BOUNDARY WALL, DRY VENTILATED WAREHOUSES AND SHOW ROOMS


30-Nov-20
Location/Description of Grid Grid Work Completed in
UOM Length Difference Total Qty.
Works Start End done Qty %
SUMMARY- Boundary wall (1 to 9)
Excavation 1117 1107 99.10%
Blinding concrete 1117 1100 98.48%
Blinding waterproofing 1117 1093 97.85%
Precast footing erection 1117 1105 98.93%
Precast column erection 1117 1063 95.17%
Precast lower beam erection 1113 1043 93.71%
Footing waterproofing 1117 660 59.09%
Beams waterproofing 1113 0 0.00%
Precast wall panel erection 1113 1045 93.89%
Backfilling 1113 49 4.40%
Painting works 1113 0 0.00%
Dry Ventilated warehouses B1-A1 to B1-A12
Excavation 1914 1914 100%
Blinding concrete 1914 1914 100%
Blinding waterproofing 1914 1914 100%
Precast footing pedestals 1914 1914 100%
Precast Columns installation 858 857 100%
1st stage S.o.Grade concrete 451 390 86%
Precast Plinth installation 1199 1199 100%
Precast wall panels 7060 2616 37%
Precast roof beam installation 1254 1121 89%
HC Slab installation 9547 6627 69%
Parapet Installation 680 256 37.65%
Show Rooms B8-A1, B8-A2 & B8-A3
Excavation 123 123 100%
Blinding concrete 123 123 100%
Blinding waterproofing 123 123 100%
Precast footing pedestals 123 123 100%
Precast Columns installation 123 122
AC warehouses B2-A9 & B2-A10
Excavation 242 239 99%
Blinding concrete 242 242 100%
Blinding waterproofing 242 205 85%
Precast footing pedestals 242 242 100%
Precast Columns installation 242 194 80%

Boundary wall 1
Excavation 541 1 121 120 121 121 100.00%
Blinding concrete 121 121 100.00%
Blinding waterproofing 121 119 98.35%
Precast footing erection 121 121 100.00%
Precast column erection 121 121 100.00%
Precast lower beam erection 121 121 100.00%
Footing waterproofing 121 91 75.21%
Beams waterproofing 121 0 0.00%
Precast wall panel erection 121 121 100.00%
Backfilling 121 0 0.00%
Painting works 121 0 0.00%
Boundary wall 2 603 122 255 133
Excavation 133 129 96.99%
Blinding concrete 133 129 96.99%
Blinding waterproofing 133 129 96.99%
Precast footing erection 133 129 96.99%
Precast column erection 133 129 96.99%
Precast lower beam erection 133 123 92.48%
Footing waterproofing 133 77 57.89%
Beams waterproofing 133 0 0.00%
Precast wall panel erection 133 123 92.48%
Backfilling 133 0 0.00%
Painting works 133 0 0.00%
Boundary wall 3 312 256 324 68
Excavation 69 66 95.65%
Blinding concrete 69 66 95.65%
Blinding waterproofing 69 66 95.65%
Precast footing erection 69 65 94.20%
Precast column erection 69 65 94.20%
Precast lower beam erection 68 59 86.76%
Footing waterproofing 69 52 75.36%
Beams waterproofing 68 0 0.00%
Precast wall panel erection 68 61 89.71%
Backfilling 68 45 66.18%
Painting works 68 0 0.00%
Boundary wall 4 60 325 338 13
Excavation 14 14 100.00%
Blinding concrete 14 13 92.86%
Blinding waterproofing 14 13 92.86%
Precast footing erection 14 13 92.86%
Precast column erection 14 0 0.00%
Precast lower beam erection 14 0 0.00%
As on
BOUNDARY WALL, DRY VENTILATED WAREHOUSES AND SHOW ROOMS
30-Nov-20
Location/Description of Grid Grid Work Completed in
UOM Length Difference Total Qty.
Works Start End done Qty %
Footing waterproofing 14 0 0.00%
Beams waterproofing 14 0 0.00%
Precast wall panel erection 14 0 0.00%
Backfilling 14 0 0.00%
Painting works 14 0 0.00%
Boundary wall 5 60 339 352 13
Excavation 14 14 100.00%
Blinding concrete 14 14 100.00%
Blinding waterproofing 14 14 100.00%
Precast footing erection 14 14 100.00%
Precast column erection 14 0 0.00%
Precast lower beam erection 14 0 0.00%
Footing waterproofing 14 0 0.00%
Beams waterproofing 14 0 0.00%
Precast wall panel erection 14 0 0.00%
Backfilling 14 0 0.00%
Painting works 14 0 0.00%
Boundary wall 6 60 353 366 13
Excavation 14 14 100.00%
Blinding concrete 14 14 100.00%
Blinding waterproofing 14 14 100.00%
Precast footing erection 14 14 100.00%
Precast column erection 14 0 0.00%
Precast lower beam erection 14 0 0.00%
Footing waterproofing 14 0 0.00%
Beams waterproofing 14 0 0.00%
Precast wall panel erection 14 0 0.00%
Backfilling 14 0 0.00%
Painting works 14 0 0.00%
Boundary wall 7 1202 367 630 263
Excavation 264 261 98.86%
Blinding concrete 264 255 96.59%
Blinding waterproofing 264 255 96.59%
Precast footing erection 264 261 98.86%
Precast column erection 264 262 99.24%
Precast lower beam erection 261 254 97.32%
Footing waterproofing 264 143 54.17%
Beams waterproofing 261 0 0.00%
Precast wall panel erection 261 254 97.32%
Backfilling 261 0 0.00%
Painting works 261 0 0.00%
Boundary wall 8 1027 631 859 228
Excavation 229 229 100.00%
Blinding concrete 229 229 100.00%
Blinding waterproofing 229 224 97.82%
Precast footing erection 229 229 100.00%
Precast column erection 229 227 99.13%
Precast lower beam erection 229 227 99.13%
Footing waterproofing 229 155 67.69% 141 no water proofing
Beams waterproofing 229 0 0.00%
Precast wall panel erection 229 227 99.13%
Backfilling 229 4 1.75% 27 improper backfilling
Painting works 229 0 0.00%
Boundary wall 9 1166 860 1118 258
Excavation 259 259 100.00%
Blinding concrete 259 259 100.00%
Blinding waterproofing 259 259 100.00%
Precast footing erection 259 259 100.00%
Precast column erection 259 259 100.00%
Precast lower beam erection 259 259 100.00%
Footing waterproofing 259 142 54.83%
Beams waterproofing 259 0 0.00%
Precast wall panel erection 259 259 100.00%
Backfilling 259 0 0.00%
Painting works 259 0 0.00%
Dry Ventilated Warehouses and Show Rooms Blinding Concrete Status

Total

26/Sep

27/Sep

28/Sep

29/Sep

30/Sep

10/Oct

11/Oct

12/Oct

13/Oct

14/Oct

15/Oct

16/Oct

17/Oct

18/Oct

19/Oct

20/Oct

21/Oct

22/Oct

23/Oct

24/Oct

25/Oct

26/Oct

27/Oct

28/Oct

29/Oct

30/Oct

31/Oct

1/Nov

2/Nov

3/Nov

4/Nov
2/Sep

1/Oct

2/Oct

3/Oct

4/Oct

5/Oct

6/Oct

7/Oct

8/Oct

9/Oct
Area Total Percent
Completed

B1A1 158 158 100.0%


B1A2 146 146 100.0%
B1A3 161 161 100.0%
B1A4 161 161 100.0%
B1A5 161 161 100.0%
Dry Ventilated

B1A6 161 161 100.0%


B1A7 161 161 100.0%
B1A8 161 161 100.0%
B1A9 161 161 100.0%
B1A10 161 161 100.0%
B1A11 161 161 100.0%
B1A12 161 161 100.0%
Total 1914 1914
Show Rooms

B8 A01 48 48 100.0%
B8 A02 48 48 100.0%
B8 A03 27 27 100.0%
Total 123 123
B2 A09 121 121 100.0%
AC

B2 A10 121 3 121 100.0%


Total 242 242

Dry Ventilated Warehouses and Show Rooms footing pedestal installations Status

Total

10/Nov

11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov
29/Sep

30/Sep

10/Oct

11/Oct

12/Oct

13/Oct

14/Oct

15/Oct

16/Oct

17/Oct

18/Oct

19/Oct

20/Oct

21/Oct

22/Oct

27/Oct

28/Oct

29/Oct

30/Oct

31/Oct

1/Nov

2/Nov

3/Nov

4/Nov

5/Nov

6/Nov

7/Nov

8/Nov

9/Nov
8/Sep

9/Sep

1/Oct

2/Oct

3/Oct

4/Oct

5/Oct

6/Oct

7/Oct

8/Oct

9/Oct

Area Total Completed Percent

B1A1 158 158 100.0%


B1A2 146 146 100.0%
B1A3 161 161 100.0%
B1A4 161 161 100.0%
B1A5 161 161 100.0%
Dry Ventilated

B1A6 161 161 100.0%


B1A7 161 161 100.0%
B1A8 161 161 100.0%
B1A9 161 161 100.0%
B1A10 161 161 100.0%
B1A11 161 161 100.0%
B1A12 161 161 100.0%
Total 1914 1914
Show Rooms

B8 A01 48 2 2 1 1 48 100.0%
B8 A02 48 2 48 100.0%
B8 A03 27 1 27 100.0%
Total 123 123
B2 A09 121 1 1 2 121 100.0%
4 1 1 2 2 2 2 2 2 4 1 1 1 1
AC

B2 A10 121 121 100.0%


Total 242 242
100.00%
100.00%
100.00%
AC, Dry Ventilated Warehouses and Show Rooms Columns installations Status

Total

10/Nov

11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov
24/Sep

28/Sep

29/Sep

30/Sep

10/Oct

11/Oct

12/Oct

13/Oct

14/Oct

15/Oct

20/Oct

21/Oct

22/Oct

23/Oct

24/Oct

25/Oct

26/Oct

27/Oct

28/Oct

29/Oct

30/Oct

31/Oct

1/Nov

2/Nov

3/Nov

4/Nov

5/Nov

6/Nov

7/Nov

8/Nov

9/Nov
1/Oct

2/Oct

3/Oct

4/Oct

5/Oct

6/Oct

7/Oct

8/Oct

9/Oct
Area Total Percent
Completed

B1A1 71 1 1 71 100.0%
B1A2 67 3 3 3 66 98.5%
B1A3 72 72 100.0%
B1A4 72 72 100.0%
B1A5 72 72 100.0%
Dry Ventilated

B1A6 72 72 100.0%
B1A7 72 72 100.0%
B1A8 72 72 100.0%
B1A9 72 72 100.0%
B1A10 72 72 100.0%
B1A11 72 72 100.0%
B1A12 72 72 100.0%
Total 858 857
2 1 1
Show Rooms

B8 A01 48 48 100.0%
B8 A02 48 1 1 1 1 48 100.0%
B8 A03 27 1 26 96.3%
Total 123 122
B2 A09 121 6 10 12 2 1 1 1 4 5 7 6 4 6 3 2 2 2 3 3 3 2 4 4 4 4 2 117 96.7%
4 3 5 3 2 2 2 2 2 1 5 7 5 7 4 4 4 4 4 4 2 1
AC

B2 A10 121 77 63.6%


Total 242 194

AC, Dry Ventilated Warehouses and Show Rooms 1st stage S.o.Grade concrete Status

Total

10/Nov

11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov

18/Nov

19/Nov

20/Nov

21/Nov

22/Nov

23/Nov

24/Nov

25/Nov

26/Nov

27/Nov

28/Nov

29/Nov

30/Nov
17/Oct

18/Oct

19/Oct

20/Oct

21/Oct

22/Oct

23/Oct

24/Oct

25/Oct

26/Oct

27/Oct

28/Oct

29/Oct

30/Oct

31/Oct

1/Nov

2/Nov

3/Nov

4/Nov

5/Nov

6/Nov

7/Nov

8/Nov

9/Nov

1/Dec

2/Dec

3/Dec
Area Total Completed Percent

B1A1 37 2 8 10 27.0%
B1A2 34 0 0.0%
B1A3 38 2 3 5 6 8 2 5 7 38 100.0%
B1A4 38 3 6 8 7 7 1 2 2 1 1 38 100.0%
B1A5 38 3 38 100.0%
Dry Ventilated

B1A6 38 1 38 100.0%
B1A7 38 38 100.0%
B1A8 38 38 100.0%
B1A9 38 38 100.0%
B1A10 38 38 100.0%
B1A11 38 38 100.0%
B1A12 38 38 100.0%
Total 451 390
Show Rooms

B8 A01 30 22 2 2 2 2 30 100.0%
B8 A02 30 1 2 4 1 2 2 2 2 16 53.3%
B8 A03 16 0 0.0%
Total 76 46
B2 A09 0
AC

B2 A10 0
Total 0 0
86.47%
60.53%
#DIV/0!
AC, Dry Ventilated Warehouses and Show Rooms Precast wall panels installations Status

Total

10/Nov

11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov

18/Nov

19/Nov

20/Nov

21/Nov

22/Nov

23/Nov

24/Nov

25/Nov

26/Nov

27/Nov

28/Nov

29/Nov

30/Nov

10/Dec

11/Dec

12/Dec
26/Oct

27/Oct

28/Oct

29/Oct

30/Oct

31/Oct

1/Nov

2/Nov

3/Nov

4/Nov

5/Nov

6/Nov

7/Nov

8/Nov

9/Nov

1/Dec

2/Dec

3/Dec

4/Dec

5/Dec

6/Dec

7/Dec

8/Dec

9/Dec
Area Total Percent
Completed

B1A1 554 5 5 10 1.8%


B1A2 530 0 0.0%
B1A3 598 2 7 7 7 7 6 23 25 21 105 17.6%
B1A4 598 4 9 9 9 9 32 24 3 99 16.6%
B1A5 598 1 125 20.9%
Dry Ventilated

B1A6 598 2 111 18.6%


B1A7 598 362 60.5%
B1A8 594 355 59.8%
B1A9 598 362 60.5%
B1A10 598 357 59.7%
B1A11 598 365 61.0%
B1A12 598 365 61.0%
Total 7060 2616
14 13 12 12 12 12 5
Show Rooms

B8 A01 200 195 97.5%


B8 A02 202 4 4 3 1 1 12 15 23 80
B8 A03 200 0
Total 602 275
B2 A09 86 2 2 4 4 4 2 25 29.1%
2 2 2 3 4
AC

B2 A10 86 13
Total 172 38
37.05%
45.68%
22.09%

AC, Dry Ventilated Warehouses and Show Rooms Precast roof beam installation Status

Total
10/Nov

11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov

18/Nov

19/Nov

20/Nov

21/Nov

22/Nov

23/Nov

24/Nov

25/Nov

26/Nov

27/Nov

28/Nov

29/Nov

30/Nov

10/Dec

11/Dec

12/Dec
26/Oct

27/Oct

28/Oct

29/Oct

30/Oct

31/Oct

1/Nov

2/Nov

3/Nov

4/Nov

5/Nov

6/Nov

7/Nov

8/Nov

9/Nov

1/Dec

2/Dec

3/Dec

4/Dec

5/Dec

6/Dec

7/Dec

8/Dec

9/Dec
Area Total Percent
Completed

B1A1 101 3 5 5 5 70 69.3%


B1A2 103 2 3 4 4 4 57 55.3%
B1A3 105 1 2 2 75 71.4%
B1A4 105 1 3 3 97 92.4%
B1A5 105 103 98.1%
Dry Ventilated

B1A6 105 100 95.2%


B1A7 105 103 98.1%
B1A8 105 102 97.1%
B1A9 105 102 97.1%
B1A10 105 102 97.1%
B1A11 105 105 100.0%
B1A12 105 105 100.0%
Total 1254 1121
Show Rooms

B8 A01 47 1 1 1 1 2 45
B8 A02 47 40
B8 A03 25 23
Total 119 108
B2 A09 162 12 12 16 14 15 16 4 4 5 4 120
2 2 2 4 4 4 4 4 4 12 14 7
AC

B2 A10 162 63
Total 324 183
89.39%
90.76%
56.48%
Dry Ventilated

Area

Total
B1A9
B1A8
B1A7
B1A6
B1A5
B1A4
B1A3
B1A2
B1A1

B1A12
B1A11
B1A10

57
57
57
57
57
57
57
57
57
57
57
53

680
Total

8
4/Nov

6
5/Nov

6/Nov

1
9
1 7/Nov

4
11
8/Nov
4
7

9/Nov
3
5

10/Nov

11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov

18/Nov

19/Nov
AC, Dry Ventilated Warehouses and Show Rooms Precast parapet installation Status

20/Nov

21/Nov

22/Nov

23/Nov

24/Nov

25/Nov

26/Nov

27/Nov

28/Nov

29/Nov

30/Nov

1/Dec

2/Dec

3/Dec

4/Dec

5/Dec

6/Dec

7/Dec

8/Dec

9/Dec

10/Dec

11/Dec

12/Dec

13/Dec

14/Dec

15/Dec

16/Dec

17/Dec

18/Dec

19/Dec

20/Dec

21/Dec
9
5
0
0
0
0

56
56
28
57
30
15

256
Total
Completed

8.8%
0.0%
0.0%
0.0%
0.0%

98.2%
98.2%
49.1%
52.6%
26.3%
15.8%

100.0%
Percent
Show Rooms B8 A01 32 1 2 2 25 78.1%
B8 A02 32 3 8 25.0%
B8 A03 20 0 0.0%
Total 84 33
B2 A09 0
AC

B2 A10 0
Total 0 0
37.65%
39.29%
#DIV/0!
Dry Ventilated Warehouses and Show Rooms Blinding Concrete Status

16/Jun

17/Jun

18/Jun

19/Jun

20/Jun

21/Jun

22/Jun
23/Jun
24/Jun
25/Jun

26/Jun
27/Jun
28/Jun
29/Jun
30/Jun
Area Total

1/Jul
2/Jul
B1A1 158
B1A2 146
B1A3 161 8 9 24 8 42
B1A4 161 22 47 38
B1A5 161 41 43 8 10
Dry Ventilated

B1A6 161 122 21 11


B1A7 161 51 50 19 11
B1A8 161 18 41 8 48 11
B1A9 161 31 65 11 15 12
B1A10 161 29 37 43 20 9 20 3
B1A11 161 117 39 5
B1A12 161 149 11
Total 1914
Show Rooms

B8 A01 48 48
B8 A02 48 48
B8 A03 27
Total 123
B2 A09 121
AC

B2 A10 121
Total 242

Dry Ventilated Warehouses and Show Rooms footing pedestal installations Status
16/Jun

17/Jun

18/Jun

19/Jun

20/Jun

21/Jun

22/Jun
23/Jun
24/Jun
25/Jun

26/Jun
27/Jun
28/Jun
29/Jun
30/Jun

Area Total
1/Jul
2/Jul

B1A1 158
B1A2 146
B1A3 161
B1A4 161
B1A5 161
Dry Ventilated

B1A6 161
B1A7 161
B1A8 161 5 12
B1A9 161
Dry Ventil B1A10 161 7 7 5 10 12
B1A11 161 7 66 43 8 26 0
B1A12 161 12 35 7 2
Total 1914
Show Rooms

B8 A01 48
B8 A02 48
B8 A03 27
Total 123
B2 A09 121
AC

B2 A10 121
Total 242

AC, Dry Ventilated Warehouses and Show Rooms Columns installations Status
16/Jun

30/Jun

10/Jul
Area Total
1/Jul
2/Jul
3/Jul

4/Jul
5/Jul
6/Jul
7/Jul
8/Jul

9/Jul
B1A1 71
B1A2 67
B1A3 72
B1A4 72
B1A5 72
Dry Ventilated

B1A6 72
B1A7 72
B1A8 72
B1A9 72
B1A10 72
B1A11 72 5 5 4 7 10 10 10 7 9
B1A12 72 1 6 5 10 11
Total 858
Show Rooms

B8 A01 48
B8 A02 48
B8 A03 27
Total 123
B2 A09 121
AC

B2 A10 121
Total 242
AC, Dry Ventilated Warehouses and Show Rooms 1st stage S.o.Grade concrete Status

19/Jul
20/Jul
21/Jul
22/Jul

23/Jul
24/Jul
25/Jul
26/Jul
27/Jul

28/Jul
29/Jul
Area Total

B1A1 37
B1A2 34
B1A3 38
B1A4 38
B1A5 38
Dry Ventilated

B1A6 38
B1A7 38
B1A8 38
B1A9 38
B1A10 38
B1A11 38 1 7 5 6 9 5 1 3
B1A12 38 1 5 5
Total 451
Show Rooms

B8 A01 30
B8 A02 30
B8 A03 16
Total 76
B2 A09
AC

B2 A10
Total 0

AC, Dry Ventilated Warehouses and Show Rooms Precast wall panels installations Status
10/Aug
11/Aug
12/Aug

13/Aug
14/Aug
15/Aug
16/Aug
17/Aug

18/Aug
19/Aug
9/Aug

Area Total

B1A1 554
B1A2 530
B1A3 598
B1A4 598
B1A5 598
Dry Ventilated

B1A6 598
B1A7 598
B1A8 594
Dry Ventilate B1A9 598
B1A10 598 91 16 15 4
B1A11 598 162 3 4 7
B1A12 598 140 6
Total 7060
Show Rooms

B8 A01 200
B8 A02 202
B8 A03 200
Total 602
B2 A09 86
AC

B2 A10 86
Total 172

AC, Dry Ventilated Warehouses and Show Rooms Precast roof beam installation Status
10/Aug
11/Aug
12/Aug

13/Aug
14/Aug
15/Aug
16/Aug
17/Aug

18/Aug
19/Aug
9/Aug

Area Total

B1A1 101
B1A2 103
B1A3 105
B1A4 105
B1A5 105
Dry Ventilated

B1A6 105
B1A7 105
B1A8 105
B1A9 105
B1A10 105 2 4 1 4
B1A11 105 87 4 2 4
B1A12 105 25 4
Total 1254
Show Rooms

B8 A01 47
B8 A02 47
B8 A03 25
Total 119
B2 A09 162
AC

B2 A10 162
Total 324
AC , Dry Ventilated Warehouses and Show Rooms Precast HC Slab installation Status

10/Aug
11/Aug
12/Aug

13/Aug
14/Aug
15/Aug
16/Aug
17/Aug

18/Aug
19/Aug
9/Aug
Area Total

B1A1 784
B1A2 722
B1A3 804
B1A4 804
B1A5 804
Dry Ventilated

B1A6 804 75
B1A7 804
B1A8 804
B1A9 804
B1A10 804 28 22 35 6 30 35
B1A11 805 408 7 9
B1A12 804 201 12 17
Total 9547
Show Rooms

B8 A01 162
B8 A02 162
B8 A03 86
Total 410

AC, Dry Ventilated Warehouses and Show Rooms Precast Plinth installation Status
10/Aug
11/Aug
12/Aug

13/Aug
14/Aug
15/Aug
16/Aug
17/Aug

18/Aug
19/Aug
9/Aug

Area Total

B1A1 98
B1A2 91
B1A3 101
B1A4 101
B1A5 101
Dry Ventilated

B1A6 101
B1A7 101
B1A8 101
B1A9 101
B1A10 101
Dry Ve B1A11 101 22 2
B1A12 101
Total 1199
Show Rooms

B8 A01
B8 A02
B8 A03
Total 0
ACWarehouses Precast Purlin installation Status
B2 A09 866
AC

B2 A10 866
Total 1732

AC, Dry Ventilated Warehouses and Show Rooms Precast parapet installation Status
18/Aug
19/Aug
20/Aug
21/Aug

22/Aug
23/Aug
24/Aug
25/Aug
26/Aug

27/Aug
28/Aug
Area Total

B1A1 53
B1A2 57
B1A3 57
B1A4 57
B1A5 57
Dry Ventilated

B1A6 57
B1A7 57
B1A8 57
B1A9 57
B1A10 57
B1A11 57 1
B1A12 57
Total 680
Show Rooms

B8 A01 32
B8 A02 32
B8 A03 20
Total 84
B2 A09
AC

B2 A10
Total 0
ons Status
3/Jul 3/Jul

2
2
14
16
50
4/Jul 4/Jul

6
1
9

65
14
15
51
5/Jul 5/Jul

12
15
26
28
6/Jul 6/Jul

20 9
7
8

10 15
15
27
7/Jul 7/Jul

16
38
27
23
14
8/Jul 8/Jul

10
32
39
41
11
47
9/Jul 9/Jul
10/Jul 10/Jul

8
7

10
20
11/Jul 11/Jul

7
5
8

11
10
13 20
11

12/Jul 12/Jul

4
5
8
7
13
13/Jul 13/Jul

8
8
7 7
8

10
21 21
38 20
10
14
14/Jul 14/Jul

9
2
15/Jul 15/Jul

4 4
4
9 9
3 6
12 11
29 13
16/Jul 16/Jul
17/Jul 17/Jul

1
5
1
2
2
18/Jul 18/Jul

1
2
3
4
2
8

19/Jul 19/Jul

9
14

20/Jul 20/Jul

20
20
3
8
Day wise castings

21/Jul 21/Jul
15
10 21
21 10

22/Jul 22/Jul

6
1
4
4

12
9
23/Jul 23/Jul
5

4 9 10

24/Jul 24/Jul
Day wise installations
7
11/Jul

4
5
7
2
12

12/Jul

4
4
7
55
11
73

13/Jul

5
9

10
22

14/Jul

3
10
15/Jul
5

10
16/Jul
17/Jul
18/Jul

6
5 13
19/Jul

1
9
5
5
5

20/Jul

21/Jul

22/Jul

3
4
6
3
7
9
5

11
16
24
23/Jul
10

24/Jul

2
2
4
2

10
16
25/Jul

15
26/Jul

9
7 4 6
16 3
7
5
7

27/Jul

21
28/Jul
3

10
8 10 20 5 10
29/Jul

4
10
30/Jul
1
11

31/Jul
Day wise installations

1/Aug
7
20/Aug 30/Jul
ncrete Status

stallations Status
21/Aug 31/Jul

22/Aug 1/Aug

23/Aug 2/Aug

9
24/Aug 3/Aug

6
4
25/Aug 4/Aug

5
1
26/Aug 5/Aug

7 12
27/Aug 6/Aug
28/Aug 7/Aug

4
11
29/Aug 8/Aug
2

10
27
12
30/Aug 2 9/Aug
9

14
23
31/Aug 10/Aug
8

1/Sep 11/Aug
5
6

2/Sep 12/Aug
1

4 6 13
27 19 61
3/Sep 13/Aug
4

4/Sep 26/Aug

4
2

5/Sep 27/Aug

16 7
6/Sep 28/Aug
2

12
55
7/Sep 29/Aug
2

8/Sep 30/Aug

1
4

9/Sep 31/Aug

4
4

10/Sep 1/Sep
Day wise castings

Day wise installations


30 72 76 20 28 7 9 6 6 5 6
12 32 40 7 7 7 3 6 8 7 3
5 12 9 10 6 6 8 15 12 9 5 3 16 21 11 11
4 4 20 10 26 9 10 10

tallation Status
Day wise installations
20/Aug

21/Aug

22/Aug

23/Aug
24/Aug

25/Aug
26/Aug
27/Aug
28/Aug
29/Aug

30/Aug

31/Aug

10/Sep
1/Sep
2/Sep
3/Sep
4/Sep
5/Sep
6/Sep

7/Sep
8/Sep
9/Sep
7 12 13 16
4 16 5 10
10 10 11 8 7 2
15 1 2 2 7 9 11
20 2 2 4 10 12
20 29 14 1
4 1 7 7 2

2 2 2 2 1 8 1 4
4 1 2 1 2

5 7 12 9
lation Status
Day wise installations
20/Aug

21/Aug

22/Aug

23/Aug
24/Aug

25/Aug
26/Aug
27/Aug
28/Aug
29/Aug

30/Aug

31/Aug

10/Sep
1/Sep
2/Sep
3/Sep
4/Sep
5/Sep
6/Sep

7/Sep
8/Sep
9/Sep
90 120 92 36 40 20 29 59
30 59 62 21 31 32
50 81 52 57 25 140 25 69 51
54 60 42 28 12 120 125
42 125 20 20 10 125 140 26
77 100 95 90 10 25 42
14 12 10 20

12 20 20 17 5 4 120 25 25 26
15 14 40 25 32
20 2 4 82 10 10 7
6 6 18 25 85 25 25 25

tion Status
Day wise installations
20/Aug

21/Aug

22/Aug

23/Aug
24/Aug

25/Aug
26/Aug
27/Aug
28/Aug
29/Aug

30/Aug

31/Aug

10/Sep
1/Sep
2/Sep
3/Sep
4/Sep
5/Sep
6/Sep

7/Sep
8/Sep
9/Sep

12 16 46
16 3
3 3 44 45
12 23
3 3 54
15 15 25
6 12 41 11
9 10
12 6 6
1 11
lation Status
29/Aug

30/Aug

31/Aug

1/Sep
2/Sep

3/Sep
4/Sep
5/Sep
6/Sep
7/Sep

8/Sep

9/Sep

10/Sep
11/Sep
12/Sep
13/Sep
14/Sep
15/Sep
12 16 23
16 26 29

16/Sep
17/Sep
18/Sep
19/Sep
Day wise installations
1
5
9
5
7
25/Jul 25/Jul

se installations

2 6
7
3
4
26/Jul 26/Jul

4
1 21 7
3
4
27/Jul 27/Jul

4
5
9
4
28/Jul 28/Jul

4
9
1
7
5
29/Jul 29/Jul

4
7
2
30/Jul 30/Jul
31/Jul 31/Jul
1/Aug 1/Aug
2/Aug 2/Aug

4
3/Aug 3/Aug

9
8
4/Aug 4/Aug
100

5/Aug 5/Aug

8 27
6/Aug 6/Aug
7/Aug 7/Aug

7
4
8/Aug 8/Aug

1
3
7
9/Aug 9/Aug

2
5
24 25 15
10/Aug 10/Aug

1
7
0
11/Aug 11/Aug
12/Aug 10 4 12/Aug
13
13/Aug 13/Aug
14/Aug 14/Aug
15/Aug 15/Aug

16 5
16/Aug 16/Aug

7
17/Aug 17/Aug
stallations
2/Aug 4

3
3
10
3/Aug
1

4/Aug

3
4
7
3
5

5/Aug

2
4
9
4

6/Aug

5
5
7/Aug

8
8/Aug
9/Aug

2
10/Aug

8
11/Aug
12/Aug
13/Aug
14/Aug
7

15/Aug

5 7
5 7
16 7
16/Aug

6
6
8
17/Aug

7
7
4
18/Aug

9
2
19/Aug

1 9
4
10 10
17 19

20/Aug
13

21/Aug
13 4
22 2

22/Aug
4

23/Aug
2
2
2

24/Aug
3 6
1

5 18

25/Aug
AC Warehose
Dry ventilated
4
11/Sep 2/Sep

y wise castings

wise installations
4
12/Sep 3/Sep
13/Sep 4/Sep

4
4
14/Sep 5/Sep

4
15/Sep 6/Sep

6
3
16/Sep 7/Sep

67 70
4 46 43
17/Sep 8/Sep

5
18/Sep 9/Sep

5
19/Sep 10/Sep
20/Sep 11/Sep
21/Sep 4 12/Sep

7
4

22/Sep 13/Sep
0

23/Sep 14/Sep
4

14 16 18 12 21 20
24/Sep 15/Sep
0

25/Sep 16/Sep
0

26/Sep 17/Sep
0

27/Sep 18/Sep
0

28/Sep 19/Sep

12 14 16 2
4 4 6 4
4 12 16 5
9 14
29/Sep 20/Sep
4

30/Sep 21/Sep

4
5
2

1/Oct 22/Sep
3
4

2/Oct 23/Sep

2
4
3
4

3/Oct 24/Sep

7
6
4/Oct 25/Sep
AC Warehose 1st stag
Show room 1st stag
7 7 16 20 12 8 3 2 4 6
5 6 6 15 4 16 14 15 12 2 2
12 4 4 3 2 1 2
12 12 5 5 6 10 12 9 4 19 15 4 5 2 2

wise installations
11/Sep
12/Sep
13/Sep
14/Sep
15/Sep
16/Sep
17/Sep
18/Sep
19/Sep
20/Sep
21/Sep
22/Sep
23/Sep
24/Sep
25/Sep
26/Sep
27/Sep

28/Sep
29/Sep
30/Sep
1/Oct
2/Oct
3/Oct
4/Oct
2 2
5
7 4
5 9
2 9 10 12 7 5
4 6 5 4 2 3 2 3
7 5 9 26 27 2 2 1 1
14 12 9 2 16 25 5 6 4 2 1 3
14 8 16 9 8 5 6 4 5 2
14 9 16 17 8 2 2
6 2
9 7 10 7 2 3

2 2 2 3
2 2
11/Sep 11/Sep

wise installations
wise installations

27
9 34
47
12/Sep 12/Sep
13/Sep 13/Sep

20 25 33
16 35 37
47
55 59 75
59
14/Sep 14/Sep

7
3
8

15
40
53
75
79
49
15/Sep 15/Sep

2
9
6
3
49
59
75
72
16/Sep 16/Sep

6
6
3

12 18 18
12 23 21
21 23 35
19 22
21 23 18
51
70
95
54
17/Sep 17/Sep
18/Sep 18/Sep
19/Sep 19/Sep
20/Sep 20/Sep
21/Sep 17 21/Sep
22/Sep 22/Sep

9 9
3
3
4
2
50 45
14

23/Sep 23/Sep

4
4
2 3 3

7 12 16
19 21 26
52 57 76
24/Sep 24/Sep
25/Sep 25/Sep

2
1
5
7
2
5
18

26/Sep 26/Sep

2
1
6
27/Sep 27/Sep

2
1
4
3 3

28/Sep 28/Sep
9 12 5
6 4 5
27 25 21

29/Sep 29/Sep
30/Sep 30/Sep
3
2

1/Oct 1/Oct
2/Oct 2/Oct
5
5
5
2

3/Oct 3/Oct
5 4
1
4
4
2

7 14

4/Oct 4/Oct
20/Sep 6

wise installations
21/Sep
22/Sep
23/Sep
7

24/Sep
25/Sep
9 12

26/Sep
27/Sep
28/Sep
29/Sep
30/Sep
7

1/Oct
9

2/Oct
6

3/Oct
4/Oct

2
4
5/Oct

4
6/Oct

7/Oct
8/Oct
9/Oct
1
10/Oct
1

11/Oct

1
1

12/Oct
1
13/Oct
18/Aug 18/Aug

1
4
19/Aug 19/Aug

1
1
1

28 20
14 13 11
10
20/Aug 20/Aug
21/Aug 21/Aug

6
6
2
22/Aug 22/Aug
23/Aug 23/Aug

3
24/Aug 24/Aug

1
13 16 18
14

25/Aug 25/Aug

5
1
11 16 10 10 11
26/Aug 26/Aug

5
9
27/Aug 27/Aug

28/Aug 28/Aug

29/Aug 29/Aug

7
20
17

30/Aug 30/Aug

9
23
15

31/Aug 31/Aug

1/Sep 1/Sep

3
2/Sep 2/Sep

3/Sep 26/Sep

4/Sep 27/Sep

3
5/Sep 28/Sep

6/Sep 29/Sep

7/Sep 30/Sep

8/Sep 1/Oct
5 6 6 2
5 6 8 1
4 3

1 32 27 57
9 11 75

Dry ventilated precast footing insallation %


Show room precast footing insallation %
AC Warehose precast footing insallation %
26/Aug
27/Aug
28/Aug
29/Aug
30/Aug
31/Aug

10/Sep

19/Sep

20/Sep

21/Sep

22/Sep

23/Sep

24/Sep
1/Sep
2/Sep
3/Sep

4/Sep

5/Sep

6/Sep

7/Sep

8/Sep

9/Sep
2 6 6 2 2
7 10 11 3 1

12 10 6 6 5 2 1 2 2
11 7 7 13 3 3
9 4 3 7 2

1 2 2 2 2 5 6
6
5
2
3
5/Oct 26/Sep

7
5
1
6/Oct 27/Sep

4
7/Oct 28/Sep

4
4

14
8/Oct 29/Sep

2
2
9/Oct 30/Sep

2
1
12
14
4
10/Oct 1/Oct

3
1
9
16
11/Oct 2/Oct

1
2
2
12/Oct 3/Oct

1 1
7 5
14 12
AC Warehose 1st stage S.o.Grade concrete %
Show room 1st stage S.o.Grade concrete %
Dry ventilated 1st stage S.o.G %
5
13/Oct 4/Oct

1
1
3

14/Oct 5/Oct

1
2
15/Oct 6/Oct
3
3
3

16/Oct 7/Oct

1
2
3
1

17/Oct 8/Oct

2
2
18/Oct 9/Oct

1
2
19/Oct 10/Oct

3
2
20/Oct 11/Oct

21/Oct 12/Oct

22/Oct 13/Oct

23/Oct 14/Oct

24/Oct 15/Oct

25/Oct 16/Oct

26/Oct 17/Oct
1
1
1
1
1
4
6
5
1
1
5/Oct

1
2
2
2
1
2
9 2
1
1
6/Oct
7/Oct

4
1
8/Oct
9/Oct

1
3
1
4

10/Oct

4
1
2
1
1
3

11/Oct

2
1
4
1
1
2

12/Oct

5
3
1
5
1
1
1
3

13/Oct

5
10 12 12

14/Oct

5
5
21

15/Oct

16/Oct

2
5
12
18

17/Oct

2
5
1
1
2

12
16

18/Oct

2
9
5
1
2
1

12
14

19/Oct

2
5
3

14
12

20/Oct
5

21/Oct
4

22/Oct

23/Oct
4

24/Oct
4

25/Oct
4

26/Oct
5
5/Oct 5/Oct

7 6
1 1
7 8
7 9
2 2

7 11
6/Oct 6/Oct
7/Oct 7/Oct
8/Oct 8/Oct
9/Oct 9/Oct
10/Oct 10/Oct

1
11/Oct 11/Oct

3
12/Oct 12/Oct

3
13/Oct 13/Oct
Dry ventilated roof beems insallation %

14/Oct 14/Oct

15/Oct 15/Oct

16/Oct 16/Oct

17/Oct 17/Oct

18/Oct 18/Oct

7
19/Oct 19/Oct

5
20/Oct 20/Oct

21/Oct 21/Oct

22/Oct 22/Oct

23/Oct 23/Oct

24/Oct 24/Oct

25/Oct 25/Oct

26/Oct 26/Oct
24 28 22 26 22 24 28 22 26

Dry ventilated roof beems insallation %


14/Oct
15/Oct
16/Oct
17/Oct
18/Oct
19/Oct
20/Oct
21/Oct
22/Oct

23/Oct

24/Oct

25/Oct

26/Oct

27/Oct

28/Oct

29/Oct

30/Oct

31/Oct

1/Nov

2/Nov

3/Nov

4/Nov
1 1
1 2 2 2 2
5 3 3 4
5 3 3 4 8
1 1 1 6 7 7
2 1 2 8 3
1 9 12 9 7 9
1 2 2 2 1 9 12 9 7 9

4 4 4 4 4
3 2

Dry ventilated roof beems insallation %


9/Sep 2/Oct

29/Sep 3/Oct

30/Sep 4/Oct

1/Oct 5/Oct

2/Oct 6/Oct

3/Oct 7/Oct

4/Oct 8/Oct

5/Oct 9/Oct

6/Oct 10/Oct

7/Oct 11/Oct

8/Oct 12/Oct

9/Oct 13/Oct

10/Oct 14/Oct

11/Oct 15/Oct

12/Oct 16/Oct

13/Oct 17/Oct

14/Oct 18/Oct

15/Oct 19/Oct

16/Oct 20/Oct

17/Oct 21/Oct
1
2

10
28/Sep

4
1
1
2
2

12
29/Sep

4
30/Sep

3
2
1
1/Oct

5
1
2/Oct

3
1

3/Oct

3
1
1
3
1
1
4/Oct

2
1
1
3
1

5/Oct

6/Oct

7/Oct

8/Oct
2

9/Oct

2
2

10/Oct

2
1
2

11/Oct

2
4
1
2

12/Oct

2
5
2

13/Oct

1
7
1
2

14/Oct

6
1
2

15/Oct

20/Oct

5
4
21/Oct
27/Oct 18/Oct

28/Oct 19/Oct

29/Oct 20/Oct

3
30/Oct 21/Oct

1
31/Oct 22/Oct

1/Nov 23/Oct

2/Nov 24/Oct
3

3/Nov 25/Oct
6

4/Nov 26/Oct
8

22
5/Nov 27/Oct

4
2
6/Nov 28/Oct

9
7
1
2
7/Nov 29/Oct

9
7
8/Nov 30/Oct

9
7
2
2
7
2

9/Nov 31/Oct

9
7
4
2
7
3

10/Nov 1/Nov
1
2
1
5

32
11/Nov 2/Nov
2
6

24
12/Nov 3/Nov
2
8

13/Nov 4/Nov

2
1
3
6
2

14/Nov 5/Nov

23
15/Nov 6/Nov
4
27/Oct

2
3

12
14
28/Oct

12
13
29/Oct

30/Oct

1
2

16
12

31/Oct

2
1
2
4
1

14
12

1/Nov

2
1
2
4
1

15
12

2/Nov

2
1
2
4

16
12

3/Nov

4
4/Nov

4
5/Nov

6/Nov

4
4
3
3
7/Nov

4
4
1
1
4
5
8/Nov

4
5
3
2
4
5
3

9/Nov

4
4
2
3
2
4
5
4
2

10/Nov

11/Nov

12/Nov

13/Nov
5

12
12

14/Nov

14
15

15/Nov
27/Oct 27/Oct

25
28/Oct 28/Oct

25
29/Oct 29/Oct

30/Oct 30/Oct

7
25
31/Oct 31/Oct

7
25
1/Nov 1/Nov

7
20
2/Nov 2/Nov

7
18
3/Nov 3/Nov
55

4/Nov 4/Nov
45

5/Nov 5/Nov

6/Nov 6/Nov
5
1
35

7/Nov 7/Nov
35
10

8/Nov 8/Nov
25
10

9/Nov 9/Nov
5
5
2
31
10

10/Nov 10/Nov
14
11/Nov 11/Nov
12

12/Nov 12/Nov

13/Nov 13/Nov
2

14/Nov 14/Nov
3

15/Nov 15/Nov
6
32
5/Nov

32
6/Nov

1
9
1
7/Nov

1
4
11
28
8/Nov

2
4
7
32
9/Nov

2
3
5
10/Nov 32
28
11/Nov
30

12/Nov
9

13/Nov
7

14/Nov

3
15/Nov
7

16/Nov
9

17/Nov
5

18/Nov
6

19/Nov
25

20/Nov
32

21/Nov

22/Nov
40

23/Nov
44

24/Nov
18/Oct 22/Oct

19/Oct 23/Oct

20/Oct 24/Oct

21/Oct 25/Oct

22/Oct 26/Oct

27/Oct 27/Oct

28/Oct 28/Oct

29/Oct 29/Oct

30/Oct 30/Oct

31/Oct 31/Oct

1/Nov 1/Nov

2/Nov 2/Nov

3/Nov 3/Nov

4/Nov 4/Nov

5/Nov

6/Nov

7/Nov

8/Nov

9/Nov

10/Nov
7
6
22/Oct

23/Oct

5
3
24/Oct

7
2
4
25/Oct

26/Oct

27/Oct

4
2
28/Oct

4
2
1

29/Oct

30/Oct

4
3
1

31/Oct

4
3
1/Nov

4
3
2/Nov

4
2
3/Nov

4/Nov

5/Nov

6/Nov

4
7/Nov

2
4
8/Nov

4
1
1

9/Nov

4
1

10/Nov
5
5

25
16/Nov 7/Nov

21
17/Nov 8/Nov

1
7
2
18/Nov 9/Nov

8
19/Nov 10/Nov

2
1
20/Nov 11/Nov

2
21/Nov 12/Nov

22/Nov 13/Nov

2
23/Nov 14/Nov

2
24/Nov 15/Nov

25/Nov 16/Nov

26/Nov 17/Nov

27/Nov 18/Nov

28/Nov 19/Nov

29/Nov 20/Nov

30/Nov 21/Nov

1/Dec 22/Nov

2/Dec 23/Nov

3/Dec 24/Nov

4/Dec 25/Nov

5/Dec 26/Nov
7
23
16/Nov

17/Nov

18/Nov

19/Nov

20/Nov

21/Nov

22/Nov

23/Nov

24/Nov

25/Nov

26/Nov

27/Nov

28/Nov

29/Nov

30/Nov

1/Dec

2/Dec

3/Dec

4/Dec

5/Dec
3
16/Nov 16/Nov

17/Nov 17/Nov

18/Nov 18/Nov

19/Nov 19/Nov

20/Nov 20/Nov

21/Nov 21/Nov

22/Nov 22/Nov

23/Nov 23/Nov

24/Nov 24/Nov

25/Nov 25/Nov

26/Nov 26/Nov

27/Nov 27/Nov

28/Nov 28/Nov

29/Nov 29/Nov

30/Nov 30/Nov

1/Dec 1/Dec

2/Dec 2/Dec

3/Dec 3/Dec

4/Dec 4/Dec

5/Dec 5/Dec
47
25/Nov

42
26/Nov

27/Nov

28/Nov

29/Nov

30/Nov

1/Dec

2/Dec

3/Dec

4/Dec

5/Dec

6/Dec

7/Dec

8/Dec

9/Dec

10/Dec

11/Dec

12/Dec

13/Dec

14/Dec
Tota
l
Co
mpl
ete
d
158
146
161
161
161
161
161
161
161
161
161
161
###
48
48
27
123
121
121
242

Total
11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov

Percent
Completed

158 100.0%
146 100.0%
161 100.0%
161 100.0%
161 100.0%
161 100.0%
161 100.0%
161 100.0%
161 100.0%
161 100.0%
161 100.0%
161 100.0%
1914
48 100.0%
48 100.0%
27 100.0%
123
121 100.0%
1 121 100.0%
242
100.00%
100.00%
100.00%

Total
11/Nov

12/Nov

13/Nov

14/Nov

15/Nov

16/Nov

17/Nov

Completed Percent

71 100.0%
66 98.5%
72 100.0%
72 100.0%
72 100.0%
72 100.0%
72 100.0%
72 100.0%
72 100.0%
72 100.0%
72 100.0%
72 100.0%
857
48 100.0%
48 100.0%
26 96.3%
122
2 117 96.7%
1 77 63.6%
194
Total
27/Nov

28/Nov

29/Nov

30/Nov

1/Dec

2/Dec

3/Dec
Percent
Completed

10 27.0%
0 0.0%
38 100.0%
38 100.0%
38 100.0%
38 100.0%
38 100.0%
38 100.0%
38 100.0%
38 100.0%
38 100.0%
38 100.0%
390
30 100.0%
16 53.3%
0 0.0%
46
0
0
0
86.47%
60.53%
#DIV/0!

Total
10/Dec

11/Dec

12/Dec
6/Dec

7/Dec

8/Dec

9/Dec

Percent
Completed

10 1.8%
0 0.0%
105 17.6%
99 16.6%
125 20.9%
111 18.6%
362 60.5%
355 59.8%
362 60.5%
357 59.7%
365 61.0%
365 61.0%
2616
195 97.5%
80
0
275
25 29.1%
13
38
37.05%
45.68%
22.09%

Total
10/Dec

11/Dec

12/Dec
6/Dec

7/Dec

8/Dec

9/Dec

Percent
Completed

70 69.3%
57 55.3%
75 71.4%
97 92.4%
103 98.1%
100 95.2%
103 98.1%
102 97.1%
102 97.1%
102 97.1%
105 100.0%
105 100.0%
1121
45
40
23
108
120
63
183
89.39%
90.76%
56.48%

Total
10/Dec

11/Dec

12/Dec
6/Dec

7/Dec

8/Dec

9/Dec
Percent
Completed

517 65.9%
510 70.6%
555 69.0%
510 63.4%
558 69.4%
565 70.3%
570 70.9%
568 70.6%
568 70.6%
566 70.4%
570 70.8%
570 70.9%
6627
150 92.6%
57 35.2%
0 0.0%
207

Total
10/Dec

11/Dec

12/Dec
6/Dec

7/Dec

8/Dec

9/Dec

Percent
Completed

98 100.0%
91 100.0%
101 100.0%
101 100.0%
101 100.0%
101 100.0%
101 100.0%
101 100.0%
101 100.0%
101 100.0%
101 100.0%
101 100.0%
1199
0
0
0
0

479 55.3%
230
709
100.00%
#DIV/0!
40.94%

Total
15/Dec

16/Dec

17/Dec

18/Dec

19/Dec

20/Dec

21/Dec

Percent
Completed

0 0.0%
0 0.0%
0 0.0%
0 0.0%
5 8.8%
9 15.8%
15 26.3%
30 52.6%
57 100.0%
28 49.1%
56 98.2%
56 98.2%
256
25 78.1%
8 25.0%
0 0.0%
33
0
0
0
37.65%
39.29%
#DIV/0!
Footing Footing Column 1st stage Roof
Area Wall panels HC Slabs Parapet Plinth beams
Blinding Installations Installations S.o.Grade beams

A - 12

A - 11

A - 10
D A-9
R
Y

V
A-8
E
N A-7
T
I
L A-6
A
T
E A-5
D

A-4

A-3

A-2

A-1
A-3
S.Rooms A - 2

A-1
A - 10
AC
A-9
As on 17.09.2020
Roof beam Parapet
Warehouse
Total Installed Total Installed
B1A1 101 52 53 0
B1A2 103 40 57 0
B1A3 105 48 57 0
B1A4 105 47 57 0
B1A5 105 52 57 0
B1A6 105 64 57 0
B1A7 105 42 57 0
B1A8 105 35 57 0
B1A9 105 60 57 0
B1A10 105 60 57 0
B1A11 105 103 57 24
B1A12 105 78 57 5
Total 1254 681 680 29
Plinth beam
Total Installed
98 90
91 25
101 97
101 97
101 101
101 98
101 97
101 98
101 80
101 60
101 101
101 79
1199 1023