1 PRODUCTION TEAM,QUALITY TEAM AND IE TEAM MUST HAVE AN OPEN COMMUNICATION SYSTEM
2 START THE PRODUCTION WITH OPEN DISCUSSION WITH TECHNICAL TEAM,QA TEAM,IE TEAM AND MACH
3 DISCUSS WITH THE OPERATION BULLETTIN , PP SAMPLE,BUYER COMMENTS,SIZE SET SAMPLE /COMME
FABRIC CHECKING REPORT,SHRINKAGE REPORT,APPROVED PATTERN,PATTERN CHECKING REPORT,P
AND MAKE MINUTS OF MEETING,DISPLAY IN THE FLOOR ALONG WITH SAMPLES INCLUDE SIZESET COM
4 BEFORE STARTING THE PILOT RUN THAT PARTICULAR BATCH INCHARGE AND SUPERVISOR HAS TO DO
UNDERSTANDING FOR THE BATCH SETTING AND FURTHER CUTTING
5 EDUCATE THE OPERATOR TO ACHIEVE THE QUALITY PARAMETERS AND SELF CHECKING METHOD
6 MAJOR DEFCTS TO BE DISPLAYED AND EDUCATE THE OPERATOR TO AVOID SUCH DEFECTS
7 ALL THE DUPLICATE PATTERNS AND TEMPLATES CHECKED AND SIGNED BY TECHNICAL TEAM AND QA
8 QAM APROVED SIZE SET SAMPLES TO BE USED FOR THE BATCH COUNTER SAMPLES
9 SET THE MACHINE AS PER BUYER REQUIRMENT AND MACHINE MAINTANANCE TO BE DONE REGULAR B
10 SET MACHINE'S NEEDLE BAR PRESSURE, BOBBIN AND FEED DOG AS PER THE FABRIC NATURE.
1112 MAKE SURE ALL SAFETY GUARDS ARE PLACED IN THE MACHINE ( PULLEY GUARD,NEEDLE GUARD, EYE
13 USE TEMPLATES,GUIDES AND FOLDER FOR THE BETTER QUALITY AND USE COLOUR CODE ON TEMPLA
14 FOLLOW FLAG SYSTEM BASED ON THE BETTER QUALITY AND PRODUCTIVITY ( GREEN FLAG ) AVERAGE
AND BELOW AVERAGE (RED FLAG).
15 CRITICAL MOCKS TO BE DISPLAYED IN THE LINES WITH THE DETAILS OF REQUIRED QUALITY LEVEL, MA
THIS MOCKS TO BE DONE BY THAT OPERATOR AND IT SHOULD BE APPROVED BY QAM
16 TRIMMING TO BE DONE BY OPERATION WISE BY THE OPERATOR
17 USE MASK , OVER LOCK OPERATOR & EDGE CUTTER OPERATOR.
18 INPUT & OUT PUT REGISTER TO BE MAINTAINED.
19 DAILY BASIS S.P.I CALIBRATION SHOULD BE RECORDED
20 SCISSOR TRIMMER TO BE ATTACHED WITH WORK TABLES
21 BROCKEN NEEDLE PROCEDURES ARE STRICTLY FOLLOWED
22 USE THE METAL COLLECTION BOXES IN THE FLOOR TO KEEP THE METAL WASTES
23 WHILE USING THE NEW OPRATOR FOR A NEW JOB,THAT MACHINE NEEDS AN ALERT IDENTIFICATION -
AND ALSO NEEDS CLOSE OBSERVATION BY THE QUALITY/PRODUCTION/ IE DEPARTMENT
24 IN THE MORNING SESSION,MUST DO STAND-UP MEETING WITH ALL THREE RESPECTIVE TEAMS,DISCU
AND TODAYS CORRECTIVE ACTION PLAN.IT SHOULD BE DONE LINE WISE FOR BETTER QUALITY AND PR
25 QA DEPT WIIL FIND AND HILIGHT THE DEFECTS.PRODUCTION TEAM IS RESPONSIBLE TO CORRECT IT.
ONLY PRODUCTION TECHNICAL TEAM CAN PRODUCE THE GOOD QUALITY OUT PUT
IE DEPARTMENT SOP
QA DEPARTMENT SOP
1 ALL LINE QA HAS TO MAKE A STYLE ANALISIS REPORT AND PATTERN CHECKING REPORT AND SUBMITT
2 DIFFECT CLASSIFICATION TO BE DISLAYED
3 PREPARE A FILE WITH SIZE SET COMMENTS,IPPM MINUTS,SHADE CARDS,TRIM CARDS &MESUREMENT
4 DISPLAY HOW TO CHECK SKETCH(CLOCK WISE) AND HOW TO MEASURE SKETCH.
5 LINE QA TO BE AUDIT ALL THE OPERATIONS AND HIGHLIGHT THE QUALITY ISSUES TO THE RESPONSIBL
6 DEFECT PIECES BUNDLES TO BE TIED WITH RED TAPES
8 DAILY LINE QA MUST CHECK THE MESUREMENTS 3 GARMENTS PER CUT NO :WISE/SIZE WISE/SHRINKAG
9 ENDLINE QC HAS TO CHECK ALL OUT PUT PIECES INCLUDE RANDOME CRITICAL MSMT AND REPORT TO
10 INLINE/ENDLINE REPORT HOURLY SINGNED BY BATCH QA AND SUPRWISER FOR IMMEDIATE CORRECT
11 END LINE PASS GARMENTS TO BE AUDITED BY QA AND PASS LOTS ONLY MOVE TO THE DISPACH SECT
12 PERFORM THE MEETING FOR NEW STYLE ANLYSIS, WEEKLY QUALITY ISSUES AND FOR THE QA'S/ QC'S
14 QA SHOULD HAVE KNOLEDGE OF PATTERN CHECKING,FABRIC QUALITY,CUTTING QUALITY.
DAILY DHU GRAPH & WEEKLY DEFECT OCCURANCE AREA BAR GRAPH TO BE DISPLAYED.
ICATION SYSTEM
EAM,IE TEAM AND MACHANICS
E SET SAMPLE /COMMENTS , MESUREMENT CHART,APROVED TRIM CARD,
N CHECKING REPORT,PILOT CUTTING REPORT,DRY RUN REPORT AND TECHNICAL FILE
NCLUDE SIZESET COMMENTS,TRIM CARD AND MSMT CHART
UPERVISOR HAS TO DO THE DRY RUN FOR BETTER-
HECKING METHOD
CH DEFECTS
CHNICAL TEAM AND QA TEAM
ERT IDENTIFICATION -
NING REPORT
NDLE TRACKING SHEET
RECORDED
REPORT AND SUBMITT TO QAM BEFORE STARTING THE PRODUCTION