Tricker (2008, 26-
effectiveness of of ISO 9001 of customer focus 29)
QMSs being principles 3.2 – The level of implementation
operated in (8 items) of leadership
Indonesian 3.3 – The level of implementation
construction of involvement of people
companies 3.4 – The level of implementation
of process approach
3.5 – The level of implementation
of system approach to
management
3.6 – The level of implementation
of continual improvement
3.7 – The level of implementation
of factual approach to
decision making
3.8 – The level of implementation
of mutually beneficial
supplier relationships
84
Table 3.2 Construction and Development of Questionnaire (continued)
Research Measurement Items and
Constructs Sources
Objectives Development
To examine the The practice 4.1 – The level of implementation Chung (1999,
effectiveness of of ISO 9001 of management responsibility 38), Rumane
QMSs being elements (20 4.2 – The level of implementation (2011, 104)
operated in items) of quality system
Indonesian 4.3 – The level of implementation
construction of contract review
companies 4.4 – The level of implementation
of design control
4.5 – The level of implementation
of document and data control
4.6 – The level of implementation
of purchasing
4.7 The level of implementation of
control of customer-supplied
product
4.8 The level of implementation of
product identification and
traceability
4.9 – The level of implementation
of process control
4.10 – The level of implementation
of inspection and testing
4.11 – The level of implementation
of control of inspection,
measuring and test equipment
4.12 – The level of implementation
of inspection and test status
4.13 – The level of implementation
of control of non-conforming
product
4.14 – The level of implementation
of corrective and preventive
action
4.15 – The level of implementation
of handling, storage,
packaging, preservation and
delivery
4.16 – The level of implementation
of control of quality records
4.17 – The level of implementation
of internal quality audits
4.18 – The level of implementation
of training
4.19 – The level of implementation
of servicing
4.20 – The level of implementation
of statistical technique
85
Table 3.2 Construction and Development of Questionnaire (continued)
Research Measurement Items and
Constructs Sources
Objectives Development
86
Table 3.2 Construction and Development of Questionnaire (continued)
Research Measurement Items and
Constructs Sources
Objectives Development
87
Table 3.2 Construction and Development of Questionnaire (continued)
Research Measurement Items and
Constructs Sources
Objectives Development
88
3.3.2 Sample Design
Questionnaire Respondents
The target population of the study in the Indonesian context was the grade 7 (G-7)
construction companies, the highest grade of Indonesian contractor qualification, as
well as all G-7 companies holding ISO 9001certification. Fellows and Liu (2008, 23)
state that “surveys operate on the basis of statistical sampling; only extremely rarely
are full population surveys possible, practical or desirable. The principles of
statistical sampling - to secure a representative sample – are employed for economy
and speed”. Therefore, the determination of the sample size for a questionnaire must
secure a sufficient number to represent the population, while govern estimated non-
response rate, cost, time, and operational constraints, with the results being able to be
generalized to the population as a whole. With these guidelines being taken into
account, this study adopted complex probability sampling designs, in particular,
stratified random sampling and cluster sampling.
89
management system implementation within their construction companies. This
sample can also be considered to be representative of the Indonesian construction
industry as a whole. The Quality Management Representative is specifically chosen
being considered to meet the criteria for the survey, to provide opinions on the
current QMS practices in their companies. He/she is a quality management specialist,
who leads the development and/or implementation of a company‟s quality
management system, and ensures the quality system complies with the ISO 9001
standards.
Israel (2003) presents the strategies for determining sample size, either by using
published tables or formulas, to calculate an appropriate sample size. Table 3.3
shows the basis for deciding the sample size for this study. The sample sizes in Table
3.3 have been based on the assumption that the attributes being measured are
distributed normally or almost so, and are considered appropriate for meeting a
combination of the sample size for precision, confidence level and degree of
variability (ibid 2003).
90
Table 3.3 Sample Size for ±5%, ±7% and ±10% Precision Levels, a Confidence
Level of 95% and P= .05
For the total population of ISO 9001 certified civil contractors (150 companies), the
sample size determined for investigation in this study was 118 companies. This
complies with the eligibility of Israel‟s (2003) required sample size of n=110 (e = ±
5%).
91
In relation to the number of participants in a FGD, Phillips and Stawarski (2008)
suggest that the group size should be kept small, with between 8 and 12 participants
being regarded as being appropriate for most focus groups. A group needs to be large
enough to ensure representation of different points of views but small enough to
provide a chance for each participant to exchange comments freely (ibid 2008). A
panel of experts was therefore established according to these guidelines. Fourteen
panellists were invited to participate in the FGD data collection to ensure a sufficient
number of respondents for valid data collection. These experts were academics,
policy makers and construction practitioners. Nine of the 14 invitees expressed their
agreement to participate in the FGD. The number of respondents conformed with the
recommended size of a FGD for representation of the three sectors covered by this
component of the study.
Before the formal data collection was undertaken, preliminary studies in the form of
interviews and pilot testing of questionnaires were conducted. The preliminary
interviews was aimed at ensuring the significance of the topic being researched,
while also establishing a working communication base for further data collection and
validation in the main survey. A pilot test questionnaire provided an opportunity to
validate the accuracy of the questionnaire statements/questions, and solicit comments
and feedback from respondents for improving and finalising the essence of the main
questionnaire. The preliminary study was conducted in the two months, December
2009 and January 2010.
92
The Preliminary Interviewees
A total of 29 respondents took part in the preliminary interviews (see Appendix C,
Table C-1). The first phase of the interviews involved 17 participants who were
made up of Directorate General for Construction and Human Resources
Development, Centre for Construction Implementation Development, and Centre for
Construction Research Organisation (four participants), all of which are under the
Ministry of Public Works, National Construction Services Development Board
(NCSDB) in Jakarta (four participants), South Sulawesi Construction Services
Development Board in Makassar (two participants) and North Sulawesi Construction
Services Development Board in Manado (two participants), Indonesian Contractors
Association (ICA) (three participants), and the National Contractors Association of
Indonesia (NCAI) (two participants).
The choice of the 17 participants (R1 – R17) (see Appendix C, Table C-1) was made
with regard to their roles as policy makers and in being functional in developing and
enhancing the role of the national construction services that can contribute to the
economic growth of the country (Indonesian Contractors Association 2010). In
addition, the Directorate General for Construction and Human Resources
Development (R5) within the Ministry of Public Works has particular responsibilities
to motivate and enhance the role of Indonesian contracting companies in becoming
qualified and professional organisations capable of undertaking construction projects
both nationally and overseas.
93
provide valuable comments and inputs, particularly regarding problems associated
with the effective operations of their companies‟ QMSs.
Each interview lasted at least one hour. In each case, the author spent the first five
minutes explaining the background of the research (for example, the topic of the
research, research background and problems, research aims and objectives). The
terminology used in this study, such as the definition of organisational culture, was
also explained to the participants before commencing the preliminary interviews. The
interviewees were asked to express their opinions and inputs on quality works and
project products issues, quality management systems, and organisational culture in
the construction organisation. They were encouraged to comment on the issue
questions in the context of their experience in their current organisations, and also to
discuss any other issues about quality and organisational culture in construction that
they felt was important.
There were six main questions covered in the preliminary interviews (see Appendix
C, Table C-2). These questions were also in some cases supplemented by supporting
or sub-questions which served to further explore the specific issues of the main
questions. The opinions of the interviewees on the questions were recorded and then
transcribed to text documents. Subsequently, the responses were categorised and
related opinions grouped. The collective opinions and inputs relating to a number of
the preliminary interview questions are summarised in Appendix C.
94
local contractors is perceived as „a good way of working‟ while national contractors
saw themselves as possessing a strong operating profile which had benefitted from
the organisational culture in supporting the company systems, including those based
on the QMS-ISO 9001.
The officers and practitioners were interested in, and supported, the research project,
as it was regarded that the results of the study would have the potential to contribute
to quality management practices in the Indonesian construction industry. However,
they acknowledged that the research topic, particularly the research on successful
quality management systems implementation by construction companies reviewed
from the angle of corporate culture, is a new group of topics that have not been
studied before in Indonesia. The research findings are expected to help provide
solutions to „quality problems‟ in the construction sector, and if applied, to improve
contractors‟ competitiveness and profitability.
The results of the meetings were also helpful in strengthening the research topic and,
clarifying key research questions, while also providing a good means of obtaining
valuable inputs regarding the current situation and conditions on quality production
and quality management issues, in the Indonesian construction industry. The
meetings were helpful in clearly defining the research gaps that could not be
identified from available research literature, and in particular, were helpful in
constructing appropriate questions for the main questionnaire.
Finally, in order to ensure the ultimate efficacy of the survey, the Board and the
Associations agreed to support the main data collection exercise through the
provision of letters of support to the respondents scheduled to participate in the main
95
survey, and to also assist in monitoring the progress of questionnaire completion
numbers.
Many scholars advise that a pilot study can be beneficial to trial a questionnaire
before it is used in the main survey. It provides opportunities to test the format of,
and instructions contained in the questionnaire, and helps ensure that the questions
are understandable to respondents and can later be easily analysed (Bell 2005;
Naoum 2007). Since a survey must be reliable and valid, by conducting a pilot study,
its reliability can be justified when answers provided by respondents are consistent
and validity is proven by the degree of accuracy of the information obtained (Fink
2009).
For pilot testing to be effective, the pilot respondents need to be similar to those who
will form the sample population in the main survey (Fink 2009). Hence, the
respondents to this pilot questionnaire were drawn from seven private construction
companies that have the ISO 9001 certification in Manado, North Sulawesi Province,
and two companies in Jakarta who were also engaged in the actual survey. The
questionnaire involved 23 respondents: eight Quality Management Representatives
96
(QMRs), six Project Managers (PMs) and nine Site Engineers (SEs) (see Appendix
C, Table C-3).
Both the English and Bahasa versions of the pilot questionnaire were tested. The two
versions were sent to the two construction companies in Jakarta, while companies in
Manado received only the Bahasa version. Finally, 27 questionnaire booklets were
sent to the targeted pilot respondents; of these, 23 were completed and returned.
Most sections were fully answered; however, two respondents did not provide full
answers relating to the company‟s organisational culture, while a third respond did
not respond to the section. In addition, only one respondent provided ideas in
response to the open-ended question relating to motives surrounding the
implementation of a quality management system. After consideration, it was
therefore decided not to include open-ended questions seeking opinions, in the main
survey. The open-ended questions were instead prepared for use in a focus group
discussion.
The findings of the follow-up feedback interview to the pilot questionnaire are
summarised below:
97
(making it less technical). No changes were needed for the layout of the
questionnaire, as all the pilot respondents indicated that it was clear and attractive.
Topics Investigated
Most of the respondents identified that the content of the questionnaire was clear and
understandable. All respondents indicated that the questionnaire covered the essential
elements relating to the barriers, QMS practices and performance during the
implementation of QMSs in construction companies. However, for most respondents,
the completion of the component of the questionnaire relating to the assessment of
the company‟s organisational culture was a very new experience for them. The pilot
respondents also provided inputs to modify some questions in the section relating to
company details, in order to provide a clearer picture of a company‟s profile. In
addition, the Jakarta respondents, based on their company‟s experience,
recommended the addition of a question regarding a company‟s motives of
developing a QMS.
In summary, all the pilot questionnaire respondents, some of whom were also
involved in the interviews and discussions, supported the proposed research topic,
and none reported difficulties in responding to the questionnaire, while they also
expressed support and readiness to participate in later surveys. As Walker (1997,
152) points out, “pilot studies are a useful tool in providing a focus mechanism to
establish the research direction more clearly. After undertaking a preliminary study,
the research question boundaries became clearer and the research became more
focused.”
98
3.3.4 Questionnaire Survey
The feedback from the preliminary studies assisted in finalizing the format of the
main questionnaire and preparing the ground for the main survey. The questionnaire
was sent to respondents and was used to achieve research objectives: (1) the
examination of the effectiveness of the QMSs being operated in Indonesian
construction companies, including identify current problems within the systems and
the examination of companies‟ performance while implementing their QMSs; (2) the
assessment of the organisational culture profiles of Indonesian construction
companies and an analysis of the influence of different organisational culture profiles
on QMSs implementation.
Considering the information needs, including the type of data required from the
designated population and its sample representation for achieving the objectives of
the study, according to Sekaran and Bougie (2009, 197) means that “a questionnaire
is an efficient data collection mechanism when the researcher knows exactly what is
required and how to measure the variables of interest”. In addition, survey techniques
(such as questionnaires) are suitable when a large amount of data needs to be
collected from people in relation to their views and experience relating to a particular
phenomenon, and time available to collect the data is limited (Naoum 2007; Fink
2009). The reason questionnaires are a popular method for collecting data is because
of their suitability to deal with time constraints and a large sample size, which were
also the main considerations in this study.
99
The overall approach to operation of the survey is illustrated in Figure 3.4.
Results:
(1) Statistical relationships between all variables.
(2) QMS improvement elements.
(3) Profile of construction companies‟ organisational culture.
Administering Questionnaires
Based on the information gathered from the pilot survey, most respondents preferred
to receive the questionnaire by hand-delivery or mail, rather than in electronic form.
In relation to conducting a postal questionnaire, Oppenheim (1992 ) and Phillips and
Stawarski (2008) remind researchers of some disadvantages of this approach,
including a low response rate, and a lack of opportunity to provide explanations and
encouragement to respondents to answer all questions. However, these authors also
present recommendations for overcoming these potential constraints, including
providing a supporting letter, statement of confidentiality and anonymity, and return
envelopes, as well as providing regular reminders and considering the appearance
and/or layout of questionnaire; these should all be noted critically by a researcher
(ibid 1992; ibid 2008).
Based on recommendations drawn from the literature review and experience during
the conduct of the pilot survey, the questionnaires for the surveys in Manado and
Makassar were hand-delivered, while postal questionnaires to companies in Jakarta
were sent by post with return envelopes enclosed. The questionnaires were
100
accompanied by a covering letter, participant information for QUT research project,
and supporting letter from the Construction Services Development Board. The
participant information for QUT research project form mainly outlined the role of
participant, expected benefits for participating in the survey, confidentiality of
responses, and low-risk categorisation for the survey.
Fink (2009) refers to the fact that even though the research method adopted in this
study might be familiar to the proposed respondents, it is important that researchers
continually monitor progress and completion. Hence, after the questionnaires were
delivered, the researcher regularly conducted progress monitoring, and reminded
respondents of the timeframe for questionnaire completion. The reminders were
provided by e-mail and telephone contact.
Distribution of the questionnaire booklets started in mid September 2010, while the
process of questionnaires collection commenced in mid October and was completed
by mid December 2010. The questionnaires in Manado and Makassar were collected
directly from respondents, while those in Jakarta were collected from the office of
the National Construction Services Development Board. One of the important
lessons learned from the survey was that, building a good approach and
communicating well with the targeted respondents, contractors associations and the
related institutes, is very important for good data collection.
101
motives driving the development of QMS under ISO 9001. Continuing the
descriptive analysis, the results depicted the current status of the QMSs
implementation including the levels of the existing QMS implementation, the levels
of barriers that affect QMSs implementation, and the levels of company‟s key
performance during QMSs implementation.
The second category of analyses undertaken was the conduct of parametric tests
using:
Principal Component Analysis (PCA) was conducted in particular to
summarise a large number of QMS variables into a smaller set of component
or factor in order to obtain sets of more meaningful QMS variables.
Pearson Correlation in order to statistically assess the relationships among the
QMS variables.
Analysis of Variance (ANOVA) was conducted to statistically test whether
different profiles of organisational culture variables have different influence
on the QMS variable.
Structural Equation Modelling (SEM) was conducted to test the entire model
of the theoretical framework on the relationships among the QMS variables
and between the QMS and the organisational culture variables.
The parametric test used in this study fulfilled the three main conditions noted by
Bryman and Cramer (2009), these being: (1) the scale of measurement be treated as
interval scale (Sekaran and Bougie 2009); (2) the distribution of the data is normal;
and (3) the assumption of homogeneity of variance is not violated.
102
3) The congruence of the culture profiles
4) A comparison of Indonesian construction companies‟ culture profiles with the
average culture profiles of other construction industries that have been
surveyed by Cameron and Quinn and other researcher using this instrument.
The comparison standard of „discrepancies‟ (Cameron and Quinn 2006) was not
interpreted in this research, as the research was focused only on the assessment of the
current culture of construction companies and not the preferred future culture
profiles. The discrepancy standard is normally applied for observing the areas that
differentiate the current and the preferred future culture profiles. Due to
consideration of the concept of organisational culture and its proper practices being a
new insight for the majority of the targeted research respondents, thus the researcher
focused on an examination of the existing picture of the way an organisation operates
and which values characterize it. Another reason for this approach was, the results
from the current culture profiles assessment are being utilised to indicate the
fundamental organisational cultures possessed by Indonesian construction
companies; these may later be used to drive companies‟ effective QMS
implementation, and used to facilitate companies to recognise their preferred culture
profile and make appropriate changes or maintain and strengthen the existing culture
profile.
This study fully adopted Cameron and Quinn‟s (2006) requirements for diagnosing
an organisation‟s culture, both for the format of the questionnaire instrument and the
method of data analysis. However, it is noted that a few other studies have preferred
to use a Likert scale, instead of using the original scoring system of the OCAI format
(Novana and Ogunlana 2006; Oney-Yazıcı et al. 2007; Koh and Low 2008).
The second strategy applied to collect new data, as well as assist in validating
previous data, for this research was to use a focus group discussion. The use of a
focus group discussion is designed to satisfy the third research objective, that is, to
communicate the proposed culture-based quality management system (QMS)
103
improvement implementation framework, and also to obtain an evaluation regarding
the perceived the usefulness and validity of the framework from specific audiences
who are closely involved with the QMS application.
Prior to the discussion, the researcher (who took on the role of moderator/facilitator)
introduced herself, explained the aim of the FGD, addressed confidentiality concerns,
and ran through the main processes of the FGD. Each panellist subsequently signed a
consent form, that the ethics of the research would always be honoured (Bell 2005).
104
The process of the discussion were both video and tape-recorded. However, as it had
been stated in the participant consent form, all comments and responses were treated
confidentially and were kept anonymous when transcribed.
Figure 3.5 illustrates the main steps in the FGD for achieving best practices and
consensus for the framework. In Step 1, the panellists were asked to introduce
themselves and to indicate their job or responsibilities in their
companies/organisations. They were then led through the introductory questions to
get them to start thinking about the discussion topics, as well as to encourage
interaction and conversation among the panelists. Transition questions were
presented to panelists before moving the discussion into the key questions for
discussion.
In Step 2, four key questions were presented to the panelists. The first question dealt
with overall opinions of the arrangement and structure of the generic integrated
framework. The second question related to seeking opinions of the culture change
elements in the framework. The third question focused on the efficacy of the QMS
improvement elements in the framework from the perspective of a construction
organisation. The final question related to the applicability of the QMS improvement
elements framework as a part of the company‟s QMS implementation strategy.
During the discussion of each question, the participants interacted with each other,
listened to all views and gave a good airing to the topic. The moderator formed a
consensus of the views expressed and summarised the key points. While only 30
minutes allocated for Step 1, in reality this Step took about 130 minutes of the total
FGD input time.
Prior to Step 3 (the last step) of the FGD, the moderator briefly summarised the main
points of the discussion. The panelists were then offered an opportunity for
concluding questions in order to bring closure to the discussion and enable panelists
to add or amend the summary. Step 3 lasted about 20 minutes. At the end of the
FGD, the moderator made closing statements that summarised the results of the
evaluation and associated discussion, and thanked the panelists for their valuable
time.
105
Focus Group Best Practices and Consensus
Questions
Discussion Steps 9 Panellists
Figure 3.5 Obtaining Best Practices and Consensus for the Framework
Refinement
The „classic analysis approach‟ (Krueger and Casey 2009) was used to allow the
results and analysis to be category based on the substance of the key questions.
During the process of analysis, decisions on the comments or themes were made by
considering several factors including the frequency of the comments made, the
specificity of the comment or comments with details, extensiveness of comments,
and participants‟ emotion and enthusiasm. These considerations allowed the
systematic and thorough analysis of the panellists‟ perceptions for evaluating and
validating the Culture-based QMS Framework. The final outcome of the research
106
was the refinement of the framework aimed at driving future improvement of the
implementation of quality management systems within the highest grade (G-7) of
Indonesian construction companies.
3.4 Summary
This chapter describes in detail, the strategic design of the research adopted in this
study. It outlines the overall research plan, including the development of the
theoretical framework in reference to the research questions, which it was aimed to
answer in a research context. It also identifies the types and sources of data which it
was aimed to collect, leading to the designated research methods adopted to meet the
research objectives. The Preliminary Studies described served the need of ensuring
the significance of the research topic and of pilot-testing questionnaire, followed by a
description of the two distinctive data collection approaches used, the Questionnaire
and Focus Group Discussion. The justification for the use of each data collection
approach is presented, followed by descriptions of the data collection processes and
methods of analysis. Instruments developed and their formats are also explained.
Ethics issues to ensure that participants were fully aware of the purpose of the
research and that they understand their rights were considered and applied
successfully during the process of data collection. The results derived from the
Questionnaire provide a strong basis for the development of Framework for Culture-
based Quality Management System Improvement Implementation. The results
derived from the Focus Group Discussion provide confirmation of the practical use
and validation of the framework, as well being used to refine the framework.
The next two chapters present the analysis and the results and related discussion of
the results for the two sets of data collected, the questionnaire (Chapter 4) and focus
group discussion (Chapter 5).
107
CHAPTER 4
INDONESIAN CONTRACTORS’ QUALITY
MANAGEMENT SYSTEM AND ORGANISATIONAL
CULTURE
4.1 Introduction
This chapter describes the analysis and results of the questionnaire survey which was
performed, and contains the following components: (1) the investigation of the
current status of quality management systems (QMSs) implementation in Indonesian
construction companies; the chapter examines in detail, the main components of the
establishment of a QMS; the motives which underlie the development of QMSs; the
implementation of ISO 9001 principles and elements, together with problems
influencing effective QMS implementation; and company performance in terms of
major achievements during the implementation of QMS; (2) the identification of the
profiles of organisational culture of Indonesian construction companies; and (3) an
examination of the theoretical framework including an analysis of the influence of
the culture profiles on QMS implementation. Following an analysis of the results, the
discussion section provides insights to the above, based on a comparison with
existing theory as covered in the literature review in Chapter 2. Chapter 4 is focused
on meeting the first and second research objectives.
This chapter is divided into four main sections: Section 4.3 concentrates on the
analyses and the presentation of results of current QMS implementation; Section 4.4
reports the contractors‟ organisational culture profiles; Section 4.5 presents the
results of the examination of the theoretical framework for this study; Section 4.6
discusses the findings of the earlier analysis and results sections.
108
4.2 Profiles of Respondents
The respondents for the questionnaires were drawn from ISO 9001 certified
construction companies in the three provincial capitals of Manado, Makassar, and
Jakarta. The companies chosen are mainly engaged in the construction of buildings
and/or civil engineering works including roads and bridges, construction of highways
and irrigation systems. The main reason for drawing respondents from these ISO
9001 certified construction companies and developers in the three cities, was that
they represented the environment of the construction industry of typical small,
medium, and large cities in Indonesia. Specifically, there were three groups
representing typical construction companies - Quality Management Representatives
(QMRs), Managers (MRs) and Project/Site Engineers (SEs). These groups of
respondents also represented the high level (QMRs), middle level (MRs), and low
level (SEs), in the organisational structure.
109
Table 4.1 Individual Respondents Levels
Table 4.2 shows that about 60% of respondents in the low level group, and 80% of
the respondents in the other two groups, had more than five years of professional
experience in the construction industry, making them well-qualified to respond to the
questionnaires.
Years with High level (n=67) Middle level (n=215) Low level (n=121)
organisation Total % Total % Total %
< 5 years 11 16.4 39 18.1 51 42.1
5 – 10 years 21 31.4 73 34.0 38 31.4
11 – 15 years 11 16.4 33 15.3 9 7.4
16 – 20 years 13 19.4 40 18.6 18 14.9
> 20 years 11 16.4 30 14.0 5 4.2
Table 4.3 summarises the years in which companies were originally certified under
QMS-ISO 9001. All but one of the local contractors in Manado and Makassar
originally obtained their ISO 9001 certification between 2001 and 2008, with the
most significant number (10 in Manado and 12 in Makassar) receiving the
certification in the period 2005 - 2008. The concentration of local contractor
certification in this period reflected the impact of a government regulation enacted in
2004, which required G-7 contractors to hold ISO 9001 certification in order to
tender for projects.
110
Table 4.3 Companies First Certified Under ISO 9001
Reflecting the type of company ownership, the company survey respondents were
grouped into three categories - public, foreign, and national private companies (Table
4.4). The data in Table 4.4 shows that the respondents from the Manado and
Makassar companies which were all privately owned Indonesian companies, with
only 12 of the overall total of 77 companies being public or foreign owned
companies.
Table 4.5 shows that 27 companies (35.1%) have been involved in the construction
business for over 10 years, while 42 companies (54.5%) have more than 20 years
construction experience. This data clearly indicates that majority of the company
respondents (89.6%) have extensive experience in the Indonesian construction
industry and have been able to survive the Indonesian financial and economic crisis
of 1997/1998.
111
Table 4.5 Company Age
The data summarised in Table 4.6 shows that all the local contractors have only been
engaged in government projects, and that this is a reflection of the market orientation
for G-7 local contractors. National contractors, on the other hand, have worked in
both government and private projects, but only a small number of these contractors
undertook foreign projects. The small number of foreign projects undertaken is a
reflection of the tight business competitiveness in the foreign sector.
This section summarises the data obtained from the quality management systems
(QMSs) survey. It outlines and analyses the perception of the construction
practitioners in relation to the development and level of implementation of QMS-ISO
9001 in their companies, along with the identification of barriers affecting the
effectiveness of the QMS implementation. The contractors‟ performances,
particularly during the implementation of the QMS, are also examined.
112
4.3.1 Development of Quality Management Systems
As shown in Table 4.7, there were 77 ISO 9001 contractor respondents, of which 65
(84.4%) responded „Yes‟ in reference to the question relating to the need to employ
consultants to assists them in setting up their QMS. Contractors which indicated the
need for consultant assistance included all the Manado contractors (13 companies),
the majority of the contractors in Makassar (19 of the 23 companies) and Jakarta (33
of the 41 companies).
For companies that answered „Yes‟ to the need for consultant assistance, the
respondents were further asked to give opinions regarding the consultants‟ role,
categorising the assistance in terms of being - (1) not helpful, (2) fairly helpful, (3)
helpful, (4) very helpful. The companies were then asked to rate the involvement
(role) of the consultants in relation to the the establishment of the company‟s QMS
113
documentation (Quality Manual, Quality Procedures, Project Quality Plan) in one of
the following categories: (1) less then 25%, (2) 25 – 50%, (3) 51 – 75%, (4) 76 –
100%.
Table 4.8 summarises the results received from 341 respondents regarding opinions
of the consultants‟ roles, while Table 4.9 summarises the level of the assistance
provided by the consultants. The majority of the respondents (Manado 61 of 100,
Makassar 46 of 103, Jakarta 83 of 138) admitted that the involvement of the
consultants was helpful, while about 24 (24%) respondents in Manado, 30 (29.1%) in
Makassar, and 28 (20.3%) in Jakarta categorised the consultants‟ role was very
helpful. In reference to the level of assistance by the consultants in the development
of the QMS manual and procedures, most respondents categorised the consultants
assistance in the range 25-50% (Manado 42 of 100, Makassar 69 of 103, Jakarta 55
of 138).
Table 4.10 summarises the results of the survey showing that in Manado, six (46.1%)
company‟ QA teams developed their quality documents, five (38.5%) company‟
divisions were required to draft QMS documents, while two (15.4%) companies
entrusted the consultants to design their QMS documents. In Makasar, 14 (60.9%)
contractors‟ QMS documents were drafted by every division, while seven (30.4%)
contractors‟ QMS documents were developed by their QA team. Likewise, in
Jakarta, 28 (68.3%) contractors required divisions to prepare QMS documents, and
11 (26.8%) contractors required their QA team to develope the quality documents. It
is apparent from this data, that contractors‟ QMS documentation were mainly
developed by the QA team in accordance with the requirements of ISO 9001, or
alternatively, all divisions were required to make draft descriptions of their operation
processes.
115
Length of Time for ISO 9001 Certification
As part of the examination of the development of QMS-ISO 9001, the company
respondents were asked how long it took for the company to be registered after
officialy starting the preparations for ISO 9001 certification. The
ISO9000Council.org (2009) states that the duration required for obtaining
certification depends on the size of a company and the motivation of the company
and its staff to get certification. Usually the fastest certification takes between three
and four months following the completion of the ISO 9001 documentation; however,
it can often take up to two years if a company has to write their ISO 9001 quality
manual and procedures from scratch, rather than base them on a template or proven
sample of the QMS documentation.
Table 4.11 summarises the company responses in the survey, regarding length of
time for ISO 9001 certification. Overall, 41.6% (32) of companies surveyed stated
that it took the company less than six months to be registered from the start of
preparations to the achievement of ISO 9001 certification; 49.4% (38) of the
surveyed companies reported taking between six and 12 months; 3.9% (3) of the
surveyed companies took between 13 and 18 months, while 5.2% (4) of companies
took between 19 and 24 months.
116
based on information derived from the literature review. Survey respondents were
asked to rank the motives from 1 (most) to 8 (least), in terms of how close these
motives reflected their companies‟ circumstances. The data was then analysed in
terms of finding the most representative values chosen by the majority of
respondents, to indicate the most prevalent motives of construction professionals in
pursuing the establishment of QMS.
Of the 403 responses, 63 were excluded due to missing data. The final sample size
was therefore 340. Table 4.12 summarises the mode, median and mean ranking for
each motive. The motives of companies in seeking ISO 9001 certification were
classified into three categories, rankings based on their „importance‟. The highest
ranking motive was „to effectively and efficiently control project activities‟; this was
also as the most prevelant motive selected. The second category of motives, was „for
the betterment of the company‟s‟ overall management system‟, „to fulfil clients‟
requests as part of the bidding process‟,‟ to improve business performance and to
minimise poor quality of construction processes and products‟. Respondents chose
„as a requirement from the Ministry of Public Works‟, „to improve the company‟s
prestige (e.g. image, reputation) and to enter the international construction market‟,
as their less important motive.
117
In summary, the examination of important steps in the development stage of QMSs
in Indonesian construction companies reveals that more than 80% of the companies
relied on external consultants to assist them in setting up their QMSs. The roles of
the consultants were considered helpful, particularly when they were involved in
between 40-60% of companies, in the development process for quality manuals and
procedures. However, the fundamental development of QMS documentation was
independently prepared by company quality assurance teams or company divisions.
The move to ISO 9001 certification required less than six months for the majority of
the local companies, while the national contractors the process took between six and
12 months from the commencement of preparations to the achievement of
certification.
The main part of the quality management system (QMS) questionnaires distributed to
the construction practitioners consisted of three component parts. The first part
related to questions aimed an examination of how construction companies perceived
the way their QMSs were being operated to comply with both ISO 9001 principles
and elements. This examination is based on the definition of an effective QMS
implementation which describes as the fulfillment of a company‟s own specified
quality requirements, and the prescribed quality objectives in relation to the eight
quality management principles and the requirements of the ISO 9001 standard (Kam
and Tang 1997; Al-Nakeeb et al. 1998).
Table 4.13 summarises the responses of the construction practitioners regarding the
level of implementation for each major principles (i.e. XthP) within the ISO 9001
standard for their companies. The analysis was based on the respondents rating for
the level of implementation of each item in the questionnaire, with a rating of „1‟ =
„yet to be implemented‟, „2‟ = „minimally implemented‟, „3‟ = „not so fully
implemented‟ and „4‟ = fully implemented‟.
118
Table 4.13 Company Implementation Levels of ISO 9001 Principles (N=403)
Rank QMS-ISO 9001 Principles Mean SD 95% CI LoI
1 Customer focus (1stP) 3.41 .62 3.35-3.47 3
2 Mutually beneficial supplier relationships (8thP) 3.31 .67 3.24-3.38 3
3 Leadership (2ndP) 3.21 .73 3.14-3.28 3
4 Systems approach (5thP) 3.19 .74 3.12-3.26 3
5 Continual improvement (6thP) 3.19 .81 3.11-3.27 3
6 Process approach (4thP) 3.15 .75 3.08-3.23 3
7 People involvement (3rdP) 3.09 .74 3.02-3.16 3
8 Factual approach to decision making (7thP) 3.06 .80 2.98-3.14 3
Total QMS-ISO 9001 Principles 3.20 .48 3.16-3.25 3
Notes: Level of Implementation (LoI): 4 = fully implemented (mean = 3.51 - 4.00), 3 = not so fully
implemented (2.51 - 3.50), 2 = minimally implemented (1.51 - 2.50), 1 = yet to be implemented (<
1.50)
The data in Table 4.13 indicates that all of the eight major ISO 9001 principles were
at a level of implementation „3‟, which represents a state of being „not so fully
implemented‟. This is reflected in the mean scores for the level of implementation,
which ranged from 2.51 to 3.50. The standard deviations (SDs) were relatively small,
indicating that the data points were close to the means (Field 2009). These results
also reflect that the mean is an appropriate statistical metric for summarising the
current implementation level of ISO 9001 principles. The 95% confidence interval
(CI) for the mean was calculated to examine the „cut-off point‟ for the determination
of the four levels of the ISO 9001 principles implementation.
The ANOVA test was used to assess differences in implementing the ISO 9001
principles, between the three levels of respondents. There were no significant
differences between the three levels of respondents in relation to the evaluation of the
implementation of ISO 9001 principles, with the exception for the first principle
(1stP) (F = 3.61, Sig = .028) (see Appendix D, Table D-1a-b). The middle level
respondents were more likely to put an emphasis on the implementation of customer
focus (1stP) than the other two levels of respondents (Table 4.14).
119
Table 4.15 presents the responses from construction practitioners regarding the levels
of implementation for each element of the ISO 9001 standard, in their own
companies. The survey findings indicate that, for a large percentage of companies
surveyed, 19 elements were at level „3‟ of implementation, which was recognised as
„not so fully implemented‟; mean scores ranged from 2.84 to 3.47. One element
(statistical techniques) was at level „2‟ of implementation (mean = 2.38) indicating
that the element was implemented only minimally. The standard deviations (SDs)
were in general relatively small, indicating that the mean is also an appropriate
summary statistic.
An ANOVA test was also used to assess differences in implementing the ISO 9001
elements between the three levels of respondents. This test shows that there are
significant differences between the three levels of respondents in evaluating the
implementation of the 5th (F = 6.54, Sig = .002), 7th (F = 3.23, Sig = .041), and 14th
(F = 3.63, Sig = .027) elements of ISO 9001 (see Appendix D, Table D-2a-b). The
higher management level of respondents identified the implementation of document
120
and data control (5th element) as being more important than the other two levels.
This element is particularly emphasized by Quality Management Representatives
(QMRs) since the assurance that all documents related to the quality of products and
services are used and controlled properly, falls under their responsibility in order to
meet the conformance status of this element. The middle level (Managers)
respondents appear more likely to pay attention to the implementation of control of
customer-supplied product (7th element) and corrective and preventive action (14th
element); these being two areas where managers are more able to ensure their
customers obtain satisfaction from product/service delivery.
The second part of the QMS questionnaire survey was designed to evaluate the major
difficulties impeding the process of fully implementing construction companies‟
QMSs. A list of the most common problems related to the rolling out QMSs in the
construction industry was sourced from an extensive literature review, and some of
the more typical problems were confirmed in a series of interviews with several
construction practitioners in Manado and Jakarta, during a preliminary study. In the
questionnaire, the respondents were asked to identify the problems that the company
faced in relation to QMS implementation, based on their experience, using a rating of
„4‟ as being „often experienced‟, „3‟ as being „sometimes experienced‟, „2‟ as being
„very seldom experienced‟ and „1‟ as being „not experienced‟.
121
Table 4.17 Barriers to the Effective Quality Management System Practices
(N=403)
The data in Table 4.17 show that the level of barriers (LoB) fall mainly into the two
categories, level „3‟ „sometimes experienced‟ (mean = 2.51 – 3.00) ranked from 1 to
7, and level „2‟ „very seldom experienced‟ (1.51 – 2.50) ranked from 8 to 14. The
95% confidence interval for the mean was calculated to examine the „cut-off point‟
in relation to the determination of the four levels of barriers. Meanwhile, the mean
rating of the barriers shows that the most considered barriers were „ISO 9001 is a
matter of fulfilling audit requirement‟ (B7), „management attitude and purposes‟
(B1), and „lack of a well-design reward system‟ (B9).
The ANOVA test, which relies on the differences in experiencing barriers to the
effective QMS practices amongst the different level of respondents (see Appendix D,
Table D-3) shows that there was no significant difference between the different
levels of the respondents.
122
4.3.4 Key Performance Indicators of ISO 9001 Certified Contractors
The last part of the QMS questionnaire evaluated the success of outcomes of ISO
9001 certified contractors in the three cities in Indonesia, after almost a decade of
implementation their QMSs. This assessment was mainly based on the several key
performance indicators (KPIs) of effective organisations adopted from Denison and
Mishra (1995), and later used by Coffey (2010) in his work related to culture-driven
performance in Hong Kong construction companies. The results of the interviews
conducted during the pilot study with the Indonesian construction practitioners also
revealed the improvements that they expected to gain from QMS implementation for
the duration of their companies‟ foreseeable business operations.
The results show that the means for all eight KPIs were less than 3.00, ranging from
1.40 to 2.95. This indicates that there are three levels of KPI. „Global market
contracts acquired‟ (mean = 1.40) is regarded to represent the worst level of
performance of KPI 1. The lowest level of performance of KPI 2 was identified as
„new product innovation and development‟ (mean = 2.43). However, all companies
123
achieved a relatively high performance level of KPI 3 in reference to „quality of
services and products‟ (mea n= 2.95), „sales growth‟ (mean = 2.87), „profitability‟
(mean = 2.83), „sustainable construction products‟ (mean = 2.75), „market share‟
(mean = 2.72) and „generating employee satisfaction‟ (mean = 2.69).
The ANOVA test results on the differences in the performance of the ISO 9001
certified contractors among the different levels of respondents (see Appendix D,
Table D-4) show that there were no significant differences among the levels of
respondents.
124
4.4.1 Overall Dominant Organisational Culture Types
In the analysis, each respondents score for each statement within the six cultural
dimensions was incorporated into one of four groups within each culture type. The
average of each group of statements then was plotted into the Cameron and Quinn‟s
(2006) Competing Values Framework (CVF) diagram, to depict the current type of a
company‟s organisational culture. When referring to the overall culture plot for the
organisational culture profile of each company, the quadrant in which scores are the
highest indicates the culture type that is most dominant in that company.
A
40 Clan
35 Organisational
30
Profile
25
20
15
10
5
D 0 B
Hierarchy Adhocracy
Now
C Market
125
Of the 77 company responses, only 74 responses were included in the analysis, as the
responses for three company respondents were incomplete. A minimum of three sets
and the maximum of nine sets of questionnaires obtained from each company were
used in the OCAI analysis. Table 4.19 summarises the overall organisational culture
profiles of the 74 construction companies. Following the charting of the overall
culture profiles of the construction companies, deeper analysis was undertaken
according to the perspectives proposed by Cameron and Quinn (2006).
As shown in Table 4.19, overall, „Clan type‟ (67.5%) was emphasized most in the
Indonesian construction companies. This means that the companies emphasized
friendly place to work and a focus on internal integration, with a need for flexibility
and discretion. Clan companies operate more like a family, with the strong „team
work‟ characteristic. They value cohesion, commitment and loyalty. Success is
defined in terms of sensitivity to customers, concern for human resources
development, and empowerment. Respondents identified „Market type‟ as the second
most dominant organisational culture in their companies (18.9%). These two
predominant cultures were followed by Hierarchy type (9.4%), while only one
company emphasized Adhocracy type (1.4%).
The culture category „No dominant type‟ (2.8%) indicates that more than one culture
type is incorporated into the companies organisational culture. These results indicate
that an eclectic culture exists in Indonesian construction companies, with no single
ideal culture category being emphasized (Cameron and Quinn 2006).
126
4.4.2 Dominant Types of Six Cultural Dimensions
By individually plotting each of the questions under the six cultural dimensions on
the Organizational Culture Assessment Instrument (OCAI) worksheet, the analysis of
the companies six cultural dimensions was focused on indicating whether the six
culture dimensions were in congruence or not. The existence of congruence implies
all the six culture dimensions have a similar dominant culture type.
Figure 4.2 presents an example of the OCAI results of the dominant culture type for
each cultural dimension from the same company respondent, as stated above. The
company emphasized Clan (A) culture in the dimension of organisational leadership
(31), management of employees (36), organisation glue (33), and criteria of success
(31). Market (C) culture was strongest in the dimension of strategic emphasis (33),
whereas Adhocracy (B) and Market (C) cultures were slightly stronger than the other
two culture types in the dimension of organisational characteristics (28).
127
A A
50 50
45 45
40 40
35 35
30 30
25 25
20 20
15 15
10 10
5 5
D 0 B D 0 B
C C
M
1 Dominant Characteristics 2 Organisational Leadership
A A
50 50
45 45
40 40
35 35
30 30
25 25
20 20
15 15
10 10
5 5
D 0 B D 0 B
C C
A A
50 50
45 45
40 40
35 35
30 30
25 25
20 20
15 15
10 10
5 5
D 0 B D 0 B
C C
Table 4.20 summarises the dominant culture types of the six cultural dimensions
possessed by most of the 74 construction companies.
128
Table 4.20 Dominant Culture Types of Six Cultural Dimensions
Clan Adhocracy Market Hierarchy No dominant
Cultural profiles
type type type type type
n % n % n % n % n %
Dominant
1st 31 41.9 11 14.9 22 29.7 5 6.8 5 6.8
characteristics (DC)
Organisational
2nd 18 24.3 8 10.8 21 28.4 22 29.7 5 6.8
leadership (OL)
Management of
3rd 42 56.8 4 5.4 11 14.9 13 17.6 4 5.4
employees (ME)
Organisation glue
4th 49 66.2 3 4.1 7 9.5 5 6.8 10 13.5
(OG)
Strategic emphasis
5th 13 17.6 6 8.1 26 35.1 15 20.3 14 18.9
(SE)
Criteria of success
6th 34 45.9 - - 11 14.9 23 31.1 6 8.1
(CS)
Note:
= total number of most prevalent culture types possessed by respondents in each
cultural dimension
Overall, respondents perceived that the dominant characteristics or the core values of
the construction companies is most represented by the „Clan culture‟ (41.9%); this is
consistent with the overall result of dominant culture type possessed by the majority
of Indonesian construction companies. The core values of „Clan type‟ in this first
dimension is the sense of „family‟ and the importance of „sharing‟. In reference to the
style of the organisation leader, most of the construction companies are strongly
Hierarchy oriented (29.7%), with the leaders being hard drivers, producers, and
competitors. The management style used to manage employees is strongly Clan
oriented (56.8%) which is characterized by the value of team work, consensus, and
participation. The organisation glue that holds companies together is also the Clan
culture (66.25%); loyalty and mutual trust are key norms of this Clan type in this
fourth cultural dimension. The companies‟ strategic emphasis is strongly Market
oriented (35.1%), the Market culture having a competitive and achievement focus.
Success criteria of companies as perceived by employees as the Clan culture (45.9%)
that believes that their success lies on the development of human resources,
commitment, and concern for people.
In summary, the six cultural dimensions do not have a single dominant culture type,
indicating these six cultural profiles were not in congruence. In addition, Clan type is
most emphasized in the four cultural profiles.
129
4.5 Examination of the Theoretical Framework
This section examines the relationships among quality management system (QMS)
variables and between some of these variables and organisational culture variables.
The following statistical analysis tools were used to explore these relationships:
Principal Component Analysis (PCA) was conducted, in particular to
summarise the large number of QMS variables into a smaller sets of
components or factors in order to obtain sets of more meaningful QMS
variables.
The identified smaller set of factors resulting from the PCA were brought
into a Pearson Correlation in order to statistically assess the relationships
among the QMS variables.
Analysis of Variance (ANOVA) was conducted to statistically test whether
different profiles of organisational culture variables have different
influences on the QMS variables.
Structural Equation Modelling (SEM) was conducted to test the entire
model of the theoretical framework on the relationships among the QMS
variables, and between the QMS and the organisational culture variables.
The PCA was conducted on the 50 quality management system (QMS) variables,
which consisted of eight QMS-ISO 9001 principles, 20 QMS-ISO 9001 elements, 14
QMS barriers, and eight QMS-key performance indicators (KPIs). These sets of
variables were analysed in terms of which variables formed coherent subsets of
variables (variables that were correlated with one another), but largely independent
of other subsets of variables were combined into factors (i.e. groups of variables)
130
(Tabachnick and Fidell 2007). When the PCA was performed on the 50 QMS
variables, a reduced set of factors which form the underlying structure of the QMS
variables was obtained and these factors were used as the representative variables for
use in the subsequent analysis.
It should be noted that a large sample size is preferred for factor analysis (Pallant
2011). Winter, Dodou and Wieringa (2009) recently suggested N = 50 as a sensible
absolute minimum for exploratory factor analysis, but a sample size of 100 or larger
is preferred (Hair et al. 2006). Thus, the sample size of 403 in this research would be
regarded as highly acceptable. The main steps in the PCA were as follows:
131
was therefore important to also look at the scree plot. The scree plot1 showed there
were inflexions in components 5 (see Appendix E, Figure E-1), suggesting that only
components above this point were retained.
1
Scree plot was first proposed by Cattell (1966) as a way of identifying the number of useful factors
to retain (Allen and Bennett 2010, 205). He argued that the cut-off point for selecting factors should
be at the point of inflexion of the curve.
2
Varimax is the most commonly used of the orthogonal rotation methods that attempt to maximize
the dispersion of loadings within factors; it therefore tries to load a smaller number of variables onto
each factor, resulting in more interpretable clusters of factors (Field 2009, 644).
132
Table 4.21 Principal Component Analysis Results for the QMS Variables
(N=403)
Factors
Questionnaire items
1 2 3 4 5
17thE Internal quality audits .77
19thE Servicing .73
16thE Control of quality records .73
18thE Training .70
10thE Inspection and Testing .67
2ndE Quality System .66
B3 Lack of corporate commitment .80
B4 Lack of strong motivation .78
Lack of effective management
B5 .72
response
Lack of effective internal
B10 .70
communication
B2 ISO 9001 is a documentation matter .65
instead of opportunity to make a
change
Difficulty in understanding ISO
B6 .63
9001
B9 Lack of a well-design reward system .62
B11 Poor external communication .60
4thP Process approach .64
6thP Continual improvement .64
7thP Factual approach to decision making .61
KPI2 Sales growth .88
KPI1 Profitability .81
KPI3 Market shares .78
KPI6 Sustainable construction products .68
KPI5 Quality of services and products .63
New product innovation and
KPI7 .61
development
% Variance 15.11 11.39 7.15 5.30 4.16
Cumulative % 15.11 26.50 33.65 38.95 43.11
Kaiser-Meyer-Olkin (KMO) Measure of
.89
Sampling Adequacy
Bartlett‟s Test of Sphericity Chi-Square 9747.19
df 1225
p < .001
Table 4.21 contains the final results of the PCA. The variables grouped on the same
factors suggest that:
Factor 1 represents a practice on QMS-ISO 9001 elements
Factor 2 represents a barrier to QMS implementation
Factor 3 represents a practice on QMS-ISO 9001 principles
Factor 4 represents a key performance indicator (KPI) on business
performance
Factor 5 represents values of the construction product
133
These results were actually compatible with the structure of the QMS questionnaire,
which was divided into sections similar to factors 1, 2, and 3 and the combination of
factors 4 and 5.
Subsequently, Cronbach‟s alpha was used to evaluate the internal consistency of the
construction of the factors, the results of which are shown in Table 4.22. The closer
Cronbach‟s alpha is to 1, the higher the internal consistency. An alpha over .80 is
considered to be good, between .70 and .80 is acceptable while below .70 is poor
(Sekaran and Bougie 2009). The Cronbach‟s alpha for factor 1 was .853, factor 2 was
.880, factor 3 was .682, and factor 4 was .828, all were greater than .60. The internal
consistency of the measures used in this study can therefore be considered to be
acceptable for the measurement of QMS. However, since the Cronbach‟s alpha
coefficient for factor 5 was lower than .6, this factor was not considered for inclusion
in the subsequent statistical analysis.
In summary, the four factors which accounted for 38.95% of the total variance are
considered to be the four most important factors in the factor model. These factors
shaped the patterns of response of current QMS implementation within Indonesian
construction companies. Factor 1 (QMS practice-elements) and Factor 3 (QMS
practice-principles) were combined into one-factor (QMS practices) - later in the
next chapter was identified as QMS improvement elements - which consists of the
following variables:
17thE – Internal quality audits
19thE – Servicing
16thE – Control of quality records
18thE – Training
10thE – Inspection and testing
134
2ndE – Quality system
4thP – Process approach
6thP – Continual improvement
7thP – Factual approach to decision making
These factors (QMS practices, QMS barriers, QMS KPIs) and the associated
variables in each factor thereafter, are further developed as fundamental design
elements in the development of a culture-based QMS improvement implementation
framework. An examination of the histograms of the total variables within the three
factors, indicates that the data were normally distributed (see Appendix E, Figure E-
2a-c). Table 4.23 presents the descriptive analysis of the total variables in each
factor, to allow an examination of the overall levels of QMS implementation.
135
Table 4.23 Descriptive Analysis of QMS Factors (N=77)
Number of
Factors Min Max Mean SD
variables
Total QMS practices 9 1.56 4.00 3.15 .47
Total QMS barriers 8 1.38 3.75 2.54 .57
Total QMS KPIs 3 1.56 3.67 2.74 .45
The above table shows that the mean score of total QMS practices was 3.15,
indicating that the total QMS practices was in the level of implementation „3‟, which
is equated with the status of „not so fully implemented‟ (see also Table 4.13 and
Table 4.15). The level of total QMS barriers was 3 (mean = 2.54), indicating that
barriers were sometimes experienced by the companies (see also Table 4.17). The
mean score of total QMS KPIs was 2.74; this indicates that the level of performance
of the companies is relatively high (see also Table 4.18).
The relationships among quality management systems variables and with the
organisational culture variable, are shown in Figure 4.3 that follows. The
examinations of the relationships were conducted with reference to the formulation
of the associated research questions and their sub-questions.
Research Question 1:
What is the current status of the quality management systems (QMSs) being
implemented by Indonesian construction companies?
136
R2 - The relationships between the barriers and performance of construction
companies certified under the QMS-ISO 9001, are associated with:
sub-question 1.2:
Do the barriers to the implementation of an effective quality management
system significantly relate to the key performance of construction companies?
Research Question 2:
What are the organisational culture profiles of Indonesian construction companies?
137
Organisational R4
culture profiles Effective Key
variable quality Performance
R3
management of
system construction
(QMS) companies
Barriers to R1 practices variable
implementing variable
effective QMS
variable
R2
The results of the Pearson correlation analyses are summarised in Table 4.24. There
are significant negative relationships between the presence of the barriers to
implementing effective quality management systems and the quality management
system practices (r = -.43, p < .01), and between the presence of the barriers to
implementing effective quality management systems and contractor key performance
(r = -.34, p < .01). However, the presence of the quality management system
practices was not significantly related to the contractor key performance (r = .13).
These results suggest that higher levels of the QMS barriers will have a negative
impact on QMS practices and the QMS KPIs, resulting in lower performance.
However, the QMS practices did not affect the QMS KPIs.
138
Table 4.24 Pearson’s rho Correlation Matrix (N=77)
139
then used as follow-up tests to find out where the differences lie. The ANOVA
analysis was conducted in SPSS 19.
The results of the ANOVA test (Table 4.25) show that there is a significant
difference in the total QMS practices across the different types of organisational
culture in the first dimension (Dominant characteristics-DC) (F = 3.06, p = .034).
The Contrast test (Table 4.26) results show that in the first dimension, the
implementation of QMS practices was significantly higher in the Hierarchy type than
Clan type (Difference (D) = -.62, p = .007). In addition, the implementation of QMS
practices was significantly higher in the Hierarchy type than Adhocracy type (D = -
.53, p = .036).
The results also show that there is a significant difference in total QMS practices
across different types of organisational culture in the third dimension (Management
of employees-ME) (F = 3.78, p = .015) (Table 4.25). The Contrast test (Table 4.26)
results show that in the third dimension, the implementation of QMS practices was
significantly higher in the Market type than Clan type (D = -.41, p = .01). In
addition, the implementation of QMS practices was significantly higher in the
Market type than Adhocracy type (D = -.81, p = .003).
140
Table 4.25 ANOVA Results: QMS Practices on the Six Cultural Dimensions
Culture Clan Adhocracy Market Hierarchy
ANOVA
Profiles type type type type
M SD M SD M SD M SD F Sig
st
1 (DC) 3.05 .50 3.14 .55 3.28 .39 3.67 .14 3.06 .034*
nd
2 (OL) 3.16 .39 3.18 .38 3.25 .48 3.02 .59 .80 .497
3rd (ME) 3.09 .49 2.69 .44 3.49 .30 3.14 .43 3.78 .015*
th
4 (OG) 3.21 .41 2.85 .18 2.98 .68 2.98 .55 1.29 .287
5th (SE) 3.27 .37 3.23 .46 3.21 .38 2.96 .63 1.37 .262
th
6 (CS) 3.15 .48 - - 3.31 .34 3.10 .49 .77 .466
Notes: DC = Dominant characteristics, OL = Organisational leadership, ME = Management of
employees, OG = Organisation glue, SE = Strategic emphasis, CS = Criteria of success
* p < .05
= significant result
The results of the ANOVA (Table 4.25), however, should be interpreted with
caution, due to the small sample sizes of some comparison groups (see Table 4.20).
For example, in the first dimension (Dominant characteristics), Hierarchy type was
excluded from the analysis since it has only had a sample size of 5, Adhocracy type
was excluded from the analyses of the second, third, fourth, fifth, and sixth
dimensions, on account of the sample sizes being less than 10. Therefore, the
141
ANOVA analysis was run a second time, based on the inclusion of only on the
groups with a sufficient number of observations (see Appendix D, Table D-8). The
non-significant results are likely to have been due to insufficient power. Finally, the
results from the first run of ANOVA were used as a basis for interpretation and
discussion. In summary, the ANOVA results showed that different profiles of
organisational culture can have different influences on the quality management
system implementation.
A Structural Equation Modelling (SEM) analysis (Figure 4.4) was conducted in order
to test the entire model of the theoretical framework on the relationships among the
QMS variables (R1, R2, R3), and the relationship between the QMS practices and
the organisational culture variables (R4). A Bayesian model was selected using
Marcov Chain Monte Carlo estimations to fit the SEM. This approach allows for
categorical variables in SEM (Lee 2007). This method provides an alternative to the
maximum likelihood estimation, which is based on strict assumption and can only be
fitted to normally distributed data. Using the Bayesian approach for SEM, posterior
distributions for the parameter estimates were formed. In the current SEM, missing
data were excluded. The six culture profiles were included with paths to QMS
practices. For QMS barriers, the paths were entered to QMS practices and QMS
KPIs. Finally, a path was entered from QMS practices to QMS KPIs. QMS barriers,
QMS practices and QMS KPIs were entered as continuous variables. The culture
profiles were entered as categorical variables. The SEM was conducted in Amos 19.
The results of the SEM analysis are presented in Figure 4.4. The model fitted well
(convergence statistics < 1.01) (see Appendix D, Table D-9). Significant paths from
organisational culture profiles to QMS practices were observed for Dominant
characteristics (DC), Management of employees (ME) and Strategic emphasis (SE).
This suggests that DC, ME and SE dimensions or profiles have an influence on QMS
practices. As expected, a significant link was found between QMS barriers and QMS
practices. Corresponding to the above correlation analysis, more QMS barriers will
result in lower levels of QMS practices. In addition, the link between QMS problems
and QMS KPIs was significant, indicating more QMS problems will result in lower
QMS KPIs. As well as corresponding to the correlation analysis, QMS practices
showed no significant relationship with QMS KPIs. In summary, observations from
142
the SEM was consistent with the above bi-variate correlations. This strengthens the
validity of the results in relation to the examination of the relationships within the
proposed theoretical framework.
.15*
Second culture profile
(Organizational
leadership)
.09
Third culture profile
(Management of
employees) .12*
Key
Effective QMS .01
performance
Fourth culture profile .05 practices
indicators
(Organisational glue) (KPIs)
.20*
.37*
Sixth culture profile .25*
(Criteria of success)
Barriers to
implementing
effective QMS
143
In the following section, the results presented above are discussed with the support
form associated literature review, to pave the way for the development of a
Framework of a Culture-based Quality Management System Improvement
Implementation for Indonesian construction companies.
The discussion of the questionnaire results is divided into three parts: (1) current
quality management system implementation; (2) contractors organisational culture
profiles; and (3) the examination of the theoretical framework. The results are
discussed in the context of the literature reviewed in Chapter 2, to further explain the
findings on the subject of quality management systems and organisational culture in
construction, as applied specifically in the context of Indonesia, which is regarded to
have relevance to other emerging and developing countries.
The results of this study show that the companies‟ motives in developing and
implementing QMS in the first instance, were encouraged by positive intentions to
successfully operate projects without substantive time-delays and cost overruns. This
scenario is common for construction organisations that are in the early stages of
familiarisation with QMS-ISO 9001, and bears similarities to the US construction
industry where the application of ISO 9001 has lagged behind other industries. The
survey results also reveal that, as indicated in some earlier studies, the main initial
motivation for ISO 9001 certification was to have an effective tool for improving
quality management procedures in companies (Chini and Valdez 2003; Turk 2006).
Some authors have opined that ISO 9001 certification is being pursued both for
company marketing reasons and in response to customers‟ requests (Chini and
Valdez 2003; Turk 2006; ISO9000Council.org 2009). The results from this study of
the Indonesian construction industry indicate similar motivations, but not specifically
in reference to establishing a foothold in international construction markets (see
Table 4.12).
144
As indicated in Table 4.12, the second ranked motive is to meet clients‟ requests as
part of the bidding process, reflecting the implication of the Government policy on
QMS in 2004; this is likely to have influential on the duration of the certification
processes (see Table 4.11). Most local construction companies took less than six
months to achieve ISO 9001 certification, while national contractors took between
six and 12 months. Although it is common for the length of time taken for ISO 9001
certification to reflect the number of employees and the readiness of company to
prepare the ISO 9001 documentation (ISO9000Council.org 2009), this does not
seem to apply in the case of the Indonesian construction industry. Indonesian
companies seem to be motivated in getting QMS-ISO 9001 certification in the
shortest possible time.
The common motive that least drives Indonesian construction companies to apply for
ISO 9001 certification, is to enter the international construction market. This
indicates that the Indonesian contractors appear to still doubt the many advantages
associated with implementing the system, which may result in having low
competitiveness. As Pamulu (2010) notes, low competitiveness is one of the reasons
for Indonesian listed construction companies have not been able to capture such
opportunities to attain a higher level of performance. Another least common motive
is to improve the company‟s prestige. This result is contrary to the literature that
reveals that it is solely for prestige that Indonesian contractors and builders obtain
ISO 9001 certification, and this is one of the main root-cases for the ineffective
application of the system (Novessro 2009). Prestige in this instance is just to be
recognised for having the system and thus being able to tender for the Government
projects. However, researchers agree that the proper implementation of QMS-ISO
9001 does have the potential to benefit Indonesian construction companies, in
particular, allowing them to become recognised and to in future become involved in
global markets, particularly the Asian and Middle Eastern construction markets.
145
being less implemented by Indonesian contractors. The findings also confirm the
earlier recent study which indicated a lack of use of „cause and effect diagrams‟ and
„statistical process control‟ as typical tools used to take a measurement of
construction processes (Ahmed et al. 2005). This is significant, as some studies
report that effective decisions on quality processes are made based mainly on the use
of data analysis and information with the assistance of some statistical tools (Tricker
2008; Center for the Advancement of Process Technology 2011).
With regard to the issues affecting effective QMS implementation, the results of this
study show that apparently Indonesian construction companies do not often
experience problems with implementing ISO 9001. However there were some
misunderstandings from the managers surveyed regarding the purpose for obtaining
the ISO 9001 certification. Many managers saw this solely in terms of a marketing
initiative, or a necessity due to customer pressure, and also to be safe from receiving
non-conformance reports (NCRs) during audits. Such misconceptions have clearly
inhibited any internal improvements to a company‟s effectiveness in implementing
its QMS, and this raises the question of „how does the construction industry
overcome the problems related to quality?‟
146
Focusing construction companies efforts on effective practices and continuous
improvement of their QMSs can result in developing the capability to deliver an
improved ultimate quality of project works. Love, Edwards and Sohal (2004)
concede the purpose of implementation of TQM in construction companies must be
in line with the company‟s organisational culture. Other researchers in the
construction quality systems and organisational culture area (Koh and Low 2008;
Yip Robin and Poon 2009) endorse this view by revealing that quality culture and
corporate culture are considered to be determinant factors in contributing to the
successful or unsuccessful implementation and maintenance of an ISO 9001 quality
system. The assessment of culture is a particularly determinant factor to the
successful implementation of such a QMS and is cited in Koh and Low (2008) as a
mutually reinforcing relationship, due to the fact that if the corporate culture is good,
the quality system will be applied appropriately. Therefore, much effort remains
necessary to exploit such successful QMS practices and quality results within
Indonesian construction companies.
Despite the views noted above, the results of this study indicate a contrary view, with
most Indonesian companies seeking ISO 9001 certification not actually possessing
aspirations relating to entry into the global construction market. This being said,
147
Indonesian contractors do see obvious potential benefits from adopting and
implementing their QMSs, and they also appear ready and enthusiastic to accept and
implement QMSs effectively, and this is well underpinned by significant government
support. There also exists a strong belief that participating in the global construction
market is beneficial to certified contractors.
The findings from the study of the identification of dominant culture types within
Indonesian construction companies indicates that the organisational culture within
most Indonesian construction companies is predominantly of the Clan type, where
the company is focused on internal maintenance with flexibility, family-like
relationships having a concern for people, and sensitivity towards its customers. This
predominant culture type is also emphasized most in the cultural dimension related to
how employees are managed, how the organisation is held together, and how the
organisation‟s success in its achievements is defined. This finding is fundamental to
the perspective of organisational culture within Indonesian construction companies.
With the rapid and remarkable growth rate in the construction industry, it is
important for this sector to recognise its individual and collective cultural patterns, in
order that they can be used to evaluate companies current operational activities,
achievements, and future successes. In addition, it needs to be recognised that
adoption of the predominant company cultural profile allows companies to adapt and
respond to challenges, and hence later set up appropriate cultural changes or maintain
and strengthen the existing fundamental culture profile.
148
points within the organisation in which the operational activities are largely governed
by standardized procedures. In the Indonesian cultural profile of leadership,
according to Rini (2002), the leader has a function to directly control with authority,
and this indicates that hierarchical control is the most effective way in managing an
organisation. Another profile of Indonesian leaders according to Danandjaja (1985),
is based on the vertical synchronization used by the leaders to pattern duties and
moral responsibilities in order to maintain staff and assure success; bad patterns of
duties and responsibilities may lead to staff frustration and demotivation (ibid 1985).
This coincides with the profile of hierarchical-leadership that tends to be expected by
the ISO 9001 certified construction companies, rather than the leader being a mentor
or parental figure (more typical of clan leaders).
The dimension labelled as „strategic emphasis‟, the area of emphasis that drives the
organisation‟s strategy, in this study is „Market type dominant‟, wherein the
company emphasizes permanence and stability; efficiency, control and smooth
operations, as the important company strategies. This finding suggests that current
form of Indonesian construction strategy is focused more on profit and goal
accomplishment, due to high competitiveness in both domestic and international
markets. Contractors‟ focus on profit and market-orientation, in fact, is in line with
of The Ministry of Public Work‟s policy to enforce Indonesian construction to take a
role in global markets, as the industry can no longer just depend on the domestic
market (Surtiningsih and Abidin 2009).
The results for the six dimensions of organisational culture of the 74 company
respondents (see Appendix F, Table F-1) show that none of the companies exhibited
true congruence in the six cultural dimensions. It is evident that different culture
types are emphasized in the six cultural dimensions, reflecting various elements of
cultural values that exist in an organisation‟s operating activities. This indicates that,
either the culture is unclear to respondents, or that the complexity of the environment
requires multiple emphases in different areas of the organisation (Cameron and
Quinn 2006). These possible reasons for the presence of an incongruent culture also
apply to the sampled companies that have „no single dominant culture type‟.
Conversely, having a congruent culture can eliminate many complications and
obstacles that might prevent an organisation from performing effectively (ibid 2006),
149
because the values of people are congruent (Nummelin 2006). In addition, the
determination that a particular strong culture is needed for an organisation to be
successful in its environment (Cameron and Quinn 2006), appears to indicate that the
possession of a single culture type within the whole of an organisation‟s operating
activities would suggest that the construction industry is operating effectively
(Nummelin 2006).
The strength of the culture according to Cameron and Quinn (2006), is determined
by the number of points awarded to a specific culture, where the higher is the score,
the stronger or more dominant is that particular culture. Research has revealed that
strong cultures are associated with homogeneity of effort, clear focus, and higher
performance in environments where unity and common vision exist within an
organisation (ibid 2006). From the CFV diagrams of the organisational culture
profile of the 74 companies covered by the survey, 46% of companies in Manado,
33% in Makassar and 25% in Jakarta have a strong dominant organisational culture
(see Appendix F, Table F-2). This indicates that the cultures in these companies are
lucid for their employees (ibid 2006). The fact that less than 50% in each city were
150
classified as having strong culture profiles, suggests many companies still have to
achieve a clear understanding with, and support of, their employees.
Construction market demand is changing rapidly, and through the CVF culture
measurement model, this research undertook an assessement of the Indonesian
construction organisational culture, and makes suggestions for a mixture of
construction company‟s culture profiles. There is a clear need for companies to have
understand their current cultures before any culture change is undertaken. Liu, Zhang
and Leung (2006) state that the understanding of organisational cultures (overlaid
with national cultures) is an important element of any business enterprise.
151
Examination of the Theoretical Framework
In reference to the relationship between the QMS barriers and QMS KPIs, this study
found that a higher level of experience of the eight variables of QMS barriers
significantly contributed to the lower level of performance of the three QMS KPIs
variables. This finding is consistent with that of other earlier studies undertaken by
Asa, Abidin and Latief (2009), which stated that Indonesian ISO 9001 construction
152
companies that intend to raise the company‟s profitability performance should
consistently implement their QMS and overcome their difficulties when following
their QMS (ibid 2009). The typical QMS barriers investigated in this study are
representative of those commonly experienced by ISO 9001 certified contractors,
that can hinder achieving a high level of business performance in the company, due
to low levels of sales growth, low profitability and poor market shares, or in general,
due to a declining capacity to be able to compete in a free-trading industrial
construction market.
153
certifications regarded as a matter relating to fulfilling tender administration
requirements. From the preliminary interviews, it was noted that since relatively few
local construction companies possess ISO 9001 certification, it is therefore not
surprising that it is only this small number of contractors who always win project
tenders, without being properly selected based on the bidding procedures. Likewise,
in national infrastructure projects, the winning contractors are often based on
corruption-collusion-nepotism (CCN), rather on quality and performance records of
the company. Mochtar (2004) also discovered and reported that Indonesian
contractors only make „average efforts‟ to make improvements or innovations in
their services, as their attitude is focused on „fees‟ policies rather than effective
marketing practises and the provision of innovative products and/or quality
promotion. Similarly, Siregar (2006) has argued that CCN and unhealthy competition
practices are the two greatest obstacles to strategic marketing of Indonesian
construction services. These findings should help reinforce the need for Indonesian
contractors to end current bad practices, and adopt procedures and practices that are
capable of forming the basis to become a reputable construction industry (ibid 2004).
Current government policy is to implement Good Corporate Governance (GCG)
within the construction services is also as an effort to eradicate fraudulent activities
within construction business entities (Minister of Public Works of the Republic of
Indonesia 2007; Minister of State-Owned Enterprises of the Republic of Indonesia
2011).
154
become more prestigious in national and international sectors, the adoption of QMS
by Indonesian companies can no longer be just for administrative purposes. Proper
and effective QMS implementation is needed to clearly reflect the profile of
companies in the context of being qualified and innovation, and able to satisfy
customers.
The last examination, R4, of the theoretical framework in this study relates to the
most important aspect of the research analysis. In this examination, the different
profiles of construction companies‟ organisational culture is analysed in reference to
the different influences on effective quality management system implementation.
There is evidence to suggest that QMS practices differ across the four culture types,
particularly in the cultural dimensions of dominant characteristics of the organisation
(DC), and style of how employees are treated and the working environment is like
(ME). In the analysis results of dominant types of the six cultural dimensions of the
surveyed contractors, Clan type was the most emphasized in the two dimensions, DC
and ME. However, in the analysis of the relationships between organisational culture
profiles and the QMS practices‟ variables, in the DC dimension, the implementation
of QMS practices was significantly higher in the Hierarchy type culture than Clan
type, while, in the ME dimension, the implementation of QMS practices was
significantly higher in the Market type than Clan type culture.
Rahman et al. (2003) argue that construction organisations should build their
required project cultures and possess a flexible organisational culture, in order to
improve their internal critical success factors to remain competitive and survive into
the future, and this view is strongly supported by Coffey (2010). In conjunction with
this view, Prajogo and McDermott (2005) argue that different subsets of TQM
practices are determined by different types of culture. They (ibid 2005) found that
the Hierarchy culture has a significant relationship with certain TQM practices. In
contrast, Thomas et al. (2002) argue that construction companies with a Clan culture
produce better quality outcomes than companies with a Market culture. The Market
culture was indeed found in Cameron and Quinn„s study, to be more common on
construction companies (Cameron and Quinn 2006).
155
In relation to this study, the Indonesian large-scale construction industry has been
cautious of reference to its domestic project competitiveness and is in a state of
short-term transition in relation to the global market. There have been some doubts
relating the qualifications and reputation of some G-7 and ISO 9001 contractors, in
reference to some unhealthy marketing practices seen on domestic infrastructure
projects. A Hierarchy oriented culture is expected to drive companies in building and
sharing values of standardisation, control, a well-defined structure for authority and
decision-making, and to support the successful implementation of QMS. In addition,
a global Market orientation is an important culture strategy to help drive companies
in building successful external relationships with customers and achieve success with
proven quality product results. These insights are strategic, as Koh and Low (2008)
found that modification of organisational culture and fortification of customer and
process management are clear strategies for successful of TQM implementation. It
therefore appears plausible that once the traits and typologies of Hierarchy-Market
shared values and underlying assumptions within the construction organisation, that
allow the organisation to operate effectively, are bound into strong organisational
cultures and that are understood by all internal stakeholders and are in existence and
integrated, there will be a positive impact on effective QMS practices. This will, in
turn, lead to improvements in organisational effective performance.
From the above findings, it is concluded that ISO 9001 certified Indonesian
construction companies should make the cultural change from a „now‟ Clan culture
to „future‟ hybrid Hierarchy-Market culture. As a pragmatic approach, this would be
the best-fit cultural profile for Indonesian construction companies to effectively
implement their QMSs and achieve optimal business performance. Moreover, in
order to bring about changes to the effectiveness and operational efficiency of QMSs
across all qualification categories of Indonesian contractors, there is a clear need for
a cultural shift within the small and medium-scale companies if they are to become
competitive and serious in the future national market, and also for supporting their
parent companies in global markets. This cultural change is needed to drive
successful QMS development and implementation and to achieve the changes
desired by the Indonesian government and the aspirations of communities affected by
infrastructure project delivery. Based on the application of the principles espoused
from the Competing Values Framework (Cameron and Quinn 2006), these mixed-
156
cultures can be applied specifically in the areas of organisational leadership,
organisational effectiveness, and human resources management roles; all of which
are bound with the quality management practices. This would then make Indonesian
construction companies more open to developing strong culture-based quality
management systems practices that will, in turn, be reflected in an enhanced
Indonesian construction industry performance profile.
4.7 Summary
The main aim of Chapter 4 was to answer the first and second research questions,
which were concerned with the identification of quality management system
development and implementation, as well as the identification of Indonesian
contractors‟ organisational culture profiles, and the analysis of the influence of
different organisational culture profiles on QMSs implementation. The chapter also
goes some way to partly answer the third research question relating to the
development of a culture-based QMS improvement implementation framework.
The predominant motive for construction companies to establish and implement ISO
9001 based QMSs is identified as being to effectively and efficiently control project
activities. The respondents apparently do not often experience any general problems
relating to QMS implementation. However, in order to fully implement and improve
the effectiveness of their current QMSs, the study highlights those ISO 9001
principles and elements that still require to be more critically applied by Indonesian
construction organisations. The findings also suggest that, although certified, many
contractors have not yet achieved a satisfactory performance level to enable them to
be competitive outside of Indonesia, in global markets.
The findings from the identification of the overall dominant organisational culture
type within Indonesian construction companies suggest that most companies are
characterized by a Clan type of culture. This predominance of this culture type is
reflected particularly in how employees are managed, how the organisation is hold
together, and how the organisation‟s success is defined. The dimension of
organisational leadership is more Hierarchy-focused than the other three culture
157
types, while the dimension of strategic emphases is Market-type dominant. It is
evident that different culture types are emphasized in the six cultural dimensions
which reflect the varying elements of cultural values which exist in an organisation‟s
operational activities.
Within the examination of the relationships among the QMS variables, it was found
that the presence of barriers to implementing an effective QMS was significantly
related to the QMS practices, and was also significantly negatively related to the
contractor‟s KPIs. However, it was also found that the QMS practices did not affect
the QMS KPIs. With respect to the examination of the relationship between the QMS
practices and the organisational culture variables, different organisational culture
profiles of construction companies were found to have different influences on
effective QMS implementation.
Based on the results of the examination of the theoretical framework concerning the
relationships among the QMS and with the organisational culture variables, the
findings were discussed within the context of existing literature and preliminary
interview evidence. In the Indonesian construction sector, problematic issues
associated with understanding, and operating the actual roll-out of, ISO 9001, inhibit
the successful implementation of the system. Certified contractors must therefore
overcome or reduce the frequency and magnitude of the problems experienced by
their companies; this requires a total commitment of all units within the company,
the most important of which is strong commitment of top management. Unhealthy
marketing practices and some fraud that still exists in the construction business
sector are diversions from the companies‟ motivations in seeking ISO 9001
certification. Possessing certification is primarily perceived as a pre-requisite for
fulfilling tender requirement. However, Indonesian contractors can no longer survive
with such perceptions in more competitive and global marketing environment,
including within Indonesia. A strong mixed Hierarchy and Market culture needs to
be developed within the construction companies in Indonesia, as the driver to support
proper and successful implementation of QMSs, in order to provide qualified,
innovative and deliverable project and service outcomes, and therefore enhance
business performance in a quality performance-oriented Indonesian construction
industry.
158
The findings of these quantitative results and the related discussion, paved the way
for the development of the Framework of a Culture-based Quality Management
System Improvement Implementation for Indonesian construction companies. The
proposed framework was disseminated and validated in focus group discussion, the
results of which are reported in Chapter 5.
159
CHAPTER 5
CULTURE-BASED QUALITY MANAGEMENT SYSTEM
IMPROVEMENT IMPLEMENTATION FRAMEWORK
5.1 Introduction
This chapter explains in detail, the process of development and evaluation of the
framework, which crystallize the findings of this research. First is the explanation of
the process of the development of the framework which contains the description of
culture-based types, and construction of components of the framework. The profile
of the panel of a focus group discussion is listed before the analysis and results of the
framework‟s evaluation. The presentation of related discussion then followed. The
final section is the resulting refinement of the framework of a culture-based QMS
improvement implementation.
Using the data extracted from the Principal Component Analysis, together with the
findings from the examination of the theoretical framework (the relationships among
quality management system variables, and the influence of different organisational
culture profiles on quality management system implementation), a Culture-based
160
Quality Management System Improvement Implementation Framework was
designed and developed. This section provides descriptions of the preferred types of
culture-based QMS, and the construction of the framework components.
In order to utilise the culture traits and typologies of Hierarchy and Market cultures
as the culture drivers, relating to a Competing Values Framework (CVF) (Cameron
and Quinn 2006), there are also additional cultural values and attributes of the two
cultures provided by Cameron and Quinn, which can assist in culture development
and culture change. The authors provide four areas of applicability of the competing
values within a model, reflecting how organisations work and how they are managed.
However the model is regarded as being applicable in other areas of organisations as
well (ibid 2006). The four major areas of the cultural applicability are: organisational
leadership, organisational effectiveness, total quality management, and human
resource management roles. These four areas of the applicability of the competing
values model are considered to be in line with the issues relating to the cultural
barriers to effective implementation of ISO 9001, outlined in Section 2.5.2.
161
In the process of development of the framework for this study, the organisational
area of total quality management, is that, which relates to the implementation of the
QMS improvement elements. The QMS improvement elements were identified in
Section 4.5.1, and for the purposes of the development of this chapter on framework
development, are referred to as „the nine QMS improvement elements‟. The
requirement that organisations should master the implementation of the QMS
improvement elements, needs to be supported by the other three organisational areas.
The values and attributes of the applicability of Hierarchy-Market culture, is
considered to be an organisation‟s quality strategy, which is also a part of the
implementation of the QMS improvement elements. The applicability of the
Hierarchy-Market profile in relation to the four organisational areas, is illustrated in
Figure 5.1.
•Organizational •Organizational
Leadership Effectiveness
Hierarchy -
Hierarchy -
Market
Market leader
organisational
types
effectiveness
Hierarchy-
Market human Hierarchy -
resources roles Market quality
and strategies
competencies
•Human •TQM / The nine
Resources improved QMS-
Management ISO 9001
Roles elements
162
Table 5.1 Applicability of Hierarchy-Market Culture in
Four Organisational Areas
163
QMS improvement implementation. The area of quality strategies of QMS-ISO 9001
was designed to be well-integrated into the implementation of the nine QMS
improvement elements.
The cultural change process needs to be incorporated into the structure of a Culture-
based Quality Management System Improvement Implementation Framework to
assist companies in finally possessing a strong-congruent Hierarchy-Market
organisational culture profile, which might then obtain full staff involvement in
support of a QMS, and ultimately gain more business opportunities. However, in
order to develop a strong and relevant organisational culture profile, the culture itself
must be sufficiently flexible to allow changes in both the internal and external
organisation environment. Thus, if a company needs to change its current culture in
order to achieve future preferred cultural profile, Figure 5.2 shows the culture change
flow for the construction organisation to follow. Details of the culture change process
are presented in Section 5.5, as is the initial framework needed for a culture-based
QMS improvement implementation framework.
164
INPUT PROCESS OUTPUT
Repeated process
The culture change framework was constructed to provide a step-by-step process for
culture change in a construction company. This culture change framework is aimed
to provide guidance for the company in undertaking culture change should it be
necessary, or to strengthen the current culture style. The strategies for effecting
165
culture change contained in the framework were mainly adopted from Cameron and
Quinn‟s (2006) steps for designing an organisational culture change process.
166
Framework component related to results and benefits
The framework describes the expected results and benefits from effective
implementation of the QMS improvement elements. The list of results and
benefits was identified from the final results of the factor analysis (Factor 4 –
QMS KPIs-business performance), in addition what was also extracted from
a rigorous literature review and construction companies‟ best practices,
focusing on the perceived benefits and outcomes due to an effective quality
management system implementation.
All the frameworks were disseminated with the panel of a focus group discussion, for
validation and adjustment, as regarded necessary. The comprehensive validated
designs of the frameworks are provided in a later section (Section 5.5).
This section introduces the composition and profiles of the expert respondents and
their organisation profiles. The panel of experts was established according to the
guidelines discussed in Section 3.3.2. Fourteen panellists were invited to participate
in the FGD data collection to ensure a sufficient number of respondents for valid data
assessment.
167
involved representation from all the three sectors related to the data collected, and
represented a balanced input and consensus to meet the aims of the data collection
exercise (Table 5.2).
168
established in 1967 and implemented its ISO 9001-QMS in 2009. It is a well-
established and fast growing construction company, with activities at both
local and national levels. Its major business lines are in the construction of
highways, roads, airfields and bridges, and construction of ports/harbours and
river related work.
The above panel composition and profile of panelists, indicate that the comments and
suggestions collected in the Focus Group Discussion represent a holistic view of
industry, government and institutional representation. The panellists have distinctive
construction professional and experts‟ backgrounds related to national infrastructure
projects and programs, and have significant decision-making roles in relevant
organisations. The majority of these experts also have duties and roles as Quality
Management Representatives, which suggests their views represents an Indonesian-
wide context of ISO 9001 certified construction companies. In addition, some of the
panellists who have professional concerns about quality management in the
170
construction industry, indicated that the consensus of the panelists in the FGD might
be taken further and used for the improvement of the national construction industry.
The data analysis and results of the Focus Group Discussion (FGD) are presented in
accordance with the three key parts related to the culture-based QMS improvement
implementation framework. The first part is the „Generic Integrated Framework for
Culture-based Quality Management System Improvement Implementation‟; the
second part is the „Culture Change Framework‟; and the third part is the „nine
frameworks of the QMS improvement elements‟. Other comments, relating to best
practices, consensus, and recommendations obtained from the panelists that enrich
the FGD findings were also included in the analysis. The descriptive summary for
each key component is presented as follows:
The panellists identified the first level in the framework as the organisational culture.
Panellists from the construction companies opinied that the organisational culture is
the most important element within the company. They further opinied that since
future direction of a company should be started from the company‟s vision and
171
mission, the importance of the organisational culture is the foundation for setting the
company‟s vision and mission. Both sectors of panellists recommended including the
company‟s vision and mission within level one of the framework The elements of
culture change and three culture drivers were agreed upon as the most important
cultural elements for driving the effectiveness of QMS implementation. Some of the
important comments relating to this topic are as follows:
“The organisational culture should be the most important one, because from the
organisational culture a company‟s vision and mission is established to direct
organisational strategies in future.”
“It would be better to include company‟s vision and mission in the first level, so
that we know the company‟s vision and mission and the organisational culture
are synergistic.”
“For the success of QMS, the most important thing is the support of the
organisational culture for the implementation of QMS. To me, organisational
leadership is the most important culture.”
The second level of the framework contains the nine QMS improvement elements.
This level was perceived by the panellists as containing the important and crucial
QMS elements currently being operated by the companies. They also agreed to
validate all the elements as the QMS-ISO 9001 „improvement‟ standards; this means
that more attention and strategies need to be considered into the implementation of
these standards. They acknowledged that level two has interrelationships and
correlations with level one and level three. This means that the successful
implementation of the nine QMS improvement elements is depended on level one
while also strenghthening this level, while this, in turn, will affect the improvement
of elements in level three. Typical comments by the panellists included:
“We are struggling to properly implement these nine QMS elements - we know
these all are important quality standards, but we often wonder how to
successfully implement them.”
“With the successful implementation of the nine elements, we also expect there
will be a cultural change in they way our staff do their work that will finally
impact on improving the performance of the company.”
172
“The success of implementing QMS-ISO 9001 will enhance the business
performance of our company. For that reason, the organisational culture
should be built in the company and strengthened to support the implementation
of QMS.”
“It is true we are expecting the success in implementing a QMS, in real terms,
reflected in company profits. We now require quality based achievements to win
the construction market contracts.”
“'Profit and winning market share are the ultimate goals for us. Although we
are already in a comfort zone, we still need to improve quality to compete
globally.”
“To be honest, we never work for a private project. Our company‟s profits
depend on the government to give us the project.”
“What the local contractors have achieved (profit and domestic market)are not
guarantees for the future. This is because in the future competitiveness will be
tougher, it will not be as easy as today in achieving the three elements of
contractor‟s performance outcomes.”
173
Second Part: Culture Change Framework
“This framework is something new for us, and we think we need a strategy to
disseminate this framework to all staff, including specific strategies for the
company to possess a strong organisational culture.”
“The corporate culture is really very important, but the culture characteristics
differ from one company to another, including strategies for dealing with
employees. In my opinion, management should seriously consider a cultural
strenghthening program and should have a strategy for the program to be
accepted by all employees.”
“With our company culture, we value our customers in getting satisfaction with
project results, so that we gain more trust from the clients, and this will
ultimately lead to an increase in corporate profits. By disseminating this point,
we try to encourage our employees to be interested in the organisational
culture.”
174
Third Part: Nine Quality Management System Improvement Elements
Frameworks
The descriptive summary of the analysis and results relating to the third part is
divided into four components. First, a component pertaining to the identified barriers
to implementing the QMS improvement elements. Second, a component pertaining
to the culture drivers for effective implementation of QMS improvement elements.
Third, a component pertaining to recommendations for effective implementation of
QMS improvement elements. Fourth, a component pertaining to results and benefits.
“We rely on our human resources understanding of QMS that are finite,
especially for local construction workers.”
“It is not easy to introduce the system to all employees, due to the amount of
documentation preparation, good and proper filing.”
“Due to the limted number of ISO 9001 certified contractors in local areas, it
is only these companies that are successful in getting contracts for local
government projects. As a result, ISO 9001 is only a formal label, as the
companies are assured to get projects without any propert review and
evaluation by relevant government agencies.”
175
“At the national level, local companies do receive competition from national
contractors or othe large regional companies. Therefore, the smaller local
companies generally do not want to compete at levels higher than they are
confortable with at the local or regional level. This is regarded as a big
problem if it is desired that local contractors be able to penetrate bigger
markets. The vision is for them to be able to do so in the future, supported by
their effective quality system implementation.”
“The ISO 9001 certification facilitates „trading‟. However, this is not a main
problem. The main problem relates to how the Government can evaluate the
quality of products of contractors, and how to determine if a company has a
good corporate culture and QMS.”
“It is important and there is an urgent need for, the improvement of local
labour and site employees‟ competencies, including those of „experts.”
“It is very difficult to audit top management, because they normally do not like
to be audited by their employees, or even external auditors, as they feel they
are the boss. But if top management is really committed to implementing a
robust, effective and efficient quality management system, they usually will not
mind being „audited‟and you can find that their whole company has customer-
focussed and quality culture.”
“Question come from employees: what are the benefits of this system? The
documentation procedures are perceived as being too burdensome.”
176
Major remark related to barriers to implementing Process Approach element:
Like the QMS barriers, the organisational culture issue was also a dominant element
brought up across all sectors during the group discussion. More often than not, the
organisational culture element evolved around the quality management system issue.
In reference to the culture driven elements aimed as supporting the effective
implementation of the nine QMS improvement elements, the construction panellists
emphasized the implementation of these elements throughout all organisational
levels, from the top management to regular employees. Some of the major remarks
relating to discussion of this topic are as follows:
“Of course we see that the success in spreading of company‟s culture depends
on strategic action by key personnel, such as the policy makers and other
management staff, to spread the cultural values throughout all levels of the
organisation.We believe that if the cultural values successfully shared at all
levels of the company, all handicaps relating to QMS implementation will be
broken down.”
177
values must be forced in the first instance, these values must then be willingly
adopted and implemented by staff, or must be self-driven by employees, with
eventually these culture values being naturally forwarded from one staff or group to
another. Some of the major remarks of panellists relating to this topic are as follows:
“It is about applying the cultural values without doubt. We would like to see
our project workers implementing the project plan and working effectively. In
the case an employee cannot do the work, other staff can replace that
employee without difficulty.”
“Human resources role and involvement are very important culture driver
elements. The human resources is the compny‟s asset that must be well-
managed and well-empowered. If we mistreat them, how can the culture values
be successfully adopted.”
178
programmes are very important for increasing staff competency. Staff without
regular training is like a plant which is not regularly watered and fertilized.”
“The capability of our construction workers is only average, and some are
even below standard. In the context of the ASEAN construction market, every
country must have its own construction workers standards in order to be
recognised and accepted by the market. It is up to our Government to ensure
that our construction workers are well-qualified and well-recognised within
the ASEAN market.”
For all sectors of panellists, how to effectivelly implement QMS-ISO 9001 was
singled out as the primary concern in pursuing successful QMS implementation and
gaining the potential related benefits. The listing of recommended actions for
implementing QMS improvement elements is not something new for them. They
reasoned that some of the recommendations have already been stated in quality
documentation procedures and also some had been discussed with their QMS
consultants during training programmes. However, according to the construction
panellists, the ISO 9001 standard which was outlined in the company ISO 9001
documentation, was regarded as being difficult to understand by management and
staff. On the other hand, the construction panellists perceived that the
recommendations would be easy to implement if the company bears in mind that it is
not seen as only a matter of fulfilling ISO 9001 requirements; rather it should be
perceived in the context of the company strategy to survive in a competitive industry,
and to gain the stated results and benefits. In addition, the panellists eventually
recognised that to effectively impelement the ISO 9001 requirements and/or the
recommendations part of QMS improvement elements, this must be done with a full
awareness of the QMS barriers and understanding the culture drivers. Some of the
main remarks of panellists are provided below:
“The system must be understandable and clear to everyone. It does not take
into account educational level, and if some people do not understand the
system, it will not be able to be operated successfully.”
179
“We need regular program for understanding the system at project level. For
example, the task force/team is appointed to discuss the QMS before the
project starts, including evaluation and quality-cost-time control planning.”
Main remarks related to recommended actions for effective Quality Audit element:
“A minimum of two or three internal audits each year, and the audit results
should state the facts relating to which process is successful, and which one is
not. An external audit at least once a year. The aim of the audit should be to
straighten out matters relating to effectiveness.”
180
Main remark related to recommended actions for effective Quality Management and
Quality System element:
“Every unit must have quality control with a PIC, quality supervisor or
quality officer. He must be independent and report directly to the head of
department.”
Local contractors have doubts relating to the continual improvement of their QMS.
However, they realise this must be done through having an appropriate framework
relating to how they can continue to improve their QMS. Main remarks related to
recommendations for effective Continual Improvement element:
181
company performance improvement and organisational effectiveness, as a result of
implementing QMS, staff competence development and satisfaction, and also
customer satisfaction and external stakeholder purpose. Some of the major remarks
related to the discussion of this topic included the following:
“It is hoped that the real outcome of the system is improved profitability in
addition to meeting the project time requirement as stated in the contract
document. In future, because of the quality of our product, the output we want
is to gain market share.”
Main remark related to results and benefits of Control of Quality Record element:
“Documents are properly filed, easy to control and find. Every staff can have
access to documents relating to his or her job.”
The construction panellists acknowledged that, though they have not yet got
maximum potential benefits from the system, there have been many measureable
improvements. The implementation of the quality documentation procedures and
work instructions, have also been reflected in more positive employee behaviour
when undertaking their work responsibilities. Major remarks relating to the results
and benefits of the Quality Management and Quality System element included the
following:
“It is an outcome to be effective in all lines, including the terms of project cost,
time and accuracy of project completion.”
“Our best practice from the success of the ISO 9001 implementation has been
not to have to rely on a particular person; instead, any person can understand
the system and follow the existing patern, so that the results are the same.”
“We (local contractors) expect and want our QMS to run smoothly; i.e.
whenever and wherever we develop our quality system at project level, it will
operate successfully. The project staff will be able to implement it without any
doubts and fully understand the system.”
182
Applicability of the Framework
“We (local contractors) should be aware of our good reputation for gaining
more kinds of customers‟ trust. We hope we can use these frameworks as our
guidelines together with our existing quality documentation.”
183
Other Focus Group Comments
Both the construction practitioner and policy maker groups provided additional
comments to their overall responses. Some of these are included in this section. For
anonymity and privacy reasons, the identities of the speakers cannot be provided.
Construction Company:
“If indeed the QMS is a standard required by the Government and private
customers, then for its effectiveness, these frameworks must be adopted by all
construction companies. The Government should take an active role in order to
convey the quality system to become successful and sustainable improvements
achieved.”
Policy Maker:
“So that the quality standards are the same in the 33 provinces,these
initiatives should not just be centrally focused. We know that the level of
competitiveness in Jakarta is already strong, and these service providers
already have their own formulas to survive. We hope that local contractors are
aware of this issue,for those who are not aware of the concern for quality work
outputs, will in future, be cast aside automatically.”
Construction Company:
„It is sometimes ironic for us in the local construction market, even though we
already produce quality works, on time, to satisfied customers, to not
guarantee to the QMS in order to still be able to have other new projects in
the next year. This is unique in our construction services.‟
Policy Maker:
“In conclusion, our concern is how these frameworks could be implemented
successfully by the construction companies. It is also important for the
Government to provide rewards to contractors that are fully committed to high
quality construction works.”
Policy Maker:
“The Government has been trying to regulate QMS implementation at project
level, but most of the contractors perceive quality as an odd goal.This
discussion has involved the large scale contractors, but we have concerns that
small and medium scales contractors do not realise how important quality
work is.They complete project work of poor quality because they have won
the contract - this is our homework.”
184
5.4 Discussion of Results
185
Framework model is to help organisations to set up their declarations of future
directions, based on the four characteristic culture types within the CVF (Cameron
and Quinn 2006; Cameron and Quinn 2011). As the culture-based driver of practices
in the QMS improvement elements in this study is the Hierarchy-Market type, the
vision and mission of a company should essentially emphasize values that are best
categorised by the mixed culture type.
186
2. Culture Change Framework
The distinctive steps in undertaking the culture change process itself should be
acknowledged as being depended on the character of a company and what cultural
profile(s) should be emphasized in the company. As the emphasis on making culture
change in construction organisations should be due to pressure both from internal
and external factors, the degree and rapidly of change in the external environment,
such as a competitive business environment, is a pervasiveness of the need for
culture change (Cameron and Quinn 2011; Tijhuis and Fellows 2012).
It was apparent in the Focus Group Discussion that barriers to implementing the
QMS improvement elements concerned all sector of panelist when ensuring
successful QMS-ISO 9001 implementation and the qualified delivery of construction
projects. Some of the conspicuous QMS barriers, such as management commitment,
human resources competence and staff involvement in the QMS programme, are
associated with aspects of cultural values. The presentation of the culture drivers‟
187
component in the culture-based QMS framework for QMS improvement elements,
provides key organisational areas where the culture profiles and values need to be
addressed, in order for the Indonesian construction companies to practice effective
QMSs.
In this respect, each element of the culture drivers for effective QMS improvement
elements need to be raised and agreed upon within the context of the three culture
drivers needed to support the effective ISO 9001 improvement elements
implementation. Organisational leadership becomes crucial and necessary, especially
for coordinating, controlling and leading a company to achieve its goals, as these
validate the profile of a Hierarchy-Market culture. However, management
commitment, which is strongly emphasized in a typical Clan organisation, is still also
a necessary culture driver value. Subsequently, for organisational effectiveness to be
a culture driver in the Hierarchy-Market orientation, established rules and procedures
with a clear structure for authority and decision making, are highlighted as the
espoused values within the organisation. It is perceived that, with a full involvement
and participation of all management and staff (Clan values for organisational
effectiveness), the application of the rules and procedures becomes smoother and
effective. Human resources management roles was also validated as the third culture
driver. Besides the Hierachy-Market values of expert and competent staff, Clan
human resources values of human resources development and satisfied staff are also
perceived as important culture drivers.
To advance the validity of the culture drivers‟ part, it is important to address some
values of Clan culture in each element of the Hierachy-Market based culture drivers.
As identified in Section 4.4, the overall dominant organisational culture type within
Indonesian construction companies is characterized by a Clan type of culture. It is
noted that that the current culture type should not be abandoned or ignored, when
there is culture change towards another particular type of culture (Cameron and
Quinn 2006; Cameron and Quinn 2011).
The recommendations part has been singled out as one of the primary parts in
improving an effective implementation of QMS. The lists of recommendations for
each QMS improvement element cannot be seen as only pertaining to the ISO 9001
188
requirement, but more as a gateway to achieving tangible and intangible results and
benefits, as a result of implementing effective QMS. This understanding motivates
staff to take an active part in implementing the recommended actions. Rising
successfulness in the implementation of the recommendations part also requires an
awareness in preventing potential barriers to implementation, thorough an
understanding of the culture drivers by all internal stakeholder at both company and
project level. Premised on this part, the framework is then advanced into the next
part – the results and benefits.
The group discussion on the list of primary results and benefits, reflect consensual
opinions of the group of highly experienced construction industry professionals,
academic experts and policy makers, on both intangible and tangible parameters,
relating to the effective implementation of the QMS improvement elements. Each
QMS improvement element is evaluated in terms of its results and benefits. This part
mainly covers the benefits to company effective performance, business excellence,
and satisfaction of management and staff, customer and other external stakeholders.
With regards to all these, this component (with most demanding profitability and
market share benefits) is an indispensable component of the strategy required by
management to successfully introduce a company‟s QMS.
Last but not least, external parties support and involvement is perceived as critical
for the usefulness and applicability of the culture-based QMS improvement
implementation framework. As the Government is perceived as the figure-head for
Indonesian construction industry development, it naturally has inherent authority in
moving the industry in the direction of quality demand and competitive advantage.
Given its influence on construction organisations and project development, the
Construction Service Development Board (CSDB) is also tasked with the
responsibility to turn the quality and competitiveness goals into reality.
Based on the findings from the analysis and results (Section 5.3.2) together with
conclusions of the above discussion, final versions of the Generic Integrated
Framework for Culture-based Quality Management System Improvement
Implementation (Figure 5.3), Culture Change Framework (Figure 5.4), and Culture-
based Quality Management System Framework for Improvement QMS-ISO 9001
189
Elements (Figure 5.5 – 5.13), were established. The framework serves as an
additional guideline for Indonesian construction companies in understanding and
implementing effective QMS-ISO 9001 standard, while in the same time developing
and strenghthening a Hierarchy-Market based culture within the companies.
190
Culture Drivers for Quality Management Systems Improvement
1 Human
Organisational Organisational Resources Company
Culture Leadership Effectiveness Management Vision and
Change Roles Mission
2 3 4 5 6 7 8 9 10
Quality Control of Training and Verification Quality Process Continual Factual
Servicing Management Approach to
Audits Quality Development of Product Approach Improvement
& Quality Decision
Records Realization System Making
Figure 5.3 Generic Integrated Framework for Culture-based Quality Management System
Improvement Implementation
191
Definition of Culture in Construction Organisations
Shared values and underlying assumptions within the construction organisation that drive its
personnel to feel, think and perform tasks as well as mutually support each other in a correct way,
which allow the organisation to operate its business processes effectively.
1. Action research to be carried out by a set of the company‟s key personnel (e.g. culture
change task force team) to analyse results of „culture change input‟ (culture gap) and
develop a range of solutions and recommendations for the current culture and the desired
future culture, to top management.
2. Top management needs to convince other levels of management, as well as staff, of the
correct way of working and determining the changes to be made, while retaining
unaltered values.
3. A task force team prepares a scenario for every value changing action: how it merges into
a company‟s business operation and what effects changing the desired future culture will
have on the company‟s business operations. This process is communicated throughout all
levels the company to obtain evaluation and feedback for a sensible articulated vision of
the company‟s future.
4. Consensus will be moderated by a task force team who will then develop a rational
strategic implementation plan, a plan involving and supported by committed personnel
throughout the entire company.
5. The integration of the desired culture change into a company‟s business operation is
evaluated and monitored by top management and a task force team. This is as an
organisational learning process to ensure the company‟s personnel contribute to the new
culture and hence the company is better able to respond to a changing business
environment.
192
Culture Change Output
193
Identified Barriers to Implementing Effective Quality Audits
Activity reports are completed „at the last minute‟ prior to the implementation of an internal
and/or external audit.
The Quality Management System is perceived as just being needed to fulfill the internal and/or
external audit‟s requirements.
There is a lack of understanding of the requirement to conduct quality audits throughout all
levels in the company.
There is a lack of staff involvement and participation in internal and/or external quality audits
due to: (a) ineffective internal communication processes between management and staff and
amongst staff; and (b) low levels of satisfaction.
Involvement and
participation of
management and staff in
quality audit programmes
is seen as part of the
company‟s culture.
194
Results and Benefits
Top management will obtain regular visible results of the implementation of the company‟s
quality management system at determined periods, which could lead to the maintenance of
compliant status and improvement of important processes and areas in the quality management
system, as well as attending to the results of previous audits.
Improved effective responsiveness due to management coordinating and monitoring the review
of audit results, which will lead to the improvements in the company‟s quality management
and quality system.
Effective corrective and preventive actions, once implemented, can satisfy management and
enable staff to be more consistent with work instructions, procedures, and productive, and
therefore, the company can achieve higher level of effectiveness.
195
Identified Barriers to Implementing Effective Servicing
There is a lack of company commitment to consistently control all services provided to
customers.
Internal communication processes between management and staff and amongst staff lack
effectiveness.
There is a lack of well-trained and qualified personnel engaged in undertaking construction work
and providing any related services.
Staff productivity does not operate at a high level due to low levels of motivation and
satisfaction.
196
Results and Benefits
Customers better satisfied with the quality servicing because their expectations are understood,
determined, defined, reviewed, and monitored by the company. Customer satisfaction leads to
the company‟s recognition and high reputation.
Recognition and high reputation will secure market and customer bases, and improve the
company‟s business and performance.
197
Identified Barriers to Implementing Effective Control of Quality Records
There is a lack of obvious and understandable procedures for the control of quality records.
Completing and updating of quality records occurs only „at the last minute‟ prior to the conduct
of an internal and/or external audit.
The internal communication processes between management and staff, and amongst staff,
regarding handling of record keeping and maintenance, are ineffective.
A perception exists that quality documentation is solely restricted to the quality manual and the
six major procedures, and there is therefore not sufficient consideration to keeping quality
records.
198
Identified Barriers to Implementing Effective Training and Development
There is no effective management response for settlement of staff grievances and needs.
No well-designed reward system is in place to motivate employees to espouse the QMS values,
such as staff training and capability development.
No strategic planning exists for staff training and development programmes to be roled out
within a prescribed time schedule.
199
Results and Benefits
Only competent and qualified staff should perform tasks and undertake work affecting quality
processes and results.
All staff will be able to learn from competent and qualified staff; this will lead to a better and
more professional working environment.
Effective and efficient team building and team-work, if developed, should lead to less conflict.
Competent and qualified staff enhance process improvement, customer relations, and general
business skills
Productive staff should be impelled to create competition.
200
Identified Barriers to Implementing Effective Verification of Product
Realization
The verification of product realization lacks obvious and understandable procedures such as not
including important set-up information or useful hints for performing a particular task, and/or
written procedures containing classic quality systems controls.
There is a lack of understanding of ISO 9001 QMS based terminology which is not fully
integrated into companies operating procedures for verification of product realization (clause 7).
201
Identified Barriers to Implementing Effective Quality Management and
Quality System
Corporate commitment is lacking and there is inconsistency of management action and
decision-making.
Strong motivation is lacking in all levels of management and there is no effective management
response to settle staff grievances and needs.
Internal communication processes between management and staff, and amongst staff, are not
always well defined and lead to misunderstandings.
The purpose of obtaining the ISO 9001 certification from the perspective of management is
solely seen as a marketing initiative or as being due to customer pressure.
There is a difficulty in understanding ISO 9001 terminology in order to integrate it fully into a
company‟s operating procedures.
202
Results and Benefits
Confident and cooperative staff perform work better, because responsibilities and authority
are defined, communicated, and understood. This leads both to better work and less conflict.
Personnel in the company will benefit from better working conditions, increased job
satisfaction, improved health and safety, improved incentives for achievement, and improved
stability of employment.
Customers will receive products and services that conform to requirements. This leads to
improving company market share and shows a highly recognizable business performance.
There needs to be top management idealism in implementing the quality management system
to effectively and efficiently control project activities, and for the betterment of the
company‟s overall management system, which will then be reflected in similar positive
attitudes of company staff.
203
Identified Barriers to Implementing Effective Process Approach
The nature of diverse services and activities found in the construction sector means that it is a
challenge for construction companies to place every activity within the concept of process
approach.
The lack of understanding of the essence of the process approach of ISO 9001 QMS is evident
throughout all levels in many companies.
There is a lack of integration of the fundamental elements of a process approach of ISO 9001
QMS into many companys‟ operating procedures.
The shortage of effective internal communication processes between management and staff, and
amongst staff, is evident in companies.
A shortage of effective communication processes between the company and its external
stakeholders, particularly in the project execution stage, exists.
204
Results and Benefits
More efficient use of cost resources, with results from costs being controlled and operations
having a shorter process cycle times.
Reworking, defects, delays and waste, can be reduced because all project stakeholders
understand and recognise their role in meeting company needs and customer requirements.
An effective process approach allows a process, service and product to be appropriately
controlled and measured for the assurance of the quality of work.
An effective process approach leads to ongoing improvements in the all processes within a
company.
Undertaking an effective process approach leads to an opportunity for improvement of the
company‟s quality management system.
Undertaking an effective process approach leads to fast market penetration and increased
profitability.
205
Identified Barriers to Implementing Effective Continual Improvement
Top management only considers compliance to ISO 9001 as a documentation task rather than
the opportunity to change to an improved and systematic management style.
The lack of understanding of ISO 9001 QMS based terminology needs to be fully integrated into
a company‟s operating procedures.
There appears to be a distinct shortage of strong motivation in all levels of management.
There is a shortage of an effective management response to settle staffgrievances and needs.
No well-designed reward system, such as training, development and promotion, and/or a
financial bonus, exists to motivate employees to espouse QMS values.
Internal communication processes between management and staff, and amongst staff, are not
always well defined and lead to misunderstandings.
206
Results and Benefits
Improved company organisational capability, coordination and flexibility in reacting to
opportunities more quickly.
Effective continual improvement of the quality management system will positively affect the
company‟s business operations, making them more effective.
Improved working environment and effectiveness, as well as increased worker satisfaction and
retention.
Increased customer satisfaction that might lead to increased market share, sales growth and
profitability.
207
Identified Barriers to Implementing Effective Factual Approach to Decision
Making
Statistical analysis is not generally used to analyze data such customer satisfaction, conformance
to product requirements, and characteristics and trends (and opportunities) for preventive action.
Decision-making is not based on sound analysis of relevant data and information.
Management commitment, Staff are more efficient Capable staff are better
consistency and goal and productive as a able to operate statistical
achievement drive result of management analysis tools for
effective decision-making decisions that are based reviewing and analyzing
based on sound analysis of on a factual approach. data and information.
data and information.
208
5.6 Summary
This chapter presents the basic types of organisational culture, and construction of
the framework components to be incorporated in the development of the culture-
based quality management system improvement implementation framework.
Following the development of the framework, is the evaluation and validation of the
framework through a Focus Group Discussion.
This chapter presents the findings of the data analysis from the focus group
discussion. Specifically, it presents the results of the evaluation of the generic
integrated framework for culture-based quality management system improvement
implementation, the culture change framework, and the nine frameworks of the
QMS-ISO 9001 improvement elements. Nine targeted construction practitioners,
from the largest-scale Indonesian construction companies, as well as ISO 9001
certificate holders, policy makers, and academic experts, were involved in the group
discussion. All have substantial experience in civil engineering projects, and
provided holistic accounts of current construction industry and policy‟s opinions on
the usefulness, applicability and validity of the framework.
The findings of the Focus Group Discussion data analysis and related discussion
have been used for the development of the final version of the Culture-based Quality
Management System Improvement Implementation Framework, as the final output
of this research. The final section (Section 5.5) of this chapter presents the
framework in full.
209
CHAPTER 6
CONCLUSIONS
This chapter summarises the conclusions of the research study. First, it summarises
the significance of the major findings in relation to the research aim and objectives. It
then presents the contributions of the study in terms of theory, practice, and policy.
Finally, this chapter reviews the limitations of the study, and provides
recommendations for further research.
6.1 Conclusions
210
have an impact on the effective implementation of the QMS, and contribute
to the lower level of business performance of the ISO 9001 certified
construction companies. The „typical QMS barriers‟ contained in the Culture-
based Quality Management System Improvement Implementation
Framework are meant to raise „the interest‟ of constructions companies to
these barriers, which are the chief inhibitors to successful QMS-ISO 9001
implementation, as well as being barriers to companies wanting to achieve
higher levels of business performance. The three main elements of culture
drivers contained in the framework (organisational leadership, organisational
effectiveness, and human resources management roles) are suggested as
potential measures to mitigate and prevent the existence of the QMS barriers.
211
opportunities to be faced by the company. This will then advantage the
company in setting up appropriate culture changes and/or strengthening its
current culture profile in order to possess the most adaptable organisational
culture; that culture will, in turn, help the company to successfully deal with
the complexities of construction business entities.
212
6.2 Research Contributions
Due to the lack of the research in this area, there is a scarcity of literature on the
Competing Values Framework and QMS-ISO 9001 implementation, in construction
organisations. For the body of knowledge, by empirically examining the theoretical
framework developed for this study, the results reported contribute to and enrich the
literature in this area. Specifically, past studies on organisational culture assessment
and QMS practices in construction organisations, coupled with the findings of this
research, have enhanced the body of literature and imparted new insights relating to
our knowledge of organisational culture and QMS implementation, in construction
organisations context. The past and current studies have also contributed to the
knowledge in the area of Indonesian construction‟s organisational culture and quality
management system development. The findings from this study have also provided
additional recommendations for more effective QMS-ISO 9001 implementation.
In addition to the contribution to the body of knowledge, this study has also
demonstrated the methods for analysis of the relationships between the
organisational culture profiles (independent variable) and QMS practices (dependent
variable), for which the original Cameron and Quinn‟s analysis model was used. By
framing the culture profiles as a categorical variable (with QMS practices being a
continuous variable), the study shows additional ways for analysing the relationships
between the two variables.
As discussed in Chapter 1, part of the objectives of the research has been the
development of practical quality management systems. To the end, the research has
established a set of Culture-based Quality Management System Improvement
213
Implementation Framework for the successful and effective implementation of
quality system strategies aimed at improving quality deliverables in Indonesian
construction services and projects. This framework is the crystallization of the
research, and reflect an attempt to move the Indonesian construction companies
towards becoming more qualified and competitive companies, in local, national and
global construction markets.
The research found that there is an increased awareness among the construction
organisations and project practitioners, of the importance of pursuing quality.
Generally, they accept the fact that quality is the basis for moving companies
forward, both in relation to satisfying clients and in the attainment of a sustainable
competitive advantage. The framework will help improve the understanding among
company internal stakeholders, and provide them practical guidelines and strategic
tools for advancing the quality culture and QMS-ISO 9001 of construction projects.
The framework potentially fit all grades in the large-scale Indonesian construction
industry, enabling them to develop strong corporate cultural profiles in order to
successfully achieve effective quality management practices and quality deliverables
in infrastructure project delivery.
In the context of the contribution to policy, the research findings, especially relating
to the framework, will provide a future reference for facilitating consultation and
communication among the construction services providers, construction companies
associations, the CSDB and the Government, in defining and determining policy for
more widespread promotion and implementation of organisational culture and
QMSs, in the Indonesian construction industry. As found in this study, with the
214
exception of the adoption of the QMS-ISO 9001 standard to assist construction
companies in measuring their performance of services and products delivery, and
whether they comply with customer requirements, there is a lack of measurement
tools for assessing a contractors‟ performance for services and projects results, as
well as achievements on defined key performance indicators (KPIs) in an Indonesian
construction context. The framework will therefore provide a stepping stone for the
development standards for performance measurement for Indonesian construction
companies to assess their companies‟ performance outcomes against defined
standards, as well as for the evaluation of their performance relative to other similar
service providers.
Although this study provides insights into the Culture-based Quality Management
System Improvement Implementation Framework, in particular the role of
organisational culture in driving the effective implementation of the quality
management system, it has some limitations.
First, given that the measurement of the organisational culture profiles within the
construction companies was conducted under „current‟ conditions, the empirical
study and conceptual arguments relating to preferred „future‟ culture profiles were
not able to be fully met in this study. Future research should therefore cover the
measurement of the preferred future culture profiles within large-scale construction
companies, to meet their perceived needs relating to internal developments and the
future business environment, including challenges and opportunities to be faced by
the companies. It is recommended that proposed future research be undertaken to
confirm the dominance of the mixed culture profile found in this study.
215
framework developed in this study. A Structural Equation Modelling (SEM) analysis
could be used to undertake such data analysis.
The third limitation relates to the empirical study of the implementation of the
research findings in this study, that has formed the Framework for Culture-based
Quality Management System Improvement Implementation. Due to the time-
constraint relating to the process of data collection, this study was not able to explore
the implementation of the framework within construction companies, which is about
the performance outcomes of companies during the time of implementing the
framework. Therefore, future research could focus on sampled construction
organisations, which are willing to be pilot-projects for the framework
implementation. A Case Study could be utilised to collect data for an in-depth
investigation of the framework‟s implementation.
Fourth, although the culture factor adopting Cameron and Quinn‟s (2006) concept in
this study is considered as having covered other related factors that are also
impacting construction company‟s quality system and quality product delivery, these
related factors (i.e. leadership, market forces, strategy practices) are recommended in
future research to be variables that can specifically be measured in relation to the
effective implementation of construction quality management system. Another
concern relates to those external factors such as corruption-collusion-nepotism, and
unhealthy competition practices. Since the focus of this research was on the
identification of the typical Indonesian contractors‟ organisational culture profiles
based on the Competing Values Framework model, and on the examination of the
influence of the culture profiles on quality management system implementation,
these additional external factors were not considered in this study. However, it is
acknowledged that external factors can potentially influence appropriate practices of
the strong organisational culture of the Indonesian contractors, and therefore the
quality management system implementation. The influence of these external factors
would, therefore, be an appropriate topic for future research.
216
The fifth limitation relates to the lack of involvement of certain external respondents
in the questionnaire surveys (e.g., project owners, professional associations,
academics, and end-user customers). In this study, where the aim was to identify the
organisational culture profiles of Indonesian construction companies, based on
responses which are internal to the organisations, external respondents are regarded
as being inappropriate. These external respondents‟ involvement might be utilised to
obtain a complete and comparative picture of the implementation of ISO 9001 by
contractors, as well as company performance, from the perspective of external
stakeholders.
Finally, given the fact that the participating respondents and the case organisations
were all from Indonesia, the framework developed are specifically applicable to
Indonesian construction organisations rather than countries more broadly. Different
countries have different and specific national cultures, different legal guidelines, and
different political and business environments, which might influence an
organisations‟ culture. However, this study might have potential value for the
examination of culture-based quality management system implementation in
construction organisations in other emerging and developing countries and on a
wider global basis. In addition, the lessons from this study might potentially provide
a good source of reference material related to construction organisations elsewhere
around the world.
217
REFERENCES
Allen, P. and K. Bennett. 2010. PASW statistics by SPSS: A practical guide version
18.0. Sydney: Cengage Learning Australia Pty Limited.
Anson, M., E. Cheng, Y. Chiang, E. Hui, P. Lam and S. Mak. 2009. An annual report
of the construction industry of China Hong Kong. In 15th Asiaconstruct
Conference. Kuala Lumpur, Malaysia: Asiaconstruct Conference.
Asa, M. F., I. S. Abidin and Y. Latief. 2009. Main variables in Quality Management
System for profitability Indonesian construction services enhancement which
have potency to improve Gross Domestic Product (GDP) construction sector.
Dinamika Teknik Sipil 9 (2):197-202.
Asa, M. F., I. S. Abidin and Y. Latif. 2008. Faktor-faktor kritis dalam Sistem
Manajemen Mutu (SMM) untuk optimasi profitabilitas dan daya saing
perusahaan jasa konstruksi di Indonesia [Critical factors in Quality
Management System (QMS) for optimization of profitability and
competitiveness of the construction company in Indonesia]. Paper read at
Seminar Nasional Sains dan Teknologi-II 2008, 17-18 November, at
Universitas Lampung.
218
Bassioni, H. A., A. D. F. Price and T. M. Hassan. 2004. Performance measurement in
construction. Journal of Management in Engineering ASCE 20 (2):42-50.
Bell, J. 2005. Doing your research project : A guide for first-time researchers in
education, health and social science. Fourth ed. Berkshire: Open University
Press.
Bryman, A. and D. Cramer. 2009. Quantitative data analysis with SPSS 14, 15 & 16:
A guide for social scientists. Hove: Routledge.
219
Cameron, K. S. and R. E. Quinn. 2011. Diagnosing and changing organizational
culture: Based on the Competing Values Framework. Third ed. San
Fransisco: Jossey-Bass.
Cattell, R. B. 1966. The scree test for the number of factors. Multivariate Behavioral
Research 1:245-276.
Center for the Advancement of Process Technology. 2011. Process quality. First ed.
Upper Saddle River: Prentice Hall.
Chini, A. and H. Valdez. 2003. ISO 9000 and the U.S. construction industry. Journal
of Management in Engineering ASCE 19 (2):69-77.
Choi, Y. S., M. Seo, D. Scott and J. Martin. 2010. Validation of the Organizational
Culture Assessment Instrument: An application of the Korean Version.
Journal of Sport Management 24:169 - 189.
220
http://www.ftsl.itb.ac.id/kk/manajemen_dan_rekayasa_konstruksi/?p=298
(accessed April 28, 2010).
Cow-Chua, C., M. Goh and B. W. Tan. 2003. Does ISO 9000 certification improve
business performance? International Journal of Quality & Reliability
Management 20 (8):936-953.
Deming, W. E. 1986. Out of the crisis. Cambridge, MA: MIT Centre for Advanced
Engineering Study.
Fellows, R. and A. Liu. 2008. Research methods for construction. Oxford: Wiley-
Blackwell.
Field, A. 2009. Discovering statistics using SPSS. Third ed. London: Sage.
221
Fink, A. 2009. How to conduct surveys : A step-by-step guide. Fourth ed. Thousand
Oaks: SAGE Publications.
Hoonakker, P., P. Carayon and T. Loushine. 2010. Barriers and benefits of quality
management in the construction industry: An empirical study. Total Quality
Management 21 (9):953-969.
222
Indonesian Contractors Association. 2010. The contractors directory year 2010: 36
years echanting accomplishment of ICA members. Jakarta: Indonesian
Contractors Association.
Irani, Z., A. Beskese and P. E. D. Love. 2004. Total Quality Management and
corporate culture: Constructs of organisational excellence. Technovation 24
(8):643-650.
Krueger, R. A. and M. A. Casey. 2009. Focus groups : a practical guide for applied
research. 3rd ed. Los Angeles: SAGE.
Kull, Th. J. and J. G. Wacker. 2010. Quality management effectiveness in Asia: The
influence of culture. Journal of Operations Management 28 (3):223-239.
223
Lakhe, R. R. and R. P. Mohanty. 1994. Total Quality Management: Concepts,
evolution and acceptability in developing countries. International Journal of
Quality and Reliability Management 11 (9):9-33.
Lam, S. W., C. M. Low and W. A. Teng. 1994. ISO 9000 in construction. Singapore:
McGraw-Hill.
Landin, A. 2000. ISO 9001 within the Swedish construction sector. Construction
Management and Economics 18 (5):509–518.
Liu, A. M. M. 2003. The quest for quality in public housing projects: A behaviour-
to-outcome paradigm. Construction Management & Economics 21:147-158.
224
implementation. Engineering, Construction and Architectural Management
11 (3):189-198.
Low, S. P. and S. H. Hong. 2005. Strategic quality management for the construction
industry. The TQM Magazine 17 (1):35-53.
Low, S. P. and D. Wee. 2001. Improving maintenance and reducing building defects
through ISO 9000. Journal of Quality in Maintenance Engineering 7 (1):6-
24.
LPJK. 2005. Panduan penerapan Manajemen Mutu ISO 9001:2000 bagi jasa
pelaksana konstruksi dan jasa konsultansi konstruksi [Guideline for Quality
Management System ISO 9001:2000 implementation in construction and
counsultant services]. Jakarta: Lembaga Pengembangan Jasa Konstruksi.
LPJK. 2007. Dengar pendapat LPJK dengan Wakil Presiden Republik Indonesia
[Hearings between CSDB and Vice President of the Republic of Indonesia].
http://www.lpjk.org/modules/article (accessed August 31, 2009).
225
Marbun, B. N. 1980. Konsep manajemen Indonesia [Indonesian management
concept]. Jakarta: PPM Management.
Maull, R., P. Brown and R. Cliffe. 2001. Organisational culture and quality
improvement. International Journal of Operations & Production
Management 21 (3):302-326.
McCabe, S. and D. Boyd. 2004. Quality management 25 years on: what can we learn
about initiatives in construction? In 20th Annual ARCOM Conference, 1-3
September 2004, edited by F. Khosrowshahi. Heriot Watt University:
Association of Researchers in Construction Management.
Media Online Finroll. 2009. Pengerjaan pembangunan proyek jalan layang terancam
dialihkan [Flyover project is threatened to be diverted].
www.news.id.finroll.com (accessed 30 November 2009).
226
tentang Penerapan Tata Kelola Perusahaan yang Baik (Good Corporate
Governance) pada Badan Usaha Milik Negara. Jakarta.
Morgan, D. L. 1997. Focus groups as qualitative research. Second ed. Vol. 16,
Qualitative Research Methods Series. Thousand Oaks: Sage Publications.
Morgan, D. L. and A. U. Scannel. 1998. The focus group kit: Planning focus groups.
Thousand Oaks: Sage Publications.
Müller, R. and J. R. Turner. 2007. Matching the project manager's leadership style to
project type. International Journal of Project Management 25 (1):21-32.
227
Novessro, M. 2009. Kekeliruan dalam menerapkan ISO 9000 [Mistake in
implementing ISO 9000]. http://www.mail-archive.com/bisnis_centre
(accessed August 27, 2009).
Nugroho, H. S., D. S. Saroso and R. Nurcahyo. 2009. Implementasi ISO 9001 pada
Industri Kontruksi [ISO 9001 implementation in construction industry].
http://www.bikasolusi.co.id/SK9k1_Konstruksi.php (accessed August 24,
2009).
Pallant, J. 2011. SPSS survival manual. 4th ed. Crows Nest, NSW: Allen & Unwin.
228
Pontianak Post Online. 2006. Tindak proyek bermasalah [Troubled project must be
executed]. www.arsip.pontianakpost.com (accessed November 9, 2009)
Prajogo, D. I. and C. M. McDermott. 2005. The relationship between Total Quality
Management practices and organizational culture. International Journal of
Operations & Production Management 25 (11):1101-1122.
Quazi, H. A., C. W. Hong and C. T. Meng. 2002. Impact of ISO 9000 certification
on quality management practices: a comparative study. Total Quality
Management 13 (1):53- 67.
Radar Banten. 2007. Proyek di SKH Merak diduga bermasalah [Merak project is
allegedly troubled].
http://www.radarbanten.com/mod.php?mod=publisher&op=viewarticle&artid
=16167 (accessed November 30, 2009).
Rini, E. S. 2002. Manajemen Indonesia: Perpaduan manajemen barat dan timur serta
budaya tradisional [Management of Indonesia: The combination of western
and eastern management and traditional culture]. Medan: Universitas
Sumatera Utara Digital Library.
Sandholm, L. 1999. Trendy versus effective quality strategies. The TQM Magazine
11 (6):437-444.
229
Saris, W. E. and I. N. Gallhofer. 2007. Design, evaluation, and analysis of
questionnaires for survey research:Wiley series in survey methodology. New
Jersey: John Wiley & Sons.
Saunders, M., P. Lewis and A. Thornhill. 2009. Research methods for business
students. Fifth ed. Harlow: Pearson Education Limited.
Schein, E. H. 2004. Organizational culture and leadership. Third ed. San Fransisco:
John Wiley & Sons.
Sharma, D. S. 2005. The association between ISO 9000 certification and financial
performance. The International Journal of Accounting 40:151-172.
Si, S. X. and J. B. Cullen. 1998. Response categories and potential cultural bias:
Effects on an explicit middle point in cross-cultural surveys. International
Journal of Organizational Analysis 6 (3):218-230.
Stevens, J. P. 2002. Applied multivariate statistics for the social sciences. 4th ed.
Hillsdale, NJ: Erlbaum.
230
Construction (EASEC-11): Building a Sustainable Environment, at Taipei,
Taiwan.
Sudaryono. 2006. Sistem Manajemen Mutu konstruksi bagi penyedia jasa golongan
kecil [Construction Quality Management System for small-group service
providers]. In Bulletin BPKSDM Jakarta: Badan Pembinaan Konstruksi dan
Sumber Daya Manusia Departemen Pekerjaan Umum.
Suraji, A., D. Krisnandar and S. S. Mulyo. 2007. The Indonesian construction: Now
and future In 13th Asiaconstruct Conference. Seoul, South Korea:
Asiaconstruct Conference.
Susilawati, C., F. Salim and T. Soesilo. 2005. Harapan dan Realita Sistem
Manajemen Mutu ISO 9000 dalam Penerapannya di Perusahaan Kontraktor
[Expectations and reality of ISO 9000 implementation in the contractor‟s
company]. Dimensi Teknik Sipil: Jurnal Keilmuan dan Penerapan Teknik
Sipil 7 (1):30-35.
The Presidential Unit of Monitoring and Control. 2012. The absorption of the 2012
national budget http://dev.ukp.go.id/web/topik-khusus/apbn2012 (accessed
April 17, 2012).
231
Thomas, R., M. Marosszeky, K. Karim, S. Davis and D. McGeroge. 2002. The
importance of project culture in achieving quality outcomes in construction.
Paper read at Proceedings of IGLC-10, at Gramado, Brazil.
http://www6.ufrgs.br/norie/iglc10/papers/98-ThomasEtAl.pdf (accessed
August 28, 2009).
Toor, S.-u.-R. and G. Ofori. 2008. Leadership for future construction industry:
Agenda for authentic leadership. International Journal of Project
Management 26 (6):620-630.
Tricker, R. 2008. ISO 9001:2000 for small business. Third edition ed. Oxford:
Butterworth-Heinemann.
232
Vianna, S. 2007. The upcoming “changes” to ISO 9001:2008: Based on ISO 9001
DIS.
http://nelsonlascanoa.wikispaces.com/file/view/The+upcoming+changes+to+
ISO+9001_2008%5B1%5D.pdf (accessed February 3, 2012).
Wahid, R. A., J. Corner and P.-L. Tan. 2011. ISO 9000 maintenance in service
organisations: Tales from two companies. International Journal of Quality &
Reliability Management 28 (7):735-757.
Yip Robin, C. P. and C. S. Poon. 2009. Cultural shift towards sustainability in the
construction industry of Hong Kong. Journal of Environmental Management
90 (11):3616-3628.
Yu, I., K. Kim, Y. Jung and S. Chin. 2007. Comparable performance measurement
system for construction companies. Journal of Management in Engineering
ASCE 23 (3):131-139.
233
Zhang, Z., A. Waszink and J. Wijngaard. 2000. An instrument for measuring TQM
implementation for Chinese manufacturing companies. International Journal
of Quality and Reliability Management Vol. 17 No 7:730-755.
234
APPENDIX A – Sample of Questionnaire
(English Version)
AIM
The aims of this survey are:
1. To investigate the current status of quality management system implementation in
Indonesian construction companies;
2. To identify organisational culture profiles of Indonesian construction companies.
CONFIDENTIALITY
All information provided in this survey will be treated as strictly confidential, no
companies or individuals will be identified in any subsequent research report, and all
information collected will be used purely for the purposes of academic research.
FEEDBACK OF RESULTS
After all surveys are collected and analysed, feedback on the overall research results will
be provided upon request to interested respondents in this study.
CONTACT DETAILS
If you have any questions regarding this survey, please do not hesitate to contact:
Debby Willar on +61 4344 91551 or e-mail: debby.willar@student.qut.edu.au
This research is being funded by the Ministry of National Education through DIKTI
Scholarships 2009-2012
235
QUESTIONNAIRES
Position of Respondent
236
Section II – Questions related to the development stage of QMS
2.1 Did your company employ consultants to assist in setting up the QMS?
Yes No (please go to 2.2)
IF YES
What is your opinion of the consultants’ role?
Very helpful Helpful Fairly helpful Not helpful
What percentage of involvement did the consultants have in the establishment of the
company’s QMS documentation (e.g. Quality Manual, Quality Procedures, Project
Quality Plan)?
< 25% 25 – 50% 51 – 75% 76 – 100%
2.2 How was the fundamental QMS documentation (e.g. Quality Manaual, Quality
Procedures, etc) generally developed?
Every division/sub-division prepared the draft of the documents
Quality Assurance Team developed the documents
The consultant developed the documents
Quality Assurance Team and the consultant developed the documents
2.3 Length of time from the start of preparation to achievement of ISO 9001
certification:
< 6 months 6 – 12 months 13 – 18 months 19 - 24 months > 24
months
2.4 Please rank order, from 1 (most) to 8 (least), the motives you find important for the
company to develop a QMS certified under ISO 9001.
Motives for developing QMS
. To effectively and efficiently control project activities _____
. To minimise poor quality of construction processes and products _____
. To enter the international construction market _____
. For the betterment of the company’s overall management system _____
. As a requirement of the Ministry of Public Works _____
. To fulfil clients’ requests as part of the bidding process _____
. To improve the company’s prestige (e.g. image, reputation) _____
. To improve business performance _____
237
Section III – Questions related to the practice of ISO 9001 principles
3 Based on your experience, please tick ( √ ) the appropriate box which indicates the
level of implementation of each major principle of ISO 9001 standard in your company.
238
Purchasing procedures fully describe supplier
4.6
requirements and there is a formal system for
ensuring compliance to these standards.
Procedures detail methods of handling and
4.7
safekeeping of product supplied by clients.
4.8 Methods of tracking the dates and lot-codes of
products and raw materials, from arrival on site to
incorporation into construction, guarantee
traceability.
Work instructions, quality plans and workmanship
4.9
standards, verify that each job is being done
correctly.
Inspection and testing at receiving, in-process and
4.10
final inspection areas, ensure quality compliance.
Test and inspection records are retained and
preserved as part of the quality documentation
system.
Instruments and measuring tools are calibrated
4.11
regularly, and records maintained.
4.12 Only inspected materials may be used or processed
further. Inspected product is always identified.
Materials or products that fail to meet specifications
4.13
are rejected and separated from normal production.
Only the proper authorities may decide if rejected
material will be used as is, reworked or returned to
the supplier.
The corrective action system focuses on identifying
4.14
the root causes of quality concerns and any
corrective and preventative actions required.
4.15 Procedures outline practices that protect products
from damage during construction and delivery.
4.16 Quality records provide an audit trail for internal and
external auditors.
4.17 Trained teams verify that the company Quality
System is working, by evaluating whether the ISO
9001 requirements examined by the external
auditors, are being met on an on-going basis.
Training records are maintained for every employee
4.18
showing their levels of expertise and frequency of
training.
Where servicing is specified in the contract,
4.19
procedures are established to verify that servicing
meets the indicated requirements.
Control charts, graphs and other methods of analysis
4.20
determine how well a process is working and
facilitate continuous improvement.
239
Section V – Questions related to the problems of QMS implementation
5 The following statements are related to problems that companies mostly faces in
relation to effective ISO 9001 implementation. Please tick ( √ ) the appropriate box
which indicates whether your company has also experienced these problems.
240
5.11 Poor external communication exists (e.g. with sub-
contractors and clients) and contributes to poor
quality outcomes.
5.12 Uncertainty exists with the effectiveness and/or
suitability of sub-contractors and suppliers quality
systems.
5.13 There is resistance to implementation of QMS
amongst staff.
5.14 Lack of identified funding in the company for
implementing QMS.
Implementatio
n QMS
Section V I – Questions related to the company’s organisational culture
The following statements are used to assess the company’s organisational culture. Please
allocate a score (0 – 100) next to the corresponding statement to indicate in your view the
degree of correctness.
The highest score is given to the statement completely true describing the current
organisational culture of your company, followed by somewhat true, etc., while the
lowest points indicate never true. The total points score for each item should add up to
100.
The organisation is a very:
A personal place. It is like an extended family. People seem to share a lot of 25
themselves.
EXAMPLE
B dynamic and entrepreneurial place. People are willing to stick their necks 45
out and take risks.
C results-oriented. A major concern is with getting the job done. People are 10
very competitive and achievement-oriented.
D controlled and structured place. Formal procedures generally govern 20
what people do.
Total 100
6.1 The organisation is a very:
A personal place. It is like an extended family. People seem to share a lot of
themselves.
B dynamic and entrepreneurial place. People are willing to stick their necks
out and take risks.
C results-oriented. A major concern is with getting the job done. People are
very competitive and achievement-oriented.
D controlled and structured place. Formal procedures generally govern
what people do.
Total
241
6.2 The leadership in the organisation is generally considered to exemplify:
A mentoring, facilitating, and nurturing.
B entrepreneurship, innovation, or risk taking.
C a no-nonsense, aggressive, results-oriented focus.
D coordinating, organising, or smooth-running efficiency.
Total
242
Section VII – Questions related to organisation performance during implementing
QMS
*** Thank you very much for your participation in this survey ***
243
(Bahasa Version)
TUJUAN SURVEI
Tujuan survei ini adalah:
1. Untuk mengetahui tingkat penerapan sistem manajemen mutu di perusahaan
kontraktor Indonesia pada saat ini.
2. Untuk mengidentifikasi profil budaya organisasi perusahaan konstruksi
Indonesia.
KERAHASIAAN INFORMASI
Seluruh informasi yang diberikan dalam survei ini akan dirahasiakan, termasuk
identitas perusahaan dan responden tidak akan dimunculkan dalam laporan
penelitian. Seluruh informasi yang terkumpul hanya akan dipergunakan untuk
penelitian akademik.
KONTAK
Apabila anda memiliki pertanyaan mengenai survei ini, disilahkan menghubungi:
Debby Willar di nomor +62821 9522 5341 atau melalui email:
debby.willar@student.qut.edu.au
244
KUESIONER
Silahkan menjawab pertanyaan-pertanyaan di bawah ini dengan memberi tanda
centang ( √ ) pada kotak yang sesuai, melingkari nomor yang sesuai, atau menulis
jawaban anda pada ruang yang tersedia.
Posisi Responden
Profil Perusahaan
245
Bagian I – Pertanyaan-pertanyaan berkaitan dengan data SMM
1.1 Pada tahun berapa perusahaan anda pertama kali disertifikasi dengan ISO 9001?
Tahun
1.2 Apa ruang lingkup sertifikasi perusahaan anda, sesuai dengan yang tercetak pada
sertifikat ISO 9001?
1.3 IS0 9000 adalah SMM yang relevan untuk industri konstruksi:
Sangat Setuju Tidak setuju Sangat tidak setuju
setuju
1.4 Apakah dengan memiliki sertifikasi ISO 9000 volume kontrak proyek perusahaan
anda meningkat?
Sangat signifikan Tidak signifikan Tidak sama sekali
Signifikan
2.2 Bagaimana dokumen-dokumen seperti manual mutu, prosedur mutu, rencana mutu
proyek, dan lain-lain, umumnya dikembangkan?
Setiap devisi/sub devisi menyiapkan konsep prosedur
Tim Penjaminan Mutu (Tim QA) yang mengembangkan dokumen
Konsultan yang mengembangkan dokumen
Tim QA dan konsultan yang mengembangkan dokumen
2.3 Panjangnya waktu mulai dari awal persiapan sampai dengan perolehan sertifikat ISO
9001:
< 6 bulan 6 – 12 bln 13 – 18 bln 19 - 24 bln > 24 bln
246
2.4 Silahkan diurut motif-motif berikut menurut tingkat kepentingannya bagi perusahaan
anda dalam mengembangkan SMM berbasis ISO 9001. Nilai ‘1’ (paling penting)
sampai dengan nilai ‘8’ (kurang penting).
Motif-motif dalam mengembangan SMM-ISO 9001
. Untuk mengontrol aktivitas proyek secara efektif dan efisien _____
. Untuk mengurangi kualitas buruk proses dan produk konstruksi _____
. Untuk memasuki pasar konstruksi internasional _____
. Untuk memiliki SMM yang lebih baik _____
. Sebagai persyaratan dari pemerintah (Departemen Pekerjaan Umum) _____
. Untuk memenuhi permintaan pelanggan / bagian dari persyaratan tender _____
. Untuk meningkatkan prestise perusahaan _____
. Untuk meningkatkan kinerja bisnis perusahaan _____
247
Bagian IV – Pertanyaan-pertanyaan yang berkaitan dengan penerapan elemen-
elemen ISO 9001
248
4.14 Tindakan koreksi berfokus pada identifikasi akar
permasalahan. Tindakan perbaikan senantiasa dilakukan.
249
5.4 Kurangnya motivasi yang kuat dari semua
tingkatan manajemen.
5.5 Kurangnya tanggapan manajemen yang efektif
untuk menyelesaikan keluhan dan kebutuhan
karyawan.
5.6 Kekurangan pembiayaan perusahaan untuk
penerapan SMM.
5.7 Kurangnya sistem bonus (mis.
pelatihan/pengembangan karyawan, promosi,
uang) untuk memotivasi karyawan mendukung
penerapan SMM.
5.8 Kesulitan dalam memahami istilah ISO 9001 untuk
diintegrasikan sepenuhnya ke dalam prosedur
operasional perusahaan.
5.9 Manajemen dan karyawan melengkapi pelaporan
mereka ‘pada menit terakhir’ sebelum kegiatan
audit internal/eksternal.
5.10 Kegagalan dalam mensosialisasikan persyaratan
SMM perusahaan di semua tingkatan organisasi.
5.11 Penolakan karyawan terhadap penerapan SMM
perusahaan.
5.12 Proses komunikasi internal antara manajemen dan
karyawan dan diantara karyawan sering tidak
terdefinisi dengan jelas sehingga sering
menyebabkan kesalahpahaman.
5.13 Komunikasi yang kurang lancar dengan pihak
eksternal (mis. sub-kontraktor/pemasok,
pelanggan).
5.14 Ketidakpastian dengan efektifitas dan kelayakan
sistem mutu sub-kontraktor dan pemasok.
250
Bagian V I – Pertanyaan-pertanyaan berkaitan dengan budaya organisasi
perusahaan
Pertanyaan-pertanyaan berikut ini digunakan untuk menilai budaya organisasi
perusahaan. Silahkan memberi nilai (0 – 100) di samping pertanyaan yang bersesuaian
untuk menunjukkan tingkatan pandangan anda.
251
6.4 Perekat yang mempersatukan organisasi adalah:
A loyalitas dan kepercayaan. Komitmen terhadap organisasi ini tinggi.
B komitmen terhadap inovasi, pengembangan, dan harus berada pada
posisi puncak.
C penekanan pada keberhasilan dan pencapaian tujuan.
D aturan dan kebijakan-kebijakan yang formal.
Total
Kinerja perusahaan 4 3 2 1
252
7.4 Kontrak internasional yang diperoleh.
*** Terima kasih atas partisipasi anda dalam survei ini ***
253
APPENDIX B – Sample of Focus Group Discussion Protocol
COVERING LETTER
8 June 2011
Dear Sir,
We are the Supervisory Team for Ms. Debby Willar, a PhD student in the School of
Civil Engineering and Built Environment at Queensland University of Technology
(QUT), Brisbane, Australia. Debby Willar is currently undertaking a research
project to establish a culture-based quality management system (QMS)
implementation framework for improving QMS implementation in Indonesian
construction companies.
To this end, we would like to invite you – as an expert in the construction industry,
to participate in a focus group discussion, which will last approximately three
hours. The information provided will contribute to the establishment of experts‟
evaluation and consensus opinions on the framework for an effective
implementation and continual improvement of QMS. This will assist Indonesian
contractors and builders in identifying and understanding their own corporate
cultures, and hence initiating changes in order to successfully prepare, develop and
apply more effective QMSs, and roll-out more efficient quality processes and
practices.
All responses will be kept confidential and no reference will be made to specific
individuals in the thesis.
If you have any queries about this project, please do not hesitate to contact us:
Email: v.coffey@qut.edu.au
Email: bambang.trigunarsyah@qut.edu.au
Yours faithfully,
254
FOCUS GROUP DISCUSSION
Jakarta, 8th July 2011
Aims:
To obtain an evaluation from focus group participants regarding the usefulness and
validity of the Framework of a Culture-based Quality Management System
Improvement Implementation in practice.
255
succession, until all responses have been heard. The proposed discussion will
take approximately three hours of your time.”
Questions
Opening
[The moderator asks each participant to introduce themself and to further
indicate their job or profession, in their respective companies/organisations].
Introductory
“What do you observe and understand in relation to the quality management
systems (QMSs) practices in an Indonesian construction context, and based
on your experiences, how are these implemented in your company?”
Transition
“What do you perceive to be the organisational culture of your company?
and how does it relate to, or impact on, QMS practices?”
Key Questions (Referring to the culture-based QMS improvement
implementation framework)
“I would like you to help me to evaluate this framework; in particular
whether it can be effectively applied in your company, what problems with its
application might exist from your perspective, and what sugegstions do you
have for improving the framework.”
[The group will then openly discuss any comments, suggestions, or ideas,
until the moderator determines that the question has been thoroughly
discussed. During the discussion, the moderator will attempt to determine a
consensus or validation of the views expressed and will summarise the key
points].
256
a. The steps to carry out the culture change (input-process-
output)?
b. Whether this framework is sufficiently clear to be effectively
applied?
c. Any suggestions for improving this framework?”
3. “What is your opinion of the culture-based QMS improvement
implementation framework, from the perspective of a construction
organisation in terms of:
a. The structure or format of the framework?
b. The identified barriers that affect the effectiveness of the QMS
improvement elements implementation?
c. The three areas of the culture drivers required to support the
QMS improvement elements implementation?
d. The recommended actions for implementing the QMS
improvement elements effectively?
e. The results and benefits as eventual outcomes of effective QMS
implementation?”
4. “What do you perceive to be the applicability of the culture-based
QMS improvement implementation framework as a part of your
company‟s QMS implementation strategy?
a. If you feel that it is not applicable, please say why?
b. If it is applicable, what suggestions do you have to further
improve the framework?”
Conclusions
[The moderator briefly summarises all of the main points of the discussion].
Concluding Questions
“Is there anything that we missed during the discussion or which you would
like to add or amend, based on my summary?”
Moderator closing sentences: “A consensus has been reached after full
evaluation to improve/accept the framework, as well as to validate its
usefulness in practice. Thank you very much for your time and participation
in this focus group discussion.”
257
APPENDIX C – Results of Preliminary Studies
Table C-1 Profiles of the Preliminary Interviewees
No. Position Sector Role/Infrastructure
Expertise
R1 Board of Management National Construction Government partner in
(Executive Director) Services Development developing and enhancing
Board-NCSDB the role of national
construction services
contribution to the economic
growth.
R2 Secretary of Board of NCSDB Government partner
Management
R3 & Board of Management NCSDB Government partner
R4 (Members)
R5 Director for Construction Directorate General Government-Public Works
Business Development for Construction and Department
Human Resources
Development
R6 Head of Quality and Centre for Government-Public Works
Reliable Construction Construction Department
Implementation
Development
R7 & Senior Officers Centre for Government-Public Works
R8 Construction Research Department
Organisation
R9 Deputy Executive Indonesian Association
Director Contractors
Association
R10 Executive Director Indonesian Association
Contractors
Association
R11 Head of Certification Indonesian Association
Body Contractors
Association
R12 General Secretary National Contractors Association
Association
R13 Deputy Executive National Contractors Association
Director Association
R14 General Chairman South Sulawesi CSDB Provincial Government
partner
R15 Manager South Sulawesi CSDB Provincial Government
partner
R16 General Chairman North Sulawesi CSDB Provincial Government
partner
R17 Secretary North Sulawesi CSDB Provincial Government
partner
R18 Operations Director Public Ownership Roads and highways
Contractor
R19 Project Control Manager National Private Power plants, oil and gas
Contractor plants, mining plants, and
fertilizer plants.
258
Table C-1 Profiles of the Preliminary Interviewees (continued)
No. Position Sector Role/Infrastructure
Expertise
R20 QHSE Management National Private Power plants, oil and gas
System Manager Contractor plants, mining plants, and
fertilizer plants.
R21 Project Manager National Private Power plants, oil and gas
Contractor plants, mining plants, and
fertilizer plants.
R22 Quality Management Local Private Roads and highways
to Representatives Contractor
R27
R28 Project Managers Local Private Roads and highways
& Contractor
R29
The collective opinions and inputs relating to a number of the preliminary interview
questions are summarised below.
259
in the medium term all grades of the construction companies must be certified by
ISO 9001. This vision reflects an attempt to ensure that all companies operate a
quality system that eventually will improve the qulity of work and processes within
construction projects. Respondents also stated that it is easy to establish a contractor
organisation within Indonesia, that the competition amongst these organisations is
high, and that the quality of construction work and evaluation of contractors‟ work
performance, have recently become burning issues.
260
leads a company to better manage its QMS and helps in applying efficient and
effective quality control processes.
Problems in, and resulting from, ineffective quality management system practices
The common problems in implementing a quality management system (QMS) that
were frequently mentioned by the respondents included:
A lack of top management commitment.
A lack of understanding and awareness of the essence of the QMS among
lower to middle strata of employees.
Employees do not care about the conduct of surveillance audit.
A perception that, without having an ISO 9001 certification, a project can still
be completed.
Companies still rely on consultant assistance even though certification has
been obtained.
Sub-contractors do not have a QMS while some of the poor back-up work is
done by parent contractors that have ISO 9001 certification
The national contractors‟ practitioners stressed that the main issue relating to
ineffective practices of QMSs in construction companies was that there is no obvious
definition of a company‟s core business. The second important issue related to the
need for the development of the QMS control function in the early stages of the
development of a company‟s QMS. These were cited as the reasons why an ISO
9001 certified company is faced with high costs for its support quality system which,
in turn, leads to a low level of competitiveness, and finally the collapose of the
company.
261
Organisational culture and the practice of quality management systems
All the practitioners agreed that the quality management system (QMS) practices
have a clear/obvious relationship with corporate cultures, in that the corporate culture
significantly influences the effective implementation of QMS. Nevertheless, most
contractors in the city of Manado appeared confused with the terms, „organisational
or corporate culture‟. They noted that they have the company‟s vision, mission, and
quality policy. However, they did not believe that they actually had demonstrable
corporate cultures which were documented or formally widespread. According to the
respondents, they perceived the organisational culture in the context of being „the
way that things get done around here‟ (Martin 2006) and that „good habits‟ are
applied to management and staff in their regular work processes, including all
project activities.
However, one leading construction company in Jakarta responded that they believed
that their organisational culture powerfully supported all their internal systems,
including their QMS, and that there was no conflict between ISO 9001 and the
company‟s culture. The profile of their organisational culture was reflected in the
feelings of being „a family‟; therefore the employees in the company aimed to
become „loyal employees‟. One interviewee stated that “…with a high loyalty and
partnership style driving the employees way of work, the top management easily
transferred an ISO 9001-QMS to middle management and employees, so that
„lower‟ strata employees also easily applied the system at project level…this is not
too overwhelming behavior because these acttions all come from the employees‟
heart”.
262
also important in contributing to the effective implementation of the QMS. In
summary, since the concept of organisational culture and its practice were perceived
as relatively new insights and tended to have a range of interpretations among
construction companies, it was decided to consider only the „current‟ organisational
culture profiles of the companies that needs to be identified in main surveys.
Features Total
Position of respondents
Quality Management Representatives 8
Project Managers 6
Site Engineers 9
Respondent‟s tenure in the firm
5 – 10 years 7
11 – 15 years 11
16 – 20 years 5
Types of most usual projects
Project Management and Engineering 1
Harbour and River Work 1
Roads and Bridges 5
Buildings 1
Years operating
< 10 years 3
10 – 20 years 2
> 20 years 4
City of operation
Manado 7
Makassar -
Jakarta 2
263
APPENDIX D – Summary of Statistical Data Analysis (Tables)
Table D-1a ANOVA Table for QMS Principles
Sum of Mean
Squares df Square F Sig.
First QMS principle Between Groups 2.73 2.00 1.36 3.61 .028
Within Groups 151.07 400.00 .38
Total 153.80 402.00
Second QMS
principle Between Groups 1.49 2.00 .75 1.42 .243
Within Groups 210.16 400.00 .53
Total 211.65 402.00
Third QMS principle Between Groups .12 2.00 .06 0.11 .897
Within Groups 220.66 400.00 .55
Total 220.78 402.00
Fourth QMS principle Between Groups .90 2.00 .45 0.80 .451
Within Groups 225.56 400.00 .56
Total 226.46 402.00
Fifth QMS principle Between Groups 2.08 2.00 1.04 1.91 .149
Within Groups 217.59 400.00 .54
Total 219.67 402.00
Sixth QMS principle Between Groups .22 2.00 .11 0.16 .851
Within Groups 265.45 400.00 .66
Total 265.67 402.00
Seventh QMS
principle Between Groups 3.03 2.00 1.51 2.37 .095
Within Groups 255.54 400.00 .64
Total 258.57 402.00
Eight QMS principle Between Groups 1.03 2.00 .52 1.17 .313
Within Groups 177.20 400.00 .44
Total 178.23 402.00
264
Table D-2a ANOVA Table for QMS Principles
Sum of Mean
Squares df Square F Sig.
Between
QMS element 1 Groups 1.51 2.00 .76 1.32 .268
Within Groups 229.19 400.00 .57
Total 230.70 402.00
Between
QMS element 2 Groups 1.31 2.00 .65 1.57 .21
Within Groups 166.72 400.00 .42
Total 168.03 402.00
Between
QMS element 3 Groups .16 2.00 .08 .17 .841
Within Groups 186.91 400.00 .47
Total 187.07 402.00
Between
QMS element 4 Groups .48 2.00 .24 .50 .608
Within Groups 192.11 400.00 .48
Total 192.59 402.00
Between
QMS element 5 Groups 7.19 2.00 3.60 6.54 .002
Within Groups 219.99 400.00 .55
Total 227.19 402.00
Between
QMS element 6 Groups .86 2.00 .43 .91 .404
Within Groups 190.12 400.00 .48
Total 190.98 402.00
Between
QMS element 7 Groups 4.27 2.00 2.13 3.23 .041
Within Groups 264.25 400.00 .66
Total 268.52 402.00
Between
QMS element 8 Groups 2.34 2.00 1.17 2.17 .115
Within Groups 214.98 400.00 .54
Total 217.32 402.00
Between
QMS element 9 Groups 1.77 2.00 .89 2.08 .127
Within Groups 170.82 400.00 .43
Total 172.59 402.00
Between
QMS element 10 Groups .42 2.00 .21 .45 .638
Within Groups 186.41 400.00 .47
Total 186.83 402.00
Between
QMS element 11 Groups .60 2.00 .30 .51 .604
Within Groups 235.32 400.00 .59
Total 235.91 402.00
265
Table D-2a ANOVA Table for QMS Principles (continued)
Sum of Mean
Squares df Square F Sig.
Between
QMS element 12 Groups .35 2.00 .18 .34 .71
Within Groups 204.40 400.00 .51
Total 204.74 402.00
Between
QMS element 13 Groups 1.50 2.00 .75 1.59 .206
Within Groups 188.80 400.00 .47
Total 190.30 402.00
Between
QMS element 14 Groups 3.34 2.00 1.67 3.63 .027
Within Groups 184.03 400.00 .46
Total 187.37 402.00
Between
QMS element 15 Groups .53 2.00 .26 .52 .594
Within Groups 201.58 400.00 .50
Total 202.10 402.00
Between
QMS element 16 Groups 2.27 2.00 1.14 2.31 .1
Within Groups 196.41 400.00 .49
Total 198.68 402.00
Between
QMS element 17 Groups 1.83 2.00 .92 1.64 .196
Within Groups 223.83 400.00 .56
Total 225.67 402.00
Between
QMS element 18 Groups 1.62 2.00 .81 1.23 .293
Within Groups 262.80 400.00 .66
Total 264.42 402.00
Between
QMS element 19 Groups .71 2.00 .35 .57 .568
Within Groups 250.19 400.00 .63
Total 250.90 402.00
Between
QMS element 20 Groups .13 2.00 .07 .12 .884
Within Groups 213.02 400.00 .53
Total 213.15 402.00
266
Table D-2b Report ANOVA for the First QMS Principles
Sum of Mean
Squares df Square F Sig.
Between
QMS barrier 1 Groups 1.17 2.00 .59 .66 .518
Within Groups 356.32 400.00 .89
Total 357.49 402.00
Between
QMS barrier 2 Groups 2.10 2.00 1.05 1.03 .359
Within Groups 409.36 400.00 1.02
Total 411.46 402.00
Between
QMS barrier 3 Groups .98 2.00 .49 .51 .603
Within Groups 386.16 400.00 .97
Total 387.14 402.00
Between
QMS barrier 4 Groups 3.07 2.00 1.53 1.65 .194
Within Groups 373.10 400.00 .93
Total 376.17 402.00
Between
QMS barrier 5 Groups 1.37 2.00 .69 .81 .447
Within Groups 339.69 400.00 .85
Total 341.06 402.00
Between
QMS barrier 6 Groups .45 2.00 .23 .21 .808
Within Groups 422.53 400.00 1.06
Total 422.98 402.00
Between
QMS barrier 7 Groups 3.03 2.00 1.52 1.80 .167
Within Groups 337.00 400.00 .84
Total 340.03 402.00
267
Table D-3 ANOVA Table for QMS Barriers (continued)
Sum of Mean
Squares df Square F Sig.
Between
QMS barrier 8 Groups 3.52 2.00 1.76 2.30 .102
Within Groups 305.93 400.00 .77
Total 309.44 402.00
Between
QMS barrier 9 Groups .28 2.00 .14 .16 .852
Within Groups 345.58 400.00 .86
Total 345.86 402.00
Between
QMS barrier 10 Groups 2.07 2.00 1.04 1.22 .297
Within Groups 340.23 400.00 .85
Total 342.30 402.00
Between
QMS barrier 11 Groups .92 2.00 .46 .48 .617
Within Groups 378.69 400.00 .95
Total 379.60 402.00
Between
QMS barrier 12 Groups .47 2.00 .24 .29 .751
Within Groups 328.28 400.00 .82
Total 328.75 402.00
Between
QMS barrier 13 Groups .11 2.00 .06 .08 .921
Within Groups 269.33 400.00 .67
Total 269.44 402.00
Between
QMS barrier 14 Groups .58 2.00 .29 .40 .672
Within Groups 289.90 400.00 .73
Total 290.48 402.00
268
Table D-4 ANOVA Table for QMS KPIs
Sum of Mean
Squares df Square F Sig.
Between
KPI Profitability Groups .53 2.00 .26 .69 .504
Within Groups 153.32 400.00 .38
Total 153.84 402.00
Between
KPI Sales growth Groups .22 2.00 .11 .27 .762
Within Groups 163.81 400.00 .41
Total 164.03 402.00
Between
KPI Market share Groups .21 2.00 .11 .26 .769
Within Groups 163.10 400.00 .41
Total 163.32 402.00
Between
KPI Global contract Groups .01 2.00 .01 .02 .977
Within Groups 105.06 400.00 .26
Total 105.07 402.00
Between
KPI Quality service Groups .70 2.00 .35 1.33 .265
Within Groups 104.31 400.00 .26
Total 105.01 402.00
Between
KPI Sustainable product Groups .48 2.00 .24 .61 .545
Within Groups 156.71 400.00 .39
Total 157.19 402.00
Between
KPI Innovation Groups .02 2.00 .01 .02 .978
Within Groups 206.57 400.00 .52
Total 206.59 402.00
Between
KPI Employee satisfaction Groups .77 2.00 .39 .84 .434
Within Groups 184.69 400.00 .46
Total 185.46 402.00
269
Table D-5 Result of Principal Component Analysis: Total Variance Explained
270
Table D-5 Result of Principal Component Analysis: Total Variance Explained
(continued)
271
Table D-6 Result of Rotated Component Matrix(a) (continued)
Variables 1 2 3 4 5 6 7 8 9 10 11
QMS element 7
QMS barrier 3 .80
QMS barrier 4 .78
QMS barrier 5 .72
QMS barrier 10 .70
QMS barrier 2 .65
QMS barrier 6 .63
QMS barrier 9 .62
QMS barrier 11 .60
QMS barrier 12
QMS barrier 8
Fourth QMS principle .64
Sixth QMS principle .64
Seventh QMS principle .61
First QMS principle
Second QMS principle
Fifth QMS principle
Third QMS principle
Eight QMS principle
KPI Sales growth .88
KPI Profitability .81
KPI Market share .78
KPI Sustainable product .68
KPI Quality service .63
KPI Innovation .61
KPI Employee
satisfaction
QMS barrier 13 .68
QMS barrier 14 .64
QMS element 4
KPI Global contract .69
QMS element 14
QMS barrier 7 .70
QMS barrier 1 .63
Extraction Method: Principal Component Analysis.
Rotation Method: Varimax with Kaiser Normalization.
a. Rotation converged in 24 iterations.
272
Table D-7a Levene’s Test Results for Organisational Characteristics
273
Table D-9 SEM Results: Regression Weights from a Structural Equation Model
1 2 3 4 5 6 7 8 9 10 11
DC to Practice* .15 .05 .25 <.01 .05 1.00002 .15 .14 .23 -.12 .42
Practice<--OL -.09 -.20 .02 <.01 .06 1.00001 -.09 -.09 .25 -.33 .21
Practice<--ME* .12 .02 .25 <.01 .06 1.00003 .12 .40 .50 -.12 .45
Practice<--OG -.05 -.17 .06 <.01 .06 1.00002 -.05 -.28 .83 -.35 .29
Practice<--SE* -.20 -.32 -.07 <.01 .06 1.00002 -.20 -.01 .18 -.50 .09
Practice<--CS .01 -.03 .06 <.01 .02 1.00001 .01 .24 .91 -.10 .14
Practice<--
-.37 -.53 -.21 <.01 .08 1.00001 -.37 -.01 .12 -.75 .00
Problems*
KPI<--Practice .01 -.23 .25 <.01 .12 1.00001 .01 .00 .10 -.59 .62
KPI<--Problems* -.25 -.45 -.05 <.01 .10 1.00001 -.25 .00 .09 -.72 .23
Notes:
1 : Mean
2 : 95% Lower bound
3 : 95% Upper bound
4 : Standard error
5 : Standard deviation
6 : Convergence statistics
7 : Median
8 : Skewness
9 : Kurtois
10 : Minimum
11 : Maximum
274
APPENDIX E – Summary of Statistical Data Analysis (Figures)
275
Figure E-2b Normal Distribution Curve for Total QMS Barriers
276
APPENDIX F – Summary of Organisational Culture Profiles
277
Table F-1 Results of Organizational Culture Assessment Instrument (continued)
278
Table F-1 Results of Organizational Culture Assessment Instrument (continued)
Table F-2 Results of the Strength of the Overall Dominant Culture Types
279
Table F-2 Results of the Strength of the Overall Dominant Culture Types
(continued)
280
Table F-2 Results of the Strength of the Overall Dominant Culture Types
(continued)
281
APPENDIX G – List of Publications
282