Quiz II

Student Name: ………………AYESHA KHAN………...…. Course: Operation management; Allowed time: 25


min Marks: 15
Q1. Using the lead time, on hand inventory, and following bill of material explode the BOM for lot for lot Master production schedule.
B (2) Demand of Product A= (last two digits of your phone number) *100
A

C (3)

Lead time in On hand Item


Week
weeks inventory identification
1 2 3 4 5 6 7 8
Gross requirement
Scheduled receipts
Projected on hand
2 25 A
Net requirement
Planned order Receipt
Planned order Released

Gross requirement
Scheduled receipts
Projected on hand
1 10 B
Net requirement
Planned order Receipt
Planned order Released

Gross requirement
Scheduled receipts
Projected on hand
2 20 C
Net requirement
Planned order Receipt
Planned order Released