7.00 46.

11 Dismantling stone masonry in lime or cement mortar including stacking the materials as
directed with all leads, lifts etc. complete.
Basic
STATE e DSR 1.00 162.00 162.00
Rate Cubic Meter
Chapter-Building maintenance

Total 162.00
46.11 Say 162.00
7.01 46.29 Dismantling the R.C.C. work 1:2:4 and sorting out the materials such as steel etc. as
directed and stacking them withinBasic
the specified lead as directed etc. complete.
STATE e DSR 1.00 615.00 615.00
Rate Number
Chapter-Building maintenance

Total 615.00
46.29 Say 615.00
7.02 46.30 Removing Np­2 and Np­3 class pipes including stacking at road side as directed by the
Engineer in charge. Upto 900mm dia. etc. complete.
Basic
STATE e DSR 1.00 150.00 150.00
Rate Running Meter
Chapter-Building maintenance

Total 150.00
46.30 Say 150.00
7.03 46.31 Removing Np­2 and Np­3 class pipes including stacking at road side as directed by the
Engineer in charge. 900mm dia. and above. etc. complete.
Basic
STATE e DSR 1.00 175.00 175.00
Rate Running Meter
Chapter-Building maintenance

Total 175.00
46.31 Say 175.00
7.04 12.02 Excavation for foundation by mechanical means in earth, soils of all types, sand, gravel, soft
murum including shoring and strutting as necessary and disposing off excavated stuff as
Basic
STATE
directedeetc.
DSR complete. 1.00 103.00 103.00
Rate Cubic Meter
Chapter-Bridge Foundation
Total 103.00
12.02 Say 103.00
7.05 12.06 Excavation for foundation by mechanical means in hard murum and boulders including
shoring and strutting as necessary Basic
and disposing off excavated stuff as directed etc.
STATE e DSR
complete. 1.00 132.00 132.00
Rate Cubic Meter
Chapter-Bridge Foundation
Total 132.00
12.06 Say 132.00
7.06 12.08 Excavation for foundation by mechanical means in soft rock including shoring and strutting as
necessary and disposing off excavated stuff as directed etc. complete.
Basic
STATE e DSR 1.00 274.00 274.00
Rate Cubic Meter
Chapter-Bridge Foundation
Total 274.00
12.08 Say 274.00
7.07 12.11 Excavation for foundation in hard rock by chiselling and wedging or line drilling including
shoring and strutting as necessary Basic
and disposing off excavated stuff as directed etc.
STATE e DSR
complete. (excluding dewatering) Rate Cubic Metre 1.00 650.00 650.00

Chapter-Bridge Foundation
Total 650.00
12.11 Say 650.00
7.08 12.14 Dewatering for abutments including diversion of stream, providing cofferdams, bunds etc. as
may be necessary for foundation and other parts of the work including bailing and pumping
Basic
STATE e DSR
out water during and after excavation Cubic Metre 1.00 78.00 78.00
Rate as may be necessary etc. comp
Chapter-Bridge Foundation
Total 78.00
12.14 Say 78.00
7.09 12.18 Dewatering for abutments including diversion of stream, providing cofferdams, bunds etc. as
may be necessary for foundation and other parts of the work including bailing and pumping
Basic
STATE e DSR
out water during and after excavation Cubic Metre 1.00 561.00 561.00
Rate as may be necessary etc. comp
Chapter-Bridge Foundation
Total 561.00
12.18 Say 561.00
7.10 12.15 Dewatering for piers including diversion of stream, providing cofferdams, bunds etc. as may
be necessary for foundation and other parts of the work including bailing and pumping out
Basic
STATEduring
water e DSRand after excavation as may be Cubic Metre etc. 1.00
necessary compl 110.00 110.00
Rate
Chapter-Bridge Foundation
Total 110.00
12.15 Say 110.00
7.11 12.17 Dewatering for rafts and cut off walls including diversion of stream, providing cofferdams,
bunds etc. as may be necessary forBasic
foundation and other parts of the work including bailing
STATE e DSRout water during and after excavation
and pumping Cubic Metre
as may be1.00
necessary 130.00
e 130.00
Rate
Chapter-Bridge Foundation
Total 130.00
12.17 Say 130.00
7.12 12.19 Dewatering for piers including diversion of stream, providing cofferdams, bunds etc. as may
be necessary for foundation and other parts of the work including bailing and pumping out
Basic
STATEduring
water e DSRand after excavation as may be Cubic Metre etc. 1.00
necessary compl 855.00 855.00
Rate
Chapter-Bridge Foundation
Total 855.00
12.19 Say 855.00
7.13 11.01 Providing rubble filling of trap/ granite/ quartzite gneiss stones for foundations including hand
packing filling gravel / sand in the voids
Basic etc. complete.
STATE e DSR 1.00 489.00 489.00
Rate Cubic Meter
Chapter-Cross Drainage Works

Total 489.00
11.01 Say 489.00
7.14 11.21 Providing and laying cement concrete pipe of IS 458:2003 NP­
4 class of 1200mm diameter in proper
Basicline, level and slope including providing and fixing
STATEine cement
collars DSR mortar 1:2 and curing etc. complete. 1.00 9,780.00 9,780.00
Rate Cubic Meter
24/269 RCC Pipe Np4 heavy duty non presure pipe
Chapter-Cross Drainage Works

Total 9,780.00
11.21 Say 9,780.00
7.15 11.28 Providing cast in situ M10 grade cement concrete for head walls of CD work / retaining walls
etc.
STATEincluding
e DSRnecessary form work, compaction, finishing and curing etc. complete. (with
reversible drumDrainage
Chapter-Cross type mixer with SCADA with natural sand, cement 4.05 bag
Works

Basic
1.00 3,570.00 3,570.00
Rate   Cubic Metre
Net Lead
Cement 0.220 MT 0.220 0.00 0.00
Metal 0.890 Cum 0.890 249.45 222.01
Natural Sand 0.470 Cum 0.470 143.78 67.58
Add For Royalty Charges 0.47 141.34 66.43
Total 3,926.02
11.28 Say 3,926.00
7.16 11.30 Providing and casting in situ PCC M15 grade of trap metal for coping to head walls / parapet
including
STATE e centering,
DSR form work, compaction and curing etc. complete. (with reversible drum
type mixer with Drainage
Chapter-Cross SCADA with
Worksnatural sand)

Basic
1.00 4,106.00 4,106.00
Rate   Cubic Metre
Net Lead
Cement 0.330 MT 0.330 0.00 0.00
Metal 0.850 Cum 0.850 249.45 212.03
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 4,446.34
11.3 Say 4,446.00
7.17 15.15 Providing Ist class brick masonry work in 1:3 in sub structure complete with watering as per
drawings
STATE e and
DSRtechnical specifications etc. complete. (excluding pointing and plastering)
Chapter-Bridge Super Structure

15.15
Basic
1.00 5,599.00 5,599.00
Rate   Cubic Metre
Net Lead
Cement 0.400 MT 0.400 0.00 0.00
Metal 0.900 Cum 0.900 249.45 224.51
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 5,951.81
15.15 Say 5,952.00
7.18 15.17 Providing stone masonry work in cement mortar 1:3 with watering for substructure complete
as per edrawings
STATE DSR and technical specifications etc. complete. (random rubble masonry)
Chapter-Bridge Super Structure

15.17
Basic
1.00 3,510.00 3,510.00
Rate   Cubic Metre
Net Lead
Cement 0.400 MT 0.400 0.00 0.00
Metal 0.900 Cum 0.900 249.45 224.51
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 3,862.81
15.17 Say 3,863.00
7.17 24.06 Providing and casting in situ cement concrete in M20of trap/ granite/quartzite/gneiss metal for
steps
STATE including
e DSR steel centering, plywood/steel formwork, compacting, roughening them if
special
Chapter-plainiscement
finish to be provided,
concrete finishing uneven and honeycombed su

Basic
1.00 5,396.00 5,396.00
Rate   Cubic Metre
Net Lead
Cement 0.400 MT 0.400 0.00 0.00
Metal 0.850 Cum 0.850 249.45 212.03
Sand 0.425 Cum 0.425 143.78 61.11
Add For Royalty Charges 0.425 141.34 60.07
Total 5,729.21
24.06 Say 5,729.00
7.18 12.25 Providing and laying in situ M10 cement concrete of trap/ granite/ quartzite/ gneiss
metal
STATE in foundation including necessary centering, formwork, bailing out water,
e DSR
compacting and curing
Chapter-Bridge etc. complete. (with fully automatic micro proce
Sub Structure
& foundation
Basic
1.00 2,926.00 2,926.00
Rate   Cubic Metre
Net Lead
Cement 0.330 MT 0.330 0.00 0.00
Metal 0.850 Cum 0.850 249.45 212.03
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 3,266.34
12.25 Say 3,266.00
7.18 24.04 Providing and casting in situ cement concrete in M15 of trap/ granite/quartzite/gneiss metal
for stepse including
STATE DSR steel centering, plywood/steel formwork, compacting, roughening them if
special
Chapter-Bridge Sub provided,
finish is to be Structurefinishing uneven and honeycombed s
& foundation
Basic
1.00 4,248.00 4,248.00
Rate   Cubic Metre
Net Lead
Cement 0.330 MT 0.330 0.00 0.00
Metal 0.850 Cum 0.850 249.45 212.03
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 4,588.34
24.04 Say 4,588.00
7.19 25.05 Providing and laying in situ cement concrete M­30 of trap / granite /quartzite/ gneiss metal for
R.C.C.
STATE work
e DSRin foundations like raft, strip foundations, grillage and footings of R.C.C. columns
and steel stanchions etc. including bailing out water, formwo
Chapter- Reinforced cement
concrete
Basic
1.00 5,175.00 5,175.00
Rate   Cubic Metre
Net Lead
Cement 0.420 MT 0.420 0.00 0.00
Metal 0.985 Cum 0.985 249.45 245.71
Sand 0.365 Cum 0.365 143.78 52.48
Add For Royalty Charges 0.37 141.34 51.59
Total 5,524.78
25.05 Say 5,525.00
7.20 14.11 Providing and laying in situ M30 controlled cement concrete of trap/ granite/ quartzite/
gneiss
STATEmetal
e DSRfor RCC work in solid/ deck slab etc. including ramming, vibrating, curing,
formwork,
Chapter-Bridge Superand
centering finishing in cement plaster excluding reinfo
Structure

Basic
1.00 6,315.00 6,315.00
Rate   Cubic Metre
Net Lead
Cement 0.450 MT 0.450 0.00 0.00
Metal 0.860 Cum 0.860 249.45 214.53
Sand 0.430 Cum 0.430 143.78 61.83
Add For Royalty Charges 0.43 141.34 60.78
Total 6,652.13
14.11 Say 6,652.00
7.21 13.02 Providing tar paper bearing including laying in proper position etc. complete.
Basic
STATE e DSR 1.00 18.00 18.00
Rate Running Meter
Chapter-Bridge Bearing
Total 18.00
13.02 Say 18.00

7.22 11.19 Providing and laying cement concrete pipe of IS 458:2003 NP­
4 class of 900mm diameter in proper
Basic line, level and slope including providing and fixing
STATE
collars ine cement
DSR mortar 1:2 and curing etc. complete. 1.00 6,970.00 6,970.00
Rate Running Meter
Chapter-Cross Drainage Works

Total 6,970.00
11.19 Say 6,970.00
7.23 11.21 Providing and laying cement concrete pipe of IS 458:2003 NP­
4 class of 1200mm diameter in proper
Basicline, level and slope including providing and fixing
STATE
collars ine cement
DSR mortar 1:2 and curing etc. complete. 1.00 9,780.00 9,780.00
Rate Running Meter
24/269 RCC Pipe Np4 heavy duty non presure pipe
Chapter-Cross Drainage Works

Total 9,780.00
11.21 Say 9,780.00
7.24 11.24 Providing selected hard murum filling including laying in layers of 15 to 20cmwith watering and
compacting
STATE e DSR etc. complete.
Chapter-Bridge Sub Structure

Basic
1.00 165.00 165.00
Rate   Cubic Metre
Net Lead
Cement 0.000 MT 0.000 0.00 0.00
MURUM 1.000 Cum 1.000 199.12 199.12
Sand 0.000 Cum 0.000 0.00 0.00
Add For Royalty Charges 1.00 141.34 141.34
Total 505.46
11.24 Say 505.00
7.25 15.01 Excavation for foundation of structure as per drawing and technical specifications including
setting out, construction of shoring Basic
, brushing, removal of stumps and other deleterious
STATE e DSR of side and bottom and back filling with approved
matter, dressing 1.00 materi 538.00 538.00
Rate MT
Chapter-Bridge Super Structure

Lead-Steel MT 1.00 0.00 0.00


Total 538.00
15.01 Say 538.00
7.26 2.28 Providing earth work in embankment with approved materials obtained from departmental
land or other sources upto lead of Basic
STATE e DSR all lifts, laying in layers of 20cm.
50m. including Cubic to
Metre 1.00
30cm. thickness 350.00clods, 350.00
breaking
Rate
dressing to the required lines, curves, g
Chapter-Road Sub grade
Lead-Murum 1 Cum 1 199.12 199.12
Add For Royalty Charges 1 141.34 141.34
Total 690.46
2.28 Say 690.00
7.27 11.27 Providing and fixing stream lined M15 grade RCC guard stone including mild steel bar
reinforcement etc. complete. Basic
STATE e DSR 1.00 330.00 330.00
Rate Number
Chapter-Cross Drainage Works

Total 330.00
11.27 Say 330.00
7.28 15.50 Providing M30 RCC cast in situ 625mm diameter bored piles each of load capacity as per
design and of specified diameter ofBasic
as directed, placed through steel shell sunk to the
STATE
requirededepth
DSR through all strata except rock, excluding provision
1.00 of 4,046.00 4,046.00
Rate Running Meter
Chapter-Cross Drainage Works

Total 4,046.00
15.50 Say 4,046.00
7.29 15.25 Back filling behind abutment, wing wall and return wall as per drawings and technical
specifications etc. complete. (byBasic granular material)
STATE e DSR 1.00 502.00 502.00
Rate Cubic Meter
Chapter-Bridge Bored Pile
Total 502.00
15.25 Say 502.00
7.30 15.23 Providing weep holes in brick masonry /plain /reinforced concrete abutment, wing wall /
return wall with 100mm diameterBasic AC pipe extending
Running through1.00
the full width of the structure
STATE
with e DSR
slope of 1V: 20H towards drawing face as per drawings and 129.00 129.00
Rate Metre
Chapter-Bridge Bored Pile
Total 129.00
15.23 Say 129.00
7.31 15.29 Providing and laying of filter media with granular materials/ stone crushed aggregates
satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a
Basic
STATE
thicknesse DSR
of not less than 600 mm with 1.00 778.00 778.00
Ratesmaller size
Sq Mtowards the soil and bigge
Chapter-Bridge Bored Pile
Total 778.00
15.29 Say 778.00
7.32 15.33 Supplying, fitting and fixing in position true to line and level forged steel rocker bearing
including all accessories as per drawings
Basic and technical specifications conforming to IRC:83
STATE e DSR
(Pt­ 1.00 583.00 583.00
Rate Sq M
1) section IX and clause 2003 of MoRTH specifications etc. comp
Chapter-Bridge Bored Pile
Total 583.00
15.33 Say 583.00
7.33 15.37 Supplying, fitting and fixing in position true to line and level elastomeric bearing including all
accessories as per drawing and technical
Basic specifications and IRC:83 (Pt­II) section IX and
STATE
clause e DSR 1.00 1.40 1.40
Rate Sq M
2005 of MoRTH specifications etc. complete.
Chapter-Bridge Bored Pile
Total 1.40
15.37 Say 1.40
7.34 16.05 Providing and laying M35 grade RCC jacketing work around the existing piers of bridges etc.
complete.
STATE e DSR (with fully automatic micro processor based PLC with SCADA enabled with
reversible drum Maintenance
Chapter-Bridge type mixer with natural sand, height of 8 to 10 meter)
Basic
1.00 5,449.00 5,449.00
Rate   Cubic Metre
Net Lead
Cement 0.460 MT 0.460 0.00 0.00
Metal 0.985 Cum 0.985 249.45 245.71
Sand 0.365 Cum 0.365 143.78 52.48
Add For Royalty Charges 0.365 141.34 51.59
Total 5,798.78
16.05 Say 5,799.00
7.35 15.44 Providing M30 RCC cast in situ 525mm diameter bored piles each of load capacity as per
design
STATEand of specified diameter of as directed, placed through steel shell sunk to the
e DSR
required
Chapter-Bridge through
depth Bored Pileall strata except rock, excluding provision of
Basic
1.00 2,842.00 2,842.00
Rate   Cubic Metre
Net Lead
Cement 0.410 MT 0.410 0.00 0.00
Metal 0.900 Cum 0.900 249.45 224.51
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 3,194.81
15.44 Say 3,195.00
7.36 15.45 Providing and laying 12mm thick mastic asphalt wearing course on top of deck slab excluding
prime
STATEcoat with paving grade bitumen meeting the requirements given in table 500­29,
e DSR
prepared by using
Chapter-Bridge mastic
Bored Pilecooker and laid to required level and slope after cle
Basic
1.00 350.00 350.00
Rate Running Meter
Total 350.00
15.45 Say 350.00
7.37 15.48 Providing M30 RCC cast in situ 600mm diameter bored piles each of load capacity as per
design
STATEand of specified diameter of as directed, placed through steel shell sunk to the
e DSR
required
Chapter-Bridge through
depth Bored Pileall strata except rock, excluding provision of

Basic
1.00 3,020.00 3,020.00
Rate Running Meter
Total 3,020.00
15.48 Say 3,020.00
7.38 15.49 Construction of RCC railing of M30 Grade in situ with 20 mm nominal size aggregate true to
line
STATEandegrade,
DSR tolerance of vertical RCC post not to exceed 1 in 500, center to center
spacing between vertical
Chapter-Bridge Bored Pilepost not to exceed 2000 mm, leaving adeq
Basic
1.00 1,435.00 1,435.00
Rate   Cubic Metre
Net Lead
Cement 0.021 MT 0.021 0.00 0.00
Metal 0.040 Cum 0.040 249.45 9.98
Sand 0.020 Cum 0.020 143.78 2.88
Add For Royalty Charges 0.02 141.34 2.83
Total 1,450.68
15.49 Say 1,451.00
7.39 15.51 Providing and laying in PCC M15 grade leveling course below approach slab complete with
fully
STATE automatic
e DSR micro processor PLC with SCADA enabled reversible drum type mixer as per
drawings and Technical
Chapter-Bridge specifications etc. complete.
Bored Pile
Basic
1.00 4,300.00 4,300.00
Rate   Cubic Metre
Net Lead
Cement 0.330 MT 0.330 0.00 0.00
Metal 0.850 Cum 0.850 249.45 212.03
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 4,640.34
15.51 Say 4,640.00
7.40 15.53 Providing and laying of RCC in M30 grade approach slab including reinforcement and
formwork
STATE e DSR complete with fully automatic micro processor PLC with SCADA enabled reversible
drum type mixerBored
Chapter-Bridge as perPile
drawings and technical specifications etc. complete.
Basic
1.00 7,850.00 7,850.00
Rate   Cubic Metre
Net Lead
Cement 0.400 MT 0.400 0.00 0.00
Metal 0.900 Cum 0.900 249.45 224.51
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 8,202.81
15.53 Say 8,203.00
0.01 15.61 Providing and filling 20 mm thick compressible fibre board in expansion joint complete as per
drawings
STATE e and DSRtechnical specifications etc. complete.
Chapter-Bridge Bored Pile
Basic
1.00 440.00 440.00
Rate Square Meter
Total 440.00
15.61 Say 440.00
7.41 15.63 Providing and filling joint sealing compound with coarse sand and 6% bitumen by weight as
per
STATEdrawings
e DSRand technical specifications etc. complete.
Chapter-Bridge Bored Pile
Basic
1.00 24.00 24.00
Rate Square Meter
Total 24.00
15.63 Say 24.00
7.42 15.71 Providing and laying of a strip seal expansion joint catering to maximum horizontal movement
upto
STATE 70 emmDSRto be installed by the manufacturer / supplier to their authorized representative
ensuring
Chapter-Bridge BoredtoPile
compliance the manufacturers instruction for installation
Basic
1.00 10,503.00 10,503.00
Rate Square Meter
Total 10,503.00
15.71 Say 10,503.00
7.43 15.73 Providing and laying boulders apron on river bed for protection against scour with stone
boulders
STATE e weighing
DSR not less than 40 kg each complete as per drawings and Technical
specifications
Chapter-Bridge Bored Pile (boulder laid without wire crates)
etc. complete.
Basic
1.00 847.00 847.00
Rate   Cubic Metre
Net Lead
Cement 0.345 MT 0.345 0.00 0.00
Metal 0.900 Cum 0.900 249.45 224.51
Sand 0.450 Cum 0.450 #REF! #REF!
Add For Royalty Charges 1.00 141.34 141.34
Total 1,212.85
15.73 Say 1,213.00
7.44 15.79 Providing and laying pitching on slopes laid over prepared filter media including boulder apron
laid
STATEdry e
in DSR
front of toe of embankment complete as per drawing and technical specifications
etc. complete. (by
Chapter-Bridge stone/boulder)
Bored Pile
Basic
1.00 743.00 743.00
Rate   Cubic Metre
Net Lead
Cement 0.000 MT 0.000 0.00 0.00
Metal 1.000 Cum 1.000 249.45 249.45
Sand 0.000 Cum 0.000 #REF! #REF!
Add For Royalty Charges 1.00 141.34 141.34
Total 1,133.79
15.79 Say 1,134.00
7.45 15.83 Providing and laying filter material underneath pitching in slopes as per drawings and
technical specifications etc. complete.
STATE e DSR
Chapter-Bridge Bored Pile

Basic
1.00 1,030.00 1,030.00
Rate   Cubic Metre
Net Lead
Cement 0.000 MT 0.000 0.00 0.00
Metal 1.000 Cum 1.000 249.45 249.45
Sand 0.000 Cum 0.000 #REF! #REF!
Add For Royalty Charges 1.00 141.34 141.34
Total 1,420.79
15.83 Say 1,421.00
7.46 15.95 Providing M15 CC work for cast in situ curtain wall as per drawing and technical
specifications
STATE e DSRetc. complete.
Chapter-Bridge bored Pile
Basic
1.00 4,200.00 4,200.00
Rate   Cubic Metre
Net Lead
Cement 0.330 MT 0.330 0.00 0.00
Metal 0.850 Cum 0.850 249.45 212.03
Sand 0.450 Cum 0.450 143.78 64.70
Add For Royalty Charges 0.45 141.34 63.60
Total 4,540.34
15.95 Say 4,540.00
7.47 14.01 Providing, cutting, bending, hooking, tying and laying in position TMT FE 500 steel bars
for reinforcement
STATE e DSR for all RCC works as per detailed drawings etc. complete.
Chapter-Bridge super structure

Basic
1.00 47,000.00 47,000.00
Rate Square Meter
Total 47,000.00
14.01 Say 47,000.00
7.48 14.02 Providing and joining 25 mm diameter MS / TMT FE 500 steel reinforcement bars by bottle
nuts
STATEincluding
e DSR supplying and fitting them in position etc. complete.
Chapter-Bridge super structure

Basic
1.00 605.00 605.00
Rate Square Meter
Total 605.00
14.02 Say 605.00
7.49 14.17 Providing and laying in situ M30 controlled cement concrete of trap/ granite/ quartzite/
gneiss
STATEmetal
e DSRfor RCC work in solid/ deck slab etc. including ramming, vibrating, curing,
formwork,
Chapter-Bridge superand
centering finishing in cement plaster excluding reinfo
structure

Basic
1.00 6,474.00 6,474.00
Rate   Cubic Metre
Net Lead
Cement 0.450 MT 0.450 0.00 0.00
Metal 0.860 Cum 0.860 249.45 214.53
Sand 0.430 Cum 0.430 143.78 61.83
Add For Royalty Charges 0.43 141.34 60.78
Total 6,811.13
14.17 Say 6,811.00
7.50 14.29 Providing and laying in situ M30 controlled cement concrete of trap/ granite/ quartzite/ gneiss
metal
STATEfore RCC
DSR work in main/ cross girders, diaphrams etc. including ramming, vibrating,
curing, formwork, centering
Chapter-Bridge super and finishing in cement plaster excluding r
structure

Basic
1.00 7,563.00 7,563.00
Rate   Cubic Metre
Net Lead
Cement 0.450 MT 0.450 0.00 0.00
Metal 0.860 Cum 0.860 249.45 214.53
Sand 0.430 Cum 0.430 143.78 61.83
Add For Royalty Charges 0.43 141.34 60.78
Total 7,900.13
14.29 Say 7,900.00
7.51 14.49 Providing RCC railing of cast in situ RCC posts with M20 CC of trap/ granite/ quartzite/ gneiss
metal
STATEfore horizontal
DSR and vertical members as per detailed drawings including reinforcement,
scaffolding, centering, formwork, compaction, finishing and curing
Chapter-Bridge super structure

Basic
1.00 1,966.00 1,966.00
Rate   Cubic Metre
Net Lead
Cement 0.400 MT 0.400 0.00 0.00
Metal 0.850 Cum 0.850
249.45 212.03
Sand 0.425 Cum 0.425
143.78 61.11
Add For Royalty Charges 0.425
141.34 60.07
Total 2,299.21
14.49 Say 2,299.00
7.52 14.50 Providing 100mm diameter GI water spouts as per detailed drawings in RCC slab and
wearing
STATE esurface
DSR / kerb etc. complete.
Chapter-Bridge super structure

Basic
1.00 550.00 550.00
Rate 0
Total 550.00
14.5 Say 550.00
7.53 12.16 Dewatering for returns including diversion of stream, providing cofferdams, bunds etc. as may
be necessary
STATE e DSRfor foundation and other parts of the work including bailing and pumping out
water during and
Chapter-Bridge after excavation as may be necessary etc. com
Foundation

Basic
1.00 60.00 60.00
Rate   Cubic Metre
Total 60.00
12.16 Say 60.00
18 3.29 Prime coat ­Providing and applying primer coat with bitumen emulsion on prepared surface
of granular Base including cleaning of road surface
Basic Squareand spraying, primer at the rate of
STATE e DSR
0.60 kg/sqm using mechanical means. 1.00 21.00 21.00
Rate Metre
Chapter-Road Base Course
Lead-Bitumen MT 0.0000 1,327.50 0.00
Total 21.80
3.29 Say 21.80
19 3.31 Providing and applying tack coat on the prepared surface heating by fames in Boiler and
spraying bitumen with sprayer on Dry / Hungry Square
Basic B.T. surface 3 kg/10 sqm. VG­30 bulk bitumen
STATE e DSR 1.00 15.00 15.00
Rate Metre
Chapter-Road Base Course

Bitummen MT 0.0000 1,327.50 0.00


Total 15.40
3.31 Say 15.40
20 3.44 DENSE BITUMINOUS MACADAM: Proving and laying dense bituminous macadam using
crushed
STATE eaggregates
DSR of Grading 1, premixed with bituminous binder VG­30 Bitumen @ 4.50 per
cent by weight of
A) Batch Mix Planttotal mix and filler, transported to site with VTS , laid over a previo
Basic   Cubic
Binder content 4.5% 1.00 6,960.00 6,838.00
Rate Metre
Lead-Bitummen 0.1000 0.00 0.00
Lead-Metal 1.528 249.45 141.05
3.44 Total 6,979.05
21 3.42 BITUMINOUS MACADAM:­­Providing and laying bituminous macadam using crushed
aggregate of Grading 1, premixed with
Basicbituminous binder, transported at site with VTS, laid
  Cubic
A) Batch
over Mix Plantprepared surface , finished to the required
a previously 1.00
grade 5,070.00 5,070.00
Rate Metre
,level, alignm
Chapter-Road Base Course

Lead-Bitummen 0.0770 0.00 0.00


Lead-Metal 1.20 249.45 141.05
3.42 Total 5,211.05
22 3.51 BITUMINOUS CONCRETE:­­Providing and laying bituminous concrete using crushed
aggregate
STATE e DSR of grading 2, premixed with bituminous binder @5.4% by weight of total mix and
filler, transported
Chapter-Road Base at site with VTS, laid over a previously prepared surface, finished t
Course

Basic
A) Batch Mix Plant 1.00 7,395.00 7,395.00
Rate   Cubic Metre
Lead-Bitumen 0.15600 0.00 0.00
Lead-Metal 1.5720 249.45 392.14
LDO 0.015 1,125.00 16.88
3.51 Total 7,804.01
Improvement of Math Kudal Shivdav Kadgaon Gargoti Road, SH-179 (PN-12 B)
Cost Estimate for Proposed Minor Bridge (Reconstruction) at Chainage: 60+223 M.
Total Length of Bridge = 1 Spans of 12 m = 12 m

Sr.
Item No. Description Quantity Total Unit Rate Amount
No.
1 46.29 Dismantling the R.C.C. work 1:2:4 and sorting out the
materials such as steel etc. as directed and stacking them
within the specified lead as directed etc. complete.
2 3.00 8.30 4.00 199.20
1 0.80 8.30 4.00 26.56
Sub Total 225.76 1 225.76 cum 615.00 138842.40
2 46.11 Dismantling stone masonry in lime or cement mortar including
stacking the materials as directed with all leads, lifts etc.
complete.
0 1.00 8.30 5.00 0.00
0 3.00 8.30 5.00 0.00
Sub Total 0.00 1 0.00 cum 162.00 0.00
3 46.30 Removing Np­2 and Np­3 class pipes including stacking at road 0 0.00 0.00 1 0.00 metre 150.00 0.00
side as directed by the Engineer in charge. Upto 900mm dia.
etc. complete.
4 46.31 Removing Np­2 and Np­3 class pipes including stacking at road 0 0.00 0.00 1 0.00 metre 175.00 0.00
side as directed by the Engineer in charge. 900mm dia. and
above. etc. complete.
5 12.02 Excavation for foundation by mechanical means in earth, soils
of all types, sand, gravel, soft murum including shoring and
strutting as necessary and disposing off excavated stuff as
directed etc. complete.
Piers 0 10.00 4.00 1.62 0.00
Abutments 2 12.00 4.80 2.39 275.10
Wing Walls 4 3.00 0.30 0.00 0.00
Sub Total 275.10 1 275.10 cum 103.00 28335.05
6 12.08 Excavation for foundation by mechanical means in soft rock
including shoring and strutting as necessary and disposing off
excavated stuff as directed etc. complete.
Piers 0 10.00 4.00 1.50 0.00
Abutments 2 12.00 4.80 1.50 172.80
Sub Total 172.80 1 172.80 cum 274.00 47347.20
7 24.04 Providing and casting in situ cement concrete in M15 of trap/
granite/quartzite/gneiss metal for steps including steel
centering, plywood/steel formwork, compacting, roughening
them if special finish is to be provided, finishing uneven and
honeycombed s
Piers 0 10.00 4.00 0.10 0.00
Abutments 2 12.00 4.80 0.10 11.52
Sub Total 11.52 1 11.52 cum 4588.00 52853.76
8 25.05 Providing and laying in situ cement concrete M­30 of trap /
granite /quartzite/ gneiss metal for R.C.C. work in foundations
like raft, strip foundations, grillage and footings of R.C.C.
columns and steel stanchions etc. including bailing out water,
formwo
Piers
Footing 0 10.00 4.00 1.00 0.00
Abutments
Footing 2 12.00 4.80 1.00 115.20
Sub Total 115.20 1 115.20 cum 5525.00 636480.00
9 25.05 Providing and laying in situ cement concrete M­30 of trap /
granite /quartzite/ gneiss metal for R.C.C. work in foundations
like raft, strip foundations, grillage and footings of R.C.C.
columns and steel stanchions etc. including bailing out water,
formwo
Wing Walls
4 3.00 0.30 0.60 2.16
4 0.5 3.00 0.30 2.00 3.60
Piers
Piers (Wall Type) 0 p/4 1.00 1.00 1.37 0.00
0 4.80 1.00 1.37 0.00
Pier Caps 0 8.00 1.40 0.75 0.00
0 3.00 1.40 0.75 0.00
0 14.00 1.40 0.75 0.00
Pedestals 0 8 0.80 0.62 0.00 0.00
Abutments
Abutments (Stem Type) 2 2 12.00 0.30 0.15 2.16
2 12.00 1.00 5.00 120.00
Abutment Caps 2 12.00 1.00 0.00 0.00
Pedestals 2 4 0.80 0.62 0.00 0.00
Dirt Walls 2 12.00 0.30 0.00 0.00
Bracket Behind Abutments 2 12.00 0.30 0.00 0.00
2 12.00 0.30 0.00 0.00
Sub Total 127.92 1 127.92 cum 5525.00 706758.00
10 14.01 Providing, cutting, bending, hooking, tying and laying in
position TMT FE 500 steel bars for reinforcement for all RCC
works as per detailed drawings etc. complete.
Improvement of Math Kudal Shivdav Kadgaon Gargoti Road, SH-179 (PN-12 B)
Cost Estimate for Proposed Minor Bridge (Reconstruction) at Chainage: 60+223 M.
Total Length of Bridge = 1 Spans of 12 m = 12 m

Sr.
Item No. Description Quantity Total Unit Rate Amount
No.
Foundations - R.C.C. (100 Kg/cum) 0.100 115.20 11.52
Sub-Structure - R.C.C. (100 Kg/cum) 0.100 127.92 12.79
Sub Total 24.31 1 24.31 tonne 47000.00 1142664.00
11 15.23 Providing weep holes in brick masonry /plain /reinforced 2 11.00 4.00 1.00 88.00 1 88.00 meter 129.00 11352.00
concrete abutment, wing wall / return wall with 100mm
diameter AC pipe extending through the full width of the
structure with slope of 1V: 20H towards drawing face as per
drawings and
12 15.25 Back filling behind abutment, wing wall and return wall as per 2 12.00 2.89 5.00 346.41 1 346.41 cum 502.00 173897.90
drawings and technical specifications etc. complete. (by
granular material)
13 15.29 Providing and laying of filter media with granular materials/ 2 12.00 0.60 5.00 72.00 1 72.00 cum 778.00 56016.00
stone crushed aggregates satisfying the requirements laid
down in clause 2504.2.2 of MoRTH specifications to a
thickness of not less than 600 mm with smaller size towards
the soil and bigge
14 15.37 Supplying, fitting and fixing in position true to line and level 8 32.00 50.00 3.90 49920 1 49920 cucm 1.40 69888.00
elastomeric bearing including all accessories as per drawing
and technical specifications and IRC:83 (Pt­II) section IX and
clause
2005 of MoRTH specifications etc. complete.
15 13.02 Providing tar paper bearing including laying in proper position 2 12.00 0.00 0 1 0 cum 18.00 0.00
etc. complete.
16 14.17 Providing and laying in situ M30 controlled cement concrete
of trap/ granite/ quartzite/ gneiss metal for RCC work in
solid/ deck slab etc. including ramming, vibrating, curing,
formwork, centering and finishing in cement plaster
excluding reinfo
Solid Slab 12.00 12.00 0.90 129.60
2 0.5 12.00 1.50 0.05 -0.90
2 12.00 1.50 0.70 -25.20
Kerb 2 12.00 0.50 0.30 3.60
Sub Total 107.10 1 107.10 cum 6811.00 729458.10
17 14.29 Providing and laying in situ M30 controlled cement concrete
of trap/ granite/ quartzite/ gneiss metal for RCC work in main/
cross girders, diaphrams etc. including ramming, vibrating,
curing, formwork, centering and finishing in cement plaster
excluding r
Super Structure 1 2.40 0.00 0.00
1 9.60 0.00 0.00
Intermediate Diaphgram 1 3 0.30 0.00 0.00
End Diaphgram 1 2 0.60 0.00 0.00
Kerb 1 12.00 0.50 0.00 0.00
Sub Total 0.00 1 0.00 cum 7900.00 0.00
18 14.01 Providing, cutting, bending, hooking, tying and laying in
position TMT FE 500 steel bars for reinforcement for all RCC
works as per detailed drawings etc. complete.

Solid Slab (85 Kg/cum) 0.085 107.10 9.10


T-Beam Girder (85 Kg/cum) 0.085 0.00 0.00
Sub Total 9.10 1 9.10 tonne 47000.00 427864.50
19 15.45 Providing and laying 12mm thick mastic asphalt wearing
course on top of deck slab excluding prime coat with paving
grade bitumen meeting the requirements given in table 500­29,
prepared by using mastic cooker and laid to required level and
slope after cle
Structure Portion 1 12.00 11.00 132.00
Approach Slab 2 3.50 11.00 77.00
Sub Total 209.00 1 209.00 sqm 350.00 73150.00
20 15.49 Construction of RCC railing of M30 Grade in situ with 20 mm 2 19.00 38.00 1 38.00 metre 1451.00 55138.00
nominal size aggregate true to line and grade, tolerance of
vertical RCC post not to exceed 1 in 500, center to center
spacing between vertical post not to exceed 2000 mm, leaving
adeq
21 14.50 Providing 100mm diameter GI water spouts as per detailed 2 3.00 6.00 1 6.00 each 550.00 3300.00
drawings in RCC slab and wearing surface / kerb etc.
complete.
22 15.51 Providing and laying in PCC M15 grade leveling course below 2 3.50 12.00 0.10 8.40 1 8.40 cum 4640.00 38976.00
approach slab complete with fully automatic micro processor
PLC with SCADA enabled reversible drum type mixer as per
drawings and Technical specifications etc. complete.

23 15.53 Providing and laying of RCC in M30 grade approach slab 2 3.50 12.00 0.30 25.20 1 25.20 cum 8203.00 206715.60
including reinforcement and formwork complete with fully
automatic micro processor PLC with SCADA enabled
reversible drum type mixer as per drawings and technical
specifications etc. complete.
Improvement of Math Kudal Shivdav Kadgaon Gargoti Road, SH-179 (PN-12 B)
Cost Estimate for Proposed Minor Bridge (Reconstruction) at Chainage: 60+223 M.
Total Length of Bridge = 1 Spans of 12 m = 12 m

Sr.
Item No. Description Quantity Total Unit Rate Amount
No.
24 14.49 Providing RCC railing of cast in situ RCC posts with M20 CC 0 19.00 0.00 1 0.00 metre 2299.00 0.00
of trap/ granite/ quartzite/ gneiss metal for horizontal and
vertical members as per detailed drawings including
reinforcement, scaffolding, centering, formwork, compaction,
finishing and curing
25 15.61 Providing and filling 20 mm thick compressible fibre board in 4 12.00 48.00 1 48.00 metre 440.00 21120.00
expansion joint complete as per drawings and technical
specifications etc. complete.
26 15.63 Providing and filling joint sealing compound with coarse sand 4 12.00 48.00 1 48.00 metre 24.00 1152.00
and 6% bitumen by weight as per drawings and technical
specifications etc. complete.
27 15.71 Providing and laying of a strip seal expansion joint catering to 4 12.00 48.00 1 48.00 metre 10503.00 504144.00
maximum horizontal movement upto 70 mm to be installed by
the manufacturer / supplier to their authorized representative
ensuring compliance to the manufacturers instruction for
installation
28 15.79 Providing and laying pitching on slopes laid over prepared 2 2 5.80 4.00 0.30 27.84 1 27.84 cum 1134.00 31570.56
filter media including boulder apron laid dry in front of toe of
embankment complete as per drawing and technical
specifications etc. complete. (by stone/boulder)

29 15.83 Providing and laying filter material underneath pitching in 2 2 5.80 4.00 0.15 13.92 1 13.92 cum 1421.00 19780.32
slopes as per drawings and technical specifications etc.
complete.
30 15.95 Providing M15 CC work for cast in situ curtain wall as per
drawing and technical specifications etc. complete.
Toe Wall 2 2 6.80 0.30 0.60 4.90
2 2 6.80 0.30 0.75 6.12
Sub Total 11.02 1 11.02 cum 4540.00 50012.64

TOTAL 5226816