India is the world's sixth largest energy consumer accounting for about 3.5% of the world's
total annual energy consumption. The thermal, hydro and nuclear energy are the major
sources of generation of electricity in India.
The Ministry has several undertakings/ organizations operating under it. They may be
classified as follows:-
State Electricity Regulatory Commission - have been constituted in order to:- (i)
determine the tariff for generation, supply, transmission and wheeling of electricity,
whole sale, bulk or retail sale within the State; (ii) issue licences for intra-State
transmission, distribution and trading; and (iii) promote generation of electricity from
renewal sources of energy etc.
Appellate Tribunal for Electricity - has been constituted for the purpose of
hearing cases against the orders of the Regulatory Commissions and the
Adjudicating officer.
Damodar valley corporation- is the first multi-purpose river valley project of the
Government, set up for the unified development of Damodar Valley region spread
over the States of West Bengal and Jharkhand. Its objectives are:- (i) flood control
and irrigation; (ii) water supply and drainage; (iii) generation, transmission and
distribution of electrical energy; (iv) afforestation and control of soil erosion; and (v)
promotion of industrial, economic and general well-being of the people.
Bhakra Beas Management Board - has been constituted for the administration,
maintenance and operation of Bhakra Nangal Project. It manages the facilities
created for harnessing the waters impounded at Bhakra and Pong in addition to
those diverted at Pandoh through the BSL Water Conductor System. It has also been
assigned the responsibility of delivering water and power to the beneficiary States in
accordance with their due/ entitled shares.
North Eastern Electric Power Corporation limited - has been set up with the
objective of developing the large power potential of the North Eastern (NE) region of
the country by installing hydro and thermal power plants so as to ensure optimum
utilization of commissioned generation projects. It aims to plan, design, operate and
maintain power stations in the NE region.
Rural Electrification Corporation - has been set up with the objective of financing
and promoting rural electrification projects all over the country. The projects cover
electrification of villages, including tribal villages and Dalit Bastis, energisation of
pump sets, provision of power for small, agro-based and rural industries, lighting of
rural households and street lighting. REC provides financial assistance to State
Electricity Boards, State Government Departments and Rural Electric Cooperatives.
National power training Institute - functions as the National Apex body for the
human resource development of the power sector personnel in India. Its headquarter
is located in Faridabad (Haryana). It operates on all India basis through its five
Regional Power Training Institutes located at Neyveli (Tamil Nadu), Durgapur (West
Bengal), Badarpur (New Delhi), Nagpur (Maharashtra) and Guwahati (Assam). They
are fully equipped with the latest state-of-the-art training infrastructure and having
expert faculties with long years of professional and teaching background.
Bureau of energy efficiency - has been set up to develop policies and strategies
within the overall framework of Energy Conservation Act 2001. It aims to promote
energy saving measures and in turn reduce energy intensity (i.e. energy consumed
per unit product/services, practice and procedure) of Indian economy.
Satluj jal vidyut nigam limited - is a joint venture of the Government of India and
the Government of Himachal Pradesh, set up with the objective to plan, promote,
organize and execute hydro-electric power projects in the Satluj river basin in the
Himachal Pradesh.
Sector MW %age
Total 1,67,077.36
Fuel MW %age
Total 1,67,077.36
As on 30/11/12
**Renewable Energy Sources (RES) include SHP, BG, BP, U&I and Wind Energy
SHP= Small Hydro Project, BG= Biomass Gasifier, BP= Biomass Power,
U & I=Urban & Industrial Waste Power, RES=Renewable Energy Sources
As on
30/11/12
STATE SECTOR
A & N ISLAND 0.00 0.00 40.05 40.05 0.00 0.00 5.25 45.30
ANDHRA PRADESH4382.50 0.00 0.00 4382.50 0.00 3695.53 190.83 8268.86
ARUNACHAL PRD.0.00 0.00 15.88 15.88 0.00 0.00 78.55 94.43
ASSAM 60.00 239.00 20.69 319.69 0.00 100.00 27.11 446.80
BIHAR 530.00 0.00 0.00 530.00 0.00 0.00 54.60 584.60
CHANDIGARH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CHHATISGARH 2060.00 0.00 0.00 2060.00 0.00 120.00 19.05 2199.05
D & N HAVELI 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DAMAN & DIU 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DELHI 385.00 800.40 0.00 1185.40 0.00 0.00 0.00 1185.40
GOA 0.00 0.00 0.00 0.00 0.00 0.00 0.05 0.05
GUJARAT 4440.00 892.72 17.28 5350.00 0.00 772.00 29.90 6151.90
HARYANA 3410.00 25.00 3.92 3438.92 0.00 884.51 70.10 4393.53
HIMACHAL PRD. 0.00 0.00 0.13 0.13 0.00 393.60 337.82 731.55
JAMMU & KASHMI0.00 175.00 8.94 183.94 0.00 780.00 129.33 1093.27
JHARKHAND 1190.00 0.00 0.00 1190.00 0.00 130.00 4.05 1324.05
KARNATAKA 2220.00 0.00 127.92 2347.92 0.00 3599.80 594.55 6542.27
KERALA 0.00 0.00 234.60 234.60 0.00 1881.50 142.83 2258.93
LAKSHADWEEP 0.00 0.00 9.97 9.97 0.00 0.00 0.00 9.97
MADHYA PRADESH2807.50 0.00 0.00 2807.50 0.00 1703.66 11.76 4522.92
MAHARASHTRA 7295.00 672.00 0.00 7967.00 0.00 2884.84 257.73 11109.57
MANIPUR 0.00 0.00 45.41 45.41 0.00 0.00 5.45 50.86
MEGHALAYA 0.00 0.00 2.05 2.05 0.00 156.00 31.03 189.08
MIZORAM 0.00 0.00 51.86 51.86 0.00 0.00 36.47 88.33
NAGALAND 0.00 0.00 2.00 2.00 0.00 0.00 28.67 30.67
ORISSA 420.00 0.00 0.00 420.00 0.00 2061.92 64.30 2546.22
PONDICHERRY 0.00 32.50 0.00 32.50 0.00 0.00 0.00 32.50
PUNJAB 2630.00 25.00 0.00 2655.00 0.00 2230.23 222.55 5107.78
RAJASTHAN 3615.00 443.80 0.00 4058.80 0.00 987.96 30.25 5077.01
SIKKIM 0.00 0.00 5.00 5.00 0.00 0.00 47.11 52.11
TAMIL NADU 2970.00 523.20 0.00 3493.20 0.00 2122.20 85.55 5700.95
TRIPURA 0.00 148.50 4.85 153.35 0.00 0.00 16.01 169.36
UTTAR PRADESH 4072.00 0.00 0.00 4072.00 0.00 524.10 25.10 4621.20
UTTRAKHAND 0.00 0.00 0.00 0.00 0.00 1252.15 132.92 1385.07
WEST BENGAL 4780.00 100.00 12.06 4892.06 0.00 977.00 143.40 6012.46
47267.0 27257.0
Total State 0 4077.12 602.61 51946.730.00 0 2822.32 82026.05
3380
15627
5969
NTPC has also formulated its business plan of capacity addition of about 1,000 MW thru
renewable resources by 2017. In addition, capacity addition of 301 MW through Solar PV
and Thermal by March 2014 has envisaged in line with National Solar Mission.
7 Jammu &
Kiru* 4 * 150 600 Awating clearances
Kashmir
Jammu &
8 Kwar* 4 * 130 520 Awating clearances
Kashmir
Arunachal
9 Tawang-I 3 * 200 600 Awating clearances
Pradesh
10 Loktak Downstream* Manipur 2 * 33 66 Awating clearances
Arunachal
11 Tawang-II 4 * 200 800 Awating clearances
Pradesh
12 Tipaimukh* Manipur 6 * 250 1500 Awating clearances
Jammu &
13 Kishenganga 3 * 110 330 Under Construction
Kashmir
Jammu & Under Survey and Investigation
14 Bursar 4 * 255 1020
Kashmir Stage
Under Survey and Investigation
15 Karmoli Lumti Tulli Uttarakhand 2 * 27.5 55
Stage
Under Survey and Investigation
16 Garba Tawaghat Uttarakhand 3 * 210 630
Stage
Under Survey and Investigation
17 Chungar Chal Uttarakhand 2 * 120 240
Stage
Under Survey and Investigation
18 Lachen Sikkim 3 * 70 210
Stage
Under Survey and Investigation
19 Goriganga-IIIA Uttarakhand 3 * 40 120
Stage
Dhauliganga Under Survey and Investigation
20 Uttarakhand 3 * 70 210
Intermediate Stage
Total 12466
* Under Joint Venture
Projects under category ‘Under Survey and Investigation Stage’ are for survey & investigation for
preparation of PFR/FR/DPR of the project for getting various statutory clearances. For preparation
of these reports, various hydrological, geological, meteorological, power potential studies etc are
carried out at the project site.
Projects under ‘Awaiting clearances’ category are awaiting various statutory clearances
from CWC / CEA / MOP / MOWR/PIB and investment sanction from Cabinet Committee on Economic
Affairs (CCEA) after preparation of DPRs.
Ongoing:
Future Projects:
Future Projects:
THDC proposes to add 2804 MW during XIIth Plan (2012-2017) in the Capacity Addition
Programme of MOP with the planned commissioning of following Projects:
1. Tehri Pumped Storage Plant - 1000 MW
2. Vishnugad Pipalkoti HEP - 444 MW
3. Kishau Multi Purpose Project - 600 MW
4. Malari Jelam HEP - 114 MW
5. Jelam Tamak HEP - 126 MW
6. Karmoli HEP - 140 MW (*)
7. Jadhganga HEP - 50 MW (*)
8. Bokang Bailing HEP - 330 MW (*)
(*) Under Wildlife clearance
Future Projects:
Future Plans:
Northern Region:
1. Delhi:
2. Punjab:
Hydel project:
Thermal Project:
Goindwal Sahib - 2X270 MW Coal Based Thermal Power Project - the 1 st unit is
scheduled for commercial operation on 31.01.2013 and 2 nd unit on 30.04.2013.
3. Rajasthan:
Ongoing:
Future Projects:
4. Himanchal Pradesh:
Projects which have been alloted/under process of allotment and expected to yield
benefit during the 12th Plan period
B) PRIVATE SECTOR
5. Haryana:
Ongoing:
Future Projects:
7. Uttar Pradesh:
S
Capacity(
No Name of Project Distt Canal
M.W)
.
1 Khairi 3.75 Saharanpur Hathini Kund Link Canal
Sharda Canal Hardoi
2 Madho-I 3.75 Pilibhit
Branch
Shahjahanp Sharda Canal Hardoi
3 Madho-II 2.50
ur Branch
Shahjahanpur(Nahil Shahjahanp Sharda Canal Hardoi
4 2.50
) ur Branch
Ram Ganga Feeder
5 Ram Ganga 3.20 Bijnore
Canal
6 Bansagar-I 12.00 Mirzapur Adwa Meja Link Canal
7 Bansagar-II 10.00 Mirzapur Adwa Meja Link Canal
8 Ken Branch-I 3.00 Banda Ken Branch
9 Ken Branch-II 1.50 Banda Ken Branch
10 Bandran 10.50 Lalitpur Dam toe
11 Karmnasa 2.00 Chanduli Dam toe
12 Sharda Sagar 3.00 Pilibhit Dam toe
Sharda Canal Hardoi
13 Dunda 5.00 Pilibhit
branch
14 Malakpur Rehni 4.00 Saharanpur Eastern Yamuna Canal
15 Meja 9.50 Mirzapur Dam toe
76.20
Total
M.W.
8. Uttrankhand:
Future Plan:
Estimated Completion
S.No. Name of Project Potential District River/Tributary Schedule
(MW)
1. Vyasi 120 Dehradun Yamuna May 2014
2. Lakhwar 300 Dehradun Yamuna 2016
Work on hold
due to
4. Pala Maneri 480 Uttarkashi Bhagirathi environment
issues in river
Bhagirathi
5. Bharon Ghati 381 Uttarkashi Bhagirathi Same as above
6. Bowla Nandprayag 300 Chamoli Alaknanda 2016
7. Nand Pyayag Langasu 100 Chamoli Alaknanda 2017
8. Tamak lata * 280 Chamoli Dhauliganga 2016
9. Sirkari Bhyol Rupsiabagar 210 Pithoragarh Goriganga
10. Sela Urthing 230 Pithoragarh Dhauliganga
11. Taluka Sankri 140 Uttarkashi Tons
12. Rishiganga I 70 Chamoli Rishiganga
13. Rishiganga - II 35 Chamoli Rishiganga
2 Asiganga I 4.5
3 Asiganga II 3.0
4 Kaliganga I 4.0
5 Kaliganga II 6.0
6 Kalidigad 9.0
7 Madhyamaheshwar 15
8 Sobla-I 8
Total 53.0 MW
Western Region
1. Goa:
The Department does not have its own generation and purchases power from the
Central Sector Power Stations of the National Thermal Power Corporation. Besides
this, the department also purchases power of 16 Mw from Reliance Industries Ltd.,
Sancoale.
The UT of Daman & Diu does not have its own power generation. The bulk power
supply is drawn from the Central Sector Power Stations in Western Region through
GETCO Grid.
3. Gujarat:
4. Madhya Pradesh:
5. Maharashtra:
Ongoing:
Future Projects:
1. Uran Gas Based Combined Cycle Power Plant (1220 MW): (Block-I : 406
MW, Block-II:
814 MW).The trial operation of Block I (406 MW) is expected by June 2013
followed by Block II (814 MW) by September 2013.
• Latur Coal Based Unit 1&2 (2 x 660 MW) or Gas based CCPP Block-
I & II (2 x 750
MW): the trial operation of the project is expected as under:
(i) Coal based: Unit 1 by June-2015 & Unit 2 by December- 2015 or
(ii) Gas based: Block-I by August 2013 and Block-II by November-2013.
Ongoing:
Future Projects:
Southern Region
1. Andhra Pradesh:
Future Projects:
2. Karnataka:
Ongoing:
• Bidadi Combined Cycle Power Plant: 1400 MW – Unit is programmed to
commission by 2013
3. Kerela:
ON GOING SCHEMES
(Undertaken by KSEB)
Sl. No. Name of Project Power in MW Energy in MU
1. PALLIVASAL EXTENSION SCHEME 60 153.9
2. THOTTIYAR HEP 40 99.0
3. POOZHITHODE SHEP 4.80 10.97
4. RANNI-PERUNAD SHEP 4.0 16.73
5. CHATHANKOTTUNADA-II SHEP 6.0 14.76
6. VILANGAD SHEP 7.5 22.63
7. PEECHI SHEP 1.25 3.315
8. SENGULAM AUGMENTATION 85.0
SCHEME
9. ADYANPARA SHEP 3.5 9.01
PROJECTS IN PIPELINE
Sl. No. Name of Project Power in MW
1 Kakkayam Small HEP 3.0
2 Poringalkuthu SHEP 24.0
3 Chimmony Small HEP 2.5
4 Sengulam Tail Race Project 3.6
5 Pazhassi Sagar HE Project 20.0
6 Chembukkadavu Stage III 6.0
7 Peruvannamoozhy 7.0
8 Upper Kallar Project 2.0
9 Peechad Project 3.0
10 Thumboormuzhi 8.0
11 Western Kallar 5.0
12 Koodam 4.5
13 Chinnar 24.0
14 Sengulam Extn. Scheme 48.0
15 Olikkal 4.5
16 Poovaramthodu 2.7
4. Tamilnadu:
Ongoing:
Future:
5. Pondicherry:
The bulk power supply is drawn from the Central Sector Power Stations and
other state electricity board. PPCL had had invited bidders to build a 500MW coal
based project. The last date for the prequalification was July 2009.
Eastern Region
1. Bihar:
Ongoing:
2. Barauni TPS Extension Under Bihar SEB: (2x250 MW) the project is scheduled
to be completed by 2013-14
3. Muzaffarpur TPS Extension - Under Kanti Bijlee Utpadan Nigam Ltd.- JV of
Bihar SEB & NTPC Ltd.
2. Jharkhand:
New projects:
Projects in Jharkhand:
Planned Project:
3. Orissa:
4. West Bengal:
The West Bengal Power Development Corporation Ltd. 2 Units of 500 MW each-Unit
No.3 & 4
2. Tripura:
3. Manipur:
New Proposals :
Estimated
Sl. Name of Capacity(K
Cost(Rs. in Present status
No. Project W)
lakhs)
1. Gelnel - II 2 x 100 115.51 DPR prepared and submitted to
2. Tuipaki 2 x 250 256.59 Govt.
3. Haipi 2 x 50 91.80
The following schemes are being taken up under the State Sector.
Estimated
Sl. Name of Capacity(K
Cost(Rs. in Present status
No. Project W)
lakhs)
Under Detail Survey and
1. Irang 4 x 15 MW 186.55 Investigation
(DSI) with NEC fund.
NEC fund is awaited for
completion of
2. Tuivai 3 x 17 MW 131.29*
survey and investigation work.
* Revision is in progress.
NEC fund is awaited for starting
Maklang-
3. 3 x 15 MW 243.00 survey
Tuyungbi
and investigation work.
Estimated
Sl. Name of Capacity
Cost (Rs. in Present status
No. Project (KW)
lakhs)
Chakpi/Phunch Pre-Feasibility Report (PFR)
1. 3 x 200 6.00
ang submitted to Govt. Detail
2. Chakpikarong 3 x 200 6.00 Survey and
3. Irang 3 x 100 4.00 Investigation (DSI) is being
taken up
4. Ijai 3 x 500 5.00 as soon as the financial health
5. Tupul 3 x 300 4.00 of the
Total : 3900 25.00 state permits.
LONG TERM FORECAST AT POWER STATION BUSBARS (UTILITIES)
1. Himachal Pradesh
2. Punjab
3. Uttarakhand
4. Andhra Pradesh
5. Kerala
6. Entire eastern region (Bihar, Jharkhand, West Bengal, Orissa and
Sikkim )
7. Entire North eastern region (Assam, Arunachal Pradesh,
Meghalaya, Tripura, Manipur, Nagaland and Mizoram)
Northern region:
1. Rajasthan
2. Haryana
3. Uttrakhand
Western Region:
1. Maharashtra
2. Gujarat
3. Madhya Pradesh
Southern Region:
1. Andhra Pradesh
2. Tamil Nadu
3. Karnataka
Eastern Region
1. Bihar
2. Jharkhand
3. West Bengal and Orissa
1. Tripura
2. Arunachal Pradesh and Manipur
The Working Group on Power has recommended a plan size of about 82,200 MW for
12th Plan also. This would comprise hydro projects totaling about 30,000 MW,
thermal projects totaling 42,200 MW and nuclear projects of about 10,000 MW
capacities.